Juragua Nuclear Power Plant | |
---|---|
Official name | Central Electronuclear de Juraguá (in Spanish) |
Country | Cuba |
Location | Cienfuegos |
Coordinates | 22°04′00.84″N80°30′33.12″W / 22.0669000°N 80.5092000°W Coordinates: 22°04′00.84″N80°30′33.12″W / 22.0669000°N 80.5092000°W |
Status | Decommissioned |
Construction began | 1983 |
Decommission date |
|
Nuclear power station | |
Reactor type | VVER-440 V318 |
Reactor supplier | Soviet Union |
Power generation | |
Nameplate capacity |
|
External links | |
Commons | Related media on Commons |
Juragua Nuclear Power Plant was a nuclear power plant under construction in Cuba when a suspension of construction was announced in 1992 following the collapse of the Soviet Union and the termination of Soviet economic aid to Cuba. Russia and Cuba sought third-country financing to complete the plant in the mid-1990s but in 2000 the two countries agreed to abandon the project. [1]
A workers' town, Ciudad Nuclear, was built next to the plant and is inhabited today with many buildings left in a half-finished state. [2]
Cuba's interest in civil use of nuclear energy dated back to 1956, when Cuba and the United States signed an "Agreement for co-operation concerning civil uses of atomic energy". This agreement suggested the possibility of further cooperation extending to the design, construction, and operation of power producing nuclear reactors. [3] The agreement was reached during Fulgencio Batista's regime, later overthrown as a result of the Cuban Revolution in 1959. The treaty was ultimately terminated during the Cuban Missile Crisis in October 1962. [4]
Russian-Cuban cooperation in nuclear energy dated back to January 1967, when the Soviet Union sponsored a photo exposition, "Atomic Energy for Peaceful Purposes", at the Cuban Academy of Sciences. Nine months later both countries reached an agreement to provide Cuba with a research reactor for experimental and teaching purposes, as well as assistance in assembling and operating the equipment. [5] In 1975 Cuban and Russian officials signed treaties for "Cooperation in the Peaceful Uses of Nuclear Energy" and the "Establishment of Direct Scientific-Technical Co-operation in the Field of the Uses of Nuclear Energy". [4]
In 1976 Cuba and the Soviet Union signed an agreement to construct two 440-megawatt nuclear power reactors (VVER-440 V318) in the south central province of Cienfuegos, near the village of Juraguá. The original plan called for 12 reactors, four each at Juraguá, Puerto Esperanza in the western part of the island, and Holguín, in the east. The project was ultimately reduced to two 440-megawatt nuclear power reactors, both at Juraguá. [6] Upon completion, the first reactor would have generated over 15% of Cuba's energy demands. The construction of these reactors was a priority for Cuba because of its dependence on imported oil. [7]
The Juragua plant included two VVER-440 V318 nuclear power reactors, the first Soviet-designed reactors to be built in the Western Hemisphere and in a tropical environment. [8] The VVER are pressurized water reactors (PWR) developed by the Soviet Union. The number 440 indicated the electric power in MWe of the reactor, which employed two turbines of 220 MWe each with an overall thermal power of 1,375 MWth for the reactor. The V318 model was the newest 440 MWe Soviet-model and it was based on V213, an improvement in safety standards over the older V230 reactors, which lacked an Emergency Core Cooling System (ECCS). The Cuban model (V318) was also designed to have full containment with a steel-lined concrete dome structure to inhibit the release of radioactive particles in the event of a severe accident. [9]
Under the supervision of Fidel Castro Díaz-Balart, the construction of the first reactor began in 1983 and the second in 1985. Most of the reactor parts, except for civil construction materials, were supplied by the Soviet Union under bilateral economic cooperation agreements. The first reactor was initially scheduled to be operational in 1993 by Cuban officials, but it was later estimated that the reactor would not be operational until late 1995 or early 1996. [8] However, the collapse of the Soviet Union disrupted construction at Juragua, as a market economy established new economic ties and Russia began providing technical assistance to Cuba on a commercial basis. The plant was being built with the help of some Russian technicians and some of them were withdrawn after the dissolution of the Soviet Union. [10]
At the behest of the Russian Federation, Cuba negotiated with European firms such as Siemens, Cegelec and Skoda to provide Instrumentation and Control equipment to upgrade the safety standards of the plant. [10] In the 1970s Russia had successfully constructed Loviisa Nuclear Power Plant in Finland through a joint venture with Siemens to comply with Finnish nuclear regulations. In 1992 Siemens visited the Juragua plant and agreed to install the systems but Russia was unable to pay in hard currency as demanded. Cuba was also incapable of delivering the $21 million payment that Siemens was asking for. [10] On September 5, 1992, Cuban President Fidel Castro announced a suspension of construction at Juragua due to Cuba's inability to meet the financial terms set by Russia to complete the reactors. [11] Castro stated that more than 1.1 billion dollars had been invested. [12]
A September 1992 GAO report estimated that civil construction on the first reactor ranged from 90 to 97% complete with only 37% of the reactor equipment installed, while the second reactor was only between 20 and 30% completed. The primary components had not been installed and the nuclear fuel was not delivered. [8] Russian press reported that at least one reactor, without nuclear fuel, and its steam turbine set were delivered to Cuba. [13]
United States opposition to the project had existed since the 1980s, but upon Soviet Union's withdrawal, concerns over Cuba's ability to safely operate the plant surfaced. In the eventuality of a nuclear accident, radioactive fallout from an accident could reach United States territory on the third day after an accident. [14] United States president Bill Clinton stated in April 1993 that the United States opposed the construction of the plant because of safety concerns and Cuba's refusal to sign the Nuclear Non-Proliferation Treaty or ratify the Treaty of Tlatelolco. [15] Some media referred to the plant as a potential "Cuban Chernobyl" and Ileana Ros-Lehtinen, a United States Representative from Florida and born in La Havana, described the plant as "a potential Chernobyl in our own backyard". Cuba also met with criticism related to the inadequate storage of deteriorating mechanical equipment. [10]
In a September 1992 report to Congress, Cuban nuclear plant workers who defected to the United States stated that the nuclear facility presented problems that could affect the safe operation of the reactors and their construction. According to these workers, the Cuban technicians did not have a good system to check the reactor's components provided by the Soviet Union. A former Cuban technician, responsible for checking the welds in the civil construction, claimed that from about 5,000 weld sites that had passed inspection, 10 to 15 percent were defective. According to another worker, individuals trained to be reactor operators received five months of instruction from the Russians on a simulator that did not resemble the reactor under construction in Cuba. [7]
In 1995 the Russian Ministry of Atomic Energy announced that it intended to resume the construction of Cuba’s reactors in 1998 with financing provided by an international consortium involving Siemens, Ansaldo and Électricité de France. However, the aforementioned companies dismissed the claims and it was reported that the announcement could have been part of a political stance against United States threat to cut aid to Russia. [16] The United States opposition on the project discouraged other countries following the Helms–Burton Act, which continued and strengthened the United States embargo against Cuba. [17] Estimates regarding the cost to finish the reactor ranged from $300 million to $750 million. [6] In 1997 Fidel Castro announced that Cuba was no longer interested in finishing the plant and would be seeking other energy alternatives. In December 2000 Russian President Vladimir Putin visited Cuba and offered to finish one reactor by investing 800 million dollars over the course of six years. [18] Castro subsequently announced that Cuba was no longer interested in completing the twin 440-megawatt reactor plant. [1] This announcement was made amid the failed attempt to resolve the problem of Cuba’s debt to the former Soviet Union, inherited by Russia.
In 2004, the main turbine at the Juragua plant was removed to replace a damaged turbine at Guiteras thermoelectric plant. [19]
A nuclear meltdown is a severe nuclear reactor accident that results in core damage from overheating. The term nuclear meltdown is not officially defined by the International Atomic Energy Agency or by the United States Nuclear Regulatory Commission. It has been defined to mean the accidental melting of the core of a nuclear reactor, however, and is in common usage a reference to the core's either complete or partial collapse.
The RBMK is a class of graphite-moderated nuclear power reactor designed and built by the Soviet Union. The name refers to its design where, instead of a large steel pressure vessel surrounding the entire core, the core is surrounded by a cylindrical annular steel tank inside a concrete vault and each fuel assembly is enclosed in an individual 8 cm (inner) diameter pipe. The channels also contain the coolant, and are surrounded by graphite.
Rosatom, also known as Rosatom State Nuclear Energy Corporation, the State Atomic Energy Corporation Rosatom or Rosatom State Corporation, is a Russian state corporation headquartered in Moscow that specializes in nuclear energy, nuclear non-energy goods and high-tech products. Established in 2007, the organization comprises more than 350 enterprises, including scientific research organizations, the nuclear weapons complex, and the world's only nuclear icebreaker fleet.
The Paks Nuclear Power Plant, located 5 kilometres (3.1 mi) from the small town of Paks, central Hungary, is the first and only operating nuclear power station in Hungary. In 2019, its four reactors produced more than 50% of Hungary's electricity production.
The water-water energetic reactor (WWER), or VVER is a series of pressurized water reactor designs originally developed in the Soviet Union, and now Russia, by OKB Gidropress. The idea of such a reactor was proposed at the Kurchatov Institute by Savely Moiseevich Feinberg. VVER were originally developed before the 1970s, and have been continually updated. As a result, the name VVER is associated with a wide variety of reactor designs spanning from generation I reactors to modern generation III+ reactor designs. Power output ranges from 70 to 1300 MWe, with designs of up to 1700 MWe in development. The first prototype VVER-210 was built at the Novovoronezh Nuclear Power Plant.
Russia is one of the world's largest producers of nuclear energy. In 2020 total electricity generated in nuclear power plants in Russia was 215.746 TWh, 20.28% of all power generation. The installed gross capacity of Russian nuclear reactors is 29.4 GW in December 2020.
As of 2017, nuclear power in Pakistan is provided by five commercial nuclear power plants. Pakistan is the first Muslim majority country in the world to construct and operate civil nuclear power plants. The Pakistan Atomic Energy Commission (PAEC), the scientific and nuclear governmental agency, is solely responsible for operating these power plants. As of 2018, the electricity generated by commercial nuclear power plants constitutes roughly 7.5% of electricity generated in Pakistan, Pakistan is not a party to the Nuclear Non-Proliferation Treaty but is a member of the International Atomic Energy Agency. Pakistan plans on constructing 32 nuclear power plants by 2050 and envisions 40,000 MW of nuclear power generation.
The Armenian Nuclear Power Plant (ANPP), also known as the Metsamor Nuclear Power Plant, is the only nuclear power plant in the South Caucasus, located 36 kilometers west of Yerevan in Armenia. The ANPP complex consists of two VVER-440 Model V270 nuclear reactors, each capable of generating 407.5 megawatts (MW) of power, for a total of 815 MW. The plant supplied approximately 40 percent of Armenia's electricity in 2015.
The Czech Republic operates two nuclear power plants: Temelín and Dukovany. In 2010 there were government and corporate moves to expand Czech nuclear power generation capacity.
Obninsk Nuclear Power Plant was built in the "Science City" of Obninsk, Kaluga Oblast, about 110 km (68 mi) southwest of Moscow, Soviet Union. Connected to the power grid in June 1954, Obninsk was the first grid-connected nuclear power plant in the world, i.e. the first nuclear reactor that produced electricity industrially, albeit at small scale. It was located at the Institute of Physics and Power Engineering. The plant is also known as APS-1 Obninsk. It remained in operation between 1954 and 2002, although its production of electricity for the grid ceased in 1959; thereafter it functioned as a research and isotope production plant only.
China is one of the world's largest producers of nuclear power. The country ranks third in the world both in total nuclear power capacity installed and electricity generated, accounting for around one tenth of global nuclear power generated. Nuclear power contributed 4.9% of the total Chinese electricity production in 2019, with 348.1 TWh. As of June 2021, China has a total nuclear power generation capacity of 49.6 GW from 50 reactors, with additional 17.1 GW under construction.
Nuclear power is the fifth-largest source of electricity in India after coal, gas, hydroelectricity and wind power. As of November 2020, India has 22 nuclear reactors in operation in 8 nuclear power plants, with a total installed capacity of 7,380 MW. Nuclear power produced a total of 43 TWh in 2020-21, contributing 3.11% of total power generation in India. 10 more reactors are under construction with a combined generation capacity of 8,000 MW.
The Bushehr Nuclear Power Plant is a nuclear power plant in Iran 1,200 kilometres (750 mi) south of Tehran, between the fishing villages of Halileh and Bandargeh along the Persian Gulf.
Ukraine operates four nuclear power plants with 15 reactors located in Volhynia and South Ukraine. The total installed nuclear power capacity is over 13 GWe, ranking 7th in the world in 2020. Energoatom, a Ukrainian state enterprise, operates all four active nuclear power stations in Ukraine. In 2019, nuclear power supplied over 20% of Ukraine's energy.
National nuclear energy policy is a national policy concerning some or all aspects of nuclear energy, such as mining for nuclear fuel, extraction and processing of nuclear fuel from the ore, generating electricity by nuclear power, enriching and storing spent nuclear fuel and nuclear fuel reprocessing. Nuclear energy policies often include the regulation of energy use and standards relating to the nuclear fuel cycle.
In Hungary, nuclear energy plays a decisive role in the national energy mix, While in 2006, only 38 percent of the country's electricity came from nuclear fission, by 2014 that proportion had risen to over 53 percent. It is predicted that rate of around 50 percent will be permanent in the near future.
Currently, Turkey has no operating commercial nuclear reactors. However, four VVER-1200 reactors at the Akkuyu Nuclear Power Plant, are currently under construction and expected to come online in 2023. The nuclear power debate has a long history, with the 2018 construction start in Mersin Province being the sixth major attempt to build a nuclear power plant since 1960. Nuclear power has been criticised as very expensive to taxpayers.
Vietnam has been considering to develop nuclear power for peaceful purposes based on modern, verified technology since 1995, and firm proposals surfaced in 2006. However, in November 2016 Vietnam decided to abandon nuclear power plans as they were "not economically viable because of other cheaper sources of power."
A core catcher is a device provided to catch the molten core material (corium) of a nuclear reactor in case of a nuclear meltdown and prevent it from escaping the containment building.
The Rooppur Nuclear Power Plant (Bengali: রূপপুর পারমাণবিক বিদ্যুৎকেন্দ্র) will be a 2.4 GWe nuclear power plant in Bangladesh. The nuclear power plant is being constructed at Rooppur of Ishwardi upazila in Pabna District, on the bank of the river Padma, 87 miles (140 km) west of Dhaka. It will be the country's first nuclear power plant, and the first of the two unit is expected to go into operation in 2024. The VVER-1200/523 Nuclear reactor and critical infrastructures are being built by the Russian Rosatom State Atomic Energy Corporation. In the main construction period, the total number of employees will reach 12,500, including 2,500 specialists from Russia. It is expected to generate around 15% of the country's electricity when completed.