Lake Volta | |
---|---|
Location | Ghana, West Africa |
Coordinates | 6°30′N0°0′E / 6.500°N 0.000°E |
Lake type | Reservoir |
Primary inflows | White Volta River Black Volta River |
Primary outflows | Volta River |
Catchment area | 385,180 km2 (148,720 sq mi) |
Basin countries | Ghana |
Surface area | 8,502 km2 (3,283 sq mi) |
Average depth | 18.8 m (61 ft 8 in) |
Max. depth | 75 m (246 ft) |
Water volume | 148 km3 (32.6 × 1012 gallons) |
Shore length1 | 4,800 kilometres (2,980 mi) |
Surface elevation | 85 m (279 ft) |
1 Shore length is not a well-defined measure. |
Lake Volta (French : Lac Volta), the largest artificial reservoir in the world based on surface area, is contained behind the Akosombo Dam which generates a substantial amount of Ghana's electricity. It is completely within the country of Ghana and has a surface area of 8,502 square kilometres (3,283 sq mi). [1] It extends from Akosombo in the south to the northern part of the country. [2] [3]
Lake Volta lies along the prime meridian, six degrees north of the Equator. The lake's northernmost point is close to the town of Yapei, and its southernmost extreme is at the Akosombo Dam, 520 km (320 mi) downstream from Yapei. Akosombo Dam holds back both the White Volta River and the Black Volta River, which formerly converged where the middle of the reservoir now lies, to form the single Volta River. The present Volta River flows from the outlets of the dam's powerhouse and spillways to the Atlantic Ocean in southern Ghana.
The main islands within the lake are Dodi, Dwarf, and Kporve. [4] Digya National Park lies on part of the lake's western shore.
The lake was formed by the Akosombo Dam, which was originally conceived by the geologist Albert Ernest Kitson during the British colonial period in 1915, to exploit the river's energy for smelting locally-sourced bauxite. The idea regained prominence at the end of the colonial era after World War II when Kwame Nkrumah became president of the Gold Coast colony and began striving for modernization of the land. British and local governments formed a joint preparatory commission, which concluded that over 60,000 people will have to be relocated, but that the lake will boost opportunities for fishing, thus helping to feed the population in the region. On the other hand, issues with water-related illnesses were predicted, such as malaria, trypanosomiasis, schistosomiasis, and onchocerciasis. [5]
Aluminium Limited, the main industrial sponsor of the project, withdrew after Ghana became independent in 1957. Revised plans dropped the idea of integrated aluminium industry and proposed smelting imported bauxite instead. Kaiser Aluminum entered the project at this point and after protracted negotiations, funding for the project was secured, but now without regard to residents of the impacted area as a cost-cutting measure. Construction thus began before the government started planning the resettlement. Soon after, a public agency was established, and organized construction of 52 replacement towns, which were envisioned to serve as a model for modernization and improving the livelihood of the local population. But because of the rush, the resettlement in 1964 turned out to be chaotic and inefficient. Poor organization caused the issues to continue long after the project's completion and caused significant hardship to the local population. [5] Together, 15,000 homes in 740 villages were flooded, necessitating resettlement of 78,000 people. [1]
In the long run, formation of the lake disrupted traditional fishing and farming practices in the region and caused a large spike in disease prevalence. Government-led modernization did not succeed, and people had to adapt to the new circumstances themselves. [5] However, regional food production intensified in the decades after the construction of Akosombo dam, and the lake also opened a large navigable pathway to the north of the country and provided new opportunities for development of tourism which is gaining in prominence. On the other hand, water level has been decreasing recently because of global warming, reducing power generation. [6]
The Akosombo Dam produces 912 MW of electricity for the country, as well as for export to Togo, Benin, and other nearby countries to earn foreign exchange. [1] Lake Volta is also important for transportation, providing a waterway for both ferries and cargo watercraft. Since the huge lake lies in a tropical area, the water remains warm year-round naturally. Given good management, Lake Volta is the location of a vast population of fish and large fisheries.
The lake also attracts tourism, and tourist cruises visit the island of Dodi. [4]
Recent developments include a large-scale enterprise to harvest submerged timber from the flooded forests under Lake Volta. This project harvests high-value tropical hardwood without requiring additional logging or destruction of existing forest and, according to Wayne Dunn, "could generate the largest source of environmentally sustainable natural tropical hardwood in the world." [7] In addition to generating foreign currency for the region and reducing the dependence of locals on fishing as a primary economic activity, the removal of submerged trees is improving navigation on the lake and increasing safety. [7]
An estimated 7,000 to 10,000 children work in the fishing industry on Lake Volta. The nature of their employment has been described as slavery in The Guardian [8] and by the CNN Freedom Project. This has been described as sensationalism by Betty Mensah and the academic Samuel Okyere since many of the children and youth whose wages are given upfront to their parents grow up to become self-sufficient fishermen in adulthood who in turn hire children themselves and could therefore also be characterized as apprentices. They conclude that many children may suffer under exploitative work but are not enslaved. [9] [10]
Ghana is a West African country in Africa, along the Gulf of Guinea.
The Volta River is the main river system in the West African country of Ghana. It flows south into Ghana from the Bobo-Dioulasso highlands of Burkina Faso. The main parts of the river are the Black Volta, the White Volta, and the Red Volta. In the northwest, the Black Volta forms the international borders between the Ivory Coast, Ghana, and Burkina Faso. The Volta flows southward along the Akwapim-Togoland highlands, and empties into the Atlantic Ocean at the Gulf of Guinea at Ada Foah. One of its smaller tributaries, the Oti River, enters Ghana from Togo in the east. The Volta River has been dammed at Akosombo for generating hydroelectricity. The reservoir named Lake Volta stretches from Akosombo Dam in the south to the northern part of the country, and is the largest man-made reservoir by area in the world.
Lake Nasser is a vast reservoir in southern Egypt and northern Sudan. It was created by the construction of the Aswan High Dam and is one of the largest man-made lakes in the world. Before its creation, the project faced opposition from Sudan as it would encroach on land in the northern part of the country, where many Nubian people lived who would have to be resettled. In the end Sudan's land near the area of Lake Nasser was mostly flooded by the lake. The lake has become an important economic resource in Egypt, improving agriculture and touting robust fishing and tourism industries.
The Akosombo Dam, also known as the Volta Dam, is a hydroelectric dam on the Volta River in southeastern Ghana in the Akosombo gorge and part of the Volta River Authority. The construction of the dam flooded part of the Volta River Basin and led to the subsequent creation of Lake Volta. Lake Volta is the largest man-made lake in the world by surface area. It covers 8,502 square kilometres (3,283 sq mi), which is 3.6% of Ghana's land area. With a volume of 148 cubic kilometers, Lake Volta is the world's third largest man-made lake by volume; the largest being Lake Kariba which contains 185 cubic kilometers of water.
The Dale Hollow Reservoir is a reservoir situated on the Kentucky/Tennessee border. The lake is formed by the damming of the Obey River, 7.3 miles (11.7 km) above its juncture with the Cumberland River at river mile 380. Portions of the lake also cover the Wolf River. Dale Hollow is one of four major flood control reservoirs for the Cumberland; the others being Percy Priest Lake, Lake Cumberland, and Center Hill Lake. It is also the site of Dale Hollow Lake State Park on the north (Kentucky) side.
The Eastern Region is located in the Eastern part of Ghana and is one of the sixteen administrative regions of Ghana. Eastern region is bordered to the east by the Lake Volta, to the north by Bono East Region and Ashanti region, to the west by Ashanti region, to the south by Central region and Greater Accra Region. Akans are the dominant inhabitants and natives of Eastern region and Akan, Ewe, Krobo, Hausa and English are the main spoken languages. The capital town of Eastern Region is Koforidua.The Eastern region is the location of the Akosombo dam and the economy of the Eastern region is dominated by its high-capacity electricity generation. Eastern region covers an area of 19,323 square kilometres, which is about 8.1% of Ghana's total landform.
The Merowe Dam, also known as Merowe High Dam, Merowe Multi-Purpose Hydro Project or Hamdab Dam, is a large dam near Merowe Town in northern Sudan, about 350 kilometres (220 mi) north of the capital Khartoum. Its dimensions make it the largest contemporary hydropower project in Africa. It is situated on the river Nile, close to and inundating the 4th Cataract where the river divides into multiple smaller branches with large islands in between. Merowe is a city about 40 kilometres (25 mi) downstream from the construction site at Hamdab. The main purpose for building the dam was the generation of electricity.
Asuogyaman District is one of the thirty-three districts in Eastern Region, Ghana. Originally created as an ordinary district assembly in 1988, which it was created from the former Kaoga District Council. The district assembly is located in the eastern part of Eastern Region and has Atimpoku as its capital town.
The Brokopondo Reservoir, officially named Professor Doctor Ingenieur W. J. van Blommestein Meer, and also called the Brokopondostuwmeer, is a large reservoir in Suriname. It is named after the Surakarta-born Dutch hydrological engineer Willem Johan van Blommestein. With a surface area of approximately 1,560 km2 (600 sq mi), depending on the current water level, it is one of the largest reservoirs in the world, covering nearly one percent of the country.
Underwater logging is the process of logging trees from underwater forests. When artificial reservoirs and dams are built, large areas of forest are often inundated; although the trees die, the wood is often preserved. The trees can then be felled using special underwater machinery and floated up to the surface. One such machine is the sawfish harvester. There is an ongoing debate to determine whether or not underwater logging is a sustainable practice and if it is more environmentally sustainable than traditional logging.
The Volta River Authority (VRA) is the main generator and supplier of electricity in Ghana. They are also responsible for the maintenance of the hydro power supply plant.
The Bui Dam is a 400-megawatt (540,000 hp) hydroelectric project in Ghana. It is built on the Black Volta river at the Bui Gorge, at the southern end of Bui National Park. The project was a collaboration between the government of Ghana and Sino Hydro, a Chinese state-owned construction company. Construction on the main dam began in December 2009. Its first generator was commissioned on 3 May 2013, and the dam was inaugurated in December of the same year.
Industry in Ghana accounts for about 24.5% of total GDP. However, Ghana's industrial production is rising at a 7.8% rate, giving it the 38th fastest growing industrial production in the world due to government industrialization policies.
Ghana generates electric power from hydropower, fossil-fuel, and renewable energy sources such as wind and solar energy. Electricity generation is one of the key factors in order to achieve the development of the Ghanaian national economy, with aggressive and rapid industrialization; Ghana's national electric energy consumption was 265 kilowatt hours per each one in 2009.
The Nechako Reservoir, sometimes called the Ootsa Lake Reservoir, is a hydroelectric reservoir in British Columbia, Canada that was formed by the Kenney Dam making a diversion of the Nechako River through a 16-km intake tunnel in the Kitimat Ranges of the Coast Mountains to the 890 MW Kemano Generating Station at sea level at Kemano to service the then-new Alcan aluminum smelter at Kitimat. When it was constructed on the Nechako River in 1952, it resulted in the relocation of over 75 families. It was one of the biggest reservoirs built in Canada until the completion of the Columbia Treaty Dams and the W.A.C. Bennett Dam that created Lake Williston. The water level may swing 10 feet between 2790 and 2800 feet.
Pardee Dam is a 345-foot (105 m)-high structure across the Mokelumne River which marks the boundary between Amador and Calaveras Counties, located in the foothills of the Sierra Nevada approximately 30 miles (48 km) northeast of Stockton.
The Kpong Dam, also known as the Akuse Dam, is a hydroelectric power generating dam on the lower Volta River near Akuse in Ghana. It is owned and operated by Volta River Authority. It was constructed between 1977 and 1982. Its power station has a capacity of 148 megawatts (198,000 hp) with all four units running, though the total nameplate capacity is 160 megawatts (210,000 hp).
Ada Foah is a town on the southeast coast of Ghana, where the Volta River meets the Atlantic Ocean. The town is located along the Volta River, off of the Accra-Aflao motorway. Known for palm-lined beaches and estuary islands, Ada Foah is also the capital of the Ada East District and the seat of the District Assembly.
Dodi Princess was a cruise boat on Lake Volta in South Ghana. It was owned by the Volta River Authority and under the management of Volta Hotels. It was the only cruise ship in Ghana. It was built as a cargo ship and later converted into a passenger ship in 1991.
The Akosombo Dam Spillage Flood is a riverine flood that occurred in the south-eastern part of Ghana. This is due to a controlled spillage of the Akosombo Dam and the Kpong Dam by the Volta River Authority to address rising water levels.
{{cite web}}
: CS1 maint: unfit URL (link)