STS-124

Last updated

STS-124
STS-124 Kibo.jpg
Kibō's pressurised module, two days after its installation, with Discovery in the background
Names Space Transportation System-124
Mission typeISS assembly
Operator NASA
COSPAR ID 2008-027A OOjs UI icon edit-ltr-progressive.svg
SATCAT no. 32960
Mission duration13 days, 18 hours, 13 minutes 7 seconds
Distance travelled9,230,622.6 kilometers (5,735,643.0 mi)
Orbits completed217
Spacecraft properties
Spacecraft Space Shuttle Discovery
Launch mass122,072 kilograms (269,123 lb)
Landing mass92,220 kilograms (203,320 lb)
Payload mass17530 kg [1]
Crew
Crew size7
Members
Launching
Landing
Start of mission
Launch dateMay 31, 2008, 21:02:12 (2008-05-31UTC21:02:12Z) UTC [2]
Launch site Kennedy LC-39A
End of mission
Landing dateJune 14, 2008, 15:15:19 (2008-06-14UTC15:15:20Z) UTC [3]
Landing site Kennedy SLF Runway 15
Orbital parameters
Reference system Geocentric
Regime Low Earth
Perigee altitude 307 kilometres (166 nmi)
Apogee altitude 328 kilometres (177 nmi)
Inclination 51.6 degrees
Period 91 minutes
Docking with ISS
Docking port PMA-2
(Harmony forward)
Docking dateJune 2, 2008, 18:03 UTC
Undocking dateJune 11, 2008, 11:42 UTC
Time docked8 days, 17 hours, 39 minutes
STS-124 patch.svg Sts124crew.jpg
From left to right: Chamitoff, Fossum, Ham, Kelly, Nyberg, Garan and Hoshide
  STS-123
STS-126  
 

STS-124 was a Space Shuttle mission, flown by Space Shuttle Discovery to the International Space Station. Discovery launched on May 31, 2008, at 17:02 EDT, moved from an earlier scheduled launch date of May 25, 2008, [4] and landed safely at the Kennedy Space Center's Shuttle Landing Facility, at 11:15 EDT on June 14, 2008. Its objective was to deliver the largest module of the space station – Kibō , the Japanese Experiment Module pressurized section. The mission is also referred to as ISS-1J by the ISS program.

Contents

Crew

Position [5] Launching AstronautLanding Astronaut
Commander Mark E. Kelly
Third spaceflight
Pilot Kenneth T. Ham
First spaceflight
Mission Specialist 1 Karen L. Nyberg
First spaceflight
Mission Specialist 2 Ronald J. Garan Jr.
First spaceflight
Mission Specialist 3 Michael E. Fossum
Second spaceflight
Mission Specialist 4 Akihiko Hoshide, JAXA
First spaceflight
Mission Specialist 5 Gregory E. Chamitoff
Expedition 17
First spaceflight
ISS Flight Engineer
Garret E. Reisman
Expedition 17
First spaceflight
ISS Flight Engineer

Crew notes

Commander Kelly discusses the crew

A crane moves Discovery toward the external tank and SRBs in high bay 3 of the Vehicle Assembly Building for STS-124. Space Shuttle Discovery lowered toward external tank and solid rocket boosters (STS-124).jpg
A crane moves Discovery toward the external tank and SRBs in high bay 3 of the Vehicle Assembly Building for STS-124.

"I'm really fortunate to be given the crew members that I have on this mission. It's myself and six others. We do swap one of our crew members with the expedition crew member on board. So Greg goes up, Greg stays on station and Garrett comes home. But the crew that was assigned to me—I'm really fortunate to have some really talented people. Ken Ham, as a pilot, knows the orbiter better than anybody I've seen. This is his first flight. My lead EVA crew member is Mike Fossum who did three spacewalks on my previous flight, STS-121. We've flown together before. I have all the confidence in the world in his ability to execute these EVAs. Karen Nyberg, my MS1, sits on the flight deck for ascent and entry. She's also the lead for all the robotic arm operations. She'll be flying three robotic arms in space, incredibly motivated, well ahead of the game and I expect great things from her. Ron Garan is my flight engineer, a colonel in the Air Force. This is going to be his first time in space as well as is Karen's and Ken's and he's doing three spacewalks. So he's got a lot on his plate. He's been doing great during training and he's going to have the opportunity to prove himself during these three spacewalks. I kind of wish it was me getting to go outside. I can't do that, but we expect great things from Ron as well. And then I have Aki Hoshide, our Japanese crew member, who grew up in New Jersey kind of like me. That's an interesting thing about our flight—we have four people from New Jersey on the mission. I look at Aki as the payload commander. He is responsible for that Japanese laboratory and he has taken on that responsibility as completely as I could have hoped for. All through our training he's been very much focused on the Japanese lab, making sure it's ready to go, making sure we're completely trained on the systems and everything we have to do. I've given him a lot of responsibility and he's completely taken it on." [7]

Mission payloads

ISS configuration after the STS-124 Mission (1J) is completed. ISS After STS-124.jpg
ISS configuration after the STS-124 Mission (1J) is completed.
JEM Kibo Pressurized Module during assembly at the Space Station Processing Facility ISS Kibo module.jpg
JEM Kibō Pressurized Module during assembly at the Space Station Processing Facility

STS-124 delivered the Pressurized Module (PM) of the Japanese Experiment Module (JEM), called Kibō , to the International Space Station (ISS). Kibō was berthed to the Harmony module and the pressurized section of the JEM Experiment Logistics Module, brought up by the STS-123 crew, was moved from Harmony to the JEM-PM. The Japanese Remote Manipulator System, a robotic arm, was also delivered by STS-124 and attached to Kibō. The entire Kibō laboratory was brought up over three missions. All the modules were manufactured at the Tsukuba Space Center and were shipped to the KSC SSPF for launch processing. It is manufactured from stainless steel and titanium.

Discovery carried with it replacement parts in a mid-deck locker for a malfunctioning toilet on the International Space Station. The crew had been using other facilities for waste until the new replacement parts were installed on the Zvezda module of the ISS.

Flying with the STS-124 crew was an action figure of Buzz Lightyear, a fictional character in the Toy Story franchise. Ken Ham, pilot of the STS-124 mission, brought with him episodes of ESPN Radio's Mike and Mike in the Morning, and a plastic microphone stand with the ESPN logo on it. Along with those, a yellow jersey from Lance Armstrong's record-setting seven victories at the Tour de France bicycle race, the backup jersey Eli Manning took to the Super Bowl, and the last jersey that American Major League Baseball's Craig Biggio wore in a game were placed inside the orbiter's lockers. [11]

With the completion of STS-124, the next permanent pressurized module would not be delivered to the ISS by a Space Shuttle until STS-130 brought up Tranquility in February 2010.

Mission background

The mission marked: [12]

Shuttle processing

Space Shuttle Discovery lifts off on mission STS-124. STS-124 Liftoff.jpg
Space Shuttle Discovery lifts off on mission STS-124.

On April 26, 2008 Discovery was rolled over to the Vehicle Assembly Building (VAB) from its processing bay in the Orbiter Processing Facility. Once in the VAB it was lifted vertically and mated with its external tank and solid rocket boosters on April 28, 2008. At the end of a week-long prep schedule on May 2, 2008, at 23:47 EDT the stack was rolled out to launch pad 39A on top the Mobile Launch Platform. Carried by the Crawler Transporter, Discovery arrived and was secured at LC-39A on May 3, 2008, at 06:06 EDT. The payload canister containing the JEM was rolled out to the Payload Changeout Room at the pad on April 29, 2008, and was later installed into Discovery's payload bay on May 5, 2008. The STS-124 crew arrived at Kennedy Space Center on May 6, 2008, for the 3-day Terminal Countdown Demonstration Test and returned to Johnson Space Center on May 9, 2008, after completion of the launch dress rehearsal. After many flight readiness review tests, Discovery was given a go for a May 31, 2008, launch. Discovery launched on May 31, 2008, at 21:02 UTC.

Mission timeline

May 31 (Flight day 1, Launch)

STS-124 launch close-up STS-124 launch closeup.jpg
STS-124 launch close-up
STS-124 launch viewed from spoil islands. STS124LaunchSpoilIslandsView.JPG
STS-124 launch viewed from spoil islands.

The Space Shuttle Discovery launched from the Kennedy Space Center at 17:02 EDT local time. Debris from the fuel tank was minimal. [13]

"While we've all prepared for this event today, the discoveries from Kibo will definitely offer hope for tomorrow," said Discovery's commander Mark Kelly just before launch. "Now stand by for the greatest show on Earth." [14]

Launch pad damage

One of the trenches at launch pad 39A that channels flames away from the shuttle during lift-off was significantly damaged. [15] The subsequent mishap investigation found that the damage was the result of carbonation of epoxy and corrosion of steel anchors which held the refractory bricks in place. These had been exacerbated by the fact that hydrochloric acid is an exhaust by-product of the solid rocket boosters. [16] Repairs to the trench were completed before the STS-125 mission's then scheduled launch attempt on October 8, 2008. [17] In fact STS-125 finally launched in May 2009, and in the meantime STS-126 (November 2008) and STS-119 (March 2009) had both been successfully launched from pad 39A.

June 1 (Flight day 2)

During the first full day in space, Ham and Nyberg completed a limited inspection of the shuttle's thermal protection system using the end effector camera of the shuttle's robotic arm. The crew also installed the centerline camera and extended the orbiter's docking system ring to prepare Discovery' for arrival at the space station. [18]

June 2 (Flight day 3)

Discovery docked with the space station at 18:03 UTC and the hatches opened at 19:36 UTC. Greg Chamitoff officially joined the Expedition 17 crew, replacing Garrett Reisman. [19]

June 3 (Flight day 4)

Ron Garan on the mission's second space walk, flight day 6. STS-124 Garan EVA2.jpg
Ron Garan on the mission's second space walk, flight day 6.

Mike Fossum and Ron Garan completed a six-hour-forty-eight-minute spacewalk at 23:10 UTC. During the excursion, the pair retrieved the Orbiter Boom Sensor System, serviced and inspected components of a Solar Alpha Rotary Joint and prepared the JEM-PS component of the Kibō laboratory for installation. Karen Nyberg and Akihiko Hoshide, using the station's robotic arm, removed the JEM-PS from the shuttle's payload bay and latched it in place on the Harmony node, completing the task at 23:01 UTC. [20]

June 4 (Flight day 5)

The Kibo module as seen from inside Space Shuttle Discovery Kibo PM and ELM-PS.jpg
The Kibō module as seen from inside Space Shuttle Discovery

The hatch to the Kibō lab was opened at 21:05 UTC. The crew also repaired the malfunctioning ISS toilet. [21] [22]

June 5 (Flight day 6)

The crew of STS-124 inside the pressurized Kibo module. STS-124 crew in Kibo.jpg
The crew of STS-124 inside the pressurized Kibō module.

Fossum and Garan completed the second STS-124 spacewalk. The 7-hour, 11-minute excursion ended at 22:15 UTC. [23] Prior to heading outside spacewalker Garan stated "Mike and I are getting ready to go out the door for our second spacewalk today. It's going to be a wonderful day." [24]

June 6 (Flight day 7)

The crew moved the Kibō Logistics Module from Harmony to the Pressurized Module. [25]

June 7 (Flight day 8)

Ron Garan works outside the Columbus lab STS-124 Columbus and Garan.jpg
Ron Garan works outside the Columbus lab

Hoshide and Nyberg moved two of the six joints on the Japanese Kibō lab's robotic arm for the first time, maneuvering them very slightly with a series of commands. [26] With the mission at its midpoint astronaut Karen Nyberg commented that "the week has gone way too fast." [27]

June 8 (Flight day 9)

Astronaut Karen Nyberg on flight day 11. STS-124 Karen window.jpg
Astronaut Karen Nyberg on flight day 11.

Fossum and Garan conducted the third and final spacewalk, replacing an empty nitrogen tank and collecting a sample of debris from the solar array. [28]

June 9 (Flight day 10)

Kibō's robot arm was extended to its full 33 feet, with all six joints tested. The astronauts also opened the hatch to the Kibō's storage unit. [29]

June 10 (Flight day 11)

The shuttle closed the hatch connecting it to the space station at 19:49 UTC. [30]

"It's amazing what's going on up here," said Chamitoff. "This is just the beginning. Overall, the mission's been a great success," said Kelly from space. "I certainly have a great crew and they're well trained, but there's also a little luck involved." [31]

June 11 (Flight day 12)

Discovery undocked from the International Space Station's Harmony Module, at 11:42 UTC. Discovery then conducted a fly-by of the ISS, so pictures could be taken. Saying goodbye to the ISS and its crew, commander Kelly said "We wish them the best with their expedition and we hope we left them a better, more capable space station than when we arrived. Sayonara." [32]

Afterwards the crew of Discovery conducted the late inspection of the shuttle's Thermal Protection System that was unable to be performed as usual on Flight Day 2, due to the size of the Kibō Pressurized Module. [33]

June 12 (Flight day 13)

Flight day 13 was a rare off-duty day. The only major projects were stowage of the Orbiter Boom Sensor System (OBSS) and an orbit adjustment burn.

During the day, pilot Kenneth Ham conducted an interview with Mike Greenberg and Mike Golic of ESPN, to be aired on their radio show, Mike and Mike in the Morning , the following morning on ESPN Radio and ESPN2.

June 13 (Flight day 14)

The crew conducted routine testing of the steering jets and an examination of the flight control system. During these tests, a shiny object was noticed trailing the shuttle. This was identified as a thermal clip from the shuttle's rudder speed brake, and should pose no danger during landing. [34]

June 14 (Flight day 15, Landing)

Space Shuttle Discovery lands Sts124landing.JPG
Space Shuttle Discovery lands

The crew worked through their lengthy list of deorbit preparations, which continued for most of the day. They closed the payload bay doors at 11:30 UTC, which took place without incident. All of Discovery's systems were nominal, and with the weather looking very good at KSC the deorbit burn took place on schedule at 14:10 UTC for landing on runway 15 at 15:15 UTC. [33]

At 12:00 UTC, the decision was made to use runway 15 rather than 33. This decision was made based on the sun glare that would be present on the Commander's window as he lined up Discovery with the runway.

Extra-vehicular activity

Three spacewalks were scheduled and completed during STS-124. [35] The cumulative time in extra-vehicular activity during the mission was 20 hours and 32 minutes.

EVASpacewalkersStart (UTC)End (UTC)Duration
EVA 1 Ronald J. Garan Jr.
Michael E. Fossum
June 3, 2008
16:22
June 3, 2008
23:10
6 hours, 48 minutes
Released straps on the shuttle's robotic arm elbow joint camera, transferred the OBSS back to shuttle. Prepared the Japanese Experiment Module, Pressurized Module (JEM-PM), named Kibō, for installation. Replaced a trundle bearing assembly on the starboard Solar Alpha Rotary Joint, and inspected damage on the SARJ. [36] [37]
EVA 2Garan
Fossum
June 5, 2008
15:04
June 5, 2008
22:15
7 hours, 11 minutes
Installed covers and external equipment to Kibō, prepared for the relocation of ELM-PS. Prepared a nitrogen tank assembly for removal, and the new tank was stowed on an External Stowage Platform to prepare for installation. Removed a television camera with failed power supply. [38]
EVA 3Fossum
Garan
June 8, 2008
13:55
June 8, 2008
20:28
6 hours, 33 minutes
Removed and replaced the starboard nitrogen tank assembly. Finished outfitting the Kibō laboratory. Reinstalled a television camera with a repaired power supply. [38]

Wake-up calls

NASA began a tradition of playing music to astronauts during the Gemini program, which was first used to wake up a flight crew during Apollo 15. Each track is specially chosen, often by their families, and usually has a special meaning to an individual member of the crew, or is applicable to their daily activities. [39]

Flight DaySongArtist/ComposerPlayed forLinks
Day 2 Your Wildest Dreams the Moody Blues Kenneth Ham WAV MP3
TRANSCRIPT
Day 3Away from HomeJosé Molina Serrano Greg Chamitoff WAV MP3
TRANSCRIPT
Day 4Hold Me with the Robot ArmYusuke Hanawa Akihiko Hoshide WAV MP3
TRANSCRIPT
Day 5 Have You Ever Brandi Carlile Karen Nyberg WAV MP3
TRANSCRIPT
Day 6 Fly Away Lenny Kravitz Ron Garan WAV MP3
TRANSCRIPT
Day 7 Bright as Yellow Innocence Mission Karen Nyberg WAV MP3
TRANSCRIPT
Day 8Taking OffGodaigoAkihiko Hoshide WAV MP3
TRANSCRIPT
Day 9 The Mickey Mouse Club March WAV MP3
TRANSCRIPT
Day 10 The Spirit of Aggieland Fightin' Texas Aggie Band Mike Fossum WAV MP3
TRANSCRIPT
Day 11 All Because of You U2 Ron Garan WAV MP3
TRANSCRIPT
Day 12 Centerfield John Fogerty Kenneth Ham WAV MP3
TRANSCRIPT
Day 13Crystal Frontier Calexico Mark Kelly WAV MP3
TRANSCRIPT
Day 14 Baby, Won't You Please Come Home Louis Prima and Keely Smith Garrett Reisman WAV MP3
TRANSCRIPT
Day 15Life on an Ocean Wave the US Merchant Marine Academy Band Mark Kelly WAV MP3
TRANSCRIPT

Contingency mission

STS-326 was the designation given to the Contingency Shuttle Crew Support mission which would have been launched in the event that Discovery became disabled during STS-124. [40] It would have been a modified version of the STS-126 mission of Endeavour , which would have involved the launch date being brought forward. The crew for this mission would have been a four-person subset of the full STS-126 crew, [40] namely:

Media

Related Research Articles

<span class="mw-page-title-main">STS-115</span> 2006 American crewed spaceflight to the ISS

STS-115 was a Space Shuttle mission to the International Space Station (ISS) flown by Space ShuttleAtlantis. It was the first assembly mission to the ISS after the Columbia disaster, following the two successful Return to Flight missions, STS-114 and STS-121. STS-115 launched from LC-39B at the Kennedy Space Center on September 9, 2006, at 11:14:55 EDT.

<span class="mw-page-title-main">STS-116</span> 2006 American crewed spaceflight to the ISS

STS-116 was a Space Shuttle mission to the International Space Station (ISS) flown by Space Shuttle Discovery. Discovery lifted off on December 9, 2006, at 20:47:35 EST. A previous launch attempt on December 7 had been canceled due to cloud cover. It was the first night launch of a Space Shuttle since STS-113 in November 2002.

<span class="mw-page-title-main">STS-117</span> 2007 American crewed spaceflight to the ISS

STS-117 was a Space Shuttle mission flown by Space Shuttle Atlantis, launched from pad 39A of the Kennedy Space Center on June 8, 2007. Atlantis lifted off from the launch pad at 19:38 EDT. Damage from a hail storm on February 26, 2007, had previously caused the launch to be postponed from an originally-planned launch date of March 15, 2007. The launch of STS-117 marked the 250th orbital human spaceflight. It was also the heaviest flight of the Space Shuttle.

<span class="mw-page-title-main">STS-119</span> 2009 American crewed spaceflight to the ISS

STS-119 was a Space Shuttle mission to the International Space Station (ISS) which was flown by Space Shuttle Discovery during March 2009. It delivered and assembled the fourth starboard Integrated Truss Segment (S6), and the fourth set of solar arrays and batteries to the station. The launch took place on March 15, 2009, at 19:43 EDT. Discovery successfully landed on March 28, 2009, at 15:13 pm EDT.

<span class="mw-page-title-main">Michael E. Fossum</span>

Michael Edward Fossum is a former American astronaut, engineer, and the Chief Operating Officer of Texas A&M University at Galveston. He flew into space on board the NASA Space Shuttle missions STS-121 and STS-124 and served as a mission specialist of Expedition 28 and commander of Expedition 29 aboard the International Space Station.

<span class="mw-page-title-main">STS-120</span> 2007 American crewed spaceflight to the ISS

STS-120 was a Space Shuttle mission to the International Space Station (ISS) that launched on October 23, 2007, from the Kennedy Space Center, Florida. The mission is also referred to as ISS-10A by the ISS program. STS-120 delivered the Harmony module and reconfigured a portion of the station in preparation for future assembly missions. STS-120 was flown by Space ShuttleDiscovery, and was the twenty-third Space Shuttle mission to the ISS.

<span class="mw-page-title-main">STS-127</span> 2009 American crewed spaceflight to the ISS

STS-127 was a NASA Space Shuttle mission to the International Space Station (ISS). It was the twenty-third flight of Space ShuttleEndeavour. The primary purpose of the STS-127 mission was to deliver and install the final two components of the Japanese Experiment Module: the Exposed Facility, and the Exposed Section of the Experiment Logistics Module (ELM-ES). When Endeavour docked with the ISS on this mission in July 2009, it set a record for the most humans in space at the same time in the same vehicle, the first time thirteen people have been at the station at the same time. Together they represented all ISS program partners and tied the general record of thirteen people in space with the first such occurrence of 1995.

<span class="mw-page-title-main">STS-126</span> 2008 American crewed spaceflight to the ISS

STS-126 was the one hundred and twenty-fourth NASA Space Shuttle mission, and twenty-second orbital flight of the Space Shuttle Endeavour (OV-105) to the International Space Station (ISS). The purpose of the mission, referred to as ULF2 by the ISS program, was to deliver equipment and supplies to the station, to service the Solar Alpha Rotary Joints (SARJ), and repair the problem in the starboard SARJ that had limited its use since STS-120. STS-126 launched on 15 November 2008 at 00:55:39 UTC from Launch Pad 39A (LC-39A) at NASA's Kennedy Space Center (KSC) with no delays or issues. Endeavour successfully docked with the station on 16 November 2008. After spending 15 days, 20 hours, 30 minutes, and 30 seconds docked to the station, during which the crew performed four spacewalks, and transferred cargo, the orbiter undocked on 28 November 2008. Due to poor weather at Kennedy Space Center, Endeavour landed at Edwards Air Force Base on 30 November 2008 at 21:25:09 UTC.

<span class="mw-page-title-main">STS-133</span> 2011 American crewed spaceflight to the ISS and final flight of Space Shuttle Discovery

STS-133 was the 133rd mission in NASA's Space Shuttle program; during the mission, Space Shuttle Discovery docked with the International Space Station. It was Discovery's 39th and final mission. The mission launched on February 24, 2011, and landed on March 9, 2011. The crew consisted of six American astronauts, all of whom had been on prior spaceflights, headed by Commander Steven Lindsey. The crew joined the long-duration six person crew of Expedition 26, who were already aboard the space station. About a month before lift-off, one of the original crew members, Tim Kopra, was injured in a bicycle accident. He was replaced by Stephen Bowen.

<span class="mw-page-title-main">STS-123</span> 2008 American crewed spaceflight to the ISS

STS-123 was a Space Shuttle mission to the International Space Station (ISS) which was flown by Space Shuttle Endeavour. STS-123 was the 1J/A ISS assembly mission. The original launch target date was February 14, 2008, but after the delay of STS-122, the shuttle was launched on March 11, 2008. It was the twenty-fifth shuttle mission to visit the ISS, and delivered the first module of the Japanese laboratory, Japanese Experiment Module (Kibō), and the Canadian Special Purpose Dexterous Manipulator, (SPDM) Dextre robotics system to the station. The mission duration was 15 days and 18 hours, and it was the first mission to fully utilize the Station-to-Shuttle Power Transfer System (SSPTS), allowing space station power to augment the shuttle power systems. The mission set a record for a shuttle's longest stay at the ISS.

<span class="mw-page-title-main">STS-129</span> 2009 American crewed spaceflight to the ISS

STS-129 was a NASA Space Shuttle mission to the International Space Station (ISS). Atlantis was launched on November 16, 2009, at 14:28 EST, and landed at 09:44 EST on November 27, 2009, on runway 33 at the Kennedy Space Center's Shuttle Landing Facility. It was also the last Shuttle mission of the 2000s.

<span class="mw-page-title-main">STS-130</span> 2010 American crewed spaceflight to the ISS

STS-130 was a NASA Space Shuttle mission to the International Space Station (ISS). Space ShuttleEndeavour's primary payloads were the Tranquility module and the Cupola, a robotic control station with six windows around its sides and another in the center, providing a 360-degree view around the station. Endeavour launched at 04:14 EST on February 8, 2010 and landed at 22:22 EST on February 21, 2010, on runway 15 at the Kennedy Space Center's Shuttle Landing Facility.

<span class="mw-page-title-main">STS-131</span> 2010 American crewed spaceflight to the ISS

STS-131 was a NASA Space Shuttle mission to the International Space Station (ISS). Space ShuttleDiscovery launched on April 5, 2010, at 6:21 am from LC-39A, and landed at 9:08 am on April 20, 2010, on runway 33 at the Kennedy Space Center's Shuttle Landing Facility. The mission marked the longest flight for Space Shuttle Discovery.

<span class="mw-page-title-main">STS-132</span> 2010 American crewed spaceflight to the ISS

STS-132 was a NASA Space Shuttle mission, during which Space Shuttle Atlantis docked with the International Space Station on May 16, 2010. STS-132 was launched from the Kennedy Space Center on May 14, 2010. The primary payload was the Russian Rassvet Mini-Research Module, along with an Integrated Cargo Carrier-Vertical Light Deployable (ICC-VLD). Atlantis landed at the Kennedy Space Center on May 26, 2010.

<span class="mw-page-title-main">Akihiko Hoshide</span> Japanese engineer and JAXA astronaut

Akihiko Hoshide is a Japanese engineer, JAXA astronaut, and former commander of the International Space Station. On August 30, 2012, Hoshide became the third Japanese astronaut to walk in space.

<span class="mw-page-title-main">Ronald J. Garan Jr.</span> American astronaut

Ronald John Garan Jr. is a retired NASA astronaut. After graduating from State University of New York College at Oneonta in 1982, he joined the Air Force, becoming a Second Lieutenant in 1984. He became an F-16 pilot, and flew combat missions in Desert Shield and Desert Storm. Before becoming an astronaut he was the Operations Officer of the 40th Flight Test Squadron (FTS). He first flew in space as a mission specialist on the May 2008 STS-124 mission to the International Space Station (ISS). He returned to ISS on April 4, 2011, for a six-month stay as a member of Expedition 27. Garan is a highly decorated former NASA astronaut who flew on the US Space Shuttle, Russian Soyuz, and International Space Station. In total he spent 178 days in space and more than 71 million miles in 2,842 orbits of Earth, 27 hours and 3 minutes of EVA in four spacewalks, and 18 days on the bottom of the ocean during the NEEMO-9 undersea mission.

<span class="mw-page-title-main">Expedition 16</span> 16th Long-duration mission to the International Space Station

Expedition 16 was the 16th expedition to the International Space Station (ISS). The first two crew members, Yuri Malenchenko and Peggy Whitson, launched on 10 October 2007, aboard Soyuz TMA-11, and were joined by spaceflight participant Sheikh Muszaphar Shukor, the first Malaysian in space.

<span class="mw-page-title-main">STS-134</span> 2011 American crewed spaceflight to the ISS and final flight of Space Shuttle Endeavour

STS-134 was the penultimate mission of NASA's Space Shuttle program and the 25th and last spaceflight of Space ShuttleEndeavour. This flight delivered the Alpha Magnetic Spectrometer and an ExPRESS Logistics Carrier to the International Space Station. Mark Kelly served as the mission commander. STS-134 was expected to be the final Space Shuttle mission if STS-135 did not receive funding from Congress. However, in February 2011, NASA stated that STS-135 would fly "regardless" of the funding situation. STS-135, flown by Atlantis, took advantage of the processing for STS-335, the Launch on Need mission that would have been necessary if the STS-134 crew became stranded in orbit.

<span class="mw-page-title-main">STS-135</span> 2011 American crewed spaceflight to the ISS and final flight of the Space Shuttle program

STS-135 was the 135th and final mission of the American Space Shuttle program. It used the orbiter Atlantis and hardware originally processed for the STS-335 contingency mission, which was not flown. STS-135 launched on July 8, 2011, and landed on July 21, 2011, following a one-day mission extension. The four-person crew was the smallest of any shuttle mission since STS-6 in April 1983. The mission's primary cargo was the Multi-Purpose Logistics Module (MPLM) Raffaello and a Lightweight Multi-Purpose Carrier (LMC), which were delivered to the International Space Station (ISS). The flight of Raffaello marked the only time that Atlantis carried an MPLM.

<span class="mw-page-title-main">Expedition 28</span> Long-duration mission to the International Space Station

Expedition 28 was the 28th long-duration expedition to the International Space Station, and began on 23 May 2011 with the departure of the members of Expedition 27. The first three members of Expedition 28 arrived on the ISS aboard the Soyuz TMA-21 spacecraft on 4 April 2011, and were joined on 9 June 2011 by the three other crew members, who arrived aboard Soyuz TMA-02M. The expedition saw a number of significant events, including the final Space Shuttle mission, STS-135, which took place in July 2011. Expedition 28 was superseded by Expedition 29 on 16 September 2011.

References

PD-icon.svg This article incorporates public domain material from websites or documents of the National Aeronautics and Space Administration .

  1. "STS-124". Archived from the original on April 25, 2018. Retrieved April 24, 2018.
  2. "Mission Information – STS-124". NASA. Archived from the original on March 14, 2022.
  3. "Page 19" (PDF). Archived (PDF) from the original on June 8, 2017. Retrieved August 22, 2010.
  4. NASA (2008). "NASA Updates Target Launch Date for Next Space Shuttle Flight". NASA. Archived from the original on December 28, 2018. Retrieved March 31, 2008.
  5. NASA (2007). "NASA Assigns Crew for Shuttle Mission to Install Japanese Lab". NASA. Archived from the original on November 20, 2007. Retrieved October 30, 2007.
  6. Stephen Withers (2007). "Crew assignments for space shuttle mission STS-126 have been revised following the resignation of an experienced astronaut". iTWire. Archived from the original on June 5, 2008. Retrieved November 22, 2007.
  7. "NASA – Preflight Interview: Mark Kelly, Commander". Nasa.gov. June 20, 2008. Archived from the original on February 3, 2013. Retrieved August 22, 2010.
  8. CTV.ca Montreal-born astronaut brings bagels into space Archived June 2, 2008, at the Wayback Machine Sun. 1 June 2008 7:29 pm ET ; CTV National News – June 1, 2008 – 11pm TV newscast
  9. The Gazette (Montreal), Here's proof: Montreal bagels are out of this world Archived June 4, 2008, at the Wayback Machine , IRWIN BLOCK, Tuesday June 3, 2008, Section A, Page A2
  10. "1J Mission - International Space Station - JAXA". iss.jaxa.jp. Retrieved February 26, 2023.
  11. "Buzz Lightyear to Soar with Discovery". NASA. May 29, 2008. Archived from the original on May 31, 2008. Retrieved May 29, 2008.
  12. "Space Shuttle Discovery Arrives at Launch Pad, Countdown Test Set". NASA. Archived from the original on January 12, 2010. Retrieved December 30, 2009.
  13. "Discovery blasts off for space station". CNN . Archived from the original on June 3, 2008. Retrieved June 2, 2008.
  14. "SPACE.com – Shuttle Discovery Launches Space Station's Largest Lab". Space.com . May 31, 2008. Archived from the original on January 5, 2010. Retrieved June 14, 2008.
  15. "SPACE.com". Space.com . June 2, 2008. Archived from the original on August 15, 2009. Retrieved July 10, 2008.
  16. Lilley, Steve K. (August 2010). "Hit the Bricks" (PDF). System Failure Case Studies. NASA. 4 (8): 1–4. Archived from the original (PDF) on 28 September 2011. Retrieved 20 July 2011.
  17. "NASA Image of the Day". Archived from the original on July 11, 2008. Retrieved July 10, 2008.
  18. "STS-124 MCC Status Report No. 03". NASA. Archived from the original on July 8, 2017. Retrieved June 3, 2008.
  19. "STS-124 MCC Status Report No. 05". NASA. Archived from the original on October 27, 2020. Retrieved June 3, 2008.
  20. "STS-124 MCC Status Report No. 07". NASA. Archived from the original on August 7, 2008. Retrieved June 5, 2008.
  21. "STS-124 MCC Status report". Nasa.gov. Archived from the original on September 25, 2020. Retrieved August 22, 2010.
  22. Harwood, William (June 4, 2008). "Russian toilet pump replaced in space station". SpaceflightNow. Archived from the original on December 4, 2022. Retrieved December 3, 2022.
  23. "STS-124 MCC status Report". Nasa.gov. Archived from the original on October 27, 2020. Retrieved August 22, 2010.
  24. "SPACE.com – Astronauts to Add Camera Eyes to New Station Lab". Space.com . June 5, 2008. Archived from the original on June 7, 2008. Retrieved June 14, 2008.
  25. "STS-124 MCC status Report". Nasa.gov. Archived from the original on November 26, 2010. Retrieved August 22, 2010.
  26. Shuttle astronauts prepare robot arm for 1st use Archived June 7, 2008, at the Wayback Machine
  27. "SPACE.com – Shuttle Crew Hits Mission Midpoint with Robot Arm Test". Space.com . June 7, 2008. Archived from the original on June 11, 2008. Retrieved June 14, 2008.
  28. Astronauts breeze through their 3rd spacewalk Archived June 8, 2008, at the Wayback Machine
  29. Astronauts wrap up space station work Archived June 9, 2008, at the Wayback Machine
  30. "STS-124 MCC Status Report #21". Archived from the original on March 17, 2010. Retrieved April 25, 2010.
  31. "SPACE.com – Space Shuttle Flight a 'Great Success,' Astronauts Say". Space.com . June 9, 2008. Archived from the original on June 13, 2008. Retrieved June 14, 2008.
  32. "SPACE.com – Shuttle Discovery Undocks From Space Station". Space.com . June 11, 2008. Archived from the original on June 13, 2008. Retrieved June 14, 2008.
  33. 1 2 "NASA – Space Shuttle". Archived from the original on April 25, 2013. Retrieved June 14, 2008.
  34. "NASA identifies shiny object trailing shuttle". CNN. June 13, 2008. Archived from the original on August 1, 2008. Retrieved August 22, 2010.
  35. "NASA Mission Summary, STS-124" (PDF). NASA. April 9, 2008. Archived (PDF) from the original on May 24, 2011. Retrieved April 9, 2008.
  36. NASA (2008). "STS-124 EVA Briefing Graphics". NASA. Archived from the original on July 2, 2017. Retrieved October 6, 2008.
  37. NASA (2008). "STS-124 MCC Status Report No. 07". NASA. Archived from the original on August 7, 2008. Retrieved October 6, 2008.
  38. 1 2 NASA (2008). "STS-124 MCC Status Report No. 11". NASA. Archived from the original on July 6, 2017. Retrieved October 6, 2008.
  39. Fries, Colin (June 25, 2007). "Chronology of Wakeup Calls" (PDF). NASA. Archived (PDF) from the original on June 20, 2010. Retrieved August 13, 2007.
  40. 1 2 Bergin, Chris (April 15, 2007). "NASA sets new launch date targets through to STS-124". NASASpaceflight. Archived from the original on March 3, 2016. Retrieved August 21, 2007.