STS-88

Last updated

STS-88
S99 03776.jpg
Endeavour's Canadarm positions Zarya above Unity, immediately prior to mating
Names Space Transportation System-88
Mission type ISS assembly
Operator NASA
COSPAR ID 1998-069A OOjs UI icon edit-ltr-progressive.svg
SATCAT no. 25549
Mission duration11 days, 19 hours, 18 minutes, 47 seconds.
Distance travelled7,600,000 kilometers (4,700,000 mi)
Orbits completed186
Spacecraft properties
Spacecraft Space Shuttle Endeavour
Launch mass119,715 kilograms (263,927 lb)
Landing mass90,853 kilograms (200,296 lb)
Crew
Crew size6
Members
Start of mission
Launch date4 December 1998, 08:35:34 (1998-12-04UTC08:35:34Z) UTC [1]
Launch site Kennedy, LC-39A
End of mission
Landing date16 December 1998, 03:53 (1998-12-16UTC03:54Z) UTC
Landing siteKennedy, SLF Runway 15
Orbital parameters
Reference system Geocentric
Regime Low Earth
Perigee altitude 388 kilometres (241 mi)
Apogee altitude 401 kilometres (249 mi)
Inclination 51.6 degrees
Period 92.4 minutes
Docking with ISS
Docking port Zarya  forward
(via PMA-2, Unity and PMA-1)
Docking date7 December 1998, 02:07 UTC
Undocking date13 December 1998, 20:24 UTC
Time docked6 days, 18 hours 17 minutes
Sts-88-patch.svg STS-88 crew.jpg
Left to right – Front: Krikalev, Currie; Back: Ross, Cabana, Sturckow, Newman
  STS-95 (92)
STS-96 (94) 

STS-88 was the first Space Shuttle mission to the International Space Station (ISS). It was flown by Space Shuttle Endeavour, and took the first American module, the Unity node, to the station. [2]

Contents

The seven-day mission was highlighted by the mating of the U.S.-built Unity node to the Functional Cargo Block (Zarya module) already in orbit, and three spacewalks to connect power and data transmission cables between the Node and the FGB. Zarya, built by Boeing and the Russian Space Agency, was launched on a Russian Proton rocket from the Baikonur Cosmodrome in Kazakhstan in November 1998. [1]

Other payloads on the STS-88 mission included the IMAX Cargo Bay Camera (ICBC), the Argentine Scientific Applications Satellite-S (SAC-A), the MightySat 1 Hitchhiker payload, the Space Experiment Module (SEM-07) and Getaway Special G-093 sponsored by the University of Michigan. [3]

Crew

Position Astronaut
Commander Flag of the United States.svg Robert D. Cabana
Fourth and last spaceflight
Pilot Flag of the United States.svg Frederick W. Sturckow
First spaceflight
Mission Specialist 1 Flag of the United States.svg Jerry L. Ross
Sixth spaceflight
Mission Specialist 2
Flight Engineer
Flag of the United States.svg Nancy J. Currie
Third spaceflight
Mission Specialist 3 Flag of the United States.svg James H. Newman
Third spaceflight
Mission Specialist 4 Flag of Russia.svg Sergei K. Krikalev, RKA
Fourth spaceflight

Launch attempts

AttemptPlannedResultTurnaroundReasonDecision pointWeather go (%)Notes
13 Dec 1998, 3:58:19 amScrubbedTechnical3 Dec 1998, 4:03 am (T−00:00:19)40Master alarm due to hydraulic problem. [4]
24 Dec 1998, 3:35:34 amSuccess0 days 23 hours 37 minutes60 [5]

Crew seat assignments

Seat [6] LaunchLanding Space Shuttle seating plan.svg
Seats 1–4 are on the flight deck.
Seats 5–7 are on the mid-deck.
1Cabana
2Sturckow
3RossNewman
4Currie-Gregg
5NewmanRoss
6Kirkalev
7Unused

Mission highlights

STS-88 launches from Kennedy Space Center, 4 December 1998. STS-88 launches.jpg
STS-88 launches from Kennedy Space Center, 4 December 1998.
The ISS after STS-88 construction. Sts088-703-019e.jpg
The ISS after STS-88 construction.
Illustration of the International Space Station after STS-88. ISSafterSTS88.jpg
Illustration of the International Space Station after STS-88.

Node 1, named Unity, was the first space station hardware delivered by the Space Shuttle. It has two Pressurized Mating Adapters (PMA), one attached to either end. One PMA (PMA-1) is permanently mated to Zarya, and the other (PMA-2) is used for orbiter dockings and crew access to the station. Unity also contains an International Standard Payload Rack used to support on-orbit activities, which was activated after the fifth Shuttle/Station assembly flight. [1]

To begin the assembly sequence, the crew conducted a series of rendezvous maneuvers similar to those conducted on other Shuttle missions to reach the orbiting FGB. On the way, Currie used the Shuttle's robot arm to place Node 1 atop the Orbiter Docking System. [7] [8] Cabana completed the rendezvous by flying Endeavour to within 10 metres (33 ft) of the FGB, allowing Currie to capture the FGB with the robot arm and place it on the Node's Pressurized Mating Adapter. [9]

Once the two elements were docked, Ross and Newman conducted two scheduled spacewalks to connect power and data cables between the Node, PMAs and the FGB. [10] The day following the spacewalks, Endeavour undocked from the two components, completing the first Space Station assembly mission. [11] [12]

Endeavour's astronauts toured the new International Space Station on Thursday, 10 December 1998, entering the Unity and Zarya modules for the first time, and establishing an S-band communications system that enables U.S. flight controllers to monitor the outpost's systems. [13] [14] Reflecting the international cooperation involved in building the largest space complex in history, Commander Robert Cabana and Russian Cosmonaut Sergei Krikalev opened the hatch to the U.S.-built Unity connecting module and floated into the new station together. [14]

The rest of the crew followed and began turning on lights and unstowing gear in the roomy hub to which other modules would be connected in the future. Each passageway within Unity was marked by a sign leading the way into tunnels to which new modules would later be connected. [14]

About an hour later, Robert Cabana and Sergei Krikalev opened the hatch to the Russian-built Zarya control module, which was the nerve center for the station in its embryonic stage. Joined by Pilot Frederick Sturckow and Mission Specialists Jerry Ross, James H. Newman and Nancy Currie, Cabana and Krikalev hailed the historic entrance into the International Space Station and said the hatch opening signified the start of a new era in space exploration. [14]

STS-88 lands at the Shuttle Landing Facility, 15 December 1998. STS-88 landing.jpg
STS-88 lands at the Shuttle Landing Facility, 15 December 1998.

Ross and Newman went right to work in Unity, completing the assembly of an early S-band communications system that allows flight controllers in Houston to send commands to Unity's systems and to keep tabs on the health of the station with a more extensive communications capability than exists through Russian ground stations. [14] The astronauts also conducted a successful test of the videoconferencing capability of the early communications system, which was used by the first crew to permanently occupy the station in November 2000 (Expedition 1). Newman downlinked greetings to controllers in the station flight control room in Houston and to astronaut Bill Shepherd, who commanded the first crew and lived aboard the station with Krikalev and Cosmonaut Yuri Gidzenko.[ citation needed ]

Krikalev and Currie replaced a faulty unit in Zarya which controlled the discharging of stored energy from one of the module's six batteries. The battery had not been working properly in its automatic configuration, but the new unit was functioning normally shortly after it was installed.[ citation needed ]

The astronauts also unstowed hardware and logistical supplies stored behind panels in Zarya, relocating the items for use by the Shuttle crew that was to visit the station in May 1999 and by Shepherd's expedition crew. The astronauts also completed their initial outfitting of the station.[ citation needed ]

The hatches to Zarya and Unity were closed before Endeavour undocked from the new station, leaving the new complex to orbit the Earth unpiloted. [15]

Mission timeline

Launch preparations

At 12:15 am EST on Monday, 23 June 1997, an Air Force C-5 air cargo plane arrived at the Shuttle Landing Facility carrying Unity (Node 1). [16] On 1 February 1998, Endeavour was towed to Orbiter Processing Facility Bay 1. [17] On 15 October 1998, Endeavour was moved from Orbiter Processing Facility Bay 1 to the Vehicle Assembly Building. [18] On 21 October 1998, Endeavour was transported atop the Crawler Transporter to Kennedy Space Center's Launch Pad 39A. [19]

3–4 December (Flight Day 1, Launch)

Space Shuttle Endeavour launched at 3:35:34 am EST from the Kennedy Space Center's Launch Pad 39A. STS-88 was the first shuttle flight to the International Space Station. After launch, the crew opened the shuttle's payload bay doors, deployed the Ku-Band antenna, and activated the shuttle's Hitchhiker payload. The crew also started preparing for the multiple engine firings that will be performed to bring shuttle Endeavour within the Shuttle Remote Manipulator System's reach of the Zarya FGB. At launch, Zarya was 240 statute miles above the Kennedy Space Center (KSC), and the module was on its 222nd orbit of the Earth since its launch. [20]

4 December (Flight Day 2)

On Flight Day 2, the crew of Endeavour performed several tasks to get ready for the docking on Sunday and the extra-vehicular activities (EVA) to be completed on the mission. Nancy Currie conducted a photo survey of Unity and Endeavour's payload bay, using the shuttle's robotic arm, Canadarm. Jerry Ross and Jim Newman checked out the spacesuits they would use on the three EVAs and prepared the shuttle's airlock for use during the spacewalks. Rick Sturckow, who would be choreographing the EVAs from inside the shuttle, joined Ross and Newman to check out the SAFER units to be worn during the spacewalks in case Ross or Newman were to become separated from Endeavour during one of the spacewalks. [21]

5 December (Flight Day 3)

On Flight Day 3, Currie used Canadarm to grapple and place Unity onto the Orbiter Docking System at 6:45 pm EST. The crew pressurized PMA-2 and entered it. They put several caps over vent valves to prepare for the entrance into Unity later in the week. Commander Bob Cabana performed a debris avoidance maneuver to move Endeavour out of the way of a casing from a Delta II rocket that launched on 6 November from Vandenberg Air Force Base in California. [7]

6 December (Flight Day 4, Docking with Zarya)

On Flight Day 4, Bob Cabana fired Endeavour's rockets several times to maneuver the shuttle within Canadarm's reach of the Zarya FGB. At 6:47 pm EST, Currie grappled Zarya. Later, at 9:07 pm EST, Cabana fired Endeavour's downward jets to bring the two modules together. [22]

7 December (Flight Day 5, EVA 1)

During a 7-hour, 21-minute spacewalk, astronauts Jerry Ross and Jim Newman helped activate the Unity node, the first module to the U.S. segment of the International Space Station. They connected 40 connectors and cables running along the 35-ton, 76-foot-tall (23 m) space station. At 10:49 pm EST, flight controllers in Houston saw Unity's systems come on. [10]

8 December (Flight Day 6)

On the 6th day of Endeavour's STS-88 mission, Mission Specialists Jerry Ross and Jim Newman relaxed after their long spacewalk on Flight Day 5. Ross, Newman, Nancy Currie, and Sergei Krikalev prepared equipment for Flight Day 7's EVA. Commander Bob Cabana and Pilot Rick Sturckow fired Endeavour's main reaction control system jets for 22 minutes to raise the ISS approximately 512 statute miles. The crew conducted interviews with ABC News, Discovery Channel, and MSNBC. [23]

9 December (Flight Day 7, EVA 2)

At 3:33 pm EST, Mission Specialists Jerry Ross and Jim Newman commenced on a 7-hour, 2-minute EVA to continue the installation of Unity. The two spacewalkers first installed two antennas on the outside of Unity. The astronauts also removed launch restraint pins on the four radial common berthing mechanisms of Unity. They installed covers on Unity's two data relay boxes to protect them from sunlight. Lastly, Newman freed a backup rendezvous system antenna on the Zarya FGB. [24]

10 December (Flight Day 8, Entrance into the ISS)

Flight Day 8 was a historic day as the International Space Station was opened for the first time on orbit. At 2:54 pm EST, Commander Bob Cabana and Russian Cosmonaut Sergei Krikalev opened the hatch to the Unity Node of the new International Space Station. The other members of the crew started unstowing gear and turning on the lights. At 4:12 pm EST, Cabana and Krikalev opened the hatch into Zarya . Jerry Ross and Jim Newman assembled a S-band communications system in Unity, and Krikalev and Nancy Currie replaced a problematic battery discharging unit in Zarya. [13]

11 December (Flight Day 9)

On Flight Day 9, Pilot Rick Sturckow and Mission Specialist Nancy Currie continued unstowing hardware in Unity. After turning off the lights, the crew later closed the hatches to Zarya and Unity. The crew prepared for the mission's third and final spacewalk on Flight Day 10. Endeavour's crew also conducted interviews with CNN and CBS News. [25]

12 December (Flight Day 10, EVA 3)

At 3:33 pm EST, astronauts Jerry Ross and Jim Newman commenced on a 6-hour, 59-minute EVA to finish the installation of the Unity Node to Zarya . The two stowed tools on the side of Unity to prepare for the spacewalks on STS-96, the next mission to the ISS. Ross also freed another antenna on Zarya, similar to the one Newman freed on EVA-2. The spacewalkers also tested the redesigned SAFER jet packs, to be used in the event an astronaut became separated from the spacecraft during a spacewalk. After the EVA, Pilot Rick Sturckow depressurized the vestibule between Endeavour and PMA-2 to prepare for the undocking of the two spacecraft on Flight Day 11. [26]

13 December (Flight Day 11, Undocking)

On Flight Day 11, Space Shuttle Endeavour undocked from the International Space Station. At 3:25 pm EST, Pilot Rick Sturckow backed Endeavour450 feet (140 m) away from the station and started a nose-forward fly-around of the station, so that the crew could take pictures of the space station. At 4:49 pm EST, Sturckow performed a final separation burn. Later, the crew deployed SAC-A, a small satellite for the Argentinean National Commission of Space Activities. [27]

14 December (Flight Day 12)

On the last full day on orbit, the crew deployed a small Air Force satellite called MightySat-1. The crew tested the orbiter's aerosurfaces and steering jets to be used on landing day and stowed equipment. [28]

15 December (Flight Day 13, Landing)

Flight Day 13 was landing day for Space Shuttle Endeavour and its crew of six. At 7:07 pm EST, the orbiter's payload bay doors were closed for entry. Flight Director John Shannon gave the go for the crew to fire the orbital maneuvering system engines for the deorbit burn at 9:46 pm EST so that Endeavour could slow down to enter the Earth's atmosphere. At 10:54 pm EST, Endeavour and crew landed on the Kennedy Space Center's Runway 15. Endeavour wrapped up a 4.7 million mile mission, and the first to the International Space Station. [29]

Extra-vehicular activity

Three extra-vehicular activity (EVA) spacewalks were scheduled and completed during STS-88.[ citation needed ]

SpacewalkersStart (UTC)End (UTC)DurationMission
EVA 1 Jerry L. Ross
James H. Newman
7 December 1998
22:10
8 December 1998
05:31
7 hours, 21 minutesBegan Unity installation.
EVA 2Ross
Newman
9 December 1998
20:33
10 December 1998
03:35
7 hours, 02 minutesContinued Unity installation.
EVA 3Ross
Newman
12 December 1998
20:33
13 December 1998
03:32
6 hours, 59 minutesCompletion of Unity installation.

Wake-up calls

NASA began a tradition of playing music to astronauts during the Gemini program, and first used music to wake up a flight crew during Apollo 15. Each track is specially chosen, often by the astronauts' families, and usually has a special meaning to an individual member of the crew, or is applicable to their daily activities. [30]

Flight DaySongArtistPlayed for
Day 2"Get Ready" The Temptations
Day 3"Anchors Aweigh" Charles A. Zimmermann
Day 4"Over the Rainbow" Judy Garland Robert D. Cabana
Day 5"Jerry the Rigger"old Celtic song Jerry L. Ross
Day 6"Streets of Bakersfield" Dwight Yoakam Frederick W. Sturckow
Day 7"Floating in the Bathtub" James H. Newman
Day 8"God Bless the U.S.A." Lee Greenwood Nancy J. Currie-Gregg
Day 9"Trepak" Pyotr Ilyich Tchaikovsky Sergei Krikalev
Day 10"Hound Dog" Elvis Presley
Day 11"Goodnite, Sweetheart, Goodnite" The Spaniels
Day 12"I Got You (I Feel Good)" James Brown "In honor of the good feelings evoked by this successful first International Space Station Assembly mission."
Day 13"Ride of the Valkyries" Richard Wagner

Media

See also

Related Research Articles

<span class="mw-page-title-main">Jerry L. Ross</span> NASA astronaut and engineer (born 1948)

Jerry Lynn Ross is a retired United States Air Force officer, engineer, and a former NASA astronaut. Ross is a veteran of 7 Space Shuttle missions, making him the joint record holder for most spaceflights.

<span class="mw-page-title-main">STS-96</span> 1999 American crewed spaceflight to the ISS

STS-96 was a Space Shuttle mission to the International Space Station (ISS) flown by Space Shuttle Discovery, and the first shuttle flight to dock[a] at the International Space Station. It was Discovery's 26th flight. The shuttle carried the Spacehab module in the payload, filled with cargo for station outfitting. STS-96 launched from Kennedy Space Center, Florida, on 27 May 1999 at 06:49:42 AM EDT and returned to Kennedy on 6 June 1999, 2:02:43 AM EDT.

<span class="mw-page-title-main">STS-106</span> 2000 American crewed spaceflight to the ISS

STS-106 was a 2000 Space Shuttle mission to the International Space Station (ISS) flown by Space Shuttle Atlantis.

<span class="mw-page-title-main">STS-97</span> 2000 American crewed spaceflight to the ISS

STS-97 was a Space Shuttle mission to the International Space Station (ISS) flown by Space Shuttle Endeavour. The crew installed the first set of solar arrays to the ISS, prepared a docking port for arrival of the Destiny Laboratory Module, and delivered supplies for the station's crew. It was the last human spaceflight of the 20th century.

<span class="mw-page-title-main">STS-108</span> 2001 American crewed spaceflight to the ISS

STS-108 was a Space Shuttle mission to the International Space Station (ISS) flown by Space Shuttle Endeavour. Its primary objective was to deliver supplies to and help maintain the ISS.

<span class="mw-page-title-main">Robert D. Cabana</span> American astronaut (born 1949)

Robert Donald Cabana is a former Associate Administrator of the National Aeronautics and Space Administration (NASA) and retired NASA astronaut, having flown on four Space Shuttle flights. He served as Chief of the Astronaut Office from 1994 to 1997 and as director of the John F. Kennedy Space Center from 2008 to 2021. He is also a former naval flight officer and naval aviator in the United States Marine Corps.

<span class="mw-page-title-main">Nancy J. Currie-Gregg</span> American astronaut, engineer and Army officer (born 1958)

Nancy Jane Currie-Gregg is an American engineer, United States Army officer and a NASA astronaut. Currie-Gregg has served in the United States Army for over 22 years and holds the rank of colonel. With NASA, she has participated in four space shuttle missions: STS-57, STS-70, STS-88, and STS-109, accruing 1,000 hours in space. She currently holds an appointment as a professor of practice in the Department of Industrial & Systems Engineering at Texas A&M University.

<span class="mw-page-title-main">Yuri Gidzenko</span> Russian cosmonaut (born 1962)

Yuri Pavlovich Gidzenko is a Russian cosmonaut. He was a test cosmonaut of the Yuri Gagarin Cosmonaut Training Center (TsPK). Gidzenko has flown into space three times and has lived on board the Mir and the International Space Station. He has also conducted two career spacewalks. Although he retired on July 15, 2001, he continued his employment by a special contract until Soyuz TM-34 concluded. Since 2004 to May 2009, Gidzenko was the Director of the 3rd department within the TsPK. Since May 2009 he serves as the Deputy Chief of Cosmonaut Training Center TsPK.

<span class="mw-page-title-main">Sergei Krikalev</span> Soviet and Russian cosmonaut (born 1958)

Sergei Konstantinovich Krikalev is a Russian mechanical engineer and former cosmonaut and head of the Yuri Gagarin Cosmonaut Training Center.

<span class="mw-page-title-main">James H. Newman</span> American astronaut (born 1956)

James Hansen Newman is an American physicist and a former NASA astronaut who flew on four Space Shuttle missions.

<span class="mw-page-title-main">Yuri Usachov</span> Russian cosmonaut (born 1957)

Yury Vladimirovich Usachov is a former cosmonaut who resides in Star City, Moscow. Usachov is a veteran of four spaceflights, including two long-duration missions on board the Mir Space Station and another on board the International Space Station. During his career, he also conducted seven spacewalks before his retirement on April 5, 2004.

<i>Unity</i> (ISS module) American module of the International Space Station

Unity, also known as Node 1, is the first U.S.-built component of the International Space Station (ISS). This cylindrical module, constructed of steel by Boeing for NASA, serves as the critical link between the orbiting laboratory's Russian Orbital Segment and US Orbital Segment.

<span class="mw-page-title-main">Expedition 1</span> First long-duration human stay aboard the International Space Station

Expedition 1 was the first long-duration expedition to the International Space Station (ISS). The three-person crew stayed aboard the station for 136 days, from 2 November 2000 to 19 March 2001. It was the beginning of an uninterrupted human presence on the station which continues as of 2024.

<span class="mw-page-title-main">STS-117</span> 2007 American crewed spaceflight to the ISS

STS-117 was a Space Shuttle mission flown by Space Shuttle Atlantis, launched from pad 39A of the Kennedy Space Center on June 8, 2007. Atlantis lifted off from the launch pad at 19:38 EDT. Damage from a hail storm on February 26, 2007, had previously caused the launch to be postponed from an originally-planned launch date of March 15, 2007. The launch of STS-117 marked the 250th orbital human spaceflight. It was also the heaviest flight of the Space Shuttle.

<span class="mw-page-title-main">Rendezvous pitch maneuver</span>

The R-bar pitch maneuver (RPM), popularly called the rendezvous pitch maneuver or backflip, was a maneuver performed by the Space Shuttle as it rendezvoused with the International Space Station (ISS) prior to docking. The Shuttle performed a backflip that exposed its heat-shield to the crew of the ISS that made photographs of it. Based on the information gathered during the rendezvous pitch maneuver, the mission team could decide that the orbiter was not safe for re-entry. They may have then decided either to wait on the ISS for a rescue mission or attempt extra-vehicular activity to repair the heat shield and secure the safe re-entry of the orbiter. This was a standard procedure recommended by CAIB for all space shuttles docking to the International Space Station after a damaged heat shield caused the Columbia disaster.

<span class="mw-page-title-main">STS-123</span> 2008 American crewed spaceflight to the ISS

STS-123 was a Space Shuttle mission to the International Space Station (ISS) which was flown by Space Shuttle Endeavour. STS-123 was the 1J/A ISS assembly mission. The original launch target date was February 14, 2008, but after the delay of STS-122, the shuttle was launched on March 11, 2008. It was the twenty-fifth shuttle mission to visit the ISS, and delivered the first module of the Japanese laboratory, Japanese Experiment Module (Kibō), and the Canadian Special Purpose Dexterous Manipulator, (SPDM) Dextre robotics system to the station. The mission duration was 15 days and 18 hours, and it was the first mission to fully utilize the Station-to-Shuttle Power Transfer System (SSPTS), allowing space station power to augment the shuttle power systems. The mission set a record for a shuttle's longest stay at the ISS.

<span class="mw-page-title-main">STS-130</span> 2010 American crewed spaceflight to the ISS

STS-130 was a NASA Space Shuttle mission to the International Space Station (ISS). Space ShuttleEndeavour's primary payloads were the Tranquility module and the Cupola, a robotic control station with six windows around its sides and another in the center, providing a 360-degree view around the station. Endeavour launched at 04:14 EST on February 8, 2010, and landed at 22:22 EST on February 21, 2010, on runway 15 at the Kennedy Space Center's Shuttle Landing Facility.

<span class="mw-page-title-main">Pressurized Mating Adapter</span> Spacecraft docking adapter

A Pressurized Mating Adapter (PMA) is a component used on the International Space Station (ISS) to convert the Common Berthing Mechanism (CBM) interface used to connect ISS modules to an APAS-95 spacecraft docking port. Three PMAs are attached to the US Orbital Segment of ISS. PMA-1 and PMA-2 were launched along with the Unity module in 1998 aboard STS-88; PMA-3 was launched in 2000 aboard STS-92. PMA-1 permanently connects the Unity and Zarya modules. International Docking Adapters were permanently installed on PMA-2 and PMA-3 in 2017 to convert them from the APAS-95 standard to the newer International Docking System Standard (IDSS).

<span class="mw-page-title-main">Assembly of the International Space Station</span> Process of assembling the International Space Station

The process of assembling the International Space Station (ISS) has been under way since the 1990s. Zarya, the first ISS module, was launched by a Proton rocket on 20 November 1998. The STS-88 Space Shuttle mission followed two weeks after Zarya was launched, bringing Unity, the first of three node modules, and connecting it to Zarya. This bare 2-module core of the ISS remained uncrewed for the next one and a half years, until in July 2000 the Russian module Zvezda was launched by a Proton rocket, allowing a maximum crew of three astronauts or cosmonauts to be on the ISS permanently.

<span class="mw-page-title-main">STS-134</span> 2011 American crewed spaceflight to the ISS and final flight of Space Shuttle Endeavour

STS-134 was the penultimate mission of NASA's Space Shuttle program and the 25th and last spaceflight of Space ShuttleEndeavour. This flight delivered the Alpha Magnetic Spectrometer and an ExPRESS Logistics Carrier to the International Space Station. Mark Kelly served as the mission commander. STS-134 was expected to be the final Space Shuttle mission if STS-135 did not receive funding from Congress. However, in February 2011, NASA stated that STS-135 would fly "regardless" of the funding situation. STS-135, flown by Atlantis, took advantage of the processing for STS-335, the Launch on Need mission that would have been necessary if the STS-134 crew became stranded in orbit.

References

  1. 1 2 3 NASA (1998). "STS-88 Mission Control Center Status Report # 2". NASA. Retrieved 6 October 2008.
  2. NASA (1998). "STS-88 (93)". NASA. Archived from the original on 6 June 2011. Retrieved 6 October 2008.
  3. shuttlepresskit.com (1998). "IMAX Cargo Bay Camera (ICBC)". Boeing/NASA/United Space Alliance . Retrieved 6 October 2008.
  4. Harwood, William (3 December 1998). "Update: Shuttle launch delayed to Friday". CBS News. Retrieved 30 August 2009.
  5. Harwood, William (3 December 1998). "Update: Shuttle fueled for second launch attempt". CBS News. Retrieved 30 August 2009.
  6. "STS-88". Spacefacts. Retrieved 26 February 2014.
  7. 1 2 NASA (1998). "STS-88 Day 3 Highlights". NASA. Archived from the original on 19 February 2010. Retrieved 26 May 2010.
  8. NASA (1998). "STS-88 Mission Control Center Status Report # 6". NASA. Archived from the original on 11 August 2009. Retrieved 6 October 2008.
  9. NASA (1998). "STS-88 Mission Control Center Status Report # 9". NASA. Archived from the original on 11 August 2009. Retrieved 6 October 2008.
  10. 1 2 NASA (1998). "STS-88 Day 5 Highlights". NASA. Archived from the original on 17 September 2008. Retrieved 26 May 2010.
  11. NASA (1998). "STS-88 Mission Control Center Status Report # 10". NASA. Archived from the original on 11 August 2009. Retrieved 6 October 2008.
  12. NASA (1998). "STS-88 Mission Control Center Status Report # 13". NASA. Archived from the original on 11 August 2009. Retrieved 6 October 2008.
  13. 1 2 NASA (1998). "STS-88 Day 8 Highlights". NASA. Archived from the original on 17 September 2008. Retrieved 26 May 2010.
  14. 1 2 3 4 5 NASA (1998). "STS-88 Mission Control Center Status Report # 17". NASA. Archived from the original on 11 August 2009. Retrieved 6 October 2008.
  15. NASA (1998). "STS-88 Mission Control Center Status Report # 18". NASA. Retrieved 6 October 2008.
  16. NASA/George H. Diller (19 June 1997). "KSC Release No. 93-97". NASA. Archived from the original on 28 May 2010. Retrieved 26 May 2010.
  17. NASA/KSC Public Affairs (2 February 1998). "2 February 1998 Space Shuttle Status Report". NASA. Archived from the original on 28 May 2010. Retrieved 29 May 2010.
  18. NASA/KSC Public Affairs (15 October 1998). "15 October 1998 Space Shuttle Status Report". NASA. Archived from the original on 28 May 2010. Retrieved 26 May 2010.
  19. NASA/KSC Public Affairs (21 October 1998). "21 October 1998 Space Shuttle Status Report". NASA. Archived from the original on 28 May 2010. Retrieved 26 May 2010.
  20. NASA (1998). "STS-88 Day 1 Highlights". NASA. Archived from the original on 27 August 2009. Retrieved 26 May 2010.
  21. NASA (1998). "STS-88 Day 2 Highlights". NASA. Archived from the original on 27 August 2009. Retrieved 26 May 2010.
  22. NASA (1998). "STS-88 Day 4 Highlights". NASA. Archived from the original on 27 August 2009. Retrieved 26 May 2010.
  23. NASA (1998). "STS-88 Day 6 Highlights". NASA. Retrieved 26 May 2010.[ permanent dead link ]
  24. NASA (1998). "STS-88 Day 7 Highlights". NASA. Archived from the original on 17 September 2008. Retrieved 26 May 2010.
  25. NASA (1998). "STS-88 Day 9 Highlights". NASA. Archived from the original on 27 August 2009. Retrieved 26 May 2010.
  26. NASA (1998). "STS-88 Day 10 Highlights". NASA. Retrieved 26 May 2010.[ permanent dead link ]
  27. NASA (1998). "STS-88 Day 11 Highlights". NASA. Archived from the original on 27 August 2009. Retrieved 26 May 2010.
  28. NASA (1998). "STS-88 Day 12 Highlights". NASA. Archived from the original on 27 August 2009. Retrieved 26 May 2010.
  29. NASA (1998). "STS-88 Day 13 Highlights". NASA. Archived from the original on 27 August 2009. Retrieved 26 May 2010.
  30. "Chronology of Wakeup Calls". NASA. 2 August 2005. p. 42.