Orbital replacement unit

Last updated

Orbital replacement units (or on-orbit replaceable unit [1] :21) (ORUs) are key elements of the International Space Station that can be readily replaced when the unit either passes its design life or fails. ORUs are parts of the main systems and subsystems of the external elements of the ISS, none are intended to be installed inside the pressurised modules. Examples of ORUs are: pumps, storage tanks, controller boxes, antennas, and battery units. Such units are replaced either by astronauts during EVA or by the Dextre (SPDM) robotic arm. All are stored on the three external stowage platforms (ESPs) or the four ExPRESS Logistics Carriers (ELCs) mounted on the Integrated Truss Structure (ITS).

Contents

Location of ESPs and ELCs on the International Space Station. ISS Unpressurized Platforms.png
Location of ESPs and ELCs on the International Space Station.

Introduction

ISS Integrated Truss Structure detailing all Orbital Replacement Units in situ Truss breakdown.png
ISS Integrated Truss Structure detailing all Orbital Replacement Units in situ

While spare parts/ORUs were routinely brought up and down during the ISS life-time via Space Shuttle resupply missions, there was a heavy emphasis[ clarification needed ] once the Station was considered complete.

Several Shuttle missions were dedicated to the delivery of ORUs using support carrier structures/pallets of which some remained in the cargo bay, some that were deployed and retrieved and other pallets that were designed to be removed from the payload bay by RMS and placed onto the station.

Deployable pallet flights included STS-102 [2] with External Stowage Platform ESP-1, STS-114 [3] with ESP-2, STS-118 [4] with ESP-2, STS-129 [5] with ExPRESS Logistics Carrier ELC-1 and ELC-2, STS-133 [6] with ELC-4 and STS-134 [7] with ELC-3.

Other modes of ORU delivery included:

Payload bay sidewall mounted ORUs, such as BCDUs, were regularly carried and transported to the ISS via EVAs.

Also, three flights of the Integrated Cargo Carrier (ICC) which remained in the cargo bay on flights STS-102, STS-105 and STS-121; one use of the ICC-Lite on STS-122 (a shortened version of the ICC); two uses of the ICC-Vertical Light Deployable on STS-127 as ICC-VLD and STS-132 as ICC-VLD2, which were deployed and retrieved during the mission; and five uses of the Lightweight MPESS Carrier (LMC) on STS-114, STS-126, STS-128, STS-131 and STS-135, the LMC was not designed to be deployed and remained in the shuttle payload bay throughout the flight.

To date other than the Space Shuttle missions, only one other mode of transportation of ORUs was utilised by the station, the Japanese cargo vessel HTV-2 delivered an FHRC and CTC-4 via its Exposed Pallet (EP), [8] and HTV-4 delivered a Main Bus Switching Unit (MBSU) and a Utility transfer assembly (UTA). [9]

Modes of ORU transport to the ISS

Types of ORUs

Orbital replacement units are parts of the main systems and subsystems of the external elements of the ISS. Affecting the control of the cooling system, the movement and control of the solar arrays and SARJ as well as the flow of power throughout the station from solar arrays to the heat rejection system as part of the External Active Thermal Control System (EATCS). As well as storage tanks for oxygen as part of the station Environmental Control and Life Support System (ECLSS). ORUs can be hardware such as radiators, or simply batteries or communication antennas, essentially any element that can readily be removed and replaced when required.

The replaceable modular nature of the station allows its life to be extended well beyond its initial design life, theoretically.

ORUs and robotic arms

ORUs to be handled by Dextre have attachments designed to be gripped with the ORU/Tool Changeout Mechanisms (OTCM) on the end of each arm. The H‐fixture is for massive objects and/or to stabilize Dextre, the most common is a Micro‐fixture (also known as a Micro‐square) and the Micro‐Conical Fitting is used in tight spaces. A Modified Truncated Cone (MTC) Target is used to visually line up Dexter's arm to grab a fixture. [1] Any ORU with a grapple fixture can be moved by the Canadarm2.

Orbital replacement unit (ORU) spares

(Weight, description and current location of the spare on the station)

Multiple spares

Three spares – ESP-2 FRAM-7 (keel side) FHRC SN1003, [3] ESP-3 FRAM-2 (top side) FHRC SN1004, [10] ELC-4 FRAM-5 (keel side) FHRC SN0005 delivered by HTV-2. [8]

Four original spares. Two unused Pump Modules remain – ELC-1 FRAM-7 (keel side) PM SN0007, [5] ESP-2 FRAM-1 (top side) PM SN0005. [5] [11] Two utilised – ELC-2 FRAM-6 (keel side) PM SN0004 (Installed on ESP-2 FRAM-1 during STS-121, then removed by the Exp 24 crew to replace the failed original PM SN0002 on the S1 truss. SN0002 was returned to earth by the STS-135 crew. SN0004 replaced by PM SN0006 and moved to MT POA by Exp 38 crew in Dec. 2013. Relocated to ESP-2 FRAM-1 by ISS-41 EVA-27 in Oct. 2014. Swapped positions with SN0005 by SPDM in Mar. 2015.); ESP-3 FRAM-3 (top side) PM SN0006 (Installed on ESP-3 FRAM-3 during STS-127, swapped with failed PM SN0004 from S1 truss by Exp 38 crew Dec. 2013).

Two spares – ELC-1 FRAM-9 (keel side), [5] ELC-3 FRAM-5 (keel side) [7] Also note – other than these two spares, two other Shuttle missions brought up new ATAs and then returned the failed ATAs: STS-128 ATA SN0004 up/SN0002 down (P1 truss original ATA) and STS-131 SN0002 up/SN0003 down (S1 truss original ATA).

Two spares – ELC-1 FRAM-6 (keel side) NTA SN0002 (refurbished) [5] ELC-2 FRAM-9 (keel side) NTA SN0003 (refurbished) [5] Also note – other than these two spares, two other Shuttle missions replaced NTAs. STS-122 delivered new NTA SN0004 and then returned the depleted P1 Truss NTA SN0003. STS-124 swapped the new NTA SN0005 from ESP-3 FRAM 2 with the depleted NTA SN0002 from the S1 Truss. The STS-126 crew returned this depleted NTA.

One spare – ELC-3 FRAM-6 (keel side), [7] one depleted tank ELC-2 FRAM-4 (top side) [5] Note the depleted tank was swapped with the original HPGTA launched on ELC-2 at FRAM-4.

Three units – CTC-3 formerly on ELC-2 FRAM-2 (top side), [5] was later moved to ESP-2 FRAM-3 via SPDM. CTC-2 on ELC-4 FRAM-2 (keel side), [8] CTC-5 on ELC-3 FRAM-1 (top side) [7]

Two spares – ESP-3 FRAM-1 (top side), [4] ESP-2 FRAM-5 (keel side) [3]

Two spares – ELC-1 FRAM-5 (top side) CMG SN104, [5] ELC-2 FRAM-5 (top side) CMG SN102 [5] Note: STS-118 crew delivered a CMG on ESP-3, swapping it for a failed unit on the ITS-Z1 truss. That failed unit was placed on ESP-2 FRAM-5 until it was returned by STS-122.[12]

Two spares – ELC-3 FRAM-4 (top side), [7] ELC-3 FRAM-7 (keel side) [7]

Three spares – ESP-1 FRAM-2, [2] ESP-2 FRAM-2 (top side), [3] ELC-2 FRAM-2 (top side) [3]

Two spares – ESP-3 FRAM-6 (keel side), [4] ELC-1 FRAM-4 (top side) [5]

Two spares – ESP-2 FRAM-4 (top side), [3] ELC-2 FRAM-7 (placed via SPDM, delivered by HTV-4 Aug. 2013). The MBSU on ESP-2 FRAM-6 (keel side) was added by STS-120 crew, then swapped with a failed unit from the S0 truss by the Exp 32 crew in late 2012.

Two spares – ESP-2 FRAM-8 (keel side) [3] ELC-4 FRAM-4 (keel side) Utility Transfer Assembly (delivered by HTV-4 EP via SPDM Aug. 2013)

Three original spares, now two available spares – ESP-1 FRAM-1 [2] plus 2 on ITS-P6 that were initially used by the Early External Active Thermal Control System (EEATCS). One EEATCS spare on ITS-P6 swapped out for a leaky unit on the 2B power channel during an Exp 35 EVA May 11, 2013. Other EEATCS spare developed electrical fault and was replaced by an additional spare launched on SpaceX CRS-14.

Single spares

The TUS reel assembly (TUS-RA) is basically a large spool much like a garden hose reel that pays out cable when the MT moves away and rolls it back up as the MT returns to the center of the truss. This is the same TUS-RA retrieved during STS-121. It was replaced and this failed unit was returned to earth and refurbished to later fly on ELC-2.

The Heat Rejection Subsystem (HRS) consists of a base, eight panels, torque panel, torque arm, an interconnected fluid system, a scissors-type deployment mechanism and a computer controlled motor/cable deployment system. Part of the station's external active thermal control system (EATCS), the HRS radiator rejects thermal energy via radiation.

The LDU provides drive and stopping forces for the mobile transporter along the integrated truss structure rail.

Plasma Contactor Unit (PCU) is used to disperse the electrical charge that builds up by providing an electrically conductive "ground path" to the plasma environment surrounding the ISS. This prevents the electrical discharges and provides a means of controlling crew shock hazard during EVA. There are two PCUs located on the ISS Zenith 1 Truss, both of which are operated during EVA.

See also

Related Research Articles

<i>Kibō</i> (ISS module) Japanese ISS module, used on ISS press conferences

The Japanese Experiment Module (JEM), nicknamed Kibō, is a Japanese science module for the International Space Station (ISS) developed by JAXA. It is the largest single ISS module, and is attached to the Harmony module. The first two pieces of the module were launched on Space Shuttle missions STS-123 and STS-124. The third and final components were launched on STS-127.

Mobile Servicing System Robotic system on board the International Space Station

The Mobile Servicing System (MSS) is a robotic system on board the International Space Station (ISS). Launched to the ISS in 2001, it plays a key role in station assembly and maintenance; it moves equipment and supplies around the station, supports astronauts working in space, and services instruments and other payloads attached to the ISS and is used for external maintenance. Astronauts receive specialized training to enable them to perform these functions with the various systems of the MSS.

STS-96

STS-96 was a Space Shuttle mission to the International Space Station (ISS) flown by Space Shuttle Discovery, and the first shuttle flight to dock at the International Space Station. The shuttle carried the Spacehab module in the payload, filled with cargo for station outfitting. STS-96 launched from Kennedy Space Center, Florida, on 27 May 1999 at 06:49:42 AM EDT and returned to Kennedy on 6 June 1999, 2:02:43 AM EDT.

STS-102

STS-102 was a Space Shuttle mission to the International Space Station (ISS) flown by Space Shuttle Discovery and launched from Kennedy Space Center, Florida. STS-102 flew in March 2001; its primary objectives were resupplying the ISS and rotating the Expedition 1 and Expedition 2 crews.

Dextre Robotic Arm

Dextre, also known as the Special Purpose Dexterous Manipulator (SPDM), is a two armed robot, or telemanipulator, which is part of the Mobile Servicing System on the International Space Station (ISS), and does repairs otherwise requiring spacewalks. It was launched March 11, 2008 on mission STS-123.

External stowage platform

External stowage platforms (ESPs) are key components of the International Space Station (ISS). Each platform is made from steel and serves as an external pallet that can hold spare parts, also known as orbital replacement units (ORUs), for the space station. As a platform it is not pressurized, but does require electricity to power the heaters of some of the stored equipment. ORUs are attached to the ESP via Flight Releasable Attachment Mechanisms (FRAMs), matching witness plates that mate the ORU to the platform.

STS-127 Space Shuttle mission

STS-127 was a NASA Space Shuttle mission to the International Space Station (ISS). It was the twenty-third flight of Space ShuttleEndeavour. The primary purpose of the STS-127 mission was to deliver and install the final two components of the Japanese Experiment Module: the Exposed Facility, and the Exposed Section of the Experiment Logistics Module (ELM-ES). When Endeavour docked with the ISS on this mission in July 2009, it set a record for the most humans in space at the same time in the same vehicle, the first time thirteen people have been at the station at the same time. It also tied the record of thirteen people in space at any one time.

STS-133

STS-133 was the 133rd mission in NASA's Space Shuttle program; during the mission, Space Shuttle Discovery docked with the International Space Station. It was Discovery's 39th and final mission. The mission launched on 24 February 2011, and landed on 9 March 2011. The crew consisted of six American astronauts, all of whom had been on prior spaceflights, headed by Commander Steven Lindsey. The crew joined the long-duration six person crew of Expedition 26, who were already aboard the space station. About a month before lift-off, one of the original crew members, Tim Kopra, was injured in a bicycle accident. He was replaced by Stephen Bowen.

STS-123

STS-123 was a Space Shuttle mission to the International Space Station (ISS) which was flown by Space Shuttle Endeavour. STS-123 was the 1J/A ISS assembly mission. The original launch target date was 14 February 2008 but after the delay of STS-122, the shuttle was launched on 11 March 2008. It was the twenty-fifth shuttle mission to visit the ISS, and delivered the first module of the Japanese laboratory, Japanese Experiment Module (Kibō), and the Canadian Special Purpose Dexterous Manipulator, (SPDM) Dextre robotics system to the station. The mission duration was 15 days and 18 hours, and it was the first mission to fully utilize the Station-to-Shuttle Power Transfer System (SSPTS), allowing space station power to augment the shuttle power systems. The mission set a record for a shuttle's longest stay at the ISS.

STS-129

STS-129 was a NASA Space Shuttle mission to the International Space Station (ISS). Atlantis was launched on November 16, 2009 at 14:28 EST, and landed at 09:44 EST on November 27, 2009 on runway 33 at the Kennedy Space Center's Shuttle Landing Facility. It was also the last shuttle launch of the 2000s.

STS-131 NASA Space Shuttle mission to the International Space Station

STS-131 was a NASA Space Shuttle mission to the International Space Station (ISS). Space ShuttleDiscovery launched on 5 April 2010 at 6:21 am from LC-39A, and landed at 9:08 am on 20 April 2010 on runway 33 at the Kennedy Space Center's Shuttle Landing Facility. The mission marked the longest flight for Space Shuttle Discovery.

STS-132

STS-132 was a NASA Space Shuttle mission, during which Space Shuttle Atlantis docked with the International Space Station on 16 May 2010. STS-132 was launched from the Kennedy Space Center on 14 May 2010. The primary payload was the Russian Rassvet Mini-Research Module, along with an Integrated Cargo Carrier-Vertical Light Deployable (ICC-VLD). Atlantis landed at the Kennedy Space Center on 26 May 2010.

Integrated Truss Structure Part of the International Space Station; sequence of connected trusses

The Integrated Truss Structure (ITS) of the International Space Station (ISS) consists of a linear arranged sequence of connected trusses on which various unpressurized components are mounted such as logistics carriers, radiators, solar arrays, and other equipment. It supplies the ISS with a bus architecture. It is approximately 110 meters long and is made from aluminum and stainless steel.

ExPRESS Logistics Carrier Module on the International Space Station

An EXpedite the PRocessing of Experiments to Space Station (ExPRESS) Logistics Carrier (ELC) is an unpressurized attached payload platform for the International Space Station (ISS) that provides mechanical mounting surfaces, electrical power, and command and data handling services for Orbital Replacement Units (ORUs) as well as science experiments on the ISS. The ELCs were developed primarily at the Goddard Space Flight Center in Greenbelt, Maryland, with support from JSC, KSC, and MSFC. ELC was formerly called "Express Pallet" and is the unpressurized counterpart to the pressurized ExPRESS Rack. An ELC provides scientists with a platform and infrastructure to deploy experiments in the vacuum of space without requiring a separate dedicated Earth-orbiting satellite.

STS-134 25th and last spaceflight of Space Shuttle Endeavour

STS-134 was the penultimate mission of NASA's Space Shuttle program and the 25th and last spaceflight of Space ShuttleEndeavour. This flight delivered the Alpha Magnetic Spectrometer and an ExPRESS Logistics Carrier to the International Space Station. Mark Kelly served as the mission commander. STS-134 was expected to be the final space shuttle mission if STS-135 did not receive funding from Congress. However, in February 2011, NASA stated that STS-135 would fly "regardless" of the funding situation. STS-135, flown by Atlantis, took advantage of the processing for STS-335, the Launch On Need mission that would have been necessary if the STS-134 crew became stranded in orbit.

Maintenance of the International Space Station

Since construction started, the International Space Station programme has had to deal with several maintenance issues, unexpected problems and failures. These incidents have affected the assembly timeline, led to periods of reduced capabilities of the station and in some cases could have forced the crew to abandon the space station for safety reasons, had these problems not been resolved.

Kounotori 2 Second H-II Transfer Vehicle

Kounotori 2, also known as HTV-2, was launched in January 2011 and was the second Japanese H-II Transfer Vehicle to resupply the International Space Station (ISS). It was launched by the H-IIB Launch Vehicle No. 2 manufactured by Mitsubishi Heavy Industries (MHI) and JAXA. After the supplies were unloaded, Kounotori 2 was loaded with waste material from ISS, including used experiment equipment and used clothes. Kounotori 2 was then unberthed and separated from the ISS and burned up upon reentering the atmosphere on 30 March 2011.

US Orbital Segment US components of the International Space Station

The US Orbital Segment (USOS) is the name given to the components of the International Space Station (ISS) constructed and operated by the United States National Aeronautics and Space Administration (NASA), European Space Agency (ESA), Canadian Space Agency (CSA) and Japan Aerospace Exploration Agency (JAXA). The segment currently consists of eleven pressurized components and various external elements, all of which were delivered by the Space Shuttle.

Integrated cargo carrier Space Shuttle module

Integrated Cargo Carrier (ICC) was a project, started in 1997 by the companies Spacehab and Airbus DS Space Systems, to develop a family of flight proven and certified cross-the-bay cargo carriers designed to fly inside the Space Shuttle cargo bay, installed either horizontally or vertically, and able to carry up to 8000 lbs. of unpressurized cargo into orbit. Airbus owns the ICC fleet of carriers.

External Active Thermal Control System International Space Station thermal control system

The International Space Station (ISS) External Active Thermal Control System (EATCS) maintains an equilibrium when the ISS environment or heat loads exceed the capabilities of the Passive Thermal Control System (PTCS). Note Elements of the PTCS are external surface materials, insulation such as Multi-Layer Insulation (MLI), or Heat Pipes. The EATCS provides heat rejection capabilities for all the U.S. pressurized modules, the Japanese Experiment Module (JEM), the Columbus Orbital Facility (COF), and the main power distribution electronics of the S0, S1 and P1 Trusses. The EATCS consists of two independent Loops, which both use mechanically pumped fluid state ammonia in closed-loop circuits. The EATCS is capable of rejecting up to 70 kW, and provides a substantial upgrade in heat rejection capacity from the 14 kW capability of the Early External Active Thermal Control System (EEATCS) via the Early Ammonia Servicer (EAS), which was launched on STS-105 and installed onto the P6 Truss.

References

  1. 1 2 Robotic Transfer and Interfaces for External ISS Payloads. 2014
  2. 1 2 3 "STS-102 Presskit" (PDF).
  3. 1 2 3 4 5 6 7 "EVA Checklist: STS-114 Flight Supplement" (PDF).
  4. 1 2 3 4 "STS-118 Presskit" (PDF).
  5. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 L. D. Welsch (October 30, 2009). "EVA Checklist: STS-129 Flight Supplement" (PDF). NASA.
  6. 1 2 "Space Shuttle Mission: STS-133" (PDF). NASA. February 2011.
  7. 1 2 3 4 5 6 7 "Space Shuttle Mission: STS-134" (PDF). NASA. April 2011.
  8. 1 2 3 "HTV2: Mission Press Kit" (PDF). Japan Aerospace Exploration Agency. January 20, 2011.
  9. "HTV4 (KOUNOTORI 4) Mission Press Kit" (PDF). Japan Aerospace Exploration Agency. August 2, 2013. Retrieved June 19, 2015.
  10. EVA Checklist STS-126 Flight Supplement, 2008
  11. "ISS Daily Summary Report – 03/06/15". ISS On-Orbit Status Report. Retrieved 30 March 2018.