Location | Surrey, British Columbia |
---|---|
Coordinates | 49°10′52″N122°50′38″W / 49.18111°N 122.84389°W |
Status | Under construction |
Groundbreaking | 2012 |
Estimated completion | 2025 |
Website | kinggeorgehub.com |
Companies | |
Architect | MCM Partnership |
Developer | PCI Group |
Technical details | |
Buildings | Hub One, Hub Two, Hub 9850, The Line, Plaza One, Plaza Two |
Size | 9 acres (3.6 ha) |
King George Hub is a mixed-use development with retail, office and residential high-rises in Surrey, British Columbia, Canada, located at the northeast corner of King George Boulevard and Fraser Highway in the Surrey City Centre district. Developed by the PCI Group and designed by MCM Partnership, the project is located adjacent to the transit hub at King George station. [1] [2]
Phase A began construction in 2012 and was completed in early 2016, houses the headquarters for Coast Capital Savings, a federal credit union. [3] The second phase, which began construction in early 2018, consists of the Hub 9850 office building, and the Hub One and Two residential towers. [4] [5] Phase B was completed in 2021.
Phase C, which began construction in 2019, consists only of The Line residential building. Phase D, the final phase, began construction in 2021. It consists of the Plaza One and Two residential buildings and are both estimated to be completed in 2025. [6] [7]
Hub One is a residential building located at 13615 Fraser Highway. Completed in 2021, it stands at 130.7 metres (429 ft) tall and is the second tallest building in Surrey. [8]
Hub Two is a residential building located at 13655 Fraser Highway. Completed in 2021, it stands at 94.8 metres (311 ft) tall. [9]
Hub 9850 is an office building located at 9850 King George Boulevard. Completed in 2021, it stands at 63.1 metres (207 ft) tall. [10] Westland Insurance has occupied the top seven floors of the building since 2022. [11]
The Line is a residential building located at 13639 George Junction. Completed in 2021, it stands at 109 metres (358 ft) tall. [10] All units in the building are rentals. [12]
The Expo Line is the oldest line of the SkyTrain rapid transit system in the Metro Vancouver region of British Columbia, Canada. The line is owned and operated by BC Rapid Transit Company, a subsidiary of TransLink, and links the cities of Vancouver, Burnaby, New Westminster and Surrey.
King George is an elevated station on the Expo Line of Metro Vancouver's SkyTrain rapid transit system. The station is located in the south end of the Surrey City Centre district of Surrey, British Columbia, Canada, and is one of the outbound termini of the Expo Line, the other being Production Way–University station. The station is located on King George Boulevard at Holland Commons, just north of Fraser Highway.
Whalley is the most densely populated and urban of the six town centres in Surrey, British Columbia, Canada. It encompasses City Centre, the city's central business district, and is home to the Surrey City Hall, the main branch of Surrey Libraries, Central City, SFU Surrey and the site of Kwantlen Polytechnic University's (KPU) Civic Plaza campus. It is the only town centre in Surrey served by Metro Vancouver's SkyTrain rapid transit system. Expo Line stations serving Whalley include Scott Road, Gateway, Surrey Central and King George.
The World Trade Center Abu Dhabi is a complex of two skyscrapers in Abu Dhabi, United Arab Emirates. Construction of these towers was scheduled to end in 2010, though the 2008 financial crisis pushed the project completion date to 2014. The complex includes two malls, and one Courtyard by Marriott hotel. The complex was initially planned to house three skyscrapers, but the 2008 crisis forced the contractors to withdraw construction of the Hotel Tower, the result being two skyscrapers.
Victoria Square is a residential skyscraper complex and wider town centre redevelopment project in Woking, Surrey, England. Upon topping out in September 2019, Tower 1 of the complex became the tallest building in Woking, overtaking Export House. Construction commenced in June 2017 and, following delays related to the COVID-19 pandemic, completed in August 2022. The total construction cost of the project was £700 million.
{{cite web}}
: CS1 maint: unfit URL (link){{cite web}}
: CS1 maint: unfit URL (link)