West London Tram | |
---|---|
Overview | |
Owner | Transport for London |
Locale | West London, England |
Transit type | Tram |
Number of lines | 1 |
Number of stations | 40 |
Operation | |
Operation will start | Abandoned proposal |
Technical | |
System length | 12 mi (19 km) |
Track gauge | Standard gauge |
West London Tram | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
The West London Tram (also known as West London Transit) was a proposed on-street light rail line that was to run along the Uxbridge Road (A4020) corridor in West London, England. The scheme was promoted by Transport for London (TfL). [1] It was postponed indefinitely on 2 August 2007, as it was opposed by the councils of all three bisected London Boroughs. [2]
The tram route was planned to run between Uxbridge and Shepherd's Bush, serving Hayes (north), Hillingdon, Southall, Hanwell, West Ealing, Ealing and Acton en route, [3] and would have replaced three equivalent London Buses routes. The proposed route was the same route as London's tram route 7 from about 1905 until 1951.
The revival of interest in tramways and light rail transit systems around the start of the 21st century led to the re-introduction of electric trams to a number of British cities and towns such as Manchester, Sheffield, and Croydon. The West London Tram scheme was first announced in 2002 by the then Mayor of London, Ken Livingstone, along with other projects such as the Cross River Tram and the Thames Gateway Transit bus rapid transit scheme. [4]
Livingstone promoted the project as a solution to traffic congestion problems in the west of London. It was forecast that the tramway would carry 50 million passengers a year and, based on research of Croydon Tramlink, promoters anticipated around 19% of those passengers would switch from using a car to the tram for their journey. The scheme was budgeted at a cost of approximately £200 million, and the line would come into service by 2009. [4]
The tram was designed to run along the congested Uxbridge Road from Uxbridge to Shepherd's Bush and replace the heavily used 207, 427 and 607 bus routes. Had the route been constructed it would have revived a tram route established in 1904 and which was replaced by a trolleybus route 607 which was itself superseded by the present bus routes. [5] [6]
The trams were to run on a completely on-street route, with a mixture of stretches shared with road traffic, "accessible" routes (controlled lanes which road traffic would be permitted to enter temporarily, for example to avoid an obstruction), and segregated stretches of track which would be for tram use only, mostly along the central reservation of the Uxbridge Road. The tram was partly envisaged as a "feeder" service for other modes of transit, transporting passengers to interchange points with London Underground, London Overground and the future Crossrail service. [7]
The West London Tram scheme proved to be a contentious proposal, with public opinion along the route more or less divided on the issue. Several consultation exercises and opinion polls reported contradictory results of narrow majorities both for and against the tram.
The scheme was opposed by the local councils of the boroughs along the intended tramway route: Ealing, Hammersmith & Fulham and Hillingdon. Ealing council had initially supported the project, but following a change of council after the local elections, the new ruling Conservative Party council voted against the tramway. [8]
Ealing was also a focus of public campaigning against the tram, where opposition was strongest. A local pressure group, Save Ealing's Streets, launched a campaign in 2004 against the construction of the tramway through Ealing and along the A40 corridor. The group voiced concerns that there were a number of "pinch points" (sections of road not wide enough to accommodate two lanes of traffic and two tram lanes) along the Uxbridge Road which would create major congestion problems and divert a significant amount of traffic through residential areas. They also took the view that the reduction in traffic resulting from the tram would not be as high as that claimed by TfL, citing TfL's own impact studies of Croydon Tramlink. The Croydon system, the group noted, runs mostly on converted railway lines with only a short section of on-street track, and traffic displacement was managed by the construction of a new bypass; the West London Tram, by contrast, would run entirely along a highway which is hemmed in by narrow residential streets, with no scope for additional road construction. [9]
The Mayor of London commissioned a public consultation in 2004 to gauge public opinion about the project and make revisions to the plans. 440,000 consultation brochures were circulated and nearly 17,000 questionnaires completed. The results of the exercise, published in March 2005, showed that, while 54% of respondents felt there was need to reduce congestion improve public transport and on the Uxbridge Road, 59 per cent were opposed to the tramway scheme. Opponents expressed concerns about the cost of the project and an anticipated increase in traffic congestion, particularly on residential side roads. [10] [11]
The consultation - the largest ever held by Transport for London - was reportedly dismissed by Mayor Ken Livingstone as "unscientific", who instead cited a separate poll of 1,100 west Londoners which claimed a 54% backing for the tram. [8] [12] Another 2004 poll of 1,800 people, commissioned from ORC by the Greater London Authority, claimed 56% support for the tram. [13]
TfL commissioned market a research programme from Ipsos MORI, who conducted 1,860 telephone interviews with residents of west London during June 2006. [14] The results found that opinion was divided, with 40% supporting the tram scheme while 44% were opposed. A further 14% were impartial. Supporters of the scheme saw the trams as an environmentally friendly and more rapid transport solution than buses, and thought that it would reduce traffic congestion. Opponents mostly expressed the view that the tram line would increase traffic congestion as the roads were not wide enough to accommodate existing traffic and trams, and that traffic would be displaced into side roads, as well as concerns over the disruption caused by tramway construction. While a majority of residents thought that trams were environmentally friendly, a majority believed that trams take up too much space on the road. Most interviewees felt that reducing congestion on the Uxbridge Road was important, an improved bus service was favoured by many. [14]
The West London Tram project was postponed indefinitely by TfL in August 2007. The decision followed the announcement that central government was to go ahead with the Crossrail project. [2] Opponents of the tramway were critical of the fact that £30 million had already been spent on the project before its cancellation. [15]
TfL have pledged to work with the local boroughs to increase bus provision instead, including interchanges with the future Crossrail stations. TfL have said the tram scheme may be revisited however if further public transport capacity is needed after Crossrail is up and running. [16]
Although there was strong opposition to the West London Tram scheme, most subjects expressed the view that congestion on the Uxbridge Road corridor was a major problem and thought that improvements to the existing bus services would be desirable. [14]
Various transport systems have been proposed as an alternative.
Tramlink, previously Croydon Tramlink and presently branded as London Trams, is a light rail tram system serving Croydon and surrounding areas in South London, England. It is the first operational tram system serving the London region since 1952. Tramlink is presently managed by London Trams, a public body part of Transport for London (TfL), and has been operated by FirstGroup since 2017. It is one of two light rail networks in Greater London, the other being the Docklands Light Railway. Tramlink is the fourth-busiest light rail network in the UK behind the Docklands Light Railway, Manchester Metrolink and Tyne and Wear Metro.
Transport for London (TfL) is a local government body responsible for most of the transport network in London, United Kingdom.
The Kingsway tramway subway is a cut-and-cover tunnel in central London, built by the London County Council, and the only one of its kind in Britain. The decision in 1898 to clear slum districts in the Holborn area provided an opportunity to use the new streets for a tramway connecting the lines in the north and south. Following the pattern of tramways in New York and Boston, it was decided to build this as an underground connection.
The London congestion charge is a fee charged on most cars and motor vehicles being driven within the Congestion Charge Zone (CCZ) in Central London between 7:00 am and 6:00 pm Monday to Friday, and between 12:00 noon and 6:00 pm Saturday and Sunday.
Uxbridge is a London Underground station in Uxbridge in the London Borough of Hillingdon, West London. The station is the terminus of the Uxbridge branches of both the Metropolitan line and the Piccadilly line. The next station towards London is Hillingdon. The station is 15.5 miles (25 km) west of Charing Cross and is in Travelcard Zone 6. The closest station on the Chiltern Line and Central line is West Ruislip, accessible by the U1 and U10 buses. The closest station on the Elizabeth line is West Drayton, accessible by the U1, U3, U5 and 222 buses. Uxbridge was formerly the terminus of a branch of the District line which ran from Ealing Common; the Piccadilly line took over in 1933.
There have been two separate generations of trams in London, from 1860 to 1952 and from 2000 to the present. There were no trams at all in London between 1952 and 2000.
Merseytram was a proposed light rail system for Merseyside, England. Originally proposed in 2001, forming part of the Merseyside Local Transport Plan, it was to consist of three lines, connecting the Metropolitan Borough of Knowsley with central Liverpool. The project was postponed due to funding problems before eventually being formally closed down by Merseytravel in October 2013.
Uxbridge Road is the name of the A4020 road in West London. The 12-mile (19 km) route starts at Shepherd's Bush Green and goes west towards Uxbridge. It passes through Acton, Ealing, Hanwell, Southall, Hayes, and Hillingdon.
London has an extensive and developed transport network which includes both public and private services. Journeys made on its integrated transport network account for 37% of London's journeys while private services accounted for 36% of journeys, walking 24% and cycling 2%, according to numbers from 2017. London's public transport network serves as the central hub for the United Kingdom in rail, air and road transport.
Cross River Tram was a Transport for London (TfL) proposal for a 10-mile (16 km) tram system in London. It was planned to run on a north–south route from Camden Town in the north, via King's Cross, to Peckham and Brixton in the south.
London United Tramways Company Limited was an operator of trams and trolleybuses in the western and southern suburbs of London, UK, from 1894 to 1933, when it passed to the London Passenger Transport Board.
Old Oak Common (OOC) is a railway station under construction on the site of the Old Oak Common traction maintenance depot to the west of London in Old Oak Common, approximately 500 m (1,600 ft) south of Willesden Junction station. When built, it is expected to be one of the largest rail hubs in London, at about 800 m (2,600 ft) in length and 20 m (66 ft) below surface level.
London Buses route 207 is a Transport for London contracted bus route in London, England. Running between Hayes Bypass and White City bus station, it is operated by Transport UK London Bus.
London Buses route SL8, formerly London Buses route 607, is a Transport for London contracted Superloop express bus route in London, England. Running between Uxbridge station and White City bus station, it is operated by Metroline.
London Buses route 427 is a Transport for London contracted bus route in London, England. Running between Uxbridge and Southall, it is operated by Transport UK London Bus.
The Bakerloo line extension is a proposed extension of the London Underground Bakerloo line in South London from its current terminus at Elephant & Castle to Lewisham station.
The West London Orbital is a proposed extension to the London Overground railway system. The extension would make use of a combination of existing freight and passenger lines including the Dudding Hill Line, North London Line and Hounslow Loop. The route would run for approximately 11 miles (17 km) from West Hampstead and Hendon at the northern end to Hounslow at the western end via Brent Cross West, Neasden, Harlesden, Old Oak Common, South Acton and Brentford.
Trolleybuses served the London Passenger Transport Area from 1931 until 1962. For much of its existence, the London system was the largest in the world. It peaked at 68 routes, with a maximum fleet of 1,811 trolleybuses.
Reading's location in the Thames Valley at the confluence of the River Thames and River Kennet, and on both the Great Western Main Line and the M4 motorway, some 40 miles (64 km) west of London has made the town an important location in the nation's transport system.
The Sutton Link was a proposed new tram line in South London, between Colliers Wood via St Helier to Sutton. Proposed since the early 2000s, consultations on the proposed route took place in the late 2010s. A preferred route was announced in February 2020. Financial issues caused by the COVID-19 pandemic led Transport for London to put the project on hold in July 2020. Despite being identified in the London Plan, the project was cancelled in 2023, due to a "weak business case" and lack of funding.