Space Shuttle Enterprise (Orbiter Vehicle Designation: OV-101) was the first orbiter of the Space Shuttle system. Rolled out on September 17, 1976, it was built for NASA as part of the Space Shuttle program to perform atmospheric test flights after being launched from a modified Boeing 747. [1] It was constructed without engines or a functional heat shield. As a result, it was not capable of spaceflight. [2]
Originally, Enterprise had been intended to be refitted for orbital flight to become the second space-rated orbiter in service. [1] However, during the construction of Space Shuttle Columbia, details of the final design changed, making it simpler and less costly to build Challenger around a body frame that had been built as a test article. [1] Similarly, Enterprise was considered for refit to replace Challenger after the latter was destroyed, but Endeavour was built from structural spares instead. [1] [3]
Enterprise was restored and placed on display in 2003 at the Smithsonian's new Steven F. Udvar-Hazy Center in Virginia. [4] Following the retirement of the Space Shuttle fleet, Discovery replaced Enterprise at the Udvar-Hazy Center, and Enterprise was transferred to the Intrepid Museum in New York City, where it has been on display since July 2012. [5]
The design of Enterprise was not the same as that planned for Columbia, the first flight model; the aft fuselage was constructed differently, and it did not have the interfaces to mount OMS pods. A large number of subsystems—ranging from main engines to radar equipment—were not installed on Enterprise, but the capacity to add them in the future was retained, as NASA originally intended to refit the orbiter for spaceflight at the conclusion of its testing. Instead of a thermal protection system, its surface was primarily covered with simulated tiles made from polyurethane foam. Fiberglass was used for the leading edge panels in place of the reinforced carbon–carbon ones of spaceflight-worthy orbiters. Only a few sample thermal tiles and some Nomex blankets were real. [6] Enterprise used fuel cells to generate its electrical power, but these were not sufficient to power the orbiter for spaceflight. [7]
Enterprise also lacked reaction control system thrusters and hydraulic mechanisms for the landing gear; the landing gear doors were simply opened through the use of explosive bolts and the gear dropped down solely by gravity. [7] As it was only used for atmospheric testing, Enterprise featured a large nose probe mounted on its nose cap, common on test aircraft because the location provides the most accurate readings for the test instruments, being mounted out in front of the disturbed airflow.
Enterprise was equipped with Lockheed-manufactured zero-zero ejection seats like those its sister Columbia carried on its first four missions. [7]
Date | Milestone [8] |
---|---|
1972 July 26 | Contract Award to North American Rockwell |
1972 August 9 | Construction authorization from NASA |
1974 June 4 | Start structural assembly of crew module at Downey plant |
1974 August 26 | Start structural assembly of aft fuselage at Downey plant |
1975 March 27 | Mid fuselage arrives at Palmdale from General Dynamics |
1975 May 23 | Wings arrive at Palmdale from Grumman |
1975 May 25 | Vertical stabilizer arrives at Palmdale from Fairchild Republic |
1975 August 25 | Start of Final Assembly |
1975 September 9 | Aft fuselage on dock, Palmdale |
1975 October 31 | Lower forward fuselage on dock, Palmdale |
1975 December 1 | Upper forward fuselage on dock, Palmdale |
1976 January 16 | Crew module on dock, Palmdale |
1976 March 3 | Payload bay doors on dock, Palmdale |
1976 March 12 | Complete final assembly and closeout systems installation |
1976 March 15 | Start functional checkout |
1976 June | Complete functional checkout, start ground vibration and proof load tests |
1976 September 17 | Rollout from Palmdale [9] |
1976 October–November | Start systems retest, complete integrated systems checkout |
1977 February 18 | First captive flight |
1977 June 18 | First crewed captive flight [10] |
1977 August 12 | First free flight |
Construction began on Enterprise on June 4, 1974. [1] Designated OV-101, it was originally planned to be named Constitution and unveiled on Constitution Day, September 17, 1976. Fans of Star Trek asked US President Gerald Ford, through a letter-writing campaign, to name the orbiter after the television show's fictional starship, USS Enterprise. White House advisors cited "hundreds of thousands of letters" from Trekkies, "one of the most dedicated constituencies in the country", as a reason for giving the shuttle the name. Although Ford did not publicly mention the campaign, the president said that he was "partial to the name" Enterprise, and directed NASA officials to change the name. [3] [11] [12]
In mid-1976 the orbiter was used for ground vibration tests, allowing engineers to compare data from an actual flight vehicle with theoretical models. [1]
On September 17, 1976, Enterprise was rolled out of Rockwell's plant at Palmdale, California. In recognition of its fictional namesake, Star Trek creator Gene Roddenberry and most of the principal cast of the original series of Star Trek were on hand at the dedication ceremony. [13]
On January 31, 1977, Enterprise was taken by road to Dryden Flight Research Center at Edwards Air Force Base to begin operational testing. [1] [14]
While at NASA Dryden Enterprise was used by NASA for a variety of ground and flight tests intended to validate aspects of the shuttle program. [15] The initial nine-month testing period was referred to by the acronym ALT, for "Approach and Landing Test". [1] [16] These tests included a maiden "flight" on February 18, 1977, atop a Boeing 747 Shuttle Carrier Aircraft (SCA) to measure structural loads and ground handling and braking characteristics of the mated system. Ground tests of all orbiter subsystems were carried out to verify functionality prior to atmospheric flight. [10]
The mated Enterprise/SCA combination was then subjected to five test flights with Enterprise uncrewed and unactivated. The purpose of these test flights was to measure the flight characteristics of the mated combination. These tests were followed with three test flights with Enterprise crewed to test the shuttle flight control systems. [1]
On August 12, 1977, Enterprise flew on its own for the first time. [17] Enterprise underwent four more free flights where the craft separated from the SCA and was landed under astronaut control. These tests verified the flight characteristics of the orbiter design and were used to carry out several aerodynamic and weight configurations. [16] The first three flights were flown with a tailcone placed at the end of Enterprise's aft fuselage, which reduced drag and turbulence when mated to the SCA. The final two flights saw the tailcone removed and mockup main engine nozzles installed. On the fifth and final glider flight, pilot-induced oscillation problems were revealed, which had to be addressed before the first orbital launch occurred. [15]
Following the conclusion of the ALT test flight program, on March 13, 1978, Enterprise was flown once again, but this time halfway across the country to NASA's Marshall Space Flight Center (MSFC) in Alabama for the Mated Vertical Ground Vibration Testing (MGVT). The orbiter was lifted up on a sling very similar to the one used at Kennedy Space Center and placed inside the Dynamic Test Stand building, and mated to the Vertical Mate Ground Vibration Test tank (VMGVT-ET), which in turn was attached to a set of inert Solid Rocket Boosters (SRB) to form a complete shuttle launch stack, and marked the first time in the program's history that all Space Shuttle elements, an Orbiter, an External Tank (ET), and two SRBs, were mated together. During the course of the program, Enterprise and the rest of the launch stack would be exposed to a punishing series of vibration tests simulating as closely as possible those expected during various phases of launch, some tests with and others without the SRBs in place. [18]
At the conclusion of this testing, Enterprise was due to be taken back to Palmdale for retrofitting as a fully spaceflight capable vehicle. Under this arrangement, Enterprise would be launched on its maiden spaceflight in July 1981 to launch a communications satellite and retrieve the Long Duration Exposure Facility, then planned for a 1980 release on the first operational orbiter, Columbia. Afterward, Enterprise would conduct two Spacelab missions. [19] However, in the period between the rollout of Enterprise and the rollout of Columbia, a number of significant design changes had taken place, particularly with regard to the weight of the fuselage and wings. This meant that retrofitting the prototype would have been a much more expensive process than previously realized, involving the dismantling of the orbiter and the return of various structural sections to subcontractors across the country. As a consequence, NASA made the decision to convert an incomplete Structural Test Article, numbered STA-099, which had been built to undergo a variety of stress tests, into a fully flight-worthy orbiter, which became Challenger.
# | Date | Designation | Launch pad | Notes |
---|---|---|---|---|
1 | July 16, 1981 | STS-17 | 39-A | Deployment of Intelsat V satellite and retrieval of Long Duration Exposure Facility |
2 | September 30, 1981 | STS-20 | 39-A | Spacelab mission |
3 | November 25, 1981 | STS-22 | 39-A | Spacelab mission |
Following the MGVT program and with the decision to not use Enterprise for orbital missions, it was ferried to Kennedy Space Center on April 10, 1979. By June 1979, it was mated with an external tank and solid rocket boosters (known as a boilerplate configuration) and tested in a launch configuration at KSC Launch Complex 39A for a series of fit checks of the facilities there. [3]
After this period, Enterprise was returned to NASA's Dryden Flight Research Facility in September 1981. [21] In 1983 and 1984, Enterprise underwent an international tour visiting France, West Germany, Italy, the United Kingdom, and Canada. Enterprise also visited California, Alabama, and Louisiana (while visiting the 1984 Louisiana World Exposition).
Between November 1984 and May 1985, Enterprise was again mated with an external tank and solid rocket boosters in a boilerplate configuration for a series of fit checks of the never-used shuttle facilities at Vandenberg Air Force Base in California. [22] [23] [24]
On November 18, 1985, Enterprise was ferried to Washington, D.C., where it became property of the Smithsonian Institution and was stored in the National Air and Space Museum's hangar at Dulles International Airport.
After the Challenger disaster, NASA considered using Enterprise as a replacement. Refitting the shuttle with all of the necessary equipment for it to be used in space was considered, but NASA decided to use spare parts constructed at the same time as Discovery and Atlantis to build Endeavour. [3]
In 2003 after the breakup of Columbia during re-entry, the Columbia Accident Investigation Board conducted tests at Southwest Research Institute, which used an air cannon to shoot foam blocks of similar size, mass and speed to that which struck Columbia at a test structure which mechanically replicated the orbiter wing leading edge. They removed a section of fiberglass leading edge from Enterprise's wing to perform analysis of the material and attached it to the test structure, then shot a foam block at it. [25] While the leading edge was not broken as a result of the test, which took place on May 29, 2003, the impact was enough to permanently deform a seal and leave a thin gap 22 in (56 cm) long. [26] [27] [28] Since the strength of the reinforced carbon–carbon (RCC) on Columbia is "substantially weaker and less flexible" than the test section from Enterprise, this result suggested that the RCC would have been shattered. [28] A section of RCC leading edge from Discovery was tested on June 6, to determine the effects of the foam on a similarly aged leading edge, resulting in a three in (7.6 cm) crack on panel 6 and cracking on a T-shaped seal between panels 6 and 7. [29] [30] On July 7, using a leading edge from Atlantis and focused on panel 8 with refined parameters stemming from the Columbia accident investigation, a second test created a ragged hole approximately 16 by 16 in (41 by 41 cm) in the RCC structure. [31] [30] The tests clearly demonstrated that a foam impact of the type Columbia sustained could seriously breach the protective RCC panels on the wing leading edge. [30]
The board determined that the probable cause of the accident was that the foam impact caused a breach of a reinforced carbon-carbon panel along the leading edge of Columbia's left wing, allowing hot gases generated during re-entry to enter the wing and cause structural collapse. This caused Columbia to tumble out of control, breaking up with the loss of the entire crew. [32]
In 1984, Enterprise was on display during the 1984 Louisiana World Exposition (World's Fair) in New Orleans.
From 1985 to 2003, [10] Enterprise was stored at the Smithsonian's hangar at Washington Dulles International Airport before it was restored and moved to the Smithsonian's newly built National Air and Space Museum Steven F. Udvar-Hazy Center at Washington Dulles, where it was the centerpiece of the space collection. [33] On April 12, 2011, NASA announced that Discovery, the most traveled orbiter in the fleet, would replace Enterprise in the Smithsonian's collection once the Shuttle fleet was retired, with ownership of Enterprise transferred to the Intrepid Museum in New York City. On April 17, 2012, Discovery was transported by Shuttle Carrier Aircraft to Dulles from Kennedy Space Center, where it made several passes over the Washington D.C. metro area. [34] [35] After Discovery had been removed from the Shuttle Carrier Aircraft, both orbiters were displayed nose-to-nose outside the Steven F. Udvar-Hazy Center before Enterprise was made ready for its flight to New York. [36]
Space Shuttle Enterprise | |
Location | New York City |
---|---|
NRHP reference No. | 13000071 |
Added to NRHP | March 13, 2013 |
On December 12, 2011, ownership of Enterprise was officially transferred to the Intrepid Museum in New York City. [37] [38] [39] In preparation for the anticipated relocation, engineers evaluated the vehicle in early 2010 and determined that it was safe to fly on the Shuttle Carrier Aircraft once again. [40] At approximately 13:40 UTC on April 27, 2012, Enterprise took off from Dulles International Airport en route to a fly-by over the Hudson River, New York's JFK International Airport, the Statue of Liberty, the George Washington and Verrazano-Narrows Bridges, and several other landmarks in the city, in an approximately 45-minute "final tour". At 15:23 UTC, Enterprise touched down at JFK International Airport. [41] [42]
The mobile Mate-Demate Device and cranes were transported from Dulles to the ramp at JFK and the shuttle was removed from the SCA overnight on May 12, 2012, placed on a specially designed flat bed trailer and returned to Hangar 12. [43] On June 3 a Weeks Marine barge took Enterprise to Jersey City. The Shuttle sustained cosmetic damage to a wingtip when a gust of wind blew the barge towards a piling. [44] It was hoisted June 6 onto the Intrepid Museum in Manhattan. [45]
Enterprise went on public display on July 19, 2012, at the Intrepid Museum's new Space Shuttle Pavilion, a temporary shelter consisting of a pressurized, air-supported fabric bubble constructed on the aft end of the carrier's flight deck. [46]
On October 29, 2012, storm surges from Hurricane Sandy caused Pier 86, including the Intrepid Museum's visitor center, to flood, and knocked out the museum's electrical power and both backup generators. The loss of power caused the Space Shuttle Pavilion to deflate, and high winds from the hurricane caused the fabric of the Pavilion to tear and collapse around the orbiter. Minor damage was spotted on the vertical stabilizer of the orbiter, as a portion of the tail fin above the rudder/speedbrake had broken off. [47] The broken section was recovered by museum staff. While the pavilion itself could not be replaced for some time in 2013, the museum erected scaffolding and sheeting around Enterprise to protect it from the environment. [48]
By April 2013, the damage sustained to Enterprise's vertical stabilizer had been fully repaired, and construction work on the structure for a new pavilion was under way. [49] The pavilion and exhibit reopened on July 10, 2013. [50]
Enterprise was listed on the National Register of Historic Places on March 13, 2013, reference number 13000071, in recognition of its role in the development of the Space Shuttle Program. The historic significance criteria are in space exploration, transportation, and engineering. [51]
The Space Shuttle is a retired, partially reusable low Earth orbital spacecraft system operated from 1981 to 2011 by the U.S. National Aeronautics and Space Administration (NASA) as part of the Space Shuttle program. Its official program name was Space Transportation System (STS), taken from the 1969 plan led by U.S. Vice President Spiro Agnew for a system of reusable spacecraft where it was the only item funded for development.
Space Shuttle Challenger (OV-099) was a Space Shuttle orbiter manufactured by Rockwell International and operated by NASA. Named after the commanding ship of a nineteenth-century scientific expedition that traveled the world, Challenger was the second Space Shuttle orbiter to fly into space after Columbia, and launched on its maiden flight in April 1983. It was destroyed in January 1986 soon after launch in a disaster that killed all seven crewmembers aboard.
Space Shuttle Columbia (OV-102) was a Space Shuttle orbiter manufactured by Rockwell International and operated by NASA. Named after the first American ship to circumnavigate the globe, and the female personification of the United States, Columbia was the first of five Space Shuttle orbiters to fly in space, debuting the Space Shuttle launch vehicle on its maiden flight on April 12, 1981 and becoming the first spacecraft to be re-used after its first flight when it launched on STS-2 on November 12, 1981. As only the second full-scale orbiter to be manufactured after the Approach and Landing Test vehicle Enterprise, Columbia retained unique external and internal features compared to later orbiters, such as test instrumentation and distinctive black chines. In addition to a heavier aft fuselage and the retention of an internal airlock throughout its lifetime, these made Columbia the heaviest of the five spacefaring orbiters; around 1,000 kilograms heavier than Challenger and 3,600 kilograms heavier than Endeavour when originally constructed. Columbia also carried ejection seats based on those from the SR-71 during its first six flights until 1983, and from 1986 onwards carried an imaging pod on its vertical stabilizer.
Space Shuttle Discovery is a retired American Space Shuttle orbiter. The spaceplane was one of the orbiters from NASA's Space Shuttle program and the third of five fully operational orbiters to be built. Its first mission, STS-41-D, flew from August 30 to September 5, 1984. Over 27 years of service it launched and landed 39 times, aggregating more spaceflights than any other spacecraft to date. The Space Shuttle launch vehicle had three main components: the Space Shuttle orbiter, a single-use central fuel tank, and two reusable solid rocket boosters. Nearly 25,000 heat-resistant tiles cover the orbiter to protect it from high temperatures on re-entry.
Space Shuttle Atlantis is a retired Space Shuttle orbiter vehicle which belongs to NASA, the spaceflight and space exploration agency of the United States. Atlantis was manufactured by the Rockwell International company in Southern California and was delivered to the Kennedy Space Center in Eastern Florida in April 1985. Atlantis is also the fourth operational and the second-to-last Space Shuttle built. Its maiden flight was STS-51-J made from October 3 to 7, 1985.
Space Shuttle Endeavour is a retired orbiter from NASA's Space Shuttle program and the fifth and final operational Shuttle built. It embarked on its first mission, STS-49, in May 1992 and its 25th and final mission, STS-134, in May 2011. STS-134 was expected to be the final mission of the Space Shuttle program, but with the authorization of STS-135 by the United States Congress, Atlantis became the last shuttle to fly.
The Space Shuttle program was the fourth human spaceflight program carried out by the U.S. National Aeronautics and Space Administration (NASA), which accomplished routine transportation for Earth-to-orbit crew and cargo from 1981 to 2011. Its official program name was Space Transportation System (STS), taken from a 1969 plan for a system of reusable spacecraft where it was the only item funded for development, as a proposed nuclear shuttle in the plan was cancelled in 1972. It flew 135 missions and carried 355 astronauts from 16 countries, many on multiple trips.
On Saturday, February 1, 2003, Space Shuttle Columbia disintegrated as it re-entered the atmosphere over Texas and Louisiana, killing all seven astronauts on board. It was the second Space Shuttle mission to end in disaster, after the loss of Challenger and crew in 1986.
The Shuttle Carrier Aircraft (SCA) are two extensively modified Boeing 747 airliners that NASA used to transport Space Shuttle orbiters. One (N905NA) is a 747-100 model, while the other (N911NA) is a short-range 747-100SR. Both are now retired.
Canadarm or Canadarm1 is a series of robotic arms that were used on the Space Shuttle orbiters to deploy, manoeuvre, and capture payloads. After the Space Shuttle Columbia disaster, the Canadarm was always paired with the Orbiter Boom Sensor System (OBSS), which was used to inspect the exterior of the shuttle for damage to the thermal protection system.
The Steven F. Udvar-Hazy Center, also called the Udvar-Hazy Center, is the Smithsonian National Air and Space Museum (NASM)'s annex at Dulles International Airport in the Chantilly area of Fairfax County, Virginia. It holds numerous exhibits, including the Space Shuttle Discovery, the Enola Gay, and the Boeing 367-80, the main prototype for the popular Boeing 707 airliner.
STS-118 was a Space Shuttle mission to the International Space Station (ISS) flown by the orbiter Endeavour. STS-118 lifted off on August 8, 2007, from launch pad 39A at Kennedy Space Center (KSC), Florida and landed at the Shuttle Landing Facility at KSC on August 21, 2007.
A boilerplate spacecraft, also known as a mass simulator, is a nonfunctional craft or payload that is used to test various configurations and basic size, load, and handling characteristics of rocket launch vehicles. It is far less expensive to build multiple, full-scale, non-functional boilerplate spacecraft than it is to develop the full system. In this way, boilerplate spacecraft allow components and aspects of cutting-edge aerospace projects to be tested while detailed contracts for the final project are being negotiated. These tests may be used to develop procedures for mating a spacecraft to its launch vehicle, emergency access and egress, maintenance support activities, and various transportation processes.
The Space Shuttle orbiter is the spaceplane component of the Space Shuttle, a partially reusable orbital spacecraft system that was part of the discontinued Space Shuttle program. Operated from 1981 to 2011 by NASA, the U.S. space agency, this vehicle could carry astronauts and payloads into low Earth orbit, perform in-space operations, then re-enter the atmosphere and land as a glider, returning its crew and any on-board payload to the Earth.
The following is an outline of 1985 in spaceflight.
The Approach and Landing Tests were a series of sixteen taxi and flight trials of the prototype Space Shuttle Enterprise that took place between February and October 1977 to test the vehicle's flight characteristics. Of the sixteen taxi-tests and flights, eleven saw Enterprise remain mated to the Shuttle Carrier Aircraft (SCA), while the final five had the shuttle jettisoned from the SCA, with the on-board crew flying and landing the spacecraft.
The Mate-Demate Device was a specialized gantry crane designed to lift a Space Shuttle orbiter onto and off the back of a Shuttle Carrier Aircraft (SCA). Two Mate-Demate Devices were built, one at the Armstrong Flight Research Center in California, the other at the Kennedy Space Center in Florida. A third Orbiter Lifting Fixture was to serve a similar function at the Vandenberg Air Force Base, the proposed West Coast launch location for the Shuttle. It was later moved to Palmdale to support the plant where the Shuttle was built and refurbished. A portable sling was also built to support mate-demate operations away from the primary locations.
The retirement of NASA's Space Shuttle fleet took place from March to July 2011. Discovery was the first of the three active Space Shuttles to be retired, completing its final mission on March 9, 2011; Endeavour did so on June 1. The final shuttle mission was completed with the landing of Atlantis on July 21, 2011, closing the 30-year Space Shuttle program.
Larry LaRose is an American NASA flight engineer.
This article incorporates public domain material from websites or documents of the National Aeronautics and Space Administration.