Ngoulmendjim Dam | |
---|---|
Location | Ngoulmendjim, Estuaire Province, Gabon |
Coordinates | 00°10′49″N10°08′53″E / 0.18028°N 10.14806°E Coordinates: 00°10′49″N10°08′53″E / 0.18028°N 10.14806°E |
Construction began | 2023 Expected |
Opening date | 2028 Expected |
Construction cost | €300 Million |
Dam and spillways | |
Type of dam | Gravity dam |
Impounds | Komo River |
Power Station | |
Turbines | Pelton: 3 x 27.35 MW |
Installed capacity | 82 MW (110,000 hp) |
Annual generation | ~500 GWh |
The Ngoulmendjim Power Station is a planned hydroelectric power station across the Komo River in Gabon. The power station is under development, by a consortium comprising the French conglomerate Eranove Group and Gabonese Fund for Strategic Investments (FGIS). As of November 2021, the development was in the "financial mobilization phase". [1]
The power station would be located astride the Komo River, in Estuaire Province, about 125 kilometres (78 mi) southeast of the capital city of Libreville. [1]
Libreville, the capital city of Gabon, is home to approximately half of the country's population. As of 2018, 15-20 megawatts of new annual generation capacity, were required to keep up with new demand in Libreville alone. Ngoulmendjim HPP, is intended to address this need. [2]
The dam will have a crest width of 635 metres (2,083 ft) with maximum height of 38.5 metres (126 ft). This will form a reservoir with surface area in excess of 30 square kilometres (7,400 acres). Three Pelton turbines will be installed and are expected to generate 82 megawatts of electricity. The energy will be transmitted from the power station via a new 225kV transmission line, measuring 135 kilometres (84 mi) long, to a location where the electricity will enter the national grid. A 30-year power purchase agreement has been executed between the Government of Gabon and the power station developers. [1] [2]
The developers of this power station, have formed a special purpose vehicle company called Asokh Energy, that will own, design, develop, operate and maintain this HPP. The table below, illustrates the shareholding in Asokh Energy. [1] [2]
Rank | Name of Owner | Percentage Ownership |
---|---|---|
1 | Eranove Group | 60.0 [1] |
2 | Gabon Power Company | 40.0 [1] |
Total | 100.0 | |
Note: Gabon Power Company (GPC) is a subsidiary of Gabonese Fund for Strategic Investments (FGIS). [1]
The construction budget is reported as €300 million. The developer/owners have selected the African Development Bank as the lead arranger of a syndicated loan. The British financial house Standard Chartered Bank was selected to structure the loan. [1]
The Bujagali Power Station is a hydroelectric power station across the Victoria Nile that harnesses the energy of its namesake; the Bujagali Falls, in Uganda. Construction began in 2007 and concluded in 2012. It was officially inaugurated on 8 October 2012 by Ugandan President Yoweri Museveni and Aga Khan IV in the presence of African politicians and investors.
Nyamwamba I Hydroelectric Power Station, also referred to as Nyamwamba I Power Station, is a 9.2 megawatts mini-hydroelectric power station in Uganda.
The Achwa 1 Hydroelectric Power Station (A1HPS), also Achwa I Hydroelectric Power Station, is a hydroelectric power station currently under construction (2020) in Uganda, with a planned installed capacity of 41 megawatts (55,000 hp).
Mpatamanga Hydroelectric Power Station, also Mpatamanga Power Station, is a planned 350 megawatts (470,000 hp) hydroelectric power project to be constructed in Malawi.
Eranove is a French company active in the management of public services and in the production of electricity and drinking water in Africa. The company was formerly known as Finagestion.
Zungeru Hydroelectric Power Station is a 700 megawatts (940,000 hp) hydroelectric power plant under construction in Niger State, Nigeria. When completed, as expected, it will be the second-largest hydroelectric power station in the country, behind the 760 megawatts (1,020,000 hp) Kainji Hydroelectric Power Station.
Sahofika Hydroelectric Power Station, also referred to as Sahofika Power Station, is a 205 megawatts (275,000 hp) hydroelectric power station under construction in Madagascar.
Malagarasi Hydroelectric Power Station, is a planned 50 megawatts (67,000 hp) hydroelectric power station in Tanzania. The development is planned in the Igamba area, west of the Malagarasi swamps, at the site of the Igamba Falls.
The Nachtigal Hydroelectric Power Station is a 420 megawatt run-of-the-river hydroelectric power station under development in Cameroon across the Sanaga River, which harnesses the energy of the Nachtigal Falls. The development rights were granted to Nachtigal Hydro Power Company (NHPC), a company owned by a consortium comprising (a) Électricité de France (b) International Finance Corporation and (c) the Government of Cameroon. A 35-year power purchase agreement is in place, between Eneo Cameroon S.A. and NHPC.
The Zongo II Power Station, also Zongo 2 Power Station, is a hydroelectric power station across the Inkisi River that harnesses the energy of the Zongo Falls in the Democratic Republic of the Congo. Construction began on 14 March 2012 and concluded in 2018. The power station was officially inaugurated on 22 June 2018 by the President of the DR Congo, at that time, Joseph Kabila.
Kinguélé Aval Hydroelectric Power Station is a planned 35 megawatts (47,000 hp) hydroelectric power station, across the Mbei River, a tributary of the Komo River, in Gabon. The power station is the first grid-ready, privately owned hydroelectric power station in the country.
The Singrobo Hydroelectric Power Station, also Singrobo-Ahouaty Hydroelectric Power Project, is a hydroelectric power station under construction across the Bandama River, in Ivory Coast. When completed, as expected in 2023, the power station will be the first, grid-ready hydroelectric power station, developed and owned by a independent power producer (IPP) in West Africa. The energy generated here will be sold to the Ivorian electric utility company, Cienergues, under a 35-year power purchase agreement (PPA).
Oyem Solar Power Station, is a planned 50 megawatts (67,000 hp) solar power plant in Gabon. The power station is under development by Amea Power, a subsidiary of the Al Nowais Investments (ANI), based in the United Arab Emirates.
The Ayémé Solar Power Station is a proposed 120 megawatts solar power plant in Gabon. The power station is under development by Solen, an independent power producer (IPP). The solar farm will be developed in two phases of 60 megawatts each. The energy generated at this power station is expected to be sold to the Energy and Water Company of Gabon (SEEG), for distribution in Libreville, the capital city of the county and its surrounding metropolis.
Ruhudji Hydroelectric Power Station is a planned 358 megawatts hydroelectric power station in Tanzania. The lead developer of this renewable energy project is Tanzania Electric Supply Company Limited (TANESCO), the government-owned electricity utility company. TANESCO plans to develop the power station, as a public private partnership (PPP) project. Work is contemporaneously ongoing, along with the development of the 222 megawatts Rumakali Hydroelectric Power Station, also located in Njombe Region.
The Volobe Power Station is a proposed 120 megawatts (160,000 hp) hydroelectric power project in Madagascar. The project is owned and is under development by a consortium comprising (a) Jovena, a subsidiary of the Axian Group (b) SN Power of Norway (c) Africa50 and Colas Madagascar. The 750 GWh of clean energy generated here annually will be sold directly to Jirama, the national electricity utility company under a 35 year power purchase agreement (PPA).
The FE2 Hydroelectric Power Station is a 36 megawatts hydroelectric power station in Gabon. Construction of this dam began in 2010. Due to lack of adequate funding, work was abandoned in 2013. In 2018, after a five-year hiatus, Tebian Electric Apparatus Stock Limited (TBEA), a Chinese independent power producer (IPP), in collaboration with the Gabonese Strategic Investment Fund, indicated their intention to invest €180 million into the development of FE2 HPP. The engineering, procurement and construction (EPC) contract was awarded to the China Gezhouba Group Company (CGGC). The energy off-taker is Société d'Énergie et d'Eau du Gabon (SEEG), the national electricity utility company of Gabon.
The Gribo–Popoli Power Station, also Gribo Popoli Power Station, is a hydroelectric power station under construction across the Sassandra River, in Ivory Coast. This renewable energy power station is owned and is under development by the Government of Ivory Coast, through its wholly owned subsidiary, CI-Energies, the national electricity utility parastatal company.
Kenié Hydroelectric Power Station is a 42 megawatts (56,000 hp) hydroelectric power station under development in Mali. The power station is owned by Eranove, a French company that specializes in the supply, distribution and management of electricity and water in Africa. In June 2015, working through its subsidiary, Kenié Énergie Renouvelable, Eranove signed a 30-year concession with the Malian government, to design, finance, build, operate and maintain this power station. Kénié Renewable Energy (KRE) is co-owned by the International Finance Corporation (IFC), a component of the World Bank Group. The energy off-taker for this power station is expected to be Société Energie du Mali (EDM-SA), the Malian public utility parastatal company.
Dibwangui Hydroelectric Power Station is a planned 15 megawatts hydroelectric power station in Gabon. The power station is under development by a consortium comprising (a) Eranove, a French independent power producer (IPP) and (b) Gabon Strategic Investment Fund (FGIS), a government-owned investment parastatal company. A long term power purchase agreement (PPA) was signed between the Gabonese authorities and Louetsi Energy, the special purpose vehicle (SPV) company which owns and is developing this power station.