Lowcountry Rapid Bus System

Last updated
Lowcountry Rapid Transit
Service area Charleston County
Service type bus rapid transit
Stations20
Fleet19 60 ft Articulating Buses
Website https://lowcountryrapidtransit.com/index.html

The Lowcountry Rapid Transit system (LCRT) is a bus rapid transit system in development which will initially connect downtown Charleston to the Exchange Park in Ladson, North Charleston (also known as the Ladson Fairgrounds). Plans are for the system to eventually reach Summerville, South Carolina.

Contents

The LCRT is the first mass transit project in the history of South Carolina. Construction is slated to begin in 2026 and the system is expected to begin operating by late 2028 or early 2029. When completed, the system will be among the longest rapid transit systems in the United States.

Plans and development

Design of the system

LCRT is expected to initially consist of 19 buses that will ferry people between the medical district in downtown Charleston to the Ladson Fairgrounds at $2 per fare. [1] [2] [3] The current plan is for the system to traverse approximately 22 miles, making it one of the longest rapid transportation systems in the United States. [4] [5] The system will start with 18 stops, a large portion of which are likely to be on Rivers Avenue in North Charleston. [2] The exact locations for many of the stops have not been determined yet. [6]

The scope of the work for the project currently includes adding dedicated bus lanes to the medians along key streets such as Rivers Avenue, adding traffic signals to give buses priority at intersections, constructing twenty bus stations and several park-and-rides, as well as overall road improvements. [5] The system will use existing infrastructure from Charleston Area Regional Transportation Authority (CARTA) when possible. [1]

The Berkeley-Charleston-Dorchester Council of Governments (BCDCOG) started the development of the LCRT in 2014. Due to the area's geographic population spread, BCDCOG determined that rail was impractical. [7] Costs for LCRT are estimated to be $625 million. [5]

Funding and planning

In 2018, the Federal Transit Administration provided a $880,000 grant to aid in planning for development along the line. [6] In 2021, the administration provided another $860,000 to BCDCOG for key development tools. [8] A transit framework plan also determined other potential bus transit corridors in the area. [6] As of July 28, 2023, BCDCOG and officials for the bus rapid transit system are hosting public input meetings for the project. Currently, the project is planned to begin construction in 2026 with a late 2028 or early 2029 finalization date. [9]

U.S. Highway 52 corridor system

In 2024, BCDCOG began conducting a feasibility study for a separate bus rapid transit system along the Highway 52 corridor. Preliminary plans of the rapid bus transit system include a connection to the planned LCRT at Rivers Avenue and Melnick Drive. [10]

Related Research Articles

<span class="mw-page-title-main">Line 3 Scarborough</span> Defunct light rapid transit line in Toronto, Canada

Line 3 Scarborough, originally known as Scarborough RT (SRT), is a defunct medium-capacity rapid transit line that was part of the Toronto subway system in Toronto, Ontario, Canada. The line ran entirely within the eastern district of Scarborough, encompassing six stations and 6.4 kilometres (4.0 mi) of mostly elevated track. It was connected with Line 2 Bloor–Danforth at its southwestern terminus, Kennedy, and terminated in the northeast at McCowan. Until its closure in July 2023, the system had a ridership of 3,908,000 per year.

<span class="mw-page-title-main">North Charleston, South Carolina</span> City in South Carolina, United States

North Charleston is a city in Berkeley, Charleston, and Dorchester counties in the U.S. state of South Carolina. As of the 2020 census, North Charleston had a population of 114,852, making it the third-most populous city in the state, and the 248th-most populous city in the United States. North Charleston is a principal city within the Charleston-North Charleston, SC Metropolitan Statistical Area, which had an estimated population of 849,417 in 2023.

<span class="mw-page-title-main">Miami-Dade Transit</span> Primary public transit authority of Miami, Florida

Miami-Dade Transit (MDT) is the primary public transit authority of Miami, Florida and the greater Miami-Dade County area. It is the largest transit system in Florida and the 15th-largest transit system in the United States. As of 2023, the system has 80,168,700 rides per year, or about 266,600 per weekday in the third quarter of 2024. MDT operates the Metrobus with their paratransit STS systems run by LSF. MDT also operates two rail transit systems: Metrorail and Metromover.

<span class="mw-page-title-main">MetroLink (St. Louis)</span> Light rail system in Missouri, US

MetroLink is a light rail system that serves the Greater St. Louis area. Operated by Metro Transit in a shared fare system with MetroBus, the two-line, 38-station system runs from St. Louis Lambert International Airport and Shrewsbury in Missouri to Scott Air Force Base in Illinois. Intermediate destinations include downtown Clayton, Forest Park, and downtown St. Louis. It is the only U.S. light rail system that crosses state lines.

<span class="mw-page-title-main">Spokane Transit Authority</span> Public transit authority

Spokane Transit Authority, more commonly Spokane Transit or STA, is the public transport authority of central Spokane County, Washington, United States, serving Spokane, Washington, and its surrounding urban areas. In 2023, the system had a ridership of 9,215,700, or about 36,000 per weekday as of the third quarter of 2024.

<span class="mw-page-title-main">MBTA bus</span> Greater Boston bus network

The Massachusetts Bay Transportation Authority (MBTA) operates 152 bus routes in the Greater Boston area. The MBTA has a policy objective to provide transit service within walking distance for all residents living in areas with population densities greater than 5,000 inhabitants per square mile (1,900/km2) within the MBTA's service district. Much of this service is provided by bus. In 2023, the system had a ridership of 91,459,700, or about 322,600 per weekday as of the third quarter of 2024.

<span class="mw-page-title-main">Charleston Area Regional Transportation Authority</span>

The Charleston Area Regional Transportation Authority (CARTA) provides area residents and visitors public transportation within parts of Charleston and Dorchester counties in the Lowcountry region of South Carolina, including the cities of Charleston, North Charleston and the surrounding communities of Mount Pleasant, Summerville, James Island, Sullivan's Island, and the Isle of Palms. CARTA presently contracts with Transdev for staffing and managing the bus drivers in addition to maintaining and scheduling the buses. In 2023, the system had a ridership of 2,191,500, or about 7,900 per weekday as of the third quarter of 2024.

<span class="mw-page-title-main">Orange Line (DART)</span> Light rail line in the Dallas-Fort Worth Metroplex, Texas

The Orange Line is a 37-mile (60 km) light rail line in the Dallas, Texas metropolitan area. The line is operated by Dallas Area Rapid Transit as a part of its DART light rail system. It is the system's only east-west line.

<span class="mw-page-title-main">Area codes 843 and 854</span> Telephone area codes for eastern South Carolina, United States

Area codes 843 and 854 are telephone area codes in the North American Numbering Plan (NANP) for a portion of the U.S. state of South Carolina that comprises roughly the eastern third and the southern tip. The numbering plan area (NPA) includes the Grand Strand, the Lowcountry, the Pee Dee, and the Sandhills. Major cities in the region are Myrtle Beach, Charleston, Beaufort, Hilton Head Island and Florence. Area code 843 was created in 1998 when area code 803 was split, while 854 was added in 2015 to form an all-services overlay.

<span class="mw-page-title-main">Bus rapid transit in New Jersey</span>

Bus rapid transit (BRT) in New Jersey comprises limited-stop bus service, exclusive bus lanes (XBL) and bus bypass shoulders (BBS). Under the banner Next Generation Bus NJ Transit (NJT), the New Jersey Department of Transportation (NJDOT), and the metropolitan planning organizations of New Jersey (MPO) which recommend and authorize transportation projects are undertaking the creation of several additional BRT systems in the state.

<span class="mw-page-title-main">Metro (Minnesota)</span> Rapid transit network in the Minneapolis metropolitan area of the United States

Metro is a transit network in Minnesota serving the cities of Minneapolis and Saint Paul. It also provides service to some suburban areas. As of 2022, the system consists of two light rail lines and five bus rapid transit (BRT) lines all of which are operated by the local public transit company: Metro Transit. The five lines connect Downtown Minneapolis and St Paul with Bloomington, Minneapolis-St Paul International Airport, Roseville, Richfield, Burnsville and Brooklyn Center.

<span class="mw-page-title-main">Glassboro–Camden Line</span> Proposed light rail line in New Jersey

The Glassboro–Camden Line (GCL) is a planned 18-mile (29 km) diesel multiple unit (DMU) light rail system to be located in South Jersey.

12th Street station is a future public transit station in Plano, Texas. Set to be operated by Dallas Area Rapid Transit, the station will service DART light rail's Red Line and the Silver Line commuter rail. During peak transit hours, it will also service the Orange Line.

The Metro Rail Transit Line 4 (MRT-4) is a proposed rapid transit line that would serve the Greater Manila Area of the Philippines. The 12.7 km (7.9 mi), 10-station elevated railway would connect Ortigas Center in Metro Manila and the suburban municipality of Taytay, Rizal. It would traverse along Ortigas Avenue and Manila East Road, starting at the former's junction with EDSA in Quezon City to the west until it terminates near the New Taytay Public Market to the east.

<span class="mw-page-title-main">Let's Move Nashville</span> Referendum on constructing a mass transit system

Let's Move Nashville was a local referendum in Nashville, Tennessee, on May 1, 2018, that would have funded the construction of a mass transit system under the Nashville Metropolitan Transit Authority in Davidson County. The $8.9 billion plan would have included several light rail and bus rapid transit lines along major corridors, to be built between 2018 and 2032. The plan was proposed in 2017 by Mayor Megan Barry under the Tennessee IMPROVE Act and supported by some Nashville politicians and businesses.

The Quebec City Tramway is a proposed light rail system in Quebec City, which will be known as TramCité.

<span class="mw-page-title-main">Frequent Express</span> High capacity bus route in Portland, Oregon, U.S.

Frequent Express (FX) is a rapid bus service in Portland, Oregon, United States. Operated by TriMet as FX2–Division, the 15-mile (24 km) route runs east–west from 5th & Hoyt on the Portland Transit Mall in downtown Portland to Cleveland Avenue Park and Ride in Gresham via Division Street. It connects Portland City Center, Portland State University (PSU), South Waterfront, Southeast Portland, and central Gresham, with transfers to MAX Light Rail and the Portland Streetcar.

The Lowcountry Lowline is a planned linear park in Charleston, South Carolina to be located on 1.7 miles of old railroad roadbed. It will run from Mt. Pleasant Street to Courtland Street.

Phoenix BRT will be Phoenix's first bus rapid transit system in the city. Phoenix BRT was announced in 2015 when voters approved Proposition 400. The bus rapid system is currently in the Detailed Corridor Planning phase. Construction of the BRT system will begin in 2026 and will be completed in 2028.

References

  1. 1 2 Baldwin, Skyler (2 April 2018). "Charleston's major mass-transit project could change how SC commutes". Charleston City Paper. Retrieved 2020-07-29.
  2. 1 2 Dennis Jr., Slade, and Wise (2020-02-02). "Overlooked for years, North Charleston's south end awaits transformation". Post and Courier. Retrieved 2020-07-29.{{cite web}}: CS1 maint: multiple names: authors list (link)
  3. "Lowcountry Rapid Transit Project - New Starts Engineering" (PDF). 2022. Retrieved January 17, 2025.{{cite web}}: CS1 maint: url-status (link)
  4. Baldwin, Skyler (2023-03-24). "Bus rapid transit project enters final design stage". Charleston City Paper. Retrieved 2023-07-28.
  5. 1 2 3 Peterson, Jenny (June 14, 2023). "Details emerge on state's first $625M mass transit system in Charleston > Charleston Business Journal". Charleston Business. Retrieved 2023-09-18.
  6. 1 2 3 Benre, Robert (19 December 2018). "Charleston region to study how bus rapid transit could reshape neighborhoods". Post and Courier. Retrieved 2020-07-29.
  7. Darlington, Abigail (2018-12-23). "Here's what the Charleston region has to do to make robust transit a reality". Post and Courier. Retrieved 2020-07-29.
  8. Baldwin, Skyler (2022-01-30). "Charleston-area COG gets $860K grant for rapid transit". Charleston City Paper. Retrieved 2022-01-31.
  9. Kennedy, Destiny (2023-07-27). "Lowcountry Rapid Transit workshops give public a chance to weigh in on project". Live5News. Retrieved 2023-07-28.
  10. Coe, Kenna (2024-10-17). "Could a new bus rapid transit system relieve Lowcountry commuter congestion?". Post and Courier. Retrieved 2024-10-17.

[1]