Niederaichbach Nuclear Power Plant

Last updated
Niederaichbach Nuclear Power Station
Bundesarchiv B 145 Bild-F078667-0007, Kernkraftwerk Niederaichbach (KKN).jpg
Reactor building (far right) during decommissioning
Niederaichbach Nuclear Power Plant
Official nameKernkraftwerk Niederaichbach
Country Germany
Location Niederaichbach
Coordinates 48°36′17″N12°18′14″E / 48.60472°N 12.30389°E / 48.60472; 12.30389
StatusDecommissioned
Construction beganJune 1, 1966
Commission date January 1, 1973
Decommission dateJuly 21, 1974
Construction cost230,000,000 DM
Owner(s) Karlsruhe Institute for Technology
Operator(s)Kernkraftwerk Niederaichbach GMBH
Nuclear power station
Reactors1 x 106 MWe
Reactor typeHeavy Water Gas Cooled Reactor
Thermal capacity321 MWt
Power generation
Capacity factor 1.1%

Niederaichbach Nuclear Power Plant (German: Kernkraftwerk Niederaichbach (KKN)) was a German nuclear plant in Niederaichbach, Bavaria. The plant consisted of one heavy water gas cooled (HWGC) reactor with a gross capacity of 106 MWe. Safety and maintenance issues caused the reactor to be decommissioned after only a year and a half in operation. It was the first nuclear plant in Europe to be completely decommissioned, with the final work being completed in autumn 1995. [1]

Contents

Although located at the same location as the Isar Nuclear Power Plant, the Niederaichbach plant used a different reactor type and was decommissioned five years before construction of the Isar plant was completed.

History

In the late 1950s the government of Bavaria became interested in developing nuclear power within the state. Construction began in 1966. Only a year later, Hans Matthöfer, German Minister of Education and Technology, remarked that the project had "No technological future", due to the limitations of its experimental HWGC reactor. [2] Nevertheless, construction continued, with others in the Bavarian government hopeful that its construction and operation would provide much needed technological and operational experience.

Construction was completed in 1972 at the cost of 230 million Deutsche Marks. It began operation in 1973, but struggled to produce anywhere close to its capacity. After problems with the steam turbines in mid-1974 the reactor was taken offline and decommissioned. [3] In its year and a half of operation it generated only 20,000 MWh of energy, equivalent to just 18 days of full capacity operation or a capacity factor of just 1.1%. [2] [4]

Decommissioning

In mid-1974 the reactor was first placed into SAFSTOR for decontamination, [5] and its fuel was transferred to CEA for disposal. [6] From 1975 to 1995 the reactor structure was demolished, returning the area to its greenfield condition. This was the first reactor in Europe to be completely decommissioned in this manner. It cost 280 million DM to demolish and remediate the area, more than its construction cost. [2]

After its decommissioning, German development of heavy water reactors was halted. [3]

Today a monument marks its former location near the current Isar Nuclear Power Plant. [ citation needed ]

Related Research Articles

Landshut is a Landkreis (district) in Bavaria, Germany. It is bounded by the districts of Kelheim, Straubing-Bogen, Dingolfing-Landau, Rottal-Inn, Mühldorf, Erding and Freising. The city of Landshut is enclosed by, but does not belong to the district. It is nonetheless its administrative seat.

<span class="mw-page-title-main">THTR-300</span> Thorium nuclear reactor in Germany

The THTR-300 was a thorium cycle high-temperature nuclear reactor rated at 300 MW electric (THTR-300) in Hamm-Uentrop, Germany. It started operating in 1983, synchronized with the grid in 1985, operated at full power in February 1987 and was shut down September 1, 1989. The THTR-300 served as a prototype high-temperature reactor (HTR) to use the TRISO pebble fuel produced by the AVR, an experimental pebble bed operated by VEW. The THTR-300 cost €2.05 billion and was predicted to cost an additional €425 million through December 2009 in decommissioning and other associated costs. The German state of North Rhine Westphalia, Federal Republic of Germany, and Hochtemperatur-Kernkraftwerk GmbH (HKG) financed the THTR-300’s construction.

<span class="mw-page-title-main">Isar Nuclear Power Plant</span> Nuclear power plant in Germany

Isar I and Isar II were two base load nuclear power plants which have been built in Germany next to the Isar river. They were fourteen kilometres away from Landshut, between Essenbach and Niederaichbach.

<span class="mw-page-title-main">Nuclear power in France</span> Overview of nuclear power in France

Since the mid 1980s, the largest source of electricity in France has been nuclear power, with a generation of 379.5 TWh in 2019 and a total electricity production of 537.7 TWh. In 2018, the nuclear share was 71.67%, the highest percentage in the world.

Nuclear decommissioning is the process leading to the irreversible complete or partial closure of a nuclear facility, usually a nuclear reactor, with the ultimate aim at termination of the operating licence. The process usually runs according to a decommissioning plan, including the whole or partial dismantling and decontamination of the facility, ideally resulting in restoration of the environment up to greenfield status. The decommissioning plan is fulfilled when the approved end state of the facility has been reached.

<span class="mw-page-title-main">SNR-300</span> Fast breeder reactor in Germany, never entered service

The SNR-300 was a fast breeder sodium-cooled nuclear reactor built near the town of Kalkar, North Rhine-Westphalia, Germany. The reactor was completed but never taken online. SNR-300 was to output 327 megawatts. The project cost about 7 billion Deutsche Mark. The site is now the location of a theme park, Wunderland Kalkar, which incorporates much of the power plant buildings into the scenery.

KKN may refer to:

<span class="mw-page-title-main">Leningrad Nuclear Power Plant</span> RBMK and VVER nuclear power plant in Sosnovy Bor, Leningrad Oblast, Russia

Leningrad Nuclear Power Plant ) is a nuclear power plant located in the town of Sosnovy Bor in Russia's Leningrad Oblast, on the southern shore of the Gulf of Finland, some 70 kilometres (43 mi) to the west of the city centre of Saint Petersburg.

<span class="mw-page-title-main">Nuclear power in Germany</span> Overview of nuclear power in Germany

Nuclear power was used in Germany from the 1960s until it was phased out in April 2023.

<span class="mw-page-title-main">AVR reactor</span> Prototype nuclear reactor in Germany

The AVR reactor was a prototype pebble-bed reactor, located immediately adjacent to Jülich Research Centre in West Germany, constructed in 1960, grid connected in 1967 and shut down in 1988. It was a 15 MWe, 46 MWt test reactor used to develop and test a variety of fuels and machinery.

<span class="mw-page-title-main">Kori Nuclear Power Plant</span> Nuclear power plant in South Korea. Largest operational nuclear power plant in the world.

The Kori Nuclear Power Plant is a South Korean nuclear power plant located in Kori, a suburban village in Busan. It is the world's largest fully operational nuclear generating station by total reactor count and the number of currently operational reactors since 2016, after it exceeded in nameplate capacity Canada's Bruce Nuclear Generating Station. It is owned and operated by Korea Hydro & Nuclear Power, a subsidiary of KEPCO. The first reactor began commercial operation in 1978 and operated until 2017 when it was decommissioned. Units 2, 3, and 4 started commercial operations in the 1980s. All reactors on site are pressurized water reactors.

<span class="mw-page-title-main">Gundremmingen Nuclear Power Plant</span> Nuclear power plant in Germany

The Gundremmingen Nuclear Power Plant was a nuclear power station in Germany. It was located in Gundremmingen, district of Günzburg, Bavaria. It was operated by Kernkraftwerk Gundremmingen GmbH, a joint operation of RWE Power AG (75%) and PreussenElektra (25%). Unit B was shut down at the end of 2017. Unit C, the last boiling water reactor in Germany, was shut down on New Year's Eve 2021, as part of the German nuclear phase out. However, Gundremmingen unit C as well as the other two German nuclear reactors shut down that day remain capable of restarting operations as of March 2022. In November 1975, Unit A was the site of the first fatal accident in a nuclear power plant and subsequently of a major incident resulting in a total loss in 1977.

The Hongyanhe Nuclear Power Plant (红沿河核电站) is located in Donggang Town, Wafangdian in Liaoning Province of China. The site is within the Prefecture-level city of Dalian, 104 kilometres (65 mi) north of Dalian City proper. The first unit started commercial operations in June 2013.

<span class="mw-page-title-main">Chooz Nuclear Power Plant</span> French nuclear power plant

The Chooz Nuclear Power Station lies in the municipality of Chooz in the Ardennes department, France, on the Meuse River in a panhandle protruding into Belgium, between the French city of Charleville-Mézières and the Belgian municipality of Dinant, near the comune of Givet.

Nuclear power in the European Union accounted for approximately 26% of total electricity production in 2019 and nearly half of low-carbon energy production across the EU.

The Niederamt Nuclear Power Plant was the name for a planned nuclear power plant near the existing Gösgen Nuclear Power Plant in Niederamt in the Canton of Solothurn between Olten and Aarau in Switzerland. The land earmarked for the project would have taken in some of the residential areas of Niedergösgen, Gretzenbach and Däniken.

Slovakia has five operational nuclear reactors, with a combined net power capacity of 2,308 MWe, with a sixth coming on line shortly.

<span class="mw-page-title-main">Rita Schwarzelühr-Sutter</span> German politician

Rita Schwarzelühr-Sutter is a German politician of the Social Democratic Party (SPD) who serves as a member of the German Bundestag, the German federal parliament.

<span class="mw-page-title-main">Großwelzheim Nuclear Power Plant</span> Nuclear power plant in Germany

Großwelzheim Nuclear Power Plant,, was an experimental nuclear power plant consisting of one 25 MW reactor in Großwelzheim, a district of Karlstein am Main.

This is a list of all the commercial nuclear reactors in the European Union and in Europe, with operational status. The list only includes civilian nuclear power reactors used to generate electricity for a power grid. All commercial nuclear reactors use nuclear fission. As of May 2021, there are 180 operable power reactors in Europe, with a combined electrical capacity of 159.36 GW. There are currently 8 power reactors under construction in Europe.

References

  1. Erfahrungen aus dem Abriß des KKW Niederaichbach (KKN) für die Entsorgung stillgelegter Kernkraftwerke (PDF). 1995. ISSN   0722-8333.
  2. 1 2 3 "KERNKRAFTWERKE : Eventuell Radi - DER SPIEGEL 41/1979". Der Spiegel. 7 October 1979. Retrieved 2020-08-04.
  3. 1 2 Joachim Radkau & Lothar Hahn: Aufstieg und Fall der deutschen Atomwirtschaft. oekom, München 2013. P. 331.
  4. "PRIS - Reactor Details". pris.iaea.org. Retrieved 2020-08-05.
  5. Strahlenschutzkommission: Demontage und Beseitigung des Kernkraftwerkes Niederaichbach, April 18, 1986, Accessed August 4, 2020
  6. Deutscher Bundestag: Stand der Wiederaufarbeitung deutscher Brennelemente im Ausland und des deutschen Plutonium-Inventares.Drucksache 17/8527. German Bundestag, 31 January 2012, accessed 4 August 2020.