Niagara Tunnel Project

Last updated

The Niagara Tunnel Project's intake point (near Upper Rapids Boulevard) under construction in 2010. Niagara-Tunnel-Project.gif
The Niagara Tunnel Project's intake point (near Upper Rapids Boulevard) under construction in 2010.

The Niagara Tunnel Project was part of a series of major additions to the Sir Adam Beck hydroelectric generation complex in Niagara Falls, Ontario, Canada.

Contents

Water delivered by the major new tunnel complements other upgrades to the Sir Adam Beck Hydroelectric Generating Stations, resulting in more efficient use of the Niagara River's hydro power.

The project's new 12.7 metres (42 ft) diameter, 10.2 kilometres (6.3 mi) long tunnel was officially placed into service on 21 March 2013, helping to increase the generating complex's nameplate capacity by 150 megawatts, [1] with the extra power produced enough for approximately 160,000 homes.

Background

First constructed in 1922, the initial Sir Adam Beck power generating station, now abbreviated as SAB 1, derived its water supply from a hydro canal connected to the Welland River. Increased power demand necessitated a second generating station, SAB 2, to be constructed in 1954. SAB 2 derives its water supply from two diversion tunnels, each about 9 kilometres (5.6 mi) in length. In 1958, a reservoir and the SAB Pump Station were constructed in order to make better use of available water by storing it during periods of low demand and using it in periods of greater demand in order to maximize the efficiency of the stations in regards to electricity supply and demand.

Between 1996 and 2005, Ontario Power Generation (OPG), which owns and operates the SAB complex, completed a series of major upgrades at the SAB 2 plant, increasing its potential generating nameplate capacity by 194 megawatts. Water delivered through the new Niagara Tunnel Project complements the SAB 2 upgrade, and results in an overall increase to the efficient use of the Niagara River's hydro power.

The new 10.2 kilometres (6.3 mi) long tunnel is 12.7 metres (42 ft) in diameter, or about four storeys in height, and allows an additional diversion of a distant part of the Niagara River to reach the SAB plant complex at a rate of about 500 cubic metres (18,000 cu ft) of water per second, a flow rate that can fill an Olympic-sized swimming pool in seconds. [2] The Ontario Government considers the Niagara Tunnel Project and the Sir Adam Beck complex as integral to its efforts to close all of the province's coal-fired generating plants as part of its clean and green energy program.

Upon the project's formal opening the Honourable Bob Chiarelli, M.P.P., Ontario's Minister of Energy, stated that "This project is a source of pride as an engineering feat and as a practical solution for meeting Ontario's energy needs through clean sources". [2]

Construction

Construction work in 2010 Niagara-Tunnel-Project2.gif
Construction work in 2010

The Niagara Tunnel was constructed using a Tunnel Boring Machine (TBM), affectionately named "Big Becky" in honour of Sir Adam Beck. The TBM machine bored a tunnel about 10.2 kilometres (6.3 mi) long and about 14.4 metres (47 feet) in diameter under the City of Niagara Falls, Ontario, from the Niagara River to the SAB complex. The bored tunnel was subsequently lined with an impervious membrane and a concrete lining, pre-stressed by high pressure grouting. [3] The massive undertaking created about 1.6 million cubic metres of rock and debris, and was designed for a minimum 90-year life span. [1]

The HP 471-316 TBM was driven by 15 electric motors totaling about 4.7 megawatts of power (6,375 horsepower), built by the Robbins Company of Solon, Ohio, and was the world's largest hard-rock tunnel boring machine as of 2006. The TBM operated as deep as 140 metres (460 ft) below ground level to avoid the machine's vibrations being felt at surface level. [1] The design-build contractor for the project was the Austrian construction company Strabag AG, a large construction group with extensive experience in large tunnel construction. [2]

Boring by the Hatch Mott MacDonald Engineering Company started on 15 September 2006 at the north end, located at 43°08′25.2″N79°03′44.2″W / 43.140333°N 79.062278°W / 43.140333; -79.062278 (Niagara Tunnel north end) and ended on 31 March 2011 at the south end, located at 43°04′10.72″N79°03′33.77″W / 43.0696444°N 79.0593806°W / 43.0696444; -79.0593806 (Niagara Tunnel south end) . [4]

Due to slower than projected boring progress caused by constant tunnel roof over-breaks, the project completion date was extended to at least December 2013, with a revised total projected cost of $1.6 billion. [5] [6]

Completion and commissioning

On 21 March 2013 the Ontario Power Generation Corporation (OPG) and the Ontario Government officially placed the new Niagara tunnel into service with a formal opening ceremony and tour. [2] [6] The OPG reported that the project will be financially rewarding despite being completed four years later than planned and about $500M over its originally estimated cost. OPG's president and CEO Tom Mitchell stated: "This was a large, complex project that will serve Ontario for more than 100 years". [7]

The tunnel project was completed at a total cost $100 million lower than its revised $1.6 billion budget, and with an in-service date of 9 March 2013. The operational start-of-service date was nine months sooner than the project's revised schedule that was drawn up in 2009 due to unexpected and difficult geological conditions encountered in the soft Queenston Shale Formation during the tunnel boring process. [6] [8]

The new tunnel will provide enough additional water to the Sir Adam Beck generating complex to produce power for approximately 160,000 homes. [8]

The Niagara Tunnel Project was selected by International Water Power & Dam Construction as the North American Project of the Year for 2013. [9]

See also

Related Research Articles

<span class="mw-page-title-main">Ontario Hydro</span> Defunct Canadian provincial utility corporation, 1906–2015

Ontario Hydro, established in 1906 as the Hydro-Electric Power Commission of Ontario, was a publicly owned electricity utility in the Province of Ontario. It was formed to build transmission lines to supply municipal utilities with electricity generated by private companies already operating at Niagara Falls, and soon developed its own generation resources by buying private generation stations and becoming a major designer and builder of new stations. As most of the readily developed hydroelectric sites became exploited, the corporation expanded into building coal-fired generation and then nuclear-powered facilities. Renamed as "Ontario Hydro" in 1974, by the 1990s it had become one of the largest, fully integrated electricity corporations in North America.

The Shoalhaven Scheme is a dual-purpose water supply and Pumped-storage Hydroelectricity scheme located on the South Coast region of New South Wales, Australia.

<span class="mw-page-title-main">Sir Adam Beck Hydroelectric Generating Stations</span> Hydroelectric dam in Ontario, Canada

Sir Adam Beck Hydroelectric Generating Stations are two hydroelectric generating stations in Niagara Falls, Ontario, Canada. Sir Adam Beck Generating Station I, Sir Adam Beck Generating Station II and the Sir Adam Beck Pump Generating Station are all owned by Ontario Power Generation. Following the development of several smaller generating stations around Niagara Falls in the late 19th and early 20th centuries, the Province of Ontario authorized the construction of the first major publicly owned generating station in the province. At the time it was built, it was the largest hydroelectric generating station in the world.

<span class="mw-page-title-main">Robert Moses Niagara Power Plant</span> Niagara River dam in New York State

The Robert Moses Niagara Hydroelectric Power Station is a hydroelectric power station in Lewiston, New York, near Niagara Falls. Owned and operated by the New York Power Authority (NYPA), the plant diverts water from the Niagara River above Niagara Falls and returns the water into the lower portion of the river near Lake Ontario. It uses 13 generators at an installed capacity of 2,525 MW (3,386,000 hp).

<span class="mw-page-title-main">Rankine Generating Station</span> Historic site in Ontario, Canada

The Rankine Generating Station is a former hydro-electric generating station along the Canadian side of the Niagara River in Niagara Falls, Ontario, slightly downstream from the older Toronto Power Generating Station. It was built in for the Canadian Niagara Power Company and named for company's founder William Birch Rankine, a New York City lawyer originally from Geneva, New York who died three days after the station opened in 1905 and renamed in 1927. Acquired by Niagara Mohawk Power Corporation in 1950 and in 2002, the station became a wholly owned subsidiary of FortisOntario. It was decommissioned in 2006.

<span class="mw-page-title-main">Adam Beck Memorial</span>

The Adam Beck Memorial is a memorial in Toronto, Ontario, Canada in honour of the founder of Ontario Hydro, Sir Adam Beck. It is located in the landscaped median of University Avenue just south of Queen Street West. Designed by sculptor Emanuel Hahn, the monument was the first place entry in a design competition for a memorial to commemorate Adam Beck. It was unveiled in 1934.

<span class="mw-page-title-main">Ontario Power Generation</span> Electric utility company in Canada

Ontario Power Generation Inc. (OPG) is a Crown corporation and "government business enterprise" that is responsible for approximately half of the electricity generation in the province of Ontario, Canada. It is wholly owned by the government of Ontario. Sources of electricity include nuclear, hydroelectric, wind, gas and biomass. Although Ontario has an open electricity market, the provincial government, as OPG's sole shareholder, regulates the price the company receives for its electricity to be less than the market average, in an attempt to stabilize prices. Since 1 April 2008, the company's rates have been regulated by the Ontario Energy Board.

According to the International Hydropower Association, Canada is the fourth largest producer of hydroelectricity in the world in 2021 after the United States, Brazil, and China. In 2019, Canada produced 632.2 TWh of electricity with 60% of energy coming from Hydroelectric and Tidal Energy Sources).

<span class="mw-page-title-main">Glendoe Hydro Scheme</span> Hydro-electric power scheme in Scotland

The Glendoe Hydro Scheme for the generation of hydro-electric power is located near Fort Augustus, above Loch Ness in the Highlands of Scotland.

<span class="mw-page-title-main">Toronto Power Generating Station</span> Abandoned power plant in Canada

The Toronto Power Generating Station is a former generating station located along the Niagara River in Niagara Falls, Ontario, Canada, slightly upstream from the newer Rankine power station. Completed in 1906 in the Beaux-Arts-style, the station was designed by architect E. J. Lennox and was built by the Electrical Development Company of Ontario (owned by William Mackenzie, Frederic Thomas Nicholls, and Henry Mill Pellatt) under supervision of Hugh L. Cooper to supply hydro-electric power to nearby Toronto, Ontario.

Saint David's Buried Gorge is an ancient pre-glacial river bed that existed 22,800 years ago on the present-day Niagara Peninsula. The ancient Saint David's River once flowed through this area prior to the advance of the Wisconsin glaciation during the Last Glacial Period. When the glacier retreated 12,000 years ago, the gorge and river valley were filled in with glacial silt and rocks. Approximately 4,200 years ago, the Niagara River intersected the buried gorge in the course of Niagara Falls receding toward Lake Erie. When the river encountered the glacial silt that filled the gorge, the river rapidly changed course to fill the ancient gorge and wash out most of the silt. This led to the formation of the Niagara Whirlpool. The Niagara River reclaimed the gorge and currently flows through part of the ancient gorge. The other part of the ancient gorge extends into Lake Ontario at a different point than the Niagara River. The gorge is estimated to be 4,000 ft (1,200 m) long, 1,000 ft (300 m) wide, and 300 ft (91 m) deep.

<span class="mw-page-title-main">Geehi Dam</span> Dam in Snowy Mountains, New South Wales

Geehi Dam is a major ungated rockfill embankment dam across the Geehi River in the Snowy Mountains of New South Wales, Australia. The reservoir impounded by the dam is known as Geehi Reservoir.

Smoky Falls Generating Station is one of four stations in the Lower Mattagami River Hydroelectric Complex owned by Ontario Power Generation (OPG) and the Moose Cree First Nation. The station is approximately 85 km (53 mi) northeast of Kapuskasing in the Cochrane District of Northern Ontario. Smoky Falls was originally commissioned as a 54 MW generating station in 1931 by the Spruce Falls Power and Paper Company but it was sold to OPG's predecessor, Ontario Hydro, in 1991. OPG completed a $2.6 billion upgrade of the four Lower Mattagami dams in 2014 and 2015. The new Smoky Falls was commissioned in late 2014 with a 267.9 MW installed capacity.

Kipling Generating Station is one of four stations in the Lower Mattagami River Hydroelectric Complex. The station is jointly owned by Ontario Power Generation and the Moose Cree First Nation (25%). The station is approximately 95 km (59 mi) northeast of Kapuskasing in the Cochrane District of Northern Ontario and is the last of four stations in OPG's Lower Mattagami River complex. Kipling GS was originally commissioned as a 2-unit, 155 MW generating station in 1966 by OPG's predecessor, Ontario Hydro. OPG completed a $2.6 billion construction project covering the four Lower Mattagami dams in 2014 and 2015, and added a third generating unit with 78.3 MW capacity to Kipling GS, bringing the total station capacity to 233.3 MW.

The Beck tunnel boring machine was the largest tunnel boring machine in the world, when it was operated by Ontario Power Generation, from 2006 to 2011. Hydro used it to bore a deep replacement tunnel to supply water from the upper Niagara River 10.2 kilometres (6.3 mi) to the Sir Adam Beck Hydroelectric Plant. The tunnel it bored was 14.4 metres (47 ft) in diameter.

<span class="mw-page-title-main">International Control Dam</span> Dam

References

  1. 1 2 3 Niagara Tunnel Project Technical Facts, NiagaraFrontier.com website, updated November 2012.
  2. 1 2 3 4 21 March 2013: Niagara Tunnel Now In-Service, Ontario Power Generation website, March 2013. Retrieved 11 April 2013.
  3. Ontario Power Generation – Niagara Tunnel Now In-Service, 21 March 2013. Retrieved September 2013.
  4. "NIAGARA TUNNEL PROJECT - Niagara Falls".
  5. Niagara Tunnel Project (2005-2013), NiagaraFrontier.com website.
  6. 1 2 3 Water Now Flowing Through Newly Completed Niagara Tunnel Project will generate 100 plus years of renewable electricity, OPG News Release, 21 March 2013 (PDF).
  7. Harris, Michael. Niagara Tunnel Completion Important Piece for Ontario's Hydroelectric Power Supply, RenewableEnergyWorld.com in association with HydroWorld.com, 9 April 2013.
  8. 1 2 Larocque, Corey. Big Becky's running late: OPG, Niagara Falls Review , 26 November 2008.
  9. International Water Power & Dam Construction – North American Project of the Year – Niagara tunnel project. Retrieved September 2013.

43°04′10.72″N79°03′33.77″W / 43.0696444°N 79.0593806°W / 43.0696444; -79.0593806