Moolamattam hydro power station
Moolamattom power house Switch yard view and area 5861.JPG
Moolamattom power house Switch yard view and area 5861
Country India
Coordinates 9°47′19″N76°51′35″E / 9.7887°N 76.8598°E / 9.7887; 76.8598
PurposeHydroelectric
StatusCompleted
Owner(s) Kerala State Electricity Board
Power Station
Type Hydro Power Plant
Installed capacity 780 MW
Website
Kerala State Electricity Board

The Moolamattom hydro power station is the power house of the Kerala State Electricity Board's Idukki Hydroelectric Project, the largest hydroelectric project in Kerala, India, with a capacity to generate 2398 million units of electricity annually. Located at Moolamattam in Arakulam Gram Panchayat of Thodupuzha Taluk of Idukki district, [1] it is one of the largest underground hydroelectric power stations in India. The power house has an installed capacity of 780 MW. In the three dams of this hydroelectric project, the water needed to generate electricity at the Moolamattam power station is pumped through tunnels (penstock pipes) near the pond level. [2]

The water discharged from the power station reaches the Thodupuzha River, which becomes full of water throughout the year due to this. The power house is located underground in the foothills of Nadukani hill, at a distance of 46 km from the Idukki dam. [3]

See also

Related Research Articles

<span class="mw-page-title-main">Idukki Dam</span> Dam in Idukki, Kerala

The Idukki Dam is a double curvature arch dam constructed across the Periyar River in a narrow gorge between two granite hills locally known as Kuravan and Kurathi in Idukki, Kerala, India. At 168.91 metres (554.2 ft), it is one of the highest arch dams in Asia. It is constructed and owned by the Kerala State Electricity Board. It supports a 780 MW hydroelectric power station in Moolamattom, which started generating power on 4 October 1975. The dam type is a concrete, double curvature parabolic, thin arc dam. The Indo-Canadian project was inaugurated by the Prime Minister Indira Gandhi on February 17, 1976.

<span class="mw-page-title-main">Ponmudi Dam</span> Dam in Kerala, India

The Ponmudi Dam is a concrete gravity dam built across the Panniyar river which is a tributary of Periyar river at Konnathady panchayath of Konnathadi village in Idukki district of Kerala, India. The dam was constructed in 1963 as a part of a hydroelectric project. Construction was led by E.U.Philipose, Superintending Engineer, Kerala State Electricity Board. It has a length of 288.80 metres (947.5 ft). The hydropower component of the dam has an installed capacity of 30 MW with firm power of 17 MW, generating 158 GWh annually. Taluks through which the river flow are Udumbanchola, Devikulam, Kothamangalam, Muvattupuzha, Kunnathunadu, Aluva, Kodungalloor and Paravur.

Moolamattom is the headquarters of Arakulam Panchayath in Thodupuzha Taluk, Idukki district in Kerala, India. It lies 22 km from Thodupuzha, on the banks of the Thodupuzha River, a tributary of the Muvattupuzha river. Moolamattom is famous for India's second largest underground hydroelectric power station - Moolamattom hydro power station.

<span class="mw-page-title-main">Koyna Hydroelectric Project</span> Power plant in India

The Koyna Hydroelectric Project is the largest hydroelectric power plant in India, just after the Tehri Dam Project. It is a complex project with four dams including the largest dam on the Koyna River, Maharashtra hence the name Koyna Hydroelectric Project. The project site is in Satara district.

<span class="mw-page-title-main">Cheruthoni Dam</span> Dam in Kerala, India

The Cheruthoni Dam, located in Idukki District, Kerala, India, is a 138m tall concrete gravity dam. Preliminary work on this project was initiated under the leadership of Superintending Engineer, E.U.Philipose.This dam was constructed in 1976 as part of the Idukki Hydroelectric Project along with two other dams Idukki and Kulamavu. The Government of Canada aided the Project with long-term loans and grants. The dam was constructed by HCC and the consultant was S.N.C.Inc., Canada,

<span class="mw-page-title-main">Malankara Dam</span> Dam in Kerala, India

Malankara dam is a gravity dam constructed across Thodupuzha river for irrigation purposes. The dam is constructed to make use of the tail water from the Moolamattom power house. The project is run under the Muvattupuzha Valley Irrigation Project and KSEB. The artificial lake covers an area of around 11 square km.

The Kakkad Hydroelectric Power Plant is located near Seethathode, in the Pathanamthitta district of the Indian state of Kerala. It is operated by the Kerala State Electricity Board.

<span class="mw-page-title-main">Kulamavu Dam</span> Dam in Idukki, Kerala

Kulamavu Dam is a gravity/masonry dam on Kilivillithode which is a tributary of the Periyar river in Arakkulam village, Idukki district of Kerala, India. It is one of the three dams associated with the Idukki hydro electric power project in the Indian state of Kerala. This dam is located towards the western side of the Idukki Arch Dam. This is a gravity dam with the top portion in concrete and the bottom in masonry.

<span class="mw-page-title-main">Pambla Dam</span> A dam in Kerala, India

The Lower Periyar Dam is a dam built on the Periyar River as part of the Lower Periyar Hydroelectric Project in Kanjikuzhi Panchayat, Idukki District, Kerala. The dam was built to generate electricity. The lower Periyar dam is at Pambla, five kilometres downstream from where Muthirapuzha merges with main river. This 32.36-metre-high dam made of concrete has a width of 284 meters. The powerhouse is at Karimanal, near Neriamangalam, where three generators are installed with a power production capacity of 60 MW each, or a cumulative 180 MW. The Dam was completed in the year 1998 Taluks through which release flow are Idukki, Kothamangalam, Muvattupuzha, Kunnathunadu, Aluva, Kodungalloor and Paravur.

<span class="mw-page-title-main">Erattayar Dam</span> Diversion dam in Kerala, India

Erattayar Dam is a small, diversion dam built on the Erattayar river in Erattayar grama panchayat near Kattappana town in Idukki district of Kerala, India. It acts mainly as a diversion dam to supply water to the Idukki dam. Diversion of water from Erattayar forebay to Idukki reservoir is through a tunnel called Anchuruli tunnel which is 3.77 km (2.34 mi) long. Construction of the dam was completed in the year 1989.

<span class="mw-page-title-main">Kallar Dam</span> Diversion dam in Kerala, India

Kallar Dam is a small, diversion dam constructed at Perinjamkutty river in Nedumkandam grama panchayat of Idukki district, Kerala, India. It acts mainly as a diversion dam to supply water to the Idukki dam.

<span class="mw-page-title-main">Kallarkutty Dam</span> Dam in Kerala, India

Kallarkutty Dam is a gravity dam built on the Muthirapuzha river, a tributary of the Periyar river, as part of the Neriamangalam Hydroelectric Project at Kallarkutty in Vellathooval panchayat of Idukki district in Kerala, India. The water discharged from the Chenkulam dam's powerhouse and the Muthirapuzha river is diverted to the Neriamangalam powerhouse near Panamkutty above the Pambla dam. The Hydroelectric Project was commissioned on 27 January 1961 to generate 45 MW of power using 3 turbines with a capacity of 15 MW. In 2006, the project was upgraded from 45 MW to 52.65 MW. Taluks through which release flow are Udumbanchola, Devikulam, Idukki, Kothamangalam, Muvattupuzha, Kunnathunadu, Aluva, Kodungalloor and Paravur.

<span class="mw-page-title-main">Moozhiyar Dam</span> Dam in Kerala, India

Moozhiyar Dam is a gravity dam located close to Kakki reservoir in Seethathodu panchayath of Pathanamthitta district in Kerala, India. The Kakkad Hydroelectric Project is powered by water from the dam. The water level is set at 192.5 meters. KSEB is responsible for the maintenance of the dam and other ancillary works. The Kakkad Hydroelectric Project generates 50 MW of electricity using 2 turbines of 25 MW each year. The annual output is 262 MU. The machine was commissioned on 16 September 1999. Kakkad Hydro electric Project is the second stage development of Pamba river basin. The installed capacity is 50 MW. This scheme utilises the tail race water from Sabarigiri power station and flow received from Moozhiyar and Velluthode rivers. Two dams feed water to the powerhouse. The Moozhiyar Dam creates the main reservoir of this project. Taluks through which release flow are Ranni, Konni, Kozhencherry, Thiruvalla, Chengannur, Kuttanadu, Mavelikara and Karthikappally.

<span class="mw-page-title-main">Kundala Dam</span> Dam in Kerala, India

Kundala Dam, also known as Setuparvatipuram Dam, is a masonry gravity dam built on Muthirapuzha River in Mattupetty panchayat of Idukki district in Kerala, India. It is part of the Pallivasal Hydroelectric Project, the first hydroelectric project in Kerala. The dam is considered to be Asia's first arch dam. It has a height of 46.93 m (154.0 ft) and length of 259.38 m (851.0 ft). Release from dam is to river Palar and taluks through which release flow are Udumbanchola, Devikulam, Kothamangalam, Muvattupuzha, Kunnathunadu, Aluva, Kodungalloor and Paravur.

<span class="mw-page-title-main">Chenkulam Dam</span> Dam in Kerala, India

Chenkulam Dam is a gravity dam located on the Muthirapuzha river in Vellathooval panchayat of Idukki district in the Indian state of Kerala. It spans 144.50 metres (474.1 ft) long and stands 26.82 metres (88.0 ft). It hosts a 48 MW power plant.

<span class="mw-page-title-main">Vellathooval Dam</span> Dam in Kerala, India

Vellathooval Dam is a diversion dam built on the Muthirappuzha river in Vellathooval village in Devikulam taluk of Idukki district in Kerala, India. The height of the dam from the deepest foundation is 16 metres (52 ft) and length is 75 metres (246 ft). Water from the Sengulam Power House and from the Muthirapuzha river gets released to the Vellathooval dam. Water from this dam is diverted through a canal system to the powerhouse near Panniyar After the water flow is used to generate hydroelectricity, the water is released back into the river. The dam is one of the major tourist attractions in the Idukki District, Kerala.

<span class="mw-page-title-main">Veluthodu Dam</span> Diversion dam in Kerala, India

Veluthodu dam is a part of Kakkad Hydro Electric Project and is located in Seethathode panchayath of Ranni Taluk in Pathanamthitta District of Kerala, India. Its a Concrete-Gravity dam built across the Veluthodu river, a tributary of Kakkad River which is again a tributary of Pamba River The dam is built primarily for electricity. This diversion dam diverts water to the water conductor system from Moozhiyar reservoir to Kakkad Power Station. This power station utilises the tail race water from Sabarigiri power station and flow received from moozhiyar and velluthode rivers. After power generation, water from Kakkad power station is released to the Kakkad River. Taluks through which release flow are Ranni, Konni, Kozhencherry, Thiruvalla, Chengannur, Kuttanadu, Mavelikara and Karthikappally It is operated by Kerala State Electricity Board.

Narakakkanam Weir is a diversion dam constructed across Narakakkanam River in Mariyapuram panchayath of Thankamani Village in Idukki district in Kerala, India. Narakakkanam weir is an augmentation weir for the Idukki Hydro Electric Project. Narakakkanam, Azhutha, Vazhikkadavu, Vadakkepuzha and Kuttiar diversion schemes were later added to augment the Idukki reservoir. The height of the dam is 11.50 metres (37.7 ft) from the deepest foundation and length is 45.20 metres (148.3 ft).

Vadakkepuzha Weir is a diversion dam of Earthen type constructed across Vadakkepuzha which is a tributary of Muvattupuzha river in Arakkulam village in Idukki district of Kerala, India. Vadakkepuzha weir is a part of an augmentation scheme for the Idukki Hydro Electric Project. Narakakkanam, Azhutha, Vazhikkadavu, Vadakkepuzha and Kuttiar diversion schemes were later added to Idukki HEP to augment the reservoir. Water from the reservoir is pumped in to Idukki reservoir through a pump house with three pumps.

<span class="mw-page-title-main">Pallivasal Hydro Electric Project</span> First Hydro Electric project in Kerala

Pallivasal Hydroelectric Project is the first hydroelectric project in Kerala, India. The project consists of 2 reservoirs, 2 dams, a diversion dam and a power house and is owned by the Kerala State Electricity Board. The power house of the project has been constructed at Chithirapuram in Pallivasal Gram Panchayat, Munnar, Idukki District. The first unit was inaugurated in March 1940 by the Travancore Diwan C. P. Ramaswamy Iyer. The second unit and third unit was commissioned in February 1941 and February 1942 respectively. In 1944, Ramaswamy Iyer constructed the R. A headworks dam on Muthirapuzha, a tributary of Periyar in Munnar to divert the water.

References

  1. Vellaram, Sandeep (26 June 2023). "Moolamattom power plant reduces power generation as storage level dips further". The Hindu. ISSN   0971-751X . Retrieved 25 August 2023.
  2. Naik, Prof Katta Narasimha Reddy, Prof E. Siva Nagi Reddy, Prof K. Krishna (27 July 2023). Kalyana Mitra: Volume 3. Blue Rose Publishers.{{cite book}}: CS1 maint: multiple names: authors list (link)
  3. "Kerala State Electricity Board Limited - Periyar Basin Hydro Projects". www.kseb.in. Retrieved 25 August 2023.