KEGOC

Last updated
KEGOC JSC
Native name
Казахстанская компания по управлению электрическими сетями, Kazakhstan Electricity Grid Operating Company
Company type Quasi-public corporation
KASE:  KEGC
Industry Power engineering
Founded11 July 1997 (1997-07-11)
Headquarters Kazakhstan: Astana
Key people
Nabi Aitzhanov(CEO) [1]
Products Electrical grid
Services Electric power transmission
Number of employees
>4 thousand (2020)
Parent Samruk Kazyna(90%)
Subsidiaries
Website www.kegoc.kz/en

Kazakhstan Electricity Grid Operating Company (KEGOC) joint-stok company is a Astana based state company of Kazakhstan established in 1997. [5]

Contents

General information

KEGOC is the System Operator of the Unified Power System (UPS) of Kazakhstan, and it owns and manages the assets of the National Power Grid (NPG). The company operates as the natural monopoly. [6]

The company employs more than 4 thousand people.

KEGOC is a subsidiary of Samruk-Kazyna Sovereign Welfare Fund JSC. [7]

In December 2014, the company was listed on the Kazakhstan Stock Exchange as part of the "People's IPO" programme. [8] KEGOC floated 10% minus one share. The minority shareholder structure included 7.3% of individuals. The demand exceeded supply by 1.5 times.

Projects

Completed projects:

Ongoing projects:

Subsidiaries

KEGOC has subsidiaries: EnergoInform JSC (100% of shares) and Financial Settlement Centre for Renewable Energy Sources LLP (FSC RES) (100% of participation shares).

EnergoInform is engaged in maintenance of the telecom equipment in the national power grid and provide telecom support for the KEGOC's operations.

Financial Settlement Centre for Renewable Energy Sources LLP (FSC RES LLP) was established in 2013 to encourage investments in renewable energy sector and increase the share of renewable energy in Kazakhstan's energy mix through government-guaranteed and centralized electricity purchase of all electricity produced by all renewable energy facilities (who have chosen such support scheme) in accordance with the fixed rates. Also FSC RES LLP was assigned by the Minister of Energy of the Republic of Kazakhstan (order No. 357 dated 7 September 2018 ) the single buyer of centralized procurement of services service of maintaining the readiness of electric capacity and centralized provider of services of ensuring readiness of electricity capacity to bear the power load (capacity market operator).

KEGOC is also a co-founder (20% of shares) of Batys Transit JSC established in 2005 to implement the project for construction of inter-regional power transmission line linking North Kazakhstan with Aktobe oblast. [9]

See also

Notes

  1. Management board
  2. Asset structure

Related Research Articles

<span class="mw-page-title-main">National Grid (Malaysia)</span>

National Grid, Malaysia is the high-voltage electric power transmission network in Peninsular Malaysia. It is operated and owned by Tenaga Nasional Berhad (TNB) by its Transmission Division. There are two other electrical grids in Sabah and Sarawak operated by Sabah Electricity Sdn Bhd (SESB) and Sarawak Energy Berhad (SEB).

<span class="mw-page-title-main">Akhmedjan Essimov</span> Kazakh politician

Ahmedjan Smagululy Essimov is a Kazakh politician who served as the chairman of Samruk-Kazyna from 2017 to 2021. Prior to that, he was the director of Expo 2017 from 2015 to 2017, akim of Almaty from 2008 to 2015, Minister of Agriculture twice from 2006 to 2008 and 2001 to 2004, Deputy Prime Minister of Kazakhstan from 2002 to 2006 and 1994 to 1996, First Deputy Prime Minister of Kazakhstan from 1996 to 1998, Acting Head of the Presidential Administration of Kazakhstan and State Secretary of Kazakhstan in 1996.

<span class="mw-page-title-main">Kazatomprom</span> Uranium producer

National Atomic Company Kazatomprom Joint Stock Company (Kazatomprom) (Kazakh: Қазатомөнеркәсіп, romanized: Qazatomónerkásip) is the world’s largest producer and seller of natural uranium, providing over 40% of global primary uranium supply in 2019 from its operations in Kazakhstan. Kazatomprom's uranium is used for the generation of nuclear power around the world.

<span class="mw-page-title-main">Ekibastuz GRES-1</span> Coal-fired thermal power station (GRES) at Ekibastusz, Kazakhstan

Ekibastuz GRES-1 is a 4,000 MW coal-fired thermal power station (GRES) at Ekibastusz, Kazakhstan. It is located by lake Zhyngyldy. The ashes of the station are dumped into nearby lake Karasor. GRES-1 has two 330-metre (1,083 ft) tall chimneys. As of June 2010, the Ekibastuz GRES-1 power station was the largest power station in Kazakhstan, and generated 13% of the nation's electricity.

Bogatyr Coal, formerly known as Bogatyr Access Komyr, is the largest coal mining company in Kazakhstan. As of 2018, the company produced 42 million tonnes of coal, accounting for approximately 40% of the country's coal output that year. The company has mined approximately 1 gigatonne of coal in its history, and has 2.5 additional gigatonnes of coal reserves, making it one of the largest coal companies in the world. Bogatyr Komir operates two mines, the Bogatyr Mine and the Severny Mine.

<span class="mw-page-title-main">Timur Kulibayev</span> Kazakh oligarch (born 1966)

Timur Askaruly Kulibayev is a Kazakh businessman.

The Moinak Hydro Power Plant or is a hydro power plant on the Sharyn River south of Almaty in Almaty Province of Kazakhstan.

Kazakhtelecom JSC is the largest telecommunication company in Kazakhstan.

<span class="mw-page-title-main">Sangtuda 1 Hydroelectric Power Plant</span> Dam in Danghara District, Khatlon Province

Sangtuda 1 Hydroelectric Power Plant is a hydroelectric power plant, located on the Vakhsh River in Tajikistan. Construction commenced during the Soviet period in the 1980s, but halted in the beginning of the 1990s due to lack of financing when the station was about 20% complete. An agreement with Russia allowed to restart the construction, with four units entering service in 2008–2009. The plant was officially commissioned on 31 July 2009. Once working at full capacity, the plant will provide around 12% of Tajikistan's electricity output.

<span class="mw-page-title-main">Samruk-Kazyna</span> Sovereign wealth fund of Kazakhstan

Joint-stock company «Sovereign Wealth Fund «Samruk-Kazyna», officially known as the National Welfare Fund "Samruk-Kazyna", is a sovereign wealth fund and joint stock company in Kazakhstan which owns, either in whole or in part, a number of major companies in the country. This includes the national rail and postal service, the state oil and gas company KazMunayGas, the state uranium company Kazatomprom, the Kazakhstani flag carrier Air Astana, and others. The state is the sole shareholder of the fund.

Latvia is a net energy importer. Primary energy use in Latvia was 49 TWh, or 22 TWh per million persons in 2009. In 2018, electricity consumption per capita was 3731 kWh.

<span class="mw-page-title-main">Ukrhydroenergo</span> Ukrainian hydro power company

PJSC «Ukrhydroenergo» is a Ukrainian state-owned enterprise that administers hydro power plants along the Dnieper and Dniester rivers.

<span class="mw-page-title-main">United Chemical Company</span>

The United Chemical Company - the state-owned company in Kazakhstan established in 2009 by the decision of the Board of Directors of the "National Welfare Fund "Samruk-Kazyna" JSC as of November 28, 2008; the main operator of the State Program on Accelerated Industrial and Innovative Development for the chemical industry. Currently, the United Chemical Company implements a number of investment projects, which include the productions existing and being modernized, as well as the ventures newly established in the Kazakhstan’s chemical industry. Their products are intended for various industries, including the gold mining industry, agriculture, etc.

Dariali Hydropower Plant, referred to as Dariali HPP, is a 108 MW run-of-the-river hydropower plant built in 2017 in Georgia. It is located on the Tergi River in Kazbegi Municipality, at less than 1 km from the Russian-Georgian border, 160 km far from Tbilisi.

The Shuakhevi Hydro Power Plant is a run-of-the-river plant in Adjara, Georgia. Construction on the project began in 2013 and was completed in June 2017. It has an installed capacity of 187 megawatts (251,000 hp) with expected electricity output of 452 gigawatt-hours (1,630 TJ). The plant has the capacity for diurnal storage in two reservoirs, allowing Shuakhevi HPP to store water for up to 12 hours and sell electricity at peak demand times. Three main tunnels were constructed on the Shuakhevi project; the 5.8 km Chirukhistsqali to Skhalta transfer tunnel, the 9.1 kilometres (5.7 mi) Skhalta to Didachara transfer tunnel and the 17.8 km Shuakhevi headrace and pressure tunnel. It is estimated that the project will cost US$417 million. For the purposes of developing, constructing and operating the Shuakhevi HPP, ADB and EBRD extended a loan to Adjaristsqali Georgia LLC of up to $86.5 million and IFC a loan of 80m USD. Adjaristsqali Georgia LLC is owned by the Norwegian Clean Energy Invest AS (40%), India's Tata Power (40%) and IFC Infraventures (20%), an investment fund created by the International Finance Corporation. Alstom was chosen to supply the electromechanical equipment for the project.

<span class="mw-page-title-main">KAZ Minerals</span> British copper miner in Kazakhstan

KAZ Minerals is a copper producer in Kazakhstan and Kyrgyzstan, focused on the mining of copper and the development of new copper mining projects in Kazakhstan and Kyrgyzstan.

There is enormous potential for renewable energy in Kazakhstan, particularly from wind and small hydropower plants. The Republic of Kazakhstan has the potential to generate 10 times as much power as it currently needs from wind energy alone. But renewable energy accounts for just 0.6 percent of all power installations. Of that, 95 percent comes from small hydropower projects. The main barriers to investment in renewable energy are relatively high financing costs and an absence of uniform feed-in tariffs for electricity from renewable sources. The amount and duration of renewable energy feed-in tariffs are separately evaluated for each project, based on feasibility studies and project-specific generation costs. Power from wind, solar, biomass and water up to 35 MW, plus geothermal sources, are eligible for the tariff and transmission companies are required to purchase the energy of renewable energy producers. An amendment that introduces and clarifies technology-specific tariffs is now being prepared. It is expected to be adopted by Parliament by the end of 2014. In addition, the World Bank's Ease of Doing Business indicator shows the country to be relatively investor-friendly, ranking it in 10th position for investor protection.

<span class="mw-page-title-main">Ministry of Energy Infrastructures and Natural Resources (Armenia)</span>

The Ministry of Energy Infrastructures and Natural Resources of Armenia is the ministry responsible for the management of the energy systems, and control of the exploitation of natural resources in Armenia. It elaborates and implements the policies of the Government of Armenia in the energy sector.

The Achwa 1 Hydroelectric Power Station (A1HPS), also Achwa I Hydroelectric Power Station, is a hydroelectric power station in Uganda, with a planned installed capacity of 41 megawatts (55,000 hp).

Samruk-Energy is a state-owned Kazakhstani company engaged in the electric power sector. The company is vertically integrated, with businesses spanning coal mining, power generation, transmission, and distribution.

References

  1. "N. Aitzhanov elected as Chairman of Management Board of KEGOC JSC".
  2. "АО "Энергоинформ"".
  3. "Financial Settlement Center of Renewable Energy LLP".
  4. "Batys Transit Home Page". Archived from the original on 2022-05-16. Retrieved 2024-09-17.
  5. "Презентация на тему: "Kazakhstan Electricity Grid Operating Company KEGOC By Nigmetullina Guldana 301 group.". Скачать бесплатно и без регистрации". www.myshared.ru (in Russian). Retrieved 2021-09-05.
  6. "Kazakhstan Electricity Grid Operating Company (KEGOC)". www.fitchratings.com. Retrieved 2021-12-15.
  7. "Samruk-Kazyna JSC 2016_VOLUME 1.pdf" (PDF).
  8. "Kazakh national grid company aims to raise $73 mln in IPO". Reuters. 2014-11-04. Retrieved 2021-09-05.
  9. "Annual Report 2017. KEGOC JSC" (PDF).