Spain has five active nuclear power plants with seven reactors producing 20% of the country's electricity as of 2023. [2]
A nuclear power moratorium was enacted by the Socialist government in 1983. [3] For a time the country had a policy of phasing out nuclear power in favor of renewables. [4] It ended in 1997 but no public or private company has been interested in building new nuclear plants. The oldest unit (at José Cabrera nuclear power plant) was shut down at the end of 2006, 40 years after its construction. [5] In December 2012, the Garoña plant was also shut down. [6] In 2011, the government lifted the 40-year limit on all reactors, allowing owners to apply for license extensions in 10-year increments. [7]
This section needs additional citations for verification .(May 2024) |
In early 1947, a commission was created within the National Research Council to deal with issues of "Technical Physics of greatest interest to the country". In the middle of that year, the Naval Attache of the United States Embassy in Spain, brought to the Laboratory and Workshop on Research Staff of the Navy an extensive collection of US journals specializing in nuclear fission and its civil and military applications. [8]
To that end, establishing the Atomic Research Board in the form of study (Irani 1987). His work during the triennium (1948–1950) focuses on two aspects. On the one hand, begin to train abroad the first Spanish experts on nuclear issues. On the other hand, begins the search for uranium to serve as raw material for the development of the first investigations. Studies conducted by the Board, led by Decree-Law on 22 October 1951 to the Nuclear Energy Board, which aims to provide new knowledge in the process of energy production.
In 1963, three significant events occur: the beginning of Project Islero, [9] the enactment of the Nuclear Energy Act, and the construction of the first Spanish nuclear plant Zorita in Guadalajara, later known as José Cabrera. In June 1965 construction began three years after the plant was synchronized and provided power to the grid for the first time. Three years later it opened in 1971, launched the Santa Maria de Garoñ
Soon on a plan was drafted to open four nuclear stations in the Basque region, i.e. Deba, Lemóniz, Ispazter and Tudela. The plan faced strong opposition and protests across the area, with all four drafted nuclear stations finally concentrating in just one located at Lemoniz. However, following a violent campaign by ETA to stop it, it finally did not come into operation either. The Spanish government officially declared a moratorium in 1984.
The fire occurred in 1989 in Vandellós destroyed part of its facilities. After evaluating the technical and economic feasibility of repair made a year after the fire, led to the decision to withdraw this plant. Zorita, Vandellòs and Garoña, the three so-called first-generation plants, represent a combined capacity of 1,220 MW. Following the good results obtained in them, and the growing need for energy, it was decided to build seven new groups (four plants) of much greater production capacity, resulting in an additional nuclear power of 6,500 MW.
At the beginning of 1981, the first group of Almaraz (Cáceres) began producing power with a capacity of 930 MW. In 1983, the reactor Ascó (Tarragona) came into operation with a capacity of 930 MW, as well as a second group with the same power in Almaraz.
In 1984 he inaugurated the central Cofrents (Valencia) with a capacity of 975 MW, a year after the network is connected to the second reactor of 930 MW Ascó group. In December 1987, enters the central testing period Vandellós II, and finally, in 1989 is put into operation the central Trillo I (Guadalajara) to 1066 MW.
As shown, nuclear power plants in Spain are located in the northern half. This is because the area is less impacted by seismic activity on the peninsula and where the presence of large rivers Tajo and Ebro meet their needs for water used for cooling.
Spain has a total of 10 nuclear installations within their mainland, among which are six stations, which are a total of eight nuclear units: Almaraz I and II, Ascó I and II, Cofrents, Trillo, Vandellós I and II. The José Cabrera, better known as Zorita, ceased operations on 30 April 2006. So did Santa Maria de Garoña in 2012. On the other hand, Vandellós I is being dismantled.
Spain also possesses a nuclear fuel factory in Salamanca (Juzbado) and a storage facility for radioactive waste, low and intermediate level in Córdoba (El Cabril).
In 2018, Teresa Ribera signed an agreement with Endesa, Iberdrola and Naturgy, which postponed the decommission of all Spanish nuclear power plants from 2028 to 2035. [10]
In 1964, Spain began construction on its first of three nuclear reactors and completed construction in 1968. This became the first commercial nuclear reactor. In the 1970s, Spain began construction on seven second generation reactors, but only completed five. A moratorium was enacted by the socialist government in 1983. Spain stopped the building of new nuclear power plants in 1984.
The first generation of nuclear plants in Spain were all turnkey projects, including the José Cabrera Nuclear Power Plant and the Vandellòs Nuclear Power Plant.
The second generation of plants were domestically built by companies including Empresarios Agrupados, INITEC and ENSA (Equipos Nucleares SA). Five of these were built.
The third generation of Spanish plants (not to be confused with Generation III) includes the Trillo-1 and Vandellos-2. All of the other five units of this series were halted in the middle of construction after a moratorium stopping further construction passed in 1994. Capacity of the nuclear fleet has still increased since then due to power uprates.
A leak of radioactive material from the Ascó I nuclear power plant in November 2007 sparked protests. [11] The country's government has pledged to shut down its eight nuclear reactors once wind and solar energy become viable alternatives such as in neighbouring country Portugal.
In December 2023, the government announced its intention to phase out nuclear energy, starting with the decommissioning of the country's first nuclear reactor in 2027. The estimated cost for the complete decommissioning process is expected to be around €20.2 billion. [12]
This section needs to be updated. The reason given is: 2010 is long gone.(July 2022) |
ENUSA is a company in Spain with various holdings in uranium mining. A Uranium mine in Saelices el Chico was operated for some time, but is now decommissioned and Spain imports all of its Uranium fuel.
State owned Empresa Nacional de Residuos Radiactivos SA was established in 1984 and is the responsible outfit for radioactive waste disposal and decommissioning. There is a temporary dry storage facility at the Trillo Nuclear Power Plant, and research for a long term geological repository won't commence until 2010.
Spain stores nuclear waste at the reactor sites for ten years with no reprocessing. Plans for future storage include a temporary storage facility in Trillo, until the establishment of a longer-term storage facility. [13] Funding for nuclear waste management is paid by a tax of 1% on all revenues from nuclear power.
As of 2017 Spain has extended the life of the Almaraz Nuclear Power Plant and a nuclear storage facility will be built according to the Spanish secretary of State for the EU Jorge Toledo Albiñana, stating work will start regardless of Portugal's complaints, and uranium bars that will remain radioactive for the next 300 years will be stored on site. [14]
In July 2022, the initial container with used fuel from the Garoña plant was placed in its onsite interim dry storage. There are plans to create 44 more containers for the remaining 2,245 used fuel rods. [12]
Nuclear power is the use of nuclear reactions to produce electricity. Nuclear power can be obtained from nuclear fission, nuclear decay and nuclear fusion reactions. Presently, the vast majority of electricity from nuclear power is produced by nuclear fission of uranium and plutonium in nuclear power plants. Nuclear decay processes are used in niche applications such as radioisotope thermoelectric generators in some space probes such as Voyager 2. Generating electricity from fusion power remains the focus of international research.
A nuclear power plant (NPP) is a thermal power station in which the heat source is a nuclear reactor. As is typical of thermal power stations, heat is used to generate steam that drives a steam turbine connected to a generator that produces electricity. As of September 2023, the International Atomic Energy Agency reported there were 410 nuclear power reactors in operation in 32 countries around the world, and 57 nuclear power reactors under construction.
Sellafield, formerly known as Windscale, is a large multi-function nuclear site close to Seascale on the coast of Cumbria, England. As of August 2022, primary activities are nuclear waste processing and storage and nuclear decommissioning. Former activities included nuclear power generation from 1956 to 2003, and nuclear fuel reprocessing from 1952 to 2022.
Japan Nuclear Fuel Ltd. (JNFL) is a nuclear energy company based in Rokkasho, Aomori Prefecture, Japan involved in the production of nuclear fuel, as well as the reprocessing, storage and disposal of nuclear waste. The mission of Japan Nuclear Fuel Limited is to establish a nuclear fuel cycle infrastructure in Japan.
Nuclear decommissioning is the process leading to the irreversible complete or partial closure of a nuclear facility, usually a nuclear reactor, with the ultimate aim at termination of the operating licence. The process usually runs according to a decommissioning plan, including the whole or partial dismantling and decontamination of the facility, ideally resulting in restoration of the environment up to greenfield status. The decommissioning plan is fulfilled when the approved end state of the facility has been reached.
Bradwell nuclear power station is a Magnox-design nuclear power station that is undergoing decommissioning. It is located on the Dengie peninsula at the mouth of the River Blackwater, Essex. In 2019, it was the first nuclear power station in the UK to be placed into long-term decommissioned management. As of 2016, China General Nuclear Power Group is considering Bradwell for the site of a new nuclear power station, named Bradwell B.
A graphite-moderated reactor is a nuclear reactor that uses carbon as a neutron moderator, which allows natural uranium to be used as nuclear fuel.
In Pakistan, nuclear power is provided by six commercial nuclear power plants with a net capacity of 3,262 megawatts (3.262 GW) from pressurized water reactors. In 2020, Pakistan's nuclear power plants produced a total of 133 terawatt-hours of electricity, which accounted for roughly 10% of the nation's total electric energy generation.
The Borssele Nuclear Power Station is a nuclear power plant near the Dutch town of Borssele. It has a pressurised water reactor (PWR). Borssele is the only nuclear power plant still operational for electricity production in the Netherlands. Its net output is 485 MWe.
Nuclear power construction costs have varied significantly across the world and in time. Large and rapid increases in cost occurred during the 1970s, especially in the United States. Recent cost trends in countries such as Japan and Korea have been very different, including periods of stability and decline in costs.
Nuclear power in Switzerland is generated by three nuclear power plants, with a total of four operational reactors (see list below). Since 1985, nuclear power has been contributing approximately 40% of Switzerland's electrical energy. In 2022, it produced 23 terawatt-hours (TWh) of electricity, and accounted for 37% of the nation's gross electricity generation of 62 TWh, while 55% was produced by hydroelectric plants and 8% came from conventional thermal power stations and non-hydro renewable energy sources.
Almaraz Nuclear Power Plant is a nuclear power station at Almaraz in Spain which uses the Tagus River, that runs into Portugal, for cooling.
The Vandellòs Nuclear Power Plant is a nuclear power plant in Vandellòs located close to the Coll de Balaguer pass in Catalonia, Spain.
Nuclear power in the European Union accounted for approximately 26% of total electricity production in 2019 and nearly half of low-carbon energy production across the EU.
Garigliano Nuclear Power Plant was a nuclear power plant located at Sessa Aurunca (Campania), in southern Italy. It was named after the river Garigliano.
The late 1950s and early 1960s saw a strong push from the Spanish Government to establish a national nuclear power industry. In response to the surge in nuclear power plant plans, a strong anti-nuclear movement emerged in 1973, which ultimately impeded the realisation of most of the projects.
Nuclear industry in Canada is an active business and research sector, producing about 15% of its electricity in nuclear power plants of domestic design. Canada is the world's largest exporter of uranium, and has the world's second largest proven reserves. Canada also exports nuclear technology within the terms of the Nuclear Non-proliferation Treaty, to which it is a signatory, and is the world's largest producer of radioactive medical isotopes.
The United Arab Emirates is installing nuclear-powered plants to meet their electricity demand, which is estimated to increase from 15 GWe to over 40 GWe in 2020. In December 2009, the US and UAE signed a Section 123 Agreement for peaceful nuclear cooperation. The UAE has also signed Nuclear Non-Proliferation Treaty (NPT), along with the additional protocol.
Bangladesh first conceived building a nuclear power plant in 1961. The Bangladesh Atomic Energy Commission was established in 1973. The country currently operates a TRIGA research reactor at the Atomic Energy Research Establishment in Savar.
The Vandellòs I nuclear Incident was a fire that caused an interruption of the cooling system in the Vandellòs Nuclear Power Plant, Catalonia (Spain) on 19 October 1989.