The Newmarket Workshops in Auckland were a major New Zealand Railways Department facility, one of 13 workshops nationwide. It was one of two main railway workshops of Auckland, used mainly for maintenance; the older facility at Newmarket was replaced in 1929 by Otahuhu Workshops.
The original Auckland Railway Workshops constructed in 1875 consisted of buildings for machining and blacksmithing work, carriage maintenance, locomotive maintenance and a boiler house. Due to the unsuitable site on which the facilities were constructed, at the beginning of the Northclimb to Newmarket, there were soon plans to relocate the buildings. [1]
The Public Works Department announced on 13 October 1879 that it had purchased a suitable site for the workshops in Newmarket. [1] Also motivating the workshops relocation was the need to use the land on which the existing buildings were sited to rearrange of the yard for the new Newmarket railway station.
The contract for construction of the new workshops was let in March 1883 and completed by 30 November 1883. [1] Relocation of plant and workshop staff to the new site occurred between October 1884 and February 1885. [1] The new site was on both sides of Remuera Road, from Mahuru Street in the south to just north of the junction with the North Auckland Line, and bounded by Broadway on the western side, Middleton Road on the east.
Up to 1908, while the Auckland section was isolated from the rest of the North Island rail network, the workshops were responsible for the construction of new carriages and the maintenance of all rolling stock used on the section. [2] This remained the status quo until 1912, when the Auckland Harbour Board initiated a reclamation project that included an area reaching out to Campbell’s Point. Included in this project was a plan to extend King’s Drive (Quay Street) out to the point, but in order for this to happen the locomotive depot had to be moved as it straddled the road. Following a Harbour Board request, the Railways Department purchased land at Newmarket. [2] Because the land was in a small gully, extensive earthworks were required to prepare the site, which were done by hand with the aid of horse-drawn muck trucks. [2]
Then plans to use the new site for the locomotive running shed were abandoned. The idea of moving the engine sheds to Newmarket from the Auckland Railway Station was mooted as early as 1912, and cited as one of the reasons why the Parnell Tunnel would have to be duplicated. [3] General Manager E. H. Hiley reported on 1 August 1914 that because its reclaimed land at Mechanics Bay would all be required for an extension of the station yard and other traffic sidings, the locomotive depot would be sited on reclaimed land in Hobson Bay and that the land that had been designated for this purpose at Newmarket would be used to extend the workshops. The extension of the Newmarket site was delayed by the war, but the land was eventually used for the construction of a carriage and wagon workshop, which freed space in some of the other workshops for locomotive maintenance. It was reported on 21 July 1916 that work on the new workshops was well underway, and the new buildings were ready for use towards the end of the year. They included a timber drying shed, a wood mill, a carriage and wagon shop, a lifting shop, a blacksmiths' shop, a tarpaulin shop and a trimming shop.
In 1924 a Royal Commission consisting of two English railwaymen, Sir Sam Fay and Sir Vincent Raven, was asked to report on New Zealand Railways. [2] They made several recommendations regarding workshops around the country, particularly for Auckland and Wellington. With respect to the Newmarket site they were especially critical of the woodworking and machine shop, which was too small, the yard arrangement was inadequate and the separation of various facilities by Remuera Road necessitated shunting through a busy and congested yard, resulting in costly delays.
The Minister of Railways reported in 1928 that it was possible to extend the existing workshops at Hillside and Addington in the South Island, but that the sites of the two main workshops in the North Island, at Newmarket and Petone, were hopelessly inadequate and that land was to be acquired at Otahuhu and Lower Hutt respectively to replace them. [4]
The new Otahuhu Workshops were opened after Christmas 1928, and Newmarket Workshops closed. [5]
Unlike the other main centre workshops, locomotives were not constructed or rebuilt at Newmarket or Otahuhu, which specialised in repair and maintenance work. The only exceptions were one FA class (FA 276) in 1896, and nine rebuilds of F and L classes (Lloyd page 188).
An experimental MacEwan-Pratt Railcar was built at Newmarket in 1912, but it did not prove satisfactory and was dismantled in 1913.
New roads and urban development have obliterated most traces of the workshops.
Newmarket is an Auckland suburb to the south-east of the central business district. With its high building density, especially of retail shops, it is considered New Zealand's premier retailing area, and a rival of local competitor Auckland CBD.
Westfield railway station was a station of the Auckland railway network in New Zealand. The station closed to all services on 12 March 2017, following an announcement by Auckland Transport on 17 January 2017, because fewer than 330 passengers used it daily and it required a costly upgrade.
Newmarket railway station is a station in the inner-city suburb of Newmarket in Auckland, New Zealand. It serves the Southern, Onehunga and Western Lines of the Auckland railway network, and is the second-busiest station in Auckland, after Waitematā.
Ōtāhuhu railway station is located on the Eastern and Southern Lines of the Auckland rail network in New Zealand. It has an island platform configuration and is part of an integrated bus-train major transport hub. It can be reached by steps and lift from an overhead concourse that leads from the adjacent bus transfer station and Walmsley Road.
Hillside Engineering Group is a trading division of the rail operator KiwiRail in Dunedin, New Zealand. Most of its work is related to KiwiRail, but it also does work for the marine industry in Dunedin. On 19 April 2012 KiwiRail announced it was putting Hillside on the market for sale. In November 2012 KiwiRail announced it had sold part of the business to Australian firm Bradken, and the rest would be closed. The workshops continued to be used for some maintenance work by Kiwirail with a skeleton staff. In October 2019, the New Zealand Government announced that it would be investing NZ$20 million into revitalising Hillside Engineering as a major mechanical hub and engineering facility to service Kiwi Rail's locomotives and rollingstock.
The New Zealand Railways Department, NZR or NZGR and often known as the "Railways", was a government department charged with owning and maintaining New Zealand's railway infrastructure and operating the railway system. The Department was created in 1880 and was corporatised on 1 April 1982 into the New Zealand Railways Corporation. Originally, railway construction and operation took place under the auspices of the former provincial governments and some private railways, before all of the provincial operations came under the central Public Works Department. The role of operating the rail network was subsequently separated from that of the network's construction. From 1895 to 1993 there was a responsible Minister, the Minister of Railways. He was often also the Minister of Public Works.
The Glenbrook Vintage Railway (GVR) is a heritage steam railway in Glenbrook, New Zealand.
This is a list of jargon commonly used by railfans and railway employees in New Zealand.
The New Zealand DA class locomotive were a class of diesel-electric mainline locomotives operated on the New Zealand railway system between 1955 and 1989. Consisting of 146 locomotives, it was the most numerous class to ever operate in New Zealand, with five more than the AB class steam locomotive.
The New Zealand DSC class locomotive is a heavy shunting locomotive used throughout New Zealand. The class was built in seven batches, the first 18 locomotives being built by British Thomson-Houston of the United Kingdom, with the further 52 locomotives being built by New Zealand Railways (NZR).
The New Zealand EA class of electric locomotives were used on the New Zealand rail network between 1968 and 1997 on the Otira – Arthur's Pass section of the Midland line in the South Island, through the Otira Tunnel. Following reconditioning, three were used by KiwiRail's Tranz Metro in Wellington from 2008 to 2011 to top and tail Metlink suburban passenger trains as an interim measure before new rolling stock arrived. Four of the five locomotives were scrapped in 2013 with one being set aside for preservation.
The Eastern Line is the name of the suburban rail service in Auckland, New Zealand between Waitematā and Manukau via the North Island Main Trunk (NIMT) and Manukau Branch. Services are operated by Auckland One Rail under the Auckland Transport brand.
Cross Creek railway station was the base of operations for the Rimutaka Incline, a Fell railway over the Rimutaka Ranges, and part of the original Wairarapa Line between Upper Hutt and Featherston in the Wellington region of New Zealand's North Island. The station was between Pigeon Bush and Summit stations on the Wairarapa Line. The station was bypassed when the Rimutaka Tunnel was opened.
The East Town Railway Workshops were a major manufacturing, maintenance and repair facility of the New Zealand Railways Department (NZR) located by the Marton - New Plymouth Line in the city of Wanganui in New Zealand's North Island. Output included not only rolling stock but also tools, equipment, huts, furniture and tarpaulins. It was a prodigious facility, and one of the larger employers in the city. Its name is sometimes formatted as Eastown or Easttown.
Otahuhu Railway Workshops were a major rolling stock construction, maintenance and repair facility operated by the New Zealand Railways Department (NZR), in the south Auckland suburb of Ōtāhuhu in New Zealand's North Island. The workshops were opened in 1928 and were closed in 1992 as part of a rationalisation of workshop facilities throughout the country.
The Hutt Railway Workshops is a major railway engineering facility in the Lower Hutt suburb of Gracefield in the Wellington region of New Zealand's North Island. It is state-owned enterprise KiwiRail's only workshops, and was opened in 1930.
The Petone Workshops were a government-owned railways maintenance and repair facility located in Petone, in Lower Hutt in the Wellington region of New Zealand's North Island. It took over construction and maintenance of rolling stock in the Wellington region from the Pipitea Point facility, starting in 1876, and became the only such facility in the region from 1878 until the opening of the replacement Hutt Workshops facility in 1929.
Christchurch railway station is in the Canterbury region of New Zealand's South Island. It is on the Main North Line at Addington junction, and is the only remaining passenger railway station in the city: suburban passenger trains were cancelled due to lack of demand in the 1970s. It is the terminus of the South Island's two remaining long-distance passenger trains, the Coastal Pacific to Picton and the TranzAlpine to Greymouth.
Railway workshops are railway facilities in which rolling stock is repaired. While often colocated with engine sheds to perform routine tasks as well as major repairs, in some countries separated concepts exist with railway workshops being specialized in major repairs and general inspections.
The NZR 50-foot carriage of 1908 were originally constructed for the North Island Main Trunk (NIMT) passenger trains. The first were clad in Kauri, with open end platforms, however those built from 1930 were clad in steel, with enclosed vestibules. These main line cars were used by the NZR.