Iru Power Plant

Last updated
Iru Power Plant
Iru power plant.jpg
Iru Power Plant
Iru Power Plant
Official nameIru Elektrijaam
CountryEstonia
LocationIru, Maardu
Coordinates 59°27′10″N24°55′39″E / 59.45278°N 24.92750°E / 59.45278; 24.92750 Coordinates: 59°27′10″N24°55′39″E / 59.45278°N 24.92750°E / 59.45278; 24.92750
StatusOperational
Construction began1976 (unit 1)
2010 (unit 3)
Commission date 1978 (unit 1)
2013 (unit 3)
Construction cost€105 million (unit 3)
Owner(s) Enefit Green
Operator(s) Enefit Green
Thermal power station
Primary fuel Natural gas (units 1 and 2)
Municipal solid waste (unit 3)
Secondary fuel Fuel oil (units 1 and 2)
Cogeneration?Yes
Power generation
Units operational1 × 80 MW
1 × 110 MW
1 × 17 MW
Make and model LMZ (units 1 and 2)
TMZ (units 1 and 2)
Sibtjazmaz (units 1 and 2)
CNIM (unit 3)
Nameplate capacity 207 MW
External links
Website www.energia.ee/en/organisatsioon/iru
Commons Related media on Commons

Iru Power Plant is a co-generation power plant in Iru village, Maardu, Estonia. It is owned by Enefit Green, a subsidiary of Eesti Energia. The plant has a heating capacity of 698 MWt. [1]

Contents

History

The first unit of power plant was commissioned in 1978. In the beginning it operated as a boiler plant. In 1980, it was converted into co-generation power plant.

Old units

Iru Power Plant (close view) Iru Elektrijaam.jpg
Iru Power Plant (close view)

The power plant has three power units with capacities of 80 MWe, 110 MWe and 17 MWe. The primary fuel of the units 1 and 2 is natural gas and reserve fuel is fuel oil, unit 3 mixed municipal waste. Total installed capacity is 207 MW of electricity, 661.5 MWth of hot water and 162 of MWth steam. [2] In co-generation mode the heating capacity is 398 MWt. It supplies heat to Maardu, and the Lasnamäe and central districts of Tallinn.

Waste-to-energy unit

In 2006, Eesti Energia started preparations for construction of a waste incineration unit with capacity of 50 MW of heat and 17 MW of electricity. Construction started in 2010. [3] [4] [5] It was commissioned on 16 June 2013. [6] The unit processes up to 220,000 tonnes of mixed municipal waste per year. The unit was built and technology was provided by Constructions industrielles de la Méditerranée (CNIM). The general construction was carried out by Merko Ehitus, with the incineration grate supplied by Martin GmbH and the system for the treatment of waste gas by LAB, a subsidiary of CNIM. The unit cost about €105 million. [3] [4]

Trivia

The director of Iru Power Plant from 2002 to 2004, Kersti Kaljulaid, the first woman to lead a power plant in Estonia, became the fifth President of Estonia in 2016, and the first woman to be President since the country declared independence in 1918.

See also

Related Research Articles

Fast-neutron reactor Type of nuclear reactor

A fast-neutron reactor (FNR) or simply a fast reactor is a category of nuclear reactor in which the fission chain reaction is sustained by fast neutrons, as opposed to thermal neutrons used in thermal-neutron reactors. Such a reactor needs no neutron moderator, but requires fuel that is relatively rich in fissile material when compared to that required for a thermal-neutron reactor.

District heating System for distributing heat generated in a centralized location for residential and commercial heating requirements

District heating is a system for distributing heat generated in a centralized location through a system of insulated pipes for residential and commercial heating requirements such as space heating and water heating. The heat is often obtained from a cogeneration plant burning fossil fuels or biomass, but heat-only boiler stations, geothermal heating, heat pumps and central solar heating are also used, as well as heat waste from nuclear power electricity generation. District heating plants can provide higher efficiencies and better pollution control than localized boilers. According to some research, district heating with combined heat and power (CHPDH) is the cheapest method of cutting carbon emissions, and has one of the lowest carbon footprints of all fossil generation plants.

Eesti Energia Company based in Estonia

Eesti Energia AS is a public limited energy company in Estonia with its headquarters in Tallinn. It is the world's biggest oil shale to energy company. The company was founded in 1939. As of 2014, it operates in Estonia, Latvia, Lithuania, Finland, Jordan and Utah, United States. In Estonia the company operates under the name Eesti Energia, while using the brand name Enefit for international operations. The main raw material for energy production – oil shale – is extracted from mines located in Eastern-Estonia and owned by the company. The group of Eesti Energia has three main operation areas: electricity generation, shale oil production, and sale and distribution electricity. Its shares are owned by the Government of Estonia.

Enefit Kaevandused was a mining company located in Jõhvi, Estonia. It was a subsidiary of Eesti Energia, an Estonian state-owned energy company. The core activity of Enefit Kaevandused was oil-shale mining. The produced oil shale was mainly used for shale oil production and to fuel oil shale-fired power stations in the north–east of Estonia. As of 2009, the company has 3,150 employees. The last chief executive officer was Andres Vainola.

Narva Power Plants

The Narva Power Plants are a power generation complex in and near Narva in Estonia, near the border with Leningrad Oblast, Russia. The complex consists of the world's two largest oil shale-fired thermal power plants, Eesti Power Plant and Balti Power Plant. In 2007, Narva Power Plants generated about 95% of total power production in Estonia. The complex is owned and operated by AS Narva Elektrijaamad, a subsidiary of Eesti Energia.

Viru Keemia Grupp (VKG) is an Estonian holding group of oil shale industry, power generation, and public utility companies.

Klaipėda Geothermal Demonstration Plant

The Klaipėda Geothermal Demonstration Plant is a geothermal heating plant in Klaipėda, Lithuania, constructed during the late 1990s and early 2000s. It was the first geothermal heating plant in the Baltic Sea region. Its purpose was to reduce carbon dioxide, sulfur dioxide, nitrogen oxide, and particulate emissions in the area, as well as to reduce Lithuania's dependence on foreign energy sources. The plant supplies district heating to the city. Construction was financed by a loan from the World Bank (US$5.9 million) and a grant from the Global Environment Facility (US$6.9 million). The Danish state company Dansk Olie og Naturgas provided technical support, and Enterprise Geoterma (EG) served as the implementing agency. The total cost of the plant was US$19.5 million.

Attarat Power Plant is an oil shale-fueled power plant under construction in the Attarat Um Ghudran area, 50 kilometres (31 mi) east of Al Qatranah in Jordan. The project is developed by the Attarat Power Company (APCO), a partnership between YTL Power International (45%), Guangdong Yudean Group (45%) and Eesti Energia (10%). It is the first oil shale power plant in Jordan and the largest private sector project in Jordan to date.

Oil shale in Estonia Overview of the industry in Estonia

There are two kinds of oil shale in Estonia, both of which are sedimentary rocks laid down during the Ordovician geologic period. Graptolitic argillite is the larger oil shale resource, but, because its organic matter content is relatively low, it is not used industrially. The other is kukersite, which has been mined for more than a hundred years. Kukersite deposits in Estonia account for 1.1% of global oil shale deposits.

Narva Oil Plant is a commercial scale shale oil retorting facility located in Auvere near Narva, Estonia. The plant produces shale oil from oil shale by using Galoter/Eneffit technology. The facility belongs to Enefit Energiatootmine, a subsidiary of Eesti Energia.

Galoter process

The Galoter process is a shale oil extraction technology for a production of shale oil, a type of synthetic crude oil. In this process, the oil shale is decomposed into shale oil, oil shale gas, and spent residue. A decomposition is caused by mixing raw oil shale with a hot oil shale ash, generated by combustion of carbonaceous residue (semi-coke) in the spent residue. The process was developed in 1950s and it is used commercially for the shale oil production in Estonia. There are projects for further development of this technology and for expansion of its usage, e.g. in Jordan and USA.

Katowice Power Station

Katowice Power Station is a coal-fired power station in Katowice, Poland. It consists of four units. Two units each with a generation capacity of 144 MWt went in service respectively in 1985, and a third unit of 233 MWt in 1991. In 2000 a new unit of BCF-100 type with a heat capacity of 200 MW and electric generation capacity of 135.5 MW was added. The plant has a heating capacity of 200 MWt

Nelja Energia Company based in Estonia

Nelja Energia AS is a renewable energy developer based in Tallinn, Estonia. The main areas of business of the company are the development of the renewable energy industry and the operation of power production. The name of the company, meaning Energy of Four, is referring to the four type of renewable energy: wind, water, biomass and solar. The company is focused on the renewable energy development in the Baltic countries. The CEO of the company is Aavo Kärmas.

Ahtme Power Plant Power station in Estonia

Ahtme Power Plant was an oil shale-fired power plant in Ahtme, Kohtla-Järve, Estonia. It was owned by VKG Soojus, a subsidiary of Viru Keemia Grupp. Until the end 2012, it supplied with heat Ahtme district of Kohtla-Järve and Jõhvi.

The Kohtla-Järve Power Plant is an oil shale-fired power plant in Kohtla-Järve, Estonia, about 15 km to north-west of the Ahtme Power Plant. It is owned by VKG Soojus, a subsidiary of Viru Keemia Grupp. It consists of Põhja Power Plant and Lõuna Power Plant.

Väo Power Plant

The Väo Power Plant is a biomass and peat-fired combined heat and power plant in Tallinn, Estonia. It's located in the eastern end of Tallinn in Väo, in a depleted part of Väo limestone quarry. The plant supplies heat to Lasnamäe and the central districts of Tallinn.

Tallinn Power Plant Former power plant in Tallinn, Estonia

The Tallinn Power Plant is a former power plant located in Tallinn, Estonia. Construction of the power plant was initiated by Volta company and it was decided by the Tallinn City Council in 1912 after the work of special committee established in 1909. The plant was located next to the Tallinn Gas Factory at the location of the former Stuart fortress. The plant was designed by Volta and the architect was Hans Schmidt. Originally it used three Laval-type 250 horsepower (0.19 MW) steam turbines and three 250 horsepower (0.19 MW) electric generators—all produced by Volta. Two coal-fired boilers were manufactured by AS Franz Krull. The power plant was opened on 24 March 1913 and originally it was fired by coal. In 1919–1920 the plant was expanded and transferred to peat and wood. In 1924 the power plant was switched to oil shale. It was the first power plant in the world to employ oil shale as its primary fuel. In 1939, the plant achieved capacity of 22 MW.

Doosan Lentjes GmbH is a subsidiary of Doosan Heavy Industries & Construction. It is a specialist in engineering, design and construction business that provides proprietary waste-to-energy and sewage sludge services and technologies, circulating fluidised bed (CFB) boiler technologies and air quality control systems (AQCS) to the thermal power generation, industrial and municipal sectors.

Termosolar Borges is a hybrid biomass-parabolic trough solar thermal power plant which provides electricity to Spain's transmission system. It is located about 100 kilometres (62 mi) west of Barcelona, about 10 kilometres (6.2 mi) south-east of Lleida, near Les Borges Blanques, Catalonia, Spain.

Enefit Green AS is a renewable energy company located in Tallinn, Estonia. It is a wholly owned subsidiary of the state owned energy company Eesti Energia. CEO of the company is Aavo Kärmas.

References

  1. Cornerstone Laid by Eesti Energia and the CNIM Group for the Waste-to-Energy unit at Iru Power Plant
  2. "Other Fossil-Fueled Plants in Estonia". Industcards. 2011-10-31. Retrieved 2012-08-20.
  3. 1 2 "Estonian Environment authority grants Iru Power Plant integrated permit". Energija un Pasaule. 2011-10-31. Retrieved 2012-08-20.
  4. 1 2 Roman, Steve (2012-06-01). "New Waste-Burning Plant Will 'Reduce Tallinn Heat Bills'". ERR . Retrieved 2012-08-20.
  5. Rikken, Kristopher (2011-06-16). "Cornerstone Laid for Revolution in Waste Handling". ERR . Retrieved 2012-08-20.
  6. "Eesti Energia Opens Iru Waste-to-Energy Plant". ERR . 2013-06-16. Retrieved 2014-02-16.