Ludington Pumped Storage Power Plant

Last updated
Ludington Pumped Storage Plant
LudingtonPumpedHydro.png
Relief map of USA Michigan.png
Red pog.svg
Location of Ludington Pumped Storage Plant in Michigan
CountryUnited States
Location Ludington, Michigan
Coordinates 43°53′37″N86°26′43″W / 43.89361°N 86.44528°W / 43.89361; -86.44528 Coordinates: 43°53′37″N86°26′43″W / 43.89361°N 86.44528°W / 43.89361; -86.44528
Purpose Power
StatusOperational
Construction beganJuly, 1968
Opening date1973
Construction cost$327 million (1973) [1]
Owner(s) Consumers Energy  (51%)
Detroit Edison  (49%)
Upper dam and spillways
Type of dam Embankment dam
Height (foundation)103 feet (31 m)
Length6 miles (9.7 km)
Width (crest)21 feet (6.4 m) [2]
Upper reservoir
Total capacity82,860 acre-feet (102,210,000 m3)
Active capacity52,171 acre-feet (64,352,000 m3)
Inactive capacity30,689 acre-feet (37,854,000 m3)
Surface area842 acres (341 ha)
Maximum length2.5 miles (4.0 km)
Maximum width1 mile (1.6 km)
Maximum water depth110 feet (34 m)
Lower reservoir
Creates Lake Michigan
Total capacity1,180 cubic miles (4,900 km3)
Surface area22,404 square miles (58,030 km2)
Maximum length307 miles (494 km)
Maximum width118 miles (190 km)
Normal elevation577 feet (176 m)
Power Station
Coordinates 43°53′37″N86°26′43″W / 43.89361°N 86.44528°W / 43.89361; -86.44528
Commission date1973
Type Pumped-storage
Hydraulic head 363 feet (111 m) [3]
Pump-generators6 × 362 MW (455 MVA) Francis pump-turbines [4] [5]
Installed capacity 2,172 MW [6]
Overall efficiency 70%
Storage capacity 9 hours (19,548 MWh)
2016 generation -752 GW·h

The Ludington Pumped Storage Plant is a hydroelectric plant and reservoir in Ludington, Michigan. It was built between 1969 and 1973 at a cost of $315 million and is owned jointly by Consumers Energy and DTE Energy and operated by Consumers Energy. At the time of its construction, it was the largest pumped storage hydroelectric facility in the world.

Contents

Characteristics

Detail of the turbines when first constructed. GENERATING STATION OF CONSUMER POWER PLANT IN LUDINGTON - NARA - 547129 -- color graded.tif
Detail of the turbines when first constructed.

It consists of a reservoir 110 feet (34 m) deep, 2.5 miles (4.0 km) long, and one mile (1.6 km) wide which holds 27 billion US gallons (100 Gl) or 82859 acre-feet of water. The 1.3-square-mile (3.4 km2) reservoir is located on the banks of Lake Michigan. Because impervious bedrock is more than 800 feet (240 m) below the reservoir, the builders had to line the reservoir with a layer of asphalt and clay to prevent water seeping into the ground.

The power plant consists of six reversible turbines that can each generate 312 megawatts of electricity for a total output of 1,872 megawatts. [7] Water is delivered from the upper reservoir to the turbines by six penstocks each 1,100 feet (340 m) long that taper from 28 to 24 feet (8.5 to 7.3 m) in diameter.

At night, during low demand for electricity, the turbines run in reverse to pump water 363 feet (111 m) uphill from Lake Michigan into the reservoir. The plant takes advantage of the natural steep sand dune landform of eastern Lake Michigan. During periods of peak demand water is released to generate power. Electrical generation can begin within two minutes with peak electric output of 1872 MW achieved in under 30 minutes. Maximum water flow is over 33 million US gallons (120,000 m3) per minute.

This process was designed to level the load of nearby nuclear power plants on the grid. It also replaces the need to build natural gas peak power plants used only during high demand. The Ludington Pumped Storage plant is connected to six 345-kV Transmission lines, all owned and maintained by METC, a subsidiary of ITC Holdings.

The project was given the 1973 award for "Outstanding Civil Engineering Achievement" by the American Society of Civil Engineers. [8]

Upgrade

Consumers Energy discussed plans in 2008 to extend the life of the facility and upgrade the pumps to increase efficiency by up to 9%. [9] Consumers Energy also planned to tap the wind power resources along the eastern Lake Michigan shore with wind farms. [9] Because wind is an intermittent power source and may inconveniently deliver large amounts of power during periods of low electric demand, pumped storage facilities are desirable to have on the same grid with large-scale wind farms. The available pumped storage capacity, along with the wind characteristics, partly determine the maximum contribution wind power can make to the overall electricity use in a region.

Consumers Energy and Detroit Edison announced an $800 million upgrade on February 7, 2011. The six-year project would begin in 2013 and extend the plant's life by at least forty years and upgrade the generating capacity from 1,872 megawatts to 2,172 megawatts. [10] Plans for the upgrade include replacing all six of the plant's turbines, which would increase the plant's total generating capacity by 15 percent, and efficiency by 5 percent. Upon completion, the plant will produce enough power for a community of 1.65 million (a quarter million increase). [11] As of August 2020, five of the six turbines had been successfully replaced; the project was expected to be completed in May or June 2021. [12] [13] However claims of defective parts and timeline overruns led Consumers Power and Detroit Edison to sue the project contractor, Toshiba America in April 2022. [14]

See also

Related Research Articles

<span class="mw-page-title-main">Power station</span> Facility generating electric power

A power station, also referred to as a power plant and sometimes generating station or generating plant, is an industrial facility for the generation of electric power. Power stations are generally connected to an electrical grid.

<span class="mw-page-title-main">Pumped-storage hydroelectricity</span> Electric energy storage system

Pumped-storage hydroelectricity (PSH), or pumped hydroelectric energy storage (PHES), is a type of hydroelectric energy storage used by electric power systems for load balancing. The method stores energy in the form of gravitational potential energy of water, pumped from a lower elevation reservoir to a higher elevation. Low-cost surplus off-peak electric power is typically used to run the pumps. During periods of high electrical demand, the stored water is released through turbines to produce electric power. Although the losses of the pumping process make the plant a net consumer of energy overall, the system increases revenue by selling more electricity during periods of peak demand, when electricity prices are highest. If the upper lake collects significant rainfall or is fed by a river then the plant may be a net energy producer in the manner of a traditional hydroelectric plant.

The Bath County Pumped Storage Station is a pumped storage hydroelectric power plant, which is described as the "largest battery in the world", with a maximum generation capacity of 3,003 MW, an average of 2,772 MW, and a total storage capacity of 24,000 MWh. The station is located in the northern corner of Bath County, Virginia, on the southeast side of the Eastern Continental Divide, which forms this section of the border between Virginia and West Virginia. The station consists of two reservoirs separated by about 1,260 feet (380 m) in elevation. It was the largest pumped-storage power station in the world until 2021, when it was surpassed by the Fengning Pumped Storage Power Station.

<span class="mw-page-title-main">Peaking power plant</span> Reserved for high demand times

Peaking power plants, also known as peaker plants, and occasionally just "peakers", are power plants that generally run only when there is a high demand, known as peak demand, for electricity. Because they supply power only occasionally, the power supplied commands a much higher price per kilowatt hour than base load power. Peak load power plants are dispatched in combination with base load power plants, which supply a dependable and consistent amount of electricity, to meet the minimum demand.

<span class="mw-page-title-main">DTE Energy</span> Energy company based in Detroit

DTE Energy is a Detroit-based diversified energy company involved in the development and management of energy-related businesses and services in the United States and Canada. Its operating units include an electric utility serving 2.2 million customers and a natural gas utility serving 1.3 million customers in Michigan.

DTE Electric Company was founded in 1886.

<span class="mw-page-title-main">Consumers Energy</span> American public utility

Consumers Energy is an investor owned utility that provides natural gas and electricity to 6.7 million of Michigan's 10 million residents. It serves customers in all 68 of the state's Lower Peninsula counties. It is the primary subsidiary of CMS Energy. The company was founded in 1886 and is currently headquartered in Jackson, Michigan.

<span class="mw-page-title-main">Lansing Board of Water & Light</span>

The Lansing Board of Water & Light is a publicly owned, municipal utility that provides electricity and water to the residents of the cities of Lansing and East Lansing, Michigan, and the surrounding townships of Delta, Delhi, Meridian and DeWitt. The Lansing Board of Water & Light also provides steam and chilled water services within the City of Lansing.

<span class="mw-page-title-main">Robert Moses Niagara Power Plant</span> Niagara River dam in New York State

The Robert Moses Niagara Hydroelectric Power Station is a hydroelectric power station in Lewiston, New York, near Niagara Falls. Owned and operated by the New York Power Authority (NYPA), the plant diverts water from the Niagara River above Niagara Falls and returns the water into the lower portion of the river near Lake Ontario. It uses 13 generators at an installed capacity of 2,525 MW (3,386,000 hp).

<span class="mw-page-title-main">Blenheim–Gilboa Hydroelectric Power Station</span> Dam in New York, USA

The Blenheim–Gilboa Pumped Storage Power Station is a pumped-storage hydroelectricity plant in the Catskill Mountains of New York State. The plant is part of the New York Power Authority, and can generate over 1,100 megawatts (1,500,000 hp) of electricity, all of which is sent to New York City. It is used daily to cover peak demand. There are two reservoirs that are involved in the project, both with a capacity of 5 billion US gallons (19,000,000 m3); one at the foot of Brown Mountain in the Schoharie Valley, and another one at the top of the mountain. The power station has an accumulated capacity of about 12,000 megawatt-hours (43,000 GJ) after storing up to 17,000 megawatt-hours (61,000 GJ).

<span class="mw-page-title-main">Run-of-the-river hydroelectricity</span> Hydroelectric power station

Run-of-river hydroelectricity (ROR) or run-of-the-river hydroelectricity is a type of hydroelectric generation plant whereby little or no water storage is provided. Run-of-the-river power plants may have no water storage at all or a limited amount of storage, in which case the storage reservoir is referred to as pondage. A plant without pondage is subject to seasonal river flows, thus the plant will operate as an intermittent energy source. Conventional hydro uses reservoirs, which regulate water for flood control, dispatchable electrical power, and the provision of fresh water for agriculture.

The Dix Dam is a dam on the Dix River located between Mercer and Garrard County, Kentucky. It was constructed to generate hydroelectricity and prevent flooding of the Kentucky River but is better known for creating Herrington Lake.

<span class="mw-page-title-main">Hydroelectric power in the United States</span>

Hydroelectricity is, as of 2019, the second-largest renewable source of energy in both generation and nominal capacity in the United States. In 2021, hydroelectric power produced 31.5% of the total renewable electricity, and 6.3% of the total U.S. electricity.

<span class="mw-page-title-main">Richard B. Russell Dam</span> Dam in Georgia, USA

Richard B. Russell Dam is a concrete-gravity and embankment dam located on the Savannah River at the border of South Carolina and Georgia, creating Richard B. Russell Lake. The dam was built by the U.S. Army Corps of Engineers between 1974 and 1985 for the purposes of flood control, hydroelectricity, recreation, additional stream flow regulation, water supply, and fish and wildlife management. The concrete structure of the dam spans 1,904 feet (580 m) and rises 210 feet (64 m) above the riverbed, housing a hydro-power plant with an installed 600 megawatts (800,000 hp) capacity. The Richard B. Russell Dam is the final large dam completed by the U.S. Army Corps in the Savannah River Basin and lies 30 miles downstream from the Hartwell Dam (1962) and 37 miles (60 km) upstream from the J. Strom Thurmond Dam (1954).

The Grand River Dam Authority (GRDA) is an agency of the state of Oklahoma created to control, develop, and maintain the Grand River waterway. It was created by the Oklahoma state legislature in 1935, and is headquartered in Tulsa, Oklahoma. GRDA was designed to be self-funding from the sales of electricity and water. The state of Oklahoma was to provide no funding from taxes. The Authority was authorized to issue revenue bonds to fund large-scale capital investments.

<span class="mw-page-title-main">Bad Creek Hydroelectric Station</span> Dam in near Salem, South Carolina

The Bad Creek Hydroelectric Station is a pumped-storage hydroelectric power station located 8 miles (13 km) north of Salem in Oconee County, South Carolina. The 1,065 megawatts (1,428,000 hp) power plant is owned by Duke Energy and its last generator was commissioned in 1991. The power station generates electricity by shifting water between an upper and lower reservoir. The upper Bad Creek Reservoir was created by damming Bad Creek and West Bad Creek while Lake Jocassee serves as the lower reservoir. During periods of low energy demand, the four 266 megawatts (357,000 hp) Francis pump turbines pump water from Lake Jocassee which lies at an elevation of 1,110 feet (340 m) to the Bad Creek Reservoir at an elevation of 2,310 ft (704 m) through a 1 mile (1.6 km) tunnel. When energy demand is high, water is released back from Bad Creek Reservoir back down to the pump turbines which then operate as generators. After electricity is produced, the water is returned to Lake Jocassee. The process is repeated as needed, primarily with the facility serving as a peaking power plant.

<span class="mw-page-title-main">Rocky Mountain Hydroelectric Plant</span> Dam in near Rome, Georgia

The Rocky Mountain Hydroelectric Plant is a pumped-storage power plant located 10 miles (16 km) northwest of Rome in the U.S. state of Georgia. It is named after Rock Mountain on top of which the plant's upper reservoir is located. Construction on the plant began in 1977 and it was commissioned in 1995. After upgrades were completed in 2011, the plant has an installed capacity of 1,095 megawatts (1,468,000 hp). It is owned by both Oglethorpe Power and Georgia Power which have 75 percent and 25 percent stakes, respectively.

<span class="mw-page-title-main">Jocassee Dam</span> Dam in Pickens/Oconee Counties, South Carolina

Jocassee Dam is an embankment dam on the Keowee River, straddling the border of Pickens and Oconee counties in South Carolina in the United States. The dam forms Lake Jocassee, which is fed by the Toxaway, Thompson, Horsepasture and Whitewater Rivers, and serves primarily for hydroelectric power generation and flood control. The dam and reservoir are part of the Keowee-Toxaway Hydroelectric Project, owned and operated by Duke Energy.

<span class="mw-page-title-main">Turlough Hill Power Station</span> Hydroelectric station in Wicklow, Ireland

The Turlough Hill Power Station is a pumped storage power station in Ireland, owned and operated by the Electricity Supply Board (ESB).

References

  1. "Ludington Pumped Storage Upgrade & Overhaul" (PDF). Retrieved 4 December 2017.
  2. Browning, Edgar A. (29 January 2017). "Looking Back: Ludington Pumped Storage Power Plant". www.constructionequipmentguide.com. No. Northeast Edition. Retrieved 4 December 2017.
  3. Maclam, Doug (1 October 2015). "Ludington Pumped Storage Plant Increases Efficiency to Provide Greater Grid Support". POWER Magazine. Retrieved 4 December 2017.
  4. Ray, Matthew; Toro, Keith; Kaneda, Hironari; Hyuga, Takeshi (11 November 2016). "Major Overhaul Boosts Performance at Ludington Pumped-Storage Plant". www.hydroworld.com. Hydro Review. Retrieved 4 December 2017.
  5. "Overhaul at Ludington - International Water Power". www.waterpowermagazine.com. International Water Power & Dam Construction. 4 January 2012. Retrieved 4 December 2017.
  6. Network, Michael McCluskey / Energy News (24 September 2018). "Michigan utilities upgrade pumped storage plant ahead of renewable push". Energy News Network. Retrieved 2020-01-30.
  7. Ludington Pumped Storage Archived 2013-10-23 at the Wayback Machine , ConsumersEnergy.com website.
  8. "Past Outstanding Civil Engineering Achievement Awards". American Society of Civil Engineers. Archived from the original on 2008-10-10.
  9. 1 2 Alexander, Dave (2008-04-12). "Shoreline generates interest in power". The Muskegon Chronicle. Retrieved 2008-10-03.
  10. "Consumers Energy, Detroit Edison announce $800 million upgrade of Ludington Pumped Storage Facility". Ludington Daily News. 2011-02-07. Retrieved 2011-02-08.
  11. "Ludington Pumped Storage Plant Recognized For 40 Years Of Service To Customers And Michigan" (Press release). PR Newswire.
  12. Lloyd, Eric (2020-08-11). "Ludington Pumped Storage Facility Close To Finishing Massive Upgrade". 9and10news.com. Retrieved 2020-12-10.
  13. Bossick, David (2020-10-29). "Turbine upgrade project delayed at Ludington Pumped Storage Plant". Ludington Daily News. Retrieved 2020-12-10.
  14. Consumers, DTE sue contractor over ‘defective work,’ project delays in $500M Ludington pumped storage plant upgrade, mibiz, Andy Blaskowitz, April 22, 2022