Industry | Energy |
---|---|
Founded | 2009 |
Headquarters | Rue de Strassen, 105 L-2555 Luxembourg |
Area served | Luxembourg |
Key people | Laurence Zenner (CEO) Mario Grotz (President) |
Products | Electricity and natural gas |
Revenue | (429.7 million € as at 31 December 2023) |
Owner | 1. Encevo S.A. (75.43%) 2. City of Luxembourg (20%) 3. State of the Grand Duchy of Luxembourg (2.28%) 4. 41 Luxembourg municipal authorities (2.08%) 5. Fédération du Génie Technique (0.10%) 6. Creos Luxembourg S.A. (0.10%) |
Number of employees | 888 (as at 31 December 2023) |
Parent | Encevo Group |
Website | creos-net |
Creos Luxembourg S.A. owns and manages electricity networks and natural gas pipelines in the Grand Duchy of Luxembourg. In this capacity, the company plans, constructs and maintains high, medium and low-voltage electricity networks and high, medium and low-pressure natural gas pipelines, which it owns or which it is responsible for managing. [1]
Creos was formed as a result of a merger between Cegedel S.A. – the Grand-Ducal electricity company of Luxembourg, which was founded in 1928 and at the time distributed 70% of the country's required electricity supply, Soteg S.A. – Luxembourg's primary gas supplier, and Saar Ferngas AG – a distribution company created in 1929 in Saarland. [2] On 23 January 2009, all the shares from Cegedel S.A. and Saar Ferngas AG were transferred to Soteg S.A., which – after successfully launching a mandatory public bid for all shares not yet in its possession – underwent extensive restructuring with retrospective effect on 1 January 2009, giving rise to a new energy group. Named Enovos, it included the parent company Enovos International S.A. as well as two main subsidiaries: Creos Luxembourg (formerly Cegedel S.A.) in charge of network activities, and Enovos Luxembourg S.A. in charge of production, sales and marketing. Enovos and Creos each have a subsidiary to serve the German market: Enovos Deutschland and Creos Deutschland. [3] [4]
Over the next two years, Creos consolidated its position on the Luxembourg market. In 2010, it expanded its gas transmission network to include a distribution network and it purchased the natural gas networks from Luxgaz Distribution S.A., whereby the management of commercial activities was handed over to Enovos Luxembourg S.A. [5] On 1 January 2011, the City of Luxembourg transferred its electricity and natural gas networks as well as its teams to Creos in exchange for a shareholding stake. The publicly owned shareholding thus rose from 5.71% to 24.57%. [6] [7]
In order to more clearly distinguish the parent company from its subsidiaries – energy provider Enovos and grid operator Creos – Enovos International was given a new visual identity in 2016 and is now called Encevo. [8] End July, private equity firm Ardian sold its stake up to 24.92 percent in Encevo to China Southern Power Grid International, the second grid operator in China and in the world. [9] [10]
Following a reorganization of the Encevo Group in Germany at the end of October 2021, Creos Luxembourg sold its stake in Creos Deutschland Holding GmbH. [11] [12] On 1 July 2023, Laurence Zenner, previously head of CFL Cargo, became the new CEO of Creos Luxembourg. [13]
Creos has a shareholding in the following companies:
Creos Luxembourg S.A. plans, constructs and maintains the electricity and natural gas transmission and distribution networks in the Grand Duchy of Luxembourg. Creos installs and manages the meters, processes the customer consumption data, invoices the network access charges and monitors the suppliers' movements and changes.
In Luxembourg, following the liberalisation of the energy markets, an independent organisation – the Luxembourg Institute of Regulation (ILR) – organises and supervises access to the networks. The tariffs are subject to its approval and it monitors the tolls invoiced to the users. The energy suppliers are thus guaranteed transparent access to Creos's networks. [15]
The majority of the electric current in the Grand Duchy of Luxembourg comes from Germany via two double high-voltage 220,000 volt (220 kV) lines that are connected to the German network. [16] The interconnection with the Belgian electricity market has become operational with the commissioning of a phase shifting transformer (PST) at the Schifflange Centre in October 2017, [17] and around 15% of the energy fed into the network is produced locally (biogas, cogeneration, wind turbines, hydroelectricity and photovoltaics) [18] The electricity is transmitted to the six transformer stations (Flebour, Roost, Itzig/Blooren, Heisdorf, Bertange and Schifflange) where the voltage is reduced from 220 to 65 kV before being distributed to industries and large municipal distribution networks. The voltage is then reduced from 65 kV to 20 kV in more than 60 transformer stations distributed across the whole country. The electric energy obtained is distributed to SMEs, towns and villages where the transformers reduce the current voltage to 0.4 kV before distributing it to the end consumer. A control centre, known as Electricity Dispatching, remotely controls and manages these high and medium-voltage networks.
The total length of the Luxembourg electricity network managed by Creos is 12,278.8 kilometres, including 944.8 kilometres of high-voltage lines, 3,520.7 kilometres of medium-tension lines and 7,813.3 kilometres of low tension lines.
Electricity | 2023 | |
---|---|---|
Electricity flow | GWh | 4,719.0 |
Electricity network peak | MW | 807.0 |
Length of network | km | 12,278.8 |
Thanks to its entry points with Germany, Belgium and France, Luxembourg is linked to the interconnected gas networks throughout Europe. Monitored by Dispatching Gas, the high and medium-pressure pipelines carry the gas to sixty or so communes that are connected to the national gas network. Pressure-reducing stations that supply the local networks then reduce the gas pressure. Creos ensures the distribution of natural gas in 45 communes. [19] [20]
Natural gas | 2023 | |
---|---|---|
Total capacity of gas network | Nm3/h | 319,000 |
Gas network peak | Nm3/h | 167,186 |
Volume transported | GWh | 6,369 |
Length of network | km | 2,204.2 |
Since 1 October 2015, Creos and its Belgian counterpart Fluxys Belgium, in collaboration with their respective regulators ILR and CREG, have merged the two national markets into one single Belux market. This integration, the first of its kind between two European Union member states, reflects the willingness of the European Union to create a borderless European gas market [21] , [22] , [23] ,. [24] Balansys, the joint venture between Creos and its Belgian counterpart Fluxys, is the balancing operator in the Belux zone from 1 June 2020. In other words, it is responsible for ensuring that the gas market is well supplied, without one of the two suppliers having to pay an entry fee for its gas on the other's market. [25]
Creos has four regional centres, which are dedicated to building, operating, maintaining and repairing the electricity and natural gas networks.
The Roost Centre manages the central and northern regions. It covers the high, medium and low-voltage electricity services and the medium and low-pressure natural gas services, the central store and both the mechanical and electrical workshops [26] ,. [27]
The Schifflange Centre covers the southern part of the country.
The Luxembourg City Centre, which covers the capital and the adjoining communes of Strassen and Hesperange, moved together with the Strassen headquarters to a new site in Merl at the end of 2021. [28]
The Contern Centre manages and adjusts the meters, in particular smart meters.
Dispatching for electricity and natural gas together with the monitoring rooms for remote network control and management are installed at the Creos facility in Bettembourg since 2020.
Creos is involved in three nationwide projects; smart grid, electro-mobility and energy management.
In accordance with the law of 7 August 2012 that transposes the European Energy Efficiency Directive into Luxembourg legislation, all the gas and electricity meters must be changed across the entire national territory, independently of the network operator. Creos has installed 300,000 smart meters that record detailed information on the consumption and production of energy throughout the entire territory of the Grand Duchy of Luxembourg, including 250,000 electricity meters and 50,000 gas meters. The installation of these new electricity and gas meters – called Smarty – in Luxembourg homes will enable the creation of networks with built-in real intelligence: smart grids. These smart grids are capable of monitoring decentralised electricity production (similarly to wind turbines and photovoltaic panels), directing the variations of the feeds into the distribution networks with greater precision and managing the isolated demand peaks linked with the charging of electric vehicles more effectively. The law from 7 August 2012 also stipulates that the metering system must be able to receive other vectors such as water and heating [29] , [30] [31] , [32] , [33] ,. [34]
Creos has participated in the national target for electric mobility, which involves the installation of around 800 public charging points for electric and plug-in hybrid cars throughout the country. Each station is equipped with two charging points, which means that the network, called Chargy, will eventually consist of 1,600 parking spaces dedicated to electric mobility. Creos handled the deployment, operation and maintenance of the public charging infrastructure on its distribution network, totalling nearly 700 out of the planned 800 stations. [35] In January 2021, Creos inaugurated the first two ultra-fast SuperChargy charging stations in Kirchberg, a district of Luxembourg City. By the end of 2023, 60 SuperChargy DC charging stations have been distributed along the country's main roads and motorways, as well as in some Park & Ride (P+R) car parks. [36]
Creos is also preparing the Third Industrial Revolution of the country. [37] This convergence of IT, renewable energy and means of transport will have an impact on how the power grids are managed. To anticipate this evolution, Creos has been involved in two major national projects since 2023. [38] The first project is called Leneda. It brings together Creos, other distribution networks and suppliers in collaboration with the Ministry of Energy and the Luxembourg Institute for Regulation (ILR). The aim is to collect all gas and electricity consumption and production data, make it available to the various market players and facilitate communication between them. The second project is called Alva. [39] Developed by DataThings, a spin-off of the University of Luxembourg, and operational since September 2023, this digital twin of Creos will eventually enable advanced analysis of network usage and load to optimise operational efficiency.
Always on the lookout for energy efficiency, Creos is also leading the FlexBeAn project which focuses on the flexibility and analysis of user behaviour, in collaboration with the Luxembourg Institute of Science and Technology and the Interdisciplinary Centre for Security, Reliability and Trust (SnT) of the University of Luxembourg.
Power-line communication (PLC) is the carrying of data on a conductor that is also used simultaneously for AC electric power transmission or electric power distribution to consumers. The line that does so is known as a power-line carrier.
Distributed generation, also distributed energy, on-site generation (OSG), or district/decentralized energy, is electrical generation and storage performed by a variety of small, grid-connected or distribution system-connected devices referred to as distributed energy resources (DER).
The electric power industry covers the generation, transmission, distribution and sale of electric power to the general public and industry. The commercial distribution of electric power started in 1882 when electricity was produced for electric lighting. In the 1880s and 1890s, growing economic and safety concerns lead to the regulation of the industry. What was once an expensive novelty limited to the most densely populated areas, reliable and economical electric power has become an essential aspect for normal operation of all elements of developed economies.
The National Grid is the high-voltage electric power transmission network serving Great Britain, connecting power stations and major substations, and ensuring that electricity generated anywhere on the grid can be used to satisfy demand elsewhere. The network serves the majority of Great Britain and some of the surrounding islands. It does not cover Northern Ireland, which is part of the Irish single electricity market.
A transmission system operator (TSO) is an entity entrusted with transporting energy in the form of natural gas or electrical power on a national or regional level, using fixed infrastructure. The term is defined by the European Commission. The certification procedure for transmission system operators is listed in Article 10 of the Electricity and Gas Directives of 2009.
Ergon Energy Network is a subsidiary of Energy Queensland Limited, which is itself a Queensland Government-owned company. Ergon distributes electricity to approximately 763,000 customers across the Australian state of Queensland through a distribution network which is regulated by the Australian Energy Regulator (AER). The AER set the prices that Ergon is allowed to charge for distribution.
A smart meter is an electronic device that records information—such as consumption of electric energy, voltage levels, current, and power factor—and communicates the information to the consumer and electricity suppliers. Such an advanced metering infrastructure (AMI) differs from automatic meter reading (AMR) in that it enables two-way communication between the meter and the supplier.
A virtual power plant (VPP) is a system that integrates multiple, possibly heterogeneous, power sources to provide grid power. A VPP typically sells its output to an electric utility. VPPs allow energy resources that are individually too small to be of interest to a utility to aggregate and market their power. As of 2024, VPPs operated in the United States, Europe, and Australia.
Cegedel S.A., was a Luxembourg company that distributed electricity. It operated under a concession written into the law under which it was formed, and distributed 70% of the electricity used in the country, amounting to 6,616 GWh.
Engie SA is a French multinational power company, headquartered in La Défense, Courbevoie, which operates in the fields of electricity generation and distribution, natural gas, nuclear power, renewable energy, and in the petroleum industry. It is involved in both upstream and downstream activities.
The smart grid is an enhancement of the 20th century electrical grid, using two-way communications and distributed so-called intelligent devices. Two-way flows of electricity and information could improve the delivery network. Research is mainly focused on three systems of a smart grid – the infrastructure system, the management system, and the protection system. Electronic power conditioning and control of the production and distribution of electricity are important aspects of the smart grid.
The electricity sector in New Zealand uses mainly renewable energy, such as hydropower, geothermal power and increasingly wind energy. As of 2021, the country generated 81.2% of its electricity from renewable sources. The strategy of electrification is being pursued to enhance the penetration of renewable energy sources and to reduce greenhouse gas (GHG) emissions across all sectors of the economy. In 2021, electricity consumption reached 40 terawatt-hours (TW⋅h), representing a 0.2% increase compared to the consumption levels in 2010.
An electrical grid is an interconnected network for electricity delivery from producers to consumers. Electrical grids consist of power stations, electrical substations to step voltage up or down, electric power transmission to carry power over long distances, and finally electric power distribution to customers. In that last step, voltage is stepped down again to the required service voltage. Power stations are typically built close to energy sources and far from densely populated areas. Electrical grids vary in size and can cover whole countries or continents. From small to large there are microgrids, wide area synchronous grids, and super grids. The combined transmission and distribution network is part of electricity delivery, known as the power grid.
A wide area synchronous grid is a three-phase electric power grid that has regional scale or greater that operates at a synchronized utility frequency and is electrically tied together during normal system conditions. Also known as synchronous zones, the most powerful is the Northern Chinese State Grid with 1,700 gigawatts (GW) of generation capacity, while the widest region served is that of the IPS/UPS system serving most countries of the former Soviet Union. Synchronous grids with ample capacity facilitate electricity trading across wide areas. In the ENTSO-E in 2008, over 350,000 megawatt hours were sold per day on the European Energy Exchange (EEX).
A super grid or supergrid is a wide-area transmission network, generally trans-continental or multinational, that is intended to make possible the trade of high volumes of electricity across great distances. It is sometimes also referred to as a "mega grid". Super grids typically are proposed to use high-voltage direct current (HVDC) to transmit electricity long distances. The latest generation of HVDC power lines can transmit energy with losses of only 1.6% per 1,000 km.
The term smart grid is most commonly defined as an electric grid that has been digitized to enable two way communication between producers and consumers. The objective of the smart grid is to update electricity infrastructure to include more advanced communication, control, and sensory technology with the hope of increasing communication between consumers and energy producers. The potential benefits from a smart grid include increased reliability, more efficient electricity use, better economics, and improved sustainability.
Electricity sector in Hong Kong ranges from generation, transmission, distribution and sales of electricity covering Hong Kong. The combustion of coal, natural gas and oil are the main sources of electricity in Hong Kong. The electricity sector contributes 60.4% of Hong Kong's total greenhouse gas emissions.
A Distribution Transformer Monitor (DTM) is a specialized hardware device that collects and measures information relative to electricity passing into and through a distribution transformer. The DTM is typically retrofitted onto pole top and pad mount transformers. A pole top or pad mount transformer commonly powers anywhere from 5-8 homes in the US and is the last voltage transition in stepping down voltage before it gets to the home or business. The conventional placement of Distributed Temperature Monitoring (DTM) devices is typically observed at the terminals of transformers. However, there are instances where these devices are directly affixed to the secondary power lines.
An interconnector is a structure which enables high voltage DC electricity to flow between electrical grids. An electrical interconnector allows electricity to flow between separate AC networks, or to link synchronous grids. They can be formed of submarine power cables or underground power cables or overhead power lines.
Turkey uses more electricity per person than the global average, but less than the European average, with demand peaking in summer due to air conditioning. Most electricity is generated from coal, gas and hydropower, with hydroelectricity from the east transmitted to big cities in the west. Electricity prices are state-controlled, but wholesale prices are heavily influenced by the cost of imported gas.