KOSTT j.s.c is a transmission system operator company with its headquarters based in Pristina, Kosovo.
It plays an important role in the energy sector in Kosovo. As a market operator it is responsible for the organization and administration of trades in electricity and the management of the settlement process.
It is a member of the Energy Community, an international organization consisting of the European Union (EU) and a number of non-EU countries.
KOSTT is control area and it is synchronously connected with continental Europe and cooperating with RG CE TSOs to abide by the EU packages. It expects to become a member of the European Network of Transmission System Operators for Electricity in the future.
Appointed by the Ministry of Energy and Mining of Kosovo and licensed by the Energy Regulatory Office pursuant to the provisions of the primary and secondary Kosovo legislation, KOSTT j.s.c became a licensed entity for the transmission system operator and for the market operation, in October 2006.
The establishment of KOSTT j.s.c was a consequence of the restructuring of the energy sector in Kosovo. The transmission and dispatch functions officially have been divided from the Kosovo Energy Corporation (KEK) (a vertically integrated company) on 1 July 2006, following the decision of the Government of Kosovo taken in July 2005 for restructuring of KEK and the obligations deriving from the Energy Community Treaty for South East Europe where Kosovo is an equal member.
In March 2018, the European electricity transmission association ENTSO-E warned over delay of electric clocks throughout Europe's power network due to lower frequency which was caused by the loss of electricity in the network. Namely, the loss was created due to political dispute between Serbia and Kosovo where the Kosovar power transmission company KOSTT took 113 GWh unauthorizedly from the network in the period of January–February 2018. [1] [2] The Serbian electricity transmission operator Elektromreža Srbije has legal jurisdiction over Kosovar electricity transmission network, but due to political dispute, does not exercise full control over it. The direct loss of 113 GWh would amount to 24.86 million euros, as per average euro area electricity price (per KWh) of 22 eurocents for households in 2017. [3]
In April 2020, a vote by the European Network of Transmission System Operators for Electricity, ENTSO-E, paved the way for Kosovo to become an independent regulatory zone for electricity. The vote confirmed that a connection agreement would be signed between ENTSO-E and KOSTT, the Kosovo Transmission System Operator, allowing KOSTT to join the 42 other transmission operators that make up the regional energy cooperation organisation. The membership of ENTSO-E as an independent zone would end Kosovo's reliance on the Serbian power grid, and enable a joint energy bloc between Kosovo and Albania, an agreement which was signed in December. [4]
With that agreement Albania and Kosovo will now be able to exchange energy reserves, which is expected to result in €4 million in savings per year for Kosovo. [5]
KOSTT j.s.c is responsible for:
KOSTT has a strategic position and it represents an important knot in the regional energy market. KOSTT is interconnected with four (4) other systems, namely, Albania, North Macedonia, Montenegro and Serbia.
The KOSTT j.s.c transmission system consists of 1186 km overhead lines (181 km – 400 kV; 361 km – 220 kV; and 643 km – 110 kV) and 2400 MVA of transformation capacities.
The energy sector is considered as one of the most important sectors in Kosovo. 96.8% of electricity in Kosovo is generated by Thermo Power Plants and 3.2% is generated by Hydro Power Plants.
A transmission system operator (TSO) is an entity entrusted with transporting energy in the form of natural gas or electrical power on a national or regional level, using fixed infrastructure. The term is defined by the European Commission. The certification procedure for transmission system operators is listed in Article 10 of the Electricity and Gas Directives of 2009.
ENTSO-E, the European Network of Transmission System Operators, represents 40 electricity transmission system operators (TSOs) from 36 countries across Europe, thus extending beyond EU borders. ENTSO-E was established and given legal mandates by the EU's Third Package for the Internal energy market in 2009, which aims at further liberalising the gas and electricity markets in the EU. Ukrainian Ukrenergo became the 40th member of the association on 1 January 2024.
Fingrid Oyj is a Finnish national electricity transmission grid operator. It is owned by the Finnish state (53.1%) and various financial and insurance institutions (46.9%).
Kosovo is a developing country with an economy that functions on the principles of the free market, with a large private sector. Kosovo is an upper-middle income economy according to the World Bank, and is a member of the World Bank and the International Monetary Fund. Its official currency is the euro.
The synchronous grid of Continental Europe is the largest synchronous electrical grid in the world. It is interconnected as a single phase-locked 50 Hz mains frequency electricity grid that supplies over 400 million customers in 24 countries, including most of the European Union. In 2009, 667 GW of production capacity was connected to the grid, providing approximately 80 GW of operating reserve margin. The transmission system operators operating this grid formed the Union for the Coordination of Transmission of Electricity (UCTE), now part of the European Network of Transmission System Operators for Electricity (ENTSO-E).
Kosovo unilaterally self proclaimed independence from Serbia in 2008, a move which Serbia strongly rejects. Serbia does not recognize Kosovo as an independent state and continues to claim it as the Autonomous Province of Kosovo and Metohija. However, differences and disputes remain, while North Kosovo is partially under Serbian rule. Initially there were no relations between the two; but in the following years there has been increased dialogue and cooperation between the two sides.
The IPS/UPS is a wide area synchronous transmission grid of some CIS countries, with a common mode of operation and centralized supervisory control. It has an installed generation capacity of 300 gigawatts, and produces 1,200 terawatt-hours (TWh) per year for its 280 million customers. The system spans eight time zones.
Nord Pool AS is a pan-European power exchange. Nord Pool has a main office in Oslo and further offices in Stockholm, Helsinki, Tallinn and London. The company is owned by the European exchange operator Euronext as well as TSO Holding, which represents the continental Nordic and Baltic countries' transmission system operators. Nord Pool has two subsidiaries, Nord Pool AB and Nord Pool Finland Oy.
Elering AS is a national transmission system operator for electricity and natural gas with headquarters in Tallinn, Estonia. The managing director of Elering is Taavi Veskimägi.
The European Network of Transmission System Operators for Gas (ENTSOG) is an association of Europe's transmission system operators (TSOs). ENTSOG was created on 1 December 2009 by 31 TSOs from 21 European countries. Creation of the ENTSOG was initiated by the adoption of the European Union third legislative package on the gas and electricity markets. It aims to promote the completion and cross-border trade for gas on the European internal market, and development of the European natural gas transmission network. According to the third energy package ENTSOG is required to develop an EU-wide ten-year gas network development plan.
The electricity sector in Iceland is 99.98% reliant on renewable energy: hydro power, geothermal energy and wind energy.
The electricity sector of Kosovo relies on coal-fired power plants and is considered one of the sectors with the greatest potential of development. The inherited issues after the war in Kosovo and the transition period have had an immense effect on the progress of this sector.
Swissgrid, based in Aarau and Prilly, is the Swiss transmission grid operator. It is subject to supervision by the Swiss Federal Electricity Commission ElCom.
Elektromreža Srbije is a Serbian national transmission system operator company with the headquarters in Belgrade, Serbia.
Independent Power Transmission Operator S.A. is the Transmission System Operator for the Hellenic Electricity Transmission System. The mission of the company is the operation, control, maintenance and development of the national transmission system of Greece to ensure the reliable and efficient electricity supply, as well as the operation of the electricity market following the principles of transparency and equality.
The Energy Identification Code (EIC) is a 16-character identifier (code) used in Europe to uniquely identify market participants and energy resources related to the electricity and gas sector.
Turkish Electricity Transmission Corporation is the transmission system operator for electricity in Turkey. It is a government-owned corporation. It is planned for a minority stake to be sold to the private sector before the end of 2022. It reportedly does not co-ordinate with EMRA re YEKA bids as of 2023.
Ukrenergo is a state-owned electricity transmission system operator in Ukraine and the sole operator of the high-voltage lines which transmit electricity in Ukraine. It is a member of the European Network of Transmission System Operators for Electricity.
Kosovo Energy Corporation J.S.C. is a company based in Kosovo engaged in generation of electricity and allied activities. Its capacity is estimated to be around 1480+ MW.
The Kitka Wind Farm is the first wind farm in Kosovo. It has a nameplate capacity of 32.4 MW and it is estimated to have a total annual output of electricity of 95.6 GWh and supplies enough clean energy to power 10,000 households. The project was commissioned in October 2018.