Abbreviation | ENTSO-E |
---|---|
Predecessor | ETSO, UCTE, NORDEL, ATSOI, UKTSOA, BALTSO |
Formation | 19 December 2008 |
Type | Association |
Legal status | AISBL |
Purpose | ENTSO-E promotes closer cooperation across Europe’s TSOs to support the implementation of EU energy policy and achieve Europe’s energy & climate policy objectives, which are changing the very nature of the power system |
Headquarters | Rue de Spa 8 Brussels, Belgium |
Region served | Europe |
Membership | Transmission system operators |
Main organ | ENTSO-E Assembly |
Website | www |
ENTSO-E, the European Network of Transmission System Operators, represents 40 electricity transmission system operators (TSOs) from 36 countries across Europe, thus extending beyond EU borders. ENTSO-E was established and given legal mandates by the EU's Third Package for the Internal energy market in 2009, which aims at further liberalising the gas and electricity markets in the EU. [1] Ukrainian Ukrenergo became the 40th member of the association on 1 January 2024. [2]
On 27 June 2008, 36 European electricity transmission system operators (TSOs) signed in Prague a declaration of intent to create the ENTSO-E. [3] ENTSO-E was established on 19 December 2008 in Brussels by 42 TSOs as a successor of six regional associations of the electricity transmission system operators. [4] [5] ENTSO-E became operational on 1 July 2009. The former associations ETSO, ATSOI, UKTSOA, NORDEL, UCTE and BALTSO became a part of the ENTSO-E, while still offering data by their predecessors for public interest. [6]
Creation of ENTSO-E was initiated by the adoption of the European Union third legislative package on the gas and electricity markets. [3] In 2003, the European Commission conducted a sector inquiry concerning the competition of electricity market in six European countries. [7] Examining competition in these countries, the final report stated serious issues to be solved. [8] It was noticed that the integration between member state's markets is still insufficient. Additionally, the absence of transparently available market information was assessed. [7] As a result, the third legislative package on the EU gas and electricity markets was adopted by the European Commission in September 2007. [9]
According to its website, "ENTSO-E promotes closer cooperation across Europe’s TSOs to support the implementation of EU energy policy and achieve Europe’s energy & climate policy objectives, which are changing the very nature of the power system. The main objectives of ENTSO-E centre on the integration of renewable energy sources (RES) such as wind and solar power into the power system, and the completion of the internal energy market (IEM), which is central to meeting the European Union’s energy policy objectives of affordability, sustainability and security of supply. [...] ENTSO-E aims to be the focal point for all technical, market and policy issues relating to TSOs and the European network, interfacing with power system users, EU institutions, regulators and national governments." [10]
TSOs are responsible for the bulk transmission of electric power on the main high voltage electric networks. TSOs provide grid access to the electricity market players (i.e., generating companies, traders, suppliers, distributors, and directly connected customers) according to non-discriminatory and transparent rules. In many countries, TSOs are in charge of the development of the grid infrastructure, too. TSOs in the European Union internal electricity market are entities operating independently from the other electricity market players (unbundling). [11]
ENTSO-E contained 40 Member TSOs from 36 countries as of January 2024. [12] Due to Brexit three Great Britain based operators left and only Northern Ireland's SONI remains from the UK. [13]
On 26 April 2022 Ukrenergo signed an observer membership agreement [14] and became the 40th member of ENTSO-E on 1 January 2024. [2]
On 14 January 2016 TEİAŞ signed an agreement with ENTSO-E to become first observer member, the agreement expired in January 2019. [15] On 13 December 2022 TEİAŞ signed a new Observer Membership Agreement that will run for a period of three years. [16]
ISO country code | Country | TSO | Abbr. |
---|---|---|---|
TR | Turkey | Turkish Electricity Transmission Corporation | TEİAŞ |
MD | Moldova | Moldelectrica | Moldelectrica |
The geographical area covered by ENTSO-E's member TSOs is divided into five synchronous areas and two isolated systems (Cyprus and Iceland). Synchronous areas are groups of countries that are connected via their respective power systems. The system frequency (50 Hz, with usually very minor deviations) is synchronous within each area, and a disturbance at one single point in the area will be registered across the entire zone. Individual synchronous areas are interconnected through direct current interconnectors.
The benefits of synchronous areas include pooling of generation capacities, common provisioning of reserves, both resulting in cost-savings, and mutual assistance in the event of disturbances, resulting in cheaper reserve power costs (for instance in case of a disturbance or outage). [17]
The Third Energy Package and Regulation (EC) No 714/2009 [19] on conditions for access to the network for cross-border exchanges in electricity regulation stipulate ENTSO-E's tasks and responsibilities. Regulation (EU) 838/2010 [20] on guidelines relating to the inter-TSO compensation mechanism sets out the methodology by which TSOs receive compensation for the costs incurred in hosting cross-border flows of electricity. Regulation (EU) 347/2013 [21] on guidelines for trans-European energy infrastructure defines European Projects of Common Interest (PCIs) [22] identifies ENTSO-E's ten-year network development plan (TYNDP) [23] as the basis for the selection of PCIs. ENTSO-E is also mandated to develop a corresponding cost–benefit methodology [24] for the assessment of transmission infrastructure projects.
The Transparency Regulation (EU) No. 543/2013 [25] on submission and publication of data in electricity markets makes it mandatory for European Member State data providers and owners to submit fundamental information related to electricity generation, load, transmission, balancing, outages, and congestion management for publication through the ENTSO-E Transparency Platform. [17]
ENTSO‑E does not class as a "public sector body" under the meaning provided in the 2019 Open Data Directive.
The ten-year network development plan 2016 (TYNDP) [26] is drafted by ENTSO-E, in close cooperation with stakeholders, under scrutiny of ACER and is finally adopted by the European Commission. It is the only existing pan-European network development plan. It is the basis for the selection of EU projects of common interest (PCIs). [27] The list of PCIs is not fixed by ENTSO-E and is subject to a different process led by the European Commission and EU Member States.
The TYNDP is updated every two years. For inclusion in the TYNDP, each project, whether transmission or storage, has to go through a cost–benefit analysis. The benefit analysis methodology [24] is developed by ENTSO-E in consultation with stakeholders and adopted by the European Commission. It assesses projects against socio-economic and environmental criteria. [17]
ENTSO-E publishes summer and winter adequacy outlooks, [28] as well as a mid-term resource adequacy assessment, the European Resource Adequacy Assessment (ERAA). [29] The seasonal outlooks assess if there is enough generation to cover supply and highlight possibilities for neighbouring countries to contribute to the generation/demand balance in critical situations in a specific country. The ERAA analyses resource adequacy on the decade ahead, accounting for investment and retirement decisions.
ENTSO-E's network codes are binding pan-European rules drafted by ENTSO-E in consultation with stakeholders, with guidance from ACER. Network codes are grouped in three areas:
The drafting and adoption process of network codes is defined by the Third Package. ACER develops a framework guideline setting the policy choices for each code. On this basis, the codes are drafted by ENTSO-E in consultation with stakeholders. After ACER's opinion and recommendation for adoption, each code is submitted to the European Commission for approval through the Comitology process, i.e., to be voted on by Member State representatives and thus to become EU law, directly binding and implemented across all Member States. [17]
ENTSO-E's Central Information Transparency Platform [31] provides free access to fundamental data and information on pan-European wholesale energy generation, transmission, and consumption. [32]
ENTSO-E's R&D Roadmap [33] provides the ENTSO-E vision on grid projects to be carried out by TSOs to meet EU objectives. The roadmap is supported by the annual R&D Implementation Plan, [34] which combines both top-down and bottom-up approaches in meeting the requirements of the roadmap. ENTSO-E publishes annually a R&D Monitoring Report [35] that assesses the progress of TSO-related R&D work. [17]
ENTSO-E is an international non-profit association (AISBL) established according to Belgian law. ENTSO-E is financed by its members. The TSOs contribute to the budget according to the number of countries and the population served. [17]
The highest body of ENTSO-E is the Assembly, which is composed of representatives at CEO level of all the currently 43 members. The ENTSO-E Board is elected every two years from the overall membership and through the Assembly. It includes 12 representatives. The president, vice president, and committee chairs are invited to board meetings. The board coordinates the committees and LRG work and implements Assembly decisions. [17] [36]
ENTSO-E has established four specialized committees [37] composed of managers from member TSOs. Each committee leads a number of regional groups and working groups.
At the same level as the four committees, the transversal Legal & Regulatory Group [38] advises all ENTSO-E bodies on legal and regulatory issues. In addition, expert groups on data, network codes implementation, and EU affairs provide specific expertise and work products to the association. [17]
ENTSO-E's Secretariat is based in Brussels. It is headed by the secretary-general and represents ENTSO-E to the European institutions, regulators, and stakeholders.
Position | Name |
---|---|
President of the Assembly | Hervé Laffaye |
Vice-President of the Assembly | Zbyněk Boldiš |
Chair of the Board | Joachim Vanzetta |
Vice Chair of the Board | Liam Ryan |
Secretary General | Sonya Twohig |
Head of Policy, Communications and Stakeholder Management Section | Christelle Verstraeten |
Head of ICT Governance & Architectures Section | Nicolas Richet |
Head of Corporate Services Section | Bertrand Macabeo |
Head of Corporate Governance Section & General Counsel | Florence Melchior |
Head of Legal Section | Ivan Taleski |
Head of Market Section | Zoltan Gyulay |
Head of Innovation Section | Norela Constantinescu |
Head of System Development Section | Edwin Haesen |
Head of Operations Section | Bruno Gouverneur |
Head of ICT Solutions Section | Ervis Bregu |
Head of People, Talent & Culture Section | Evelyne Driane |
The Energy Community, commonly referred to as the Energy Community for South East Europe (ECSEE), is an international organization consisting of the European Union (EU) and a number of non-EU countries. It aims to extend the EU internal energy market to wider Southeast Europe. The members commit to implement relevant EU energy acquis communautaire, to develop an adequate regulatory framework and to liberalize their energy markets in line with the acquis under the founding Treaty.
A transmission system operator (TSO) is an entity entrusted with transporting energy in the form of natural gas or electrical power on a national or regional level, using fixed infrastructure. The term is defined by the European Commission. The certification procedure for transmission system operators is listed in Article 10 of the Electricity and Gas Directives of 2009.
The synchronous grid of Continental Europe is the largest synchronous electrical grid in the world. It is interconnected as a single phase-locked 50 Hz mains frequency electricity grid that supplies over 400 million customers in 24 countries, including most of the European Union. In 2009, 667 GW of production capacity was connected to the grid, providing approximately 80 GW of operating reserve margin. The transmission system operators operating this grid formed the Union for the Coordination of Transmission of Electricity (UCTE), now part of the European Network of Transmission System Operators for Electricity (ENTSO-E).
The IPS/UPS is a wide area synchronous transmission grid of some CIS countries, with a common mode of operation and centralized supervisory control. It has an installed generation capacity of 300 gigawatts, and produces 1,200 terawatt-hours (TWh) per year for its 280 million customers. The system spans eight time zones.
The European Regulators' Group for Electricity and Gas (ERGEG) was an advisory group to the European Commission on internal energy market issues in Europe. ERGEG was set up by the European Commission to assist the commission in consolidating a single EU market for electricity and gas. ERGEG's members were the heads of the national energy regulatory authorities in the EU's 28 Member States. It was dissolved in 2011 when Agency for the Cooperation of Energy Regulators (ACER) took over its responsibilities.
The electricity sectors of the Republic of Ireland and Northern Ireland are integrated and supply 2.5 million customers from a combination of coal, peat, natural gas, wind and hydropower. In 2022, 34 TWh were generated. In 2018 natural gas produced 51.8%, while wind turbines generated 28.1%, coal 7%, and peat 6.8% of Ireland's average electricity demand. In 2020 wind turbines generated 36.3% of Ireland's electrical demand, one of the highest wind power proportions in the world. While the United Kingdom was one of the first countries in the world to deploy commercial nuclear power plants, the island of Ireland has never had a nuclear power plant built on either side of the Irish border. Nuclear power in Ireland was discussed in the 1960s and 1970s but ultimately never phased in, with legislation now in place explicitly forbidding its introduction.
The European Union Agency for the Cooperation of Energy Regulators (ACER) is an Agency of the European Union created under the terms of the Third Energy Package of 2009. It was established in 2010 and has its seat in Ljubljana, Slovenia.
Nord Pool AS is a pan-European power exchange. Nord Pool has a main office in Oslo and further offices in Stockholm, Helsinki, Tallinn and London. The company is owned by the European exchange operator Euronext as well as TSO Holding, which represents the continental Nordic and Baltic countries' transmission system operators. Nord Pool has two subsidiaries, Nord Pool AB and Nord Pool Finland Oy.
Elering AS is a national transmission system operator for electricity and natural gas with headquarters in Tallinn, Estonia. The managing director of Elering is Taavi Veskimägi.
The European Network of Transmission System Operators for Gas (ENTSOG) is an association of Europe's transmission system operators (TSOs). ENTSOG was created on 1 December 2009 by 31 TSOs from 21 European countries. Creation of the ENTSOG was initiated by the adoption of the European Union third legislative package on the gas and electricity markets. It aims to promote the completion and cross-border trade for gas on the European internal market, and development of the European natural gas transmission network. According to the third energy package ENTSOG is required to develop an EU-wide ten-year gas network development plan.
KOSTT j.s.c is a transmission system operator company with its headquarters based in Pristina, Kosovo.
The European Union's Third Energy Package is a legislative package for an internal gas and electricity market in the European Union. Its purpose is to further open up the gas and electricity markets in the European Union. The package was proposed by the European Commission in September 2007, and adopted by the European Parliament and the Council of the European Union in July 2009. It entered into force on 3 September 2009.
Litgrid AB is a Lithuanian electricity transmission system operator that operates Lithuania's electricity transmission grid. Litgrid is responsible for the integration of the Lithuanian electricity system into the European electricity infrastructure and the common electricity market.
Swissgrid, based in Aarau and Prilly, is the Swiss transmission grid operator. It is subject to supervision by the Swiss Federal Electricity Commission ElCom.
Independent Power Transmission Operator S.A. is the Transmission System Operator for the Hellenic Electricity Transmission System. The mission of the company is the operation, control, maintenance and development of the national transmission system of Greece to ensure the reliable and efficient electricity supply, as well as the operation of the electricity market following the principles of transparency and equality.
Turkey uses more electricity per person than the global average, but less than the European average, with demand peaking in summer due to air conditioning. Most electricity is generated from coal, gas and hydropower, with hydroelectricity from the east transmitted to big cities in the west. Electricity prices are state-controlled, but wholesale prices are heavily influenced by the cost of imported gas.
The Energy Identification Code (EIC) is a 16-character identifier (code) used in Europe to uniquely identify market participants and energy resources related to the electricity and gas sector.
Turkish Electricity Transmission Corporation is the transmission system operator for electricity in Turkey. It is a government-owned corporation. It is planned for a minority stake to be sold to the private sector before the end of 2022. It reportedly does not co-ordinate with EMRA re YEKA bids as of 2023.
Ukrenergo is a state-owned electricity transmission system operator in Ukraine and the sole operator of the high-voltage lines which transmit electricity in Ukraine. It is a member of the European Network of Transmission System Operators for Electricity.
Vsevolod Vladyslavovych Kovalchuk is a Ukrainian businessman who served as the head of PJSC Ukrenergo from October 2015 to February 2020.