Space Shuttle Enterprise

Last updated

Enterprise
Enterprise free flight.jpg
Enterprise in flight in 1977, during ALT-13
Type Spaceplane
Class Space Shuttle orbiter
Eponym USS Enterprise (NCC-1701)
Other name(s)Constitution (1975–1977)
Serial no.OV-101
Owner NASA
Manufacturer Rockwell International
History
First flight
  • August 12, 1977 (1977-08-12)
  • ALT-12
Last flight
  • October 26, 1977 (1977-10-26)
  • ALT-16
Flights5
Flight time20 m, 58 s above Earth
FatePrototype
Location
Space Shuttle orbiters
  Pathfinder
Columbia  

Space Shuttle Enterprise (Orbiter Vehicle Designation: OV-101) was the first orbiter of the Space Shuttle system. Rolled out on September 17, 1976, it was built for NASA as part of the Space Shuttle program to perform atmospheric test flights after being launched from a modified Boeing 747. [1] It was constructed without engines or a functional heat shield. As a result, it was not capable of spaceflight. [2]

Contents

Originally, Enterprise had been intended to be refitted for orbital flight to become the second space-rated orbiter in service. [1] However, during the construction of Space Shuttle Columbia, details of the final design changed, making it simpler and less costly to build Challenger around a body frame that had been built as a test article. [1] Similarly, Enterprise was considered for refit to replace Challenger after the latter was destroyed, but Endeavour was built from structural spares instead. [1] [3]

Enterprise was restored and placed on display in 2003 at the Smithsonian's new Steven F. Udvar-Hazy Center in Virginia. [4] Following the retirement of the Space Shuttle fleet, Discovery replaced Enterprise at the Udvar-Hazy Center, and Enterprise was transferred to the Intrepid Museum in New York City, where it has been on display since July 2012. [5]

Differences between Enterprise and future shuttles

The design of Enterprise was not the same as that planned for Columbia, the first flight model; the aft fuselage was constructed differently, and it did not have the interfaces to mount OMS pods. A large number of subsystems—ranging from main engines to radar equipment—were not installed on Enterprise, but the capacity to add them in the future was retained, as NASA originally intended to refit the orbiter for spaceflight at the conclusion of its testing. Instead of a thermal protection system, its surface was primarily covered with simulated tiles made from polyurethane foam. Fiberglass was used for the leading edge panels in place of the reinforced carbon–carbon ones of spaceflight-worthy orbiters. Only a few sample thermal tiles and some Nomex blankets were real. [6] Enterprise used fuel cells to generate its electrical power, but these were not sufficient to power the orbiter for spaceflight. [7]

Enterprise also lacked reaction control system thrusters and hydraulic mechanisms for the landing gear; the landing gear doors were simply opened through the use of explosive bolts and the gear dropped down solely by gravity. [7] As it was only used for atmospheric testing, Enterprise featured a large nose probe mounted on its nose cap, common on test aircraft because the location provides the most accurate readings for the test instruments, being mounted out in front of the disturbed airflow.

Enterprise was equipped with Lockheed-manufactured zero-zero ejection seats like those its sister Columbia carried on its first four missions. [7]

Construction milestones

DateMilestone [8]
1972 July 26Contract Award to North American Rockwell
1972 August 9Construction authorization from NASA
1974 June 4Start structural assembly of crew module at Downey plant
1974 August 26Start structural assembly of aft fuselage at Downey plant
1975 March 27Mid fuselage arrives at Palmdale from General Dynamics
1975 May 23Wings arrive at Palmdale from Grumman
1975 May 25Vertical stabilizer arrives at Palmdale from Fairchild Republic
1975 August 25Start of Final Assembly
1975 September 9Aft fuselage on dock, Palmdale
1975 October 31Lower forward fuselage on dock, Palmdale
1975 December 1Upper forward fuselage on dock, Palmdale
1976 January 16Crew module on dock, Palmdale
1976 March 3Payload bay doors on dock, Palmdale
1976 March 12Complete final assembly and closeout systems installation
1976 March 15Start functional checkout
1976 JuneComplete functional checkout, start ground vibration and proof load tests
1976 September 17Rollout from Palmdale [9]
1976 October–NovemberStart systems retest, complete integrated systems checkout
1977 February 18First captive flight
1977 June 18First crewed captive flight [10]
1977 August 12First free flight

Service

Star Trek creator Gene Roddenberry (third from right, in dark brown), the Star Trek cast (with the exception of William Shatner) and NASA administrators attending Enterprise's rollout ceremony The Shuttle Enterprise - GPN-2000-001363.jpg
Star Trek creator Gene Roddenberry (third from right, in dark brown), the Star Trek cast (with the exception of William Shatner) and NASA administrators attending Enterprise's rollout ceremony

Construction began on Enterprise on June 4, 1974. [1] Designated OV-101, it was originally planned to be named Constitution and unveiled on Constitution Day, September 17, 1976. Fans of Star Trek asked US President Gerald Ford, through a letter-writing campaign, to name the orbiter after the television show's fictional starship, USS Enterprise. White House advisors cited "hundreds of thousands of letters" from Trekkies, "one of the most dedicated constituencies in the country", as a reason for giving the shuttle the name. Although Ford did not publicly mention the campaign, the president said that he was "partial to the name" Enterprise, and directed NASA officials to change the name. [3] [11] [12]

In mid-1976 the orbiter was used for ground vibration tests, allowing engineers to compare data from an actual flight vehicle with theoretical models. [1]

On September 17, 1976, Enterprise was rolled out of Rockwell's plant at Palmdale, California. In recognition of its fictional namesake, Star Trek creator Gene Roddenberry and most of the principal cast of the original series of Star Trek were on hand at the dedication ceremony. [13]

Approach and landing tests (ALT)

Fred Haise and Gordon Fullerton (wearing oxygen mask) in Enterprise's cockpit, 1977 HaiseandFullertonEnterprise.jpg
Fred Haise and Gordon Fullerton (wearing oxygen mask) in Enterprise's cockpit, 1977

On January 31, 1977, Enterprise was taken by road to Dryden Flight Research Center at Edwards Air Force Base to begin operational testing. [1] [14]

While at NASA Dryden Enterprise was used by NASA for a variety of ground and flight tests intended to validate aspects of the shuttle program. [15] The initial nine-month testing period was referred to by the acronym ALT, for "Approach and Landing Test". [1] [16] These tests included a maiden "flight" on February 18, 1977, atop a Boeing 747 Shuttle Carrier Aircraft (SCA) to measure structural loads and ground handling and braking characteristics of the mated system. Ground tests of all orbiter subsystems were carried out to verify functionality prior to atmospheric flight. [10]

The mated Enterprise/SCA combination was then subjected to five test flights with Enterprise uncrewed and unactivated. The purpose of these test flights was to measure the flight characteristics of the mated combination. These tests were followed with three test flights with Enterprise crewed to test the shuttle flight control systems. [1]

On August 12, 1977, Enterprise flew on its own for the first time. [17] Enterprise underwent four more free flights where the craft separated from the SCA and was landed under astronaut control. These tests verified the flight characteristics of the orbiter design and were used to carry out several aerodynamic and weight configurations. [16] The first three flights were flown with a tailcone placed at the end of Enterprise's aft fuselage, which reduced drag and turbulence when mated to the SCA. The final two flights saw the tailcone removed and mockup main engine nozzles installed. On the fifth and final glider flight, pilot-induced oscillation problems were revealed, which had to be addressed before the first orbital launch occurred. [15]

A crane hoists Enterprise into the Dynamic Structural Test Facility to undergo dynamic testing in launch configuration. Enterprise lifted.jpg
A crane hoists Enterprise into the Dynamic Structural Test Facility to undergo dynamic testing in launch configuration.

Mated Vertical Ground Vibration Test (MGVT)

Following the conclusion of the ALT test flight program, on March 13, 1978, Enterprise was flown once again, but this time halfway across the country to NASA's Marshall Space Flight Center (MSFC) in Alabama for the Mated Vertical Ground Vibration Testing (MGVT). The orbiter was lifted up on a sling very similar to the one used at Kennedy Space Center and placed inside the Dynamic Test Stand building, and mated to the Vertical Mate Ground Vibration Test tank (VMGVT-ET), which in turn was attached to a set of inert Solid Rocket Boosters (SRB) to form a complete shuttle launch stack, and marked the first time in the program's history that all Space Shuttle elements, an Orbiter, an External Tank (ET), and two SRBs, were mated together. During the course of the program, Enterprise and the rest of the launch stack would be exposed to a punishing series of vibration tests simulating as closely as possible those expected during various phases of launch, some tests with and others without the SRBs in place. [18]

Planned preparations for spaceflight

At the conclusion of this testing, Enterprise was due to be taken back to Palmdale for retrofitting as a fully spaceflight capable vehicle. Under this arrangement, Enterprise would be launched on its maiden spaceflight in July 1981 to launch a communications satellite and retrieve the Long Duration Exposure Facility, then planned for a 1980 release on the first operational orbiter, Columbia. Afterward, Enterprise would conduct two Spacelab missions. [19] However, in the period between the rollout of Enterprise and the rollout of Columbia, a number of significant design changes had taken place, particularly with regard to the weight of the fuselage and wings. This meant that retrofitting the prototype would have been a much more expensive process than previously realized, involving the dismantling of the orbiter and the return of various structural sections to subcontractors across the country. As a consequence, NASA made the decision to convert an incomplete Structural Test Article, numbered STA-099, which had been built to undergo a variety of stress tests, into a fully flight-worthy orbiter, which became Challenger.

Planned orbital missions [19]
#DateDesignationLaunch padNotes
1July 16, 1981STS-1739-ADeployment of Intelsat V satellite and retrieval of Long Duration Exposure Facility
2September 30, 1981STS-2039-A Spacelab mission
3November 25, 1981STS-2239-A Spacelab mission

Fit checks

Enterprise visited Kennedy Space Center LC-39A in launch configuration 20 months before the first Shuttle launch. Enterprise KSC 1979.jpg
Enterprise visited Kennedy Space Center LC-39A in launch configuration 20 months before the first Shuttle launch.

Following the MGVT program and with the decision to not use Enterprise for orbital missions, it was ferried to Kennedy Space Center on April 10, 1979. By June 1979, it was mated with an external tank and solid rocket boosters (known as a boilerplate configuration) and tested in a launch configuration at KSC Launch Complex 39A for a series of fit checks of the facilities there. [3]

After this period, Enterprise was returned to NASA's Dryden Flight Research Facility in September 1981. [21] In 1983 and 1984, Enterprise underwent an international tour visiting France, West Germany, Italy, the United Kingdom, and Canada. Enterprise also visited California, Alabama, and Louisiana (while visiting the 1984 Louisiana World Exposition).

Enterprise visited Vandenberg SLC-6 in launch configuration 17 months before the first West Coast Shuttle launch was scheduled Space Shuttle Enterprise in launch configuration.jpg
Enterprise visited Vandenberg SLC-6 in launch configuration 17 months before the first West Coast Shuttle launch was scheduled

Between November 1984 and May 1985, Enterprise was again mated with an external tank and solid rocket boosters in a boilerplate configuration for a series of fit checks of the never-used shuttle facilities at Vandenberg Air Force Base in California. [22] [23] [24]

On November 18, 1985, Enterprise was ferried to Washington, D.C., where it became property of the Smithsonian Institution and was stored in the National Air and Space Museum's hangar at Dulles International Airport.

Post-Challenger

After the Challenger disaster, NASA considered using Enterprise as a replacement. Refitting the shuttle with all of the necessary equipment for it to be used in space was considered, but NASA decided to use spare parts constructed at the same time as Discovery and Atlantis to build Endeavour. [3]

Post-Columbia

Damage to the leading edge of the wing from the post-Columbia impact tests Enterprise wing panel.jpg
Damage to the leading edge of the wing from the post-Columbia impact tests

In 2003 after the breakup of Columbia during re-entry, the Columbia Accident Investigation Board conducted tests at Southwest Research Institute, which used an air cannon to shoot foam blocks of similar size, mass and speed to that which struck Columbia at a test structure which mechanically replicated the orbiter wing leading edge. They removed a section of fiberglass leading edge from Enterprise's wing to perform analysis of the material and attached it to the test structure, then shot a foam block at it. [25] While the leading edge was not broken as a result of the test, which took place on May 29, 2003, the impact was enough to permanently deform a seal and leave a thin gap 22 in (56 cm) long. [26] [27] [28] Since the strength of the reinforced carbon–carbon (RCC) on Columbia is "substantially weaker and less flexible" than the test section from Enterprise, this result suggested that the RCC would have been shattered. [28] A section of RCC leading edge from Discovery was tested on June 6, to determine the effects of the foam on a similarly aged leading edge, resulting in a three in (7.6 cm) crack on panel 6 and cracking on a T-shaped seal between panels 6 and 7. [29] [30] On July 7, using a leading edge from Atlantis and focused on panel 8 with refined parameters stemming from the Columbia accident investigation, a second test created a ragged hole approximately 16 by 16 in (41 by 41 cm) in the RCC structure. [31] [30] The tests clearly demonstrated that a foam impact of the type Columbia sustained could seriously breach the protective RCC panels on the wing leading edge. [30]

The board determined that the probable cause of the accident was that the foam impact caused a breach of a reinforced carbon-carbon panel along the leading edge of Columbia's left wing, allowing hot gases generated during re-entry to enter the wing and cause structural collapse. This caused Columbia to tumble out of control, breaking up with the loss of the entire crew. [32]

Museum exhibit

New Orleans, Louisiana

Enterprise on display at the 1984 Louisiana World Exposition in New Orleans. Shuttle Enterprise at 1984 World Fair New Orleans 27 August 1984.jpg
Enterprise on display at the 1984 Louisiana World Exposition in New Orleans.

In 1984, Enterprise was on display during the 1984 Louisiana World Exposition (World's Fair) in New Orleans.

Washington, D.C.

Space shuttle enterprise.jpg
Enterprise on display at the Steven F. Udvar-Hazy Center.
Enterprise and Discovery.jpg
Enterprise (left) stands with Discovery on the latter's delivery to the Smithsonian in Washington D.C.

From 1985 to 2003, [10] Enterprise was stored at the Smithsonian's hangar at Washington Dulles International Airport before it was restored and moved to the Smithsonian's newly built National Air and Space Museum Steven F. Udvar-Hazy Center at Washington Dulles, where it was the centerpiece of the space collection. [33] On April 12, 2011, NASA announced that Discovery, the most traveled orbiter in the fleet, would replace Enterprise in the Smithsonian's collection once the Shuttle fleet was retired, with ownership of Enterprise transferred to the Intrepid Museum in New York City. On April 17, 2012, Discovery was transported by Shuttle Carrier Aircraft to Dulles from Kennedy Space Center, where it made several passes over the Washington D.C. metro area. [34] [35] After Discovery had been removed from the Shuttle Carrier Aircraft, both orbiters were displayed nose-to-nose outside the Steven F. Udvar-Hazy Center before Enterprise was made ready for its flight to New York. [36]

New York

Space Shuttle Enterprise
Space Shuttle Enterprise is lifted by crane (7402535806).jpg
Enterprise being lifted onto the deck of Intrepid in June 2012
Location New York City
NRHP reference No. 13000071
Added to NRHPMarch 13, 2013

On December 12, 2011, ownership of Enterprise was officially transferred to the Intrepid Museum in New York City. [37] [38] [39] In preparation for the anticipated relocation, engineers evaluated the vehicle in early 2010 and determined that it was safe to fly on the Shuttle Carrier Aircraft once again. [40] At approximately 13:40  UTC on April 27, 2012, Enterprise took off from Dulles International Airport en route to a fly-by over the Hudson River, New York's JFK International Airport, the Statue of Liberty, the George Washington and Verrazano-Narrows Bridges, and several other landmarks in the city, in an approximately 45-minute "final tour". At 15:23 UTC, Enterprise touched down at JFK International Airport. [41] [42]

The mobile Mate-Demate Device and cranes were transported from Dulles to the ramp at JFK and the shuttle was removed from the SCA overnight on May 12, 2012, placed on a specially designed flat bed trailer and returned to Hangar 12. [43] On June 3 a Weeks Marine barge took Enterprise to Jersey City. The Shuttle sustained cosmetic damage to a wingtip when a gust of wind blew the barge towards a piling. [44] It was hoisted June 6 onto the Intrepid Museum in Manhattan. [45]

Enterprise went on public display on July 19, 2012, at the Intrepid Museum's new Space Shuttle Pavilion, a temporary shelter consisting of a pressurized, air-supported fabric bubble constructed on the aft end of the carrier's flight deck. [46]

Damage from Hurricane Sandy Enterprise nicked tail Sandy jeh.jpg
Damage from Hurricane Sandy

On October 29, 2012, storm surges from Hurricane Sandy caused Pier 86, including the Intrepid Museum's visitor center, to flood, and knocked out the museum's electrical power and both backup generators. The loss of power caused the Space Shuttle Pavilion to deflate, and high winds from the hurricane caused the fabric of the Pavilion to tear and collapse around the orbiter. Minor damage was spotted on the vertical stabilizer of the orbiter, as a portion of the tail fin above the rudder/speedbrake had broken off. [47] The broken section was recovered by museum staff. While the pavilion itself could not be replaced for some time in 2013, the museum erected scaffolding and sheeting around Enterprise to protect it from the environment. [48]

By April 2013, the damage sustained to Enterprise's vertical stabilizer had been fully repaired, and construction work on the structure for a new pavilion was under way. [49] The pavilion and exhibit reopened on July 10, 2013. [50]

Enterprise was listed on the National Register of Historic Places on March 13, 2013, reference number 13000071, in recognition of its role in the development of the Space Shuttle Program. The historic significance criteria are in space exploration, transportation, and engineering. [51]

See also

Related Research Articles

<span class="mw-page-title-main">Space Shuttle</span> Partially reusable launch system and space plane

The Space Shuttle is a retired, partially reusable low Earth orbital spacecraft system operated from 1981 to 2011 by the U.S. National Aeronautics and Space Administration (NASA) as part of the Space Shuttle program. Its official program name was Space Transportation System (STS), taken from the 1969 plan led by U.S. Vice President Spiro Agnew for a system of reusable spacecraft where it was the only item funded for development.

Space Shuttle <i>Challenger</i> Space Shuttle orbiter (1983–1986)

Space Shuttle Challenger (OV-099) was a Space Shuttle orbiter manufactured by Rockwell International and operated by NASA. Named after the commanding ship of a nineteenth-century scientific expedition that traveled the world, Challenger was the second Space Shuttle orbiter to fly into space after Columbia, and launched on its maiden flight in April 1983. It was destroyed in January 1986 soon after launch in a disaster that killed all seven crewmembers aboard.

Space Shuttle <i>Columbia</i> Space Shuttle orbiter (1981–2003)

Space Shuttle Columbia (OV-102) was a Space Shuttle orbiter manufactured by Rockwell International and operated by NASA. Named after the first American ship to circumnavigate the globe, and the female personification of the United States, Columbia was the first of five Space Shuttle orbiters to fly in space, debuting the Space Shuttle launch vehicle on its maiden flight on April 12, 1981 and becoming the first spacecraft to be re-used after its first flight when it launched on STS-2 on November 12, 1981. As only the second full-scale orbiter to be manufactured after the Approach and Landing Test vehicle Enterprise, Columbia retained unique external and internal features compared to later orbiters, such as test instrumentation and distinctive black chines. In addition to a heavier aft fuselage and the retention of an internal airlock throughout its lifetime, these made Columbia the heaviest of the five spacefaring orbiters; around 1,000 kilograms heavier than Challenger and 3,600 kilograms heavier than Endeavour when originally constructed. Columbia also carried ejection seats based on those from the SR-71 during its first six flights until 1983, and from 1986 onwards carried an imaging pod on its vertical stabilizer.

Space Shuttle <i>Discovery</i> Space Shuttle orbiter (1984–2011)

Space Shuttle Discovery is a retired American Space Shuttle orbiter. The spaceplane was one of the orbiters from NASA's Space Shuttle program and the third of five fully operational orbiters to be built. Its first mission, STS-41-D, flew from August 30 to September 5, 1984. Over 27 years of service it launched and landed 39 times, aggregating more spaceflights than any other spacecraft to date. The Space Shuttle launch vehicle had three main components: the Space Shuttle orbiter, a single-use central fuel tank, and two reusable solid rocket boosters. Nearly 25,000 heat-resistant tiles cover the orbiter to protect it from high temperatures on re-entry.

Space Shuttle <i>Atlantis</i> Space Shuttle orbiter (1985–2011)

Space Shuttle Atlantis is a retired Space Shuttle orbiter vehicle which belongs to NASA, the spaceflight and space exploration agency of the United States. Atlantis was manufactured by the Rockwell International company in Southern California and was delivered to the Kennedy Space Center in Eastern Florida in April 1985. Atlantis is also the fourth operational and the second-to-last Space Shuttle built. Its maiden flight was STS-51-J made from October 3 to 7, 1985.

Space Shuttle <i>Endeavour</i> Space Shuttle orbiter (1992–2011)

Space Shuttle Endeavour is a retired orbiter from NASA's Space Shuttle program and the fifth and final operational Shuttle built. It embarked on its first mission, STS-49, in May 1992 and its 25th and final mission, STS-134, in May 2011. STS-134 was expected to be the final mission of the Space Shuttle program, but with the authorization of STS-135 by the United States Congress, Atlantis became the last shuttle to fly.

<span class="mw-page-title-main">Space Shuttle program</span> 1972–2011 United States human spaceflight program

The Space Shuttle program was the fourth human spaceflight program carried out by the U.S. National Aeronautics and Space Administration (NASA), which accomplished routine transportation for Earth-to-orbit crew and cargo from 1981 to 2011. Its official program name was Space Transportation System (STS), taken from a 1969 plan for a system of reusable spacecraft where it was the only item funded for development, as a proposed nuclear shuttle in the plan was cancelled in 1972. It flew 135 missions and carried 355 astronauts from 16 countries, many on multiple trips.

Space Shuttle <i>Columbia</i> disaster 2003 American spaceflight accident

On Saturday, February 1, 2003, Space Shuttle Columbia disintegrated as it re-entered the atmosphere over Texas and Louisiana, killing all seven astronauts on board. It was the second Space Shuttle mission to end in disaster, after the loss of Challenger and crew in 1986.

<span class="mw-page-title-main">Shuttle Carrier Aircraft</span> Extensively modified Boeing 747 airliners that NASA used to transport Space Shuttle orbiters

The Shuttle Carrier Aircraft (SCA) are two extensively modified Boeing 747 airliners that NASA used to transport Space Shuttle orbiters. One (N905NA) is a 747-100 model, while the other (N911NA) is a short-range 747-100SR. Both are now retired.

<span class="mw-page-title-main">Canadarm</span> Robotic arm used on Space Shuttles

Canadarm or Canadarm1 is a series of robotic arms that were used on the Space Shuttle orbiters to deploy, manoeuvre, and capture payloads. After the Space Shuttle Columbia disaster, the Canadarm was always paired with the Orbiter Boom Sensor System (OBSS), which was used to inspect the exterior of the shuttle for damage to the thermal protection system.

<span class="mw-page-title-main">Steven F. Udvar-Hazy Center</span> Aviation museum in Virginia, U.S.

The Steven F. Udvar-Hazy Center, also called the Udvar-Hazy Center, is the Smithsonian National Air and Space Museum (NASM)'s annex at Dulles International Airport in the Chantilly area of Fairfax County, Virginia. It holds numerous exhibits, including the Space Shuttle Discovery, the Enola Gay, and the Boeing 367-80, the main prototype for the popular Boeing 707 airliner.

<span class="mw-page-title-main">STS-118</span> 2007 American crewed spaceflight to the ISS

STS-118 was a Space Shuttle mission to the International Space Station (ISS) flown by the orbiter Endeavour. STS-118 lifted off on August 8, 2007, from launch pad 39A at Kennedy Space Center (KSC), Florida and landed at the Shuttle Landing Facility at KSC on August 21, 2007.

<span class="mw-page-title-main">Boilerplate (spaceflight)</span> Nonfunctional spacecraft or payload

A boilerplate spacecraft, also known as a mass simulator, is a nonfunctional craft or payload that is used to test various configurations and basic size, load, and handling characteristics of rocket launch vehicles. It is far less expensive to build multiple, full-scale, non-functional boilerplate spacecraft than it is to develop the full system. In this way, boilerplate spacecraft allow components and aspects of cutting-edge aerospace projects to be tested while detailed contracts for the final project are being negotiated. These tests may be used to develop procedures for mating a spacecraft to its launch vehicle, emergency access and egress, maintenance support activities, and various transportation processes.

<span class="mw-page-title-main">Space Shuttle orbiter</span> Spaceplane component of the Space Shuttle

The Space Shuttle orbiter is the spaceplane component of the Space Shuttle, a partially reusable orbital spacecraft system that was part of the discontinued Space Shuttle program. Operated from 1981 to 2011 by NASA, the U.S. space agency, this vehicle could carry astronauts and payloads into low Earth orbit, perform in-space operations, then re-enter the atmosphere and land as a glider, returning its crew and any on-board payload to the Earth.

The following is an outline of 1985 in spaceflight.

<span class="mw-page-title-main">Approach and Landing Tests</span> Trials of the prototype Space Shuttle Enterprise

The Approach and Landing Tests were a series of sixteen taxi and flight trials of the prototype Space Shuttle Enterprise that took place between February and October 1977 to test the vehicle's flight characteristics. Of the sixteen taxi-tests and flights, eleven saw Enterprise remain mated to the Shuttle Carrier Aircraft (SCA), while the final five had the shuttle jettisoned from the SCA, with the on-board crew flying and landing the spacecraft.

<span class="mw-page-title-main">Mate-Demate Device</span>

The Mate-Demate Device was a specialized gantry crane designed to lift a Space Shuttle orbiter onto and off the back of a Shuttle Carrier Aircraft (SCA). Two Mate-Demate Devices were built, one at the Armstrong Flight Research Center in California, the other at the Kennedy Space Center in Florida. A third Orbiter Lifting Fixture was to serve a similar function at the Vandenberg Air Force Base, the proposed West Coast launch location for the Shuttle. It was later moved to Palmdale to support the plant where the Shuttle was built and refurbished. A portable sling was also built to support mate-demate operations away from the primary locations.

<span class="mw-page-title-main">Space Shuttle retirement</span> End of NASA Space Shuttle program in 2011

The retirement of NASA's Space Shuttle fleet took place from March to July 2011. Discovery was the first of the three active Space Shuttles to be retired, completing its final mission on March 9, 2011; Endeavour did so on June 1. The final shuttle mission was completed with the landing of Atlantis on July 21, 2011, closing the 30-year Space Shuttle program.

Larry LaRose is an American NASA flight engineer.

References

  1. 1 2 3 4 5 6 7 8 9 Jenkins, Dennis R (2007). Space Shuttle: The History of the National Space Transportation System . Voyageur Press. ISBN   978-0-9633974-5-4.
  2. Slovinac, Patricia; Deming, Joan (June 2010). Avionics Systems Laboratory/Building 16: Historical Documentation. NASA. JSC-CN-22284. Archived from the original on December 12, 2013.
  3. 1 2 3 4 Grinter, Kay (October 3, 2000). "Enterprise (OV-101)". NASA.gov. Archived from the original on March 26, 2015. Retrieved November 28, 2007.
  4. "National Air and Space Museum Steven F. Udvar-Hazy Center". NASA. October 23, 2003. Archived from the original on January 25, 2015. Retrieved September 30, 2015.
  5. D'Orazio, Dante (July 18, 2012). "NASA Space Shuttle Enterprise aboard the USS Intrepid in pictures". The Verge . Archived from the original on July 9, 2018. Retrieved September 30, 2015.
  6. "Space Shuttle, "Enterprise" OV-101". SI.edu. Smithsonian Institution. Archived from the original on February 3, 2014. Retrieved January 9, 2013.
  7. 1 2 3 Lethbridge, Cliff (1998). "Space Shuttle Enterprise (OV-101) Fact Sheet". Spaceline.org. Archived from the original on January 7, 2011.
  8. Garrett, David; Gordon, Bob (August 25, 1976). "Shuttle roll-out set for 17 September 1976" (Press release). NASA News. 76N-32224. Archived from the original on May 8, 2015. Retrieved June 16, 2013.
  9. PeriscopeFilm (January 13, 2021). "Space Shuttle program orbiter 101 / Enterprise rollout ceremony September 17–18, 1976". YouTube . Archived from the original on December 11, 2021. Retrieved February 14, 2021.
  10. 1 2 3 Gebhardt, Chris (April 27, 2012). "Space Shuttle Enterprise – The Orbiter that started it all". NASA Spaceflight. Archived from the original on June 19, 2015. Retrieved June 18, 2015.
  11. Lewine, Frances (September 6, 1976). "Star Trek Fans Win on Space Shuttle". The Lewiston Daily Sun. p. 20. Archived from the original on January 1, 2022. Retrieved March 5, 2011.
  12. Strauss, Mark (July 10, 2014). "Declassified Memos Reveal Debate Over Naming the Shuttle "Enterprise"". io9. Archived from the original on August 24, 2015. Retrieved August 21, 2015.
  13. Rioux, Terry Lee (2005). From Sawdust to Stardust: The Biography of DeForest Kelley, Star Trek's Dr. McCoy. Pocket Books. p. 221. ISBN   978-0743457620.
  14. Dismukes, Kim (February 15, 2005). "Space Shuttle Basics". NASA.gov. Archived from the original on November 27, 2007. Retrieved November 28, 2007.
  15. 1 2 "Space Shuttle Approach and Landing Tests (ALT)". NASA.gov. Archived from the original on March 15, 2008. Retrieved November 28, 2007.
  16. 1 2 "Shuttle Enterprise Free Flight". NASA.gov. 2000. Archived from the original on March 7, 2013. Retrieved November 28, 2007.
  17. Futz, Bob (1977). "1977 Year in Review: Space Shuttle Enterprise". UPI.com. United Press International. Archived from the original on January 5, 2013. Retrieved January 9, 2013.
  18. Baker, David (2011). NASA Space Shuttle: 1981 onwards (all models): An Insight into the Design, Construction and Operation of the NASA Space Shuttle. Owners' Workshop Manual. Zenith Press. ISBN   978-0-7603-4076-9.
  19. 1 2 Portree, David S F (March 24, 2012). "What Shuttle Should Have Been: The October 1977 Flight Manifest". Wired.com. Archived from the original on March 26, 2012. Retrieved November 7, 2012.
  20. "Shuttle Orbiter Enterprise on Launch Complex 39". NASA.gov. June 1, 1979. Archived from the original on November 24, 2007. Retrieved January 21, 2008.
  21. "Enterprise (OV-101)". NASA.gov. October 3, 2000. Archived from the original on May 15, 2012. Retrieved November 7, 2012.
  22. "40 Years Ago: Space Shuttle Enterprise rolls to the Pad". NASA.gov. May 1, 2019. Retrieved September 26, 2022.
  23. Scully, Janene (September 29, 2005). "New era dawns for SLC-6". Lompoc Record . Retrieved June 8, 2017.
  24. Fulks, Tom (October 16, 1985). "Vandeberg opens new space shuttle base". The County-Telegram Tribune . San Luis Obispo, California. Archived from the original on April 4, 2023. Retrieved April 4, 2023 via Newspapers.com.
  25. Harwood, William (June 4, 2003). "Critical foam impact test planned for Thursday". Spaceflight Now. Archived from the original on September 29, 2007. Retrieved July 12, 2007.
  26. "Shuttle Leading Edge Foam Impact Test Update" (Press release). Columbia Accident Investigation Board. May 29, 2003. Archived from the original on June 22, 2003.
  27. Watson, Traci (May 29, 2003). "Test supports theory foam doomed shuttle". USA Today . Archived from the original on January 26, 2021. Retrieved February 17, 2018.
  28. 1 2 Schwartz, John (June 5, 2003). "NASA's Foam Test Offered A Vivid Lesson in Kinetics". The New York Times . Archived from the original on February 18, 2018. Retrieved February 17, 2018.
  29. "Foam Impact Test Breaks Reinforced Carbon-Carbon Panel" (Press release). Columbia Accident Investigation Board. Spaceref.com. June 6, 2003. CAIB PA 32-03. Archived from the original on February 18, 2023. Retrieved February 17, 2018.
  30. 1 2 3 Walker, James D.; Grosch, Donald J. (Fall 2003). "On the Leading Edge" (PDF). Technology Today. 24 (3): 2–9. ISSN   1528-431X. Archived from the original (PDF) on February 18, 2018.
  31. Harwood, William (July 7, 2003). "Foam impact test blows hole in shuttle wing panel". Spaceflight Now. Archived from the original on December 13, 2017. Retrieved February 17, 2018.
  32. Wald, Matthew L.; Schwartz, John (July 8, 2003). "Test Shows Foam Was Likely Cause of Shuttle's Loss". The New York Times . Archived from the original on February 17, 2018. Retrieved February 16, 2018.
  33. Wilson, Jim (October 29, 2004). "Shuttle Enterprise at Center of Museum's Space Hangar". NASA.gov. Archived from the original on March 6, 2019. Retrieved November 28, 2007.
  34. Heiney, Anna (April 17, 2012). "Discovery Departs Kennedy Space Center". NASA.gov. Archived from the original on April 19, 2012. Retrieved April 17, 2012.
  35. Vastag, Brian (April 18, 2012). "Space shuttle Discovery makes final flight over Washington D.C." The Washington Post . Archived from the original on April 19, 2012. Retrieved April 19, 2012.
  36. Camusci, Tiffany (August 31, 2018). "When Enterprise Met Discovery". National Air and Space Museum. Smithsonian Institution. Archived from the original on July 21, 2019. Retrieved January 9, 2020.
  37. Pearlman, Robert Z (December 12, 2011). "Intrepid Museum Celebrates Ownership of Space Shuttle Enterprise". CollectSpace.com. Archived from the original on January 12, 2012. Retrieved January 30, 2012.
  38. Rainey, Kris (December 11, 2011). "NASA Transfers Enterprise Title to Intrepid Sea, Air & Space Museum in New York City". NASA.gov. Archived from the original on February 11, 2012. Retrieved January 30, 2012.
  39. Raskin, Deborah; Sacks, Luke (November 22, 2011). "NASA Transfers Title to Space Shuttle Orbiter Enterprise to the Intrepid Sea, Air & Space Museum in New York City" (Press release). PRWeb.com. Archived from the original on January 29, 2012. Retrieved March 27, 2012.
  40. Bergin, Chris (March 14, 2010). "Enterprise in good condition for potential SCA ferry from Smithsonian NASM". NASAspaceflight.com. Archived from the original on March 16, 2010. Retrieved March 16, 2010.
  41. "Space shuttle Enterprise lands safely in New York, after soaring over northern N.J." NJ.com. Associated Press. April 27, 2012. Archived from the original on June 5, 2012. Retrieved June 4, 2016.
  42. Shallwani, Pervaiz; Fox, Alison (April 27, 2016). "A Shuttle Meets Its City". The Wall Street Journal . Archived from the original on August 5, 2016. Retrieved June 4, 2016.
  43. Pearlman, Robert Z (March 1, 2012). "Space shuttle Enterprise lands in New York City on April 23". CollectSpace.com. Archived from the original on March 5, 2012. Retrieved March 22, 2012.
  44. Ludka, Alexandra (June 5, 2012). "Space Shuttle Enterprise Damaged On Way to New Home". ABC News . Archived from the original on June 7, 2012. Retrieved June 7, 2012.
  45. "Enterprise to spend day in Jersey City". NJ.com. Associated Press. June 4, 2012. Archived from the original on February 3, 2014. Retrieved June 7, 2012.
  46. Katz, Alex (July 18, 2012). "Space shuttle Enterprise set to open to public". PHYS.org. Archived from the original on November 4, 2022. Retrieved November 3, 2022.
  47. Pearlman, Robert Z. (October 30, 2012). "Space Shuttle Enterprise Damaged by Hurricane Sandy". Space.com. Archived from the original on November 1, 2012. Retrieved October 31, 2012.
  48. Pearlman, Robert Z (December 20, 2012). "Shuttle Enterprise Being Repaired as Museum Home Reopens Friday". Space.com. Archived from the original on December 22, 2012. Retrieved January 9, 2012.
  49. Pearlman, Robert Z (April 30, 2013). "Space Shuttle Enterprise's New Home Takes Shape at NYC Museum". Space.com. Archived from the original on June 6, 2013. Retrieved June 17, 2013.
  50. Gerberg, Jon (July 10, 2013). "Space shuttle Enterprise reopens to NYC visitors". The Big Story. Associated Press. Archived from the original on August 20, 2013.
  51. Bagrow, Daniel A. (March 13, 2013). "Space Shuttle Enterprise". NPS.gov. National Register of Historic Places. Archived from the original on May 7, 2015. Retrieved March 22, 2013.

Attribution

PD-icon.svg This article incorporates public domain material from websites or documents of the National Aeronautics and Space Administration.

40°45′55″N74°00′07″W / 40.76528°N 74.00194°W / 40.76528; -74.00194