Launch site | Vandenberg Space Force Base | ||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Location | 34°34′53″N120°37′36″W / 34.5813°N 120.6266°W | ||||||||||||
Time zone | UTC−08:00 (PST) | ||||||||||||
UTC−07:00 (PDT) | |||||||||||||
Short name | SLC-6 | ||||||||||||
Operator | United States Space Force | ||||||||||||
Launch pad(s) | 1 | ||||||||||||
Orbital inclination range | 55–145° [1] | ||||||||||||
|
Vandenberg Space Launch Complex 6 (SLC-6, pronounced "Slick Six") is a launch pad and associated support infrastructure at Vandenberg Space Force Base in California. Construction at the site began in 1966, but the first launch didn't occur until 1995 due to program cancellations and subsequent repurposing efforts.
The site was originally envisioned to support Titan IIIM rockets and the Manned Orbiting Laboratory, however, these projects were terminated before SLC-6's completion. Between 1979 and 1986 the facilities received extensive modifications to accommodate the Space Shuttle. However, budgetary constraints, safety considerations, and political factors ultimately led to the cancellation of Shuttle operations from the West Coast.
SLC-6 facilitated four launches of Athena rockets between 1995 and 1999 with minimal modifications. Subsequently, it underwent modifications to support the Delta IV and Delta IV Heavy, which conducted ten successful missions between 2006 and 2022. In 2023, SpaceX secured a lease agreement for SLC-6, with plans to modify the facility for Falcon 9 and Falcon Heavy launches commencing in 2025.
Vandenberg's southward launch trajectory is advantageous for deploying satellites into high-inclination polar and Sun-synchronous orbits, needed for weather forecasting, Earth observation, and reconnaissance missions as they enable comprehensive and regular global coverage. Launching into such orbits from the East Coast of the United States presents significant challenges due to geographical constraints. [4]
SLC-6, part of Vandenberg's "South Base," was originally part of the Sudden Ranch, prior to its purchase by the U.S. Air Force in the mid-1960s under the law of eminent domain. In addition to the ranch, the Point Arguello Light was based there, which in 1967 was replaced by an automated light. There was also the Point Arguello LORAN station, de-established 31 December 1979. [5]
No Titans were launched from SLC-6. After purchase of south base, the Air Force started construction of the SLC-6 facility on 12 March 1966, to support launches of a modified Titan III for the Manned Orbiting Laboratory (MOL). After significant construction work was completed, the MOL program was cancelled on 10 June 1969, so further work on SLC-6 stopped as the facility was placed in mothball status. [6]
No Space shuttles were launched from SLC-6. With plans of launching civilian and military equatorial space shuttle flights from Kennedy Space Center (KSC) and military polar orbit flights from Vandenberg, NASA and the Air Force looked at different sites for launching the shuttle, finally deciding upon SLC-6, due to its dedicated crewed spaceflight role that was left over from the canceled MOL/Titan program. [7] [8]
In 1972, Vandenberg AFB was chosen as the western launch site for Air Force shuttle launches. Use of SLC-6 was approved in 1975, and re-construction of the former MOL launch facility occurred between January 1979 and July 1986 as SLC-6 was rebuilt to accommodate the space shuttle. [9]
There were several reasons for using SLC-6: [8]
A Senate report summarized: "The Air Force originally justified the expenditure of such SLC-6 funding on the basis of a need to launch high-priority military payloads into polar orbits. After Defense Department officials testified that polar orbits could not be achieved by launching from Kennedy Space Center in Florida, the Congress initiated construction of ... SLC-6." [8]
There were significant layout differences between the shuttle launch complexes at KSC and SLC-6 at Vandenberg, with the facilities at KSC closer together, but with stacking operations taking place right at the launch pad at SLC-6
At KSC, the Shuttle arrived at the Shuttle Landing Facility airport either by gliding in from space or piggybacking on the Shuttle Carrier Aircraft and then being unloaded using the Mate-Demate Device. From there, it was towed a short distance to one of three Orbiter Processing Facility hangars where it was refurbished. When the orbiter was ready, it was towed across the road to the Vehicle Assembly Building where it was stacked atop a mobile launcher platform. From there, the vehicle was taken to one of two pads at Launch Complex 39 about a mile away by a crawler-transporter. At the launch pad, the Rotating Service Structure allowed payloads to be loaded into the cargo bay on the pad.
At SLC-6, the existing 5,500-foot (1,700 m) runway at the North Base was expanded to match the Shuttle Landing Facility in Florida: 15,000 feet (4,600 m) in length with additional 1,000-foot (300 m) overruns on both ends to accommodate end-of-mission landings. Just off the runway, was the Orbiter Lifting Fixture, a scaled-down version of the Mate-Demate Device, and the Orbiter Maintenance and Processing Facility (OMPF) where the Shuttle would be refurbished. [8] When the orbiter was ready, the Orbiter Transport System, a 76-wheel transporter would have been used to transport the shuttle between the North Base facilities and SLC-6 over 17 miles (27 km) of base and public roadways. The route through the hills around the base required that hills be carved away along 2 miles (3.2 km) of the route to accommodate the orbiter’s wingspan. [10] [11] At the launch pad, two buildings, the Shuttle Assembly Building and the Mobile Service Tower would envelop the access tower allowing the spacecraft to be stacked right on the launch pad. [12]
In all, over $4 billion were spent on the modifying SLC-6 for the Space Shuttle. The original Mobile Service Tower (MST) was lowered in height and two new flame ducts were added for the shuttle's solid rocket boosters. Additional modifications or improvements included liquid hydrogen and liquid oxygen storage tanks, a payload preparation room, payload changeout room, a new launch tower with escape system for the shuttle crew members, sound suppression system and water reclamation area and a Shuttle Assembly Building were added to the original complex. [8]
Between November 1984 and May 1985, the Space Shuttle Enterprise was mated with External Tank and SRBs in boilerplate configuration for a series of fit checks like those conducted at LC-39. [13] SLC-6 was declared operational during acceptance ceremonies held on 15 October 1985. [14] [15] However, much additional work and testing was still required.
The inaugural polar-orbit flight, designated STS-62-A and using Space Shuttle Discovery with Shuttle veteran Robert Crippen as commander, was planned for 15 October 1986. However, the Challenger disaster of 28 January 1986 grounded the Shuttle fleet as efforts were concentrated on recovery and returning the program to flight after a two-year hiatus. [16]
On 31 July 1986, Secretary of the Air Force Edward C. Aldridge, Jr., announced that Vandenberg's Space Shuttle program would be placed in "operational caretaker status", six months after the Space Shuttle Challenger accident. A few months later, however, SLC-6 was placed in "minimum caretaker status" on 20 February 1987. [9]
Eventually, on 13 May 1988, Secretary Aldridge then directed the Air Force to transfer Space Shuttle assets at Vandenberg to other organizations (specifically, the Kennedy Space Center) by 30 September 1989, the end of the fiscal year. The work was completed 10 days early on 20 September, when SLC-6 was placed in mothball status. [9]
Several factors accounted for this: [8]
The Air Force officially terminated the Space Shuttle program at Vandenberg on 26 December 1989. The estimated cost for the discontinued program was $4 billion. [17]
The Orbiter Lifting Fixture was relocated to United States Air Force Plant 42 where the orbiters were built and refurbished in Palmdale, California, before the delivery of the Space Shuttle Endeavour in 1991. Previously, the orbiters were trucked to Armstrong Flight Research Center at Edwards Air Force Base, about 36 miles (58 km) away, which took about 10 hours. [18] The Orbiter Lifting Fixture was dismantled in 2008. [19]
The Orbiter Transport System was sent to KSC where it was used to move orbiters between the Orbiter Processing Facility and the Vehicle Assembly Building. The vehicle was purchased by SpaceX in 2014 for $37,075. [11]
On 6 July 1990, Lockheed Space Operations Company (LSOC) was awarded an Air Force ground system contract to modify SLC-6 into a Titan IV/Centaur launch complex—essentially an uprated facility from the original MOL program that would have launched a Titan III vehicle. [20] Site work was scheduled to begin in late-FY 1992 with a planned initial launch capability sometime in FY1996. [21] [22]
However, on 22 March 1991, HQ USAF reversed itself again by announcing the termination of the Titan IV/Centaur program at SLC-6. [22] The reasons given for the project being canceled was due to "insufficient Titan IV launch requirements from the West Coast to support the construction of a new launch pad." The contract with LSOC was closed out several months later. [23] Instead, USAF continued flying military polar orbit satellites using the Titan 34D and later Titan IV rockets from SLC-4 at Vandenberg. [22] [24]
Four Athena missions flew from SLC-6, from 1995 to 1999. In the early 1990s, Lockheed Missiles and Space Company began studies on the prospect of a new family of small launch vehicles for commercial and other users. Lockheed eventually approved the development of the Lockheed Launch Vehicle (LLV) program in January 1993. After the merger of Lockheed with Martin Marietta, it was renamed Athena. [25]
After another contract was issued in 1994 by the Air Force, modification work began on the existing SLC-6 shuttle launch mount for a small "milkstool" platform to be located over one of the two exhaust ducts originally intended for one of the large solid rocket boosters. The first operational launch from SLC-6 occurred on 15 August 1995, involving the Lockheed-Martin Launch Vehicle I (LMLV-1). Unfortunately, LMLV-1 was terminated in mid-flight after uncontrolled oscillations of the rocket were detected. This resulted in the loss of the vehicle and the payload. The cause of the mishap was later determined to be a guidance system failure coupled with overheating of the booster's first stage steering mechanism. The payload on board was GEMstar 1, a small communications satellite manufactured by CTA, Inc. for the Volunteers in Technical Assistance (VITA), a non-profit organization. [26]
After some hardware redesign and testing, a newly rechristened Athena I successfully launched NASA's Lewis satellite into orbit from SLC-6 on 22 August 1997. Part of NASA's Small Spacecraft Technology Initiative (SSTI) and "Mission to Planet Earth" program. [27]
Another launch, on 24 September 1999, was successful as an Ikonos satellite operated by Space Imaging (later acquired by ORBIMAGE to form GeoEye) was successfully placed into a polar orbit using an Athena 2 booster. [28]
Ten Delta IV rockets were launched from SLC-6. With the advent of the Delta IV in the late 1990s, The Boeing Company received a lease from the Air Force on 1 September 1999, to modify SLC-6 once again to launch Boeing's Delta IV. [29]
Some of the Shuttle-specific components at SLC-6 were removed, such as the mobile Payload Changeout Room, but the Assembly Building, Mobile Service Tower, Launch Tower, flame deflection trenches and sound suppression system and some other shuttle-oriented equipment were retained and made compatible for the new Delta IV rocket. The launch vehicle's Common Booster Core and associated flight hardware was transported from the Boeing factory in Decatur, Ala., to Vandenberg aboard the MV Delta Mariner cargo vessel that docked just south of SLC-6 at the same location originally constructed for receiving and offloading space shuttle external tanks. [30] [31]
Boeing developed the Delta IV class of vehicles as its entrant in the Department of Defense's Evolved Expendable Launch Vehicle (EELV) program. EELV was intended to cut launch costs and simplify satellite launch processes.
After sitting on the pad since late-2003 and enduring technical issues with both the booster and the payload, the first of the Delta IV launch vehicles to fly from SLC-6 successfully lifted off at 8:33 p.m. PDT on 27 June 2006. [32] [33]
The Delta IV Medium+ (4,2) rocket lofted NROL-22, a classified satellite for the National Reconnaissance Office, into orbit. The payload was successfully deployed approximately 54 minutes later. [34] According to a post-launch Boeing News press release, the mission was the first for the NRO aboard a Delta IV and the second aboard a Delta rocket.
Another Delta IV Medium vehicle flew a mission for the Air Force Defense Meteorological Satellite Program, orbiting DMSP-17, on 4 November 2006. [35]
The Delta IV and the lease on SLC-6 were turned over to United Launch Alliance (ULA) when ULA was formed as a joint venture of Boeing and Lockheed Martin Space in December 2006.
On 20 January 2011, at 1:10 p.m. PST, USA-224 (NROL-49) was launched atop a Delta IV Heavy rocket. The launch was conducted by ULA and was the first flight of a Delta IV Heavy from Vandenberg. [36]
On 24 September 2022, ULA launched the last Delta IV Heavy from the pad, concluding their use of SLC-6. [37] Vulcan Centaur, Delta IV Heavy's successor, will launch from SLC-3 at Vandenberg, currently used by Atlas V. [38]
On 24 April 2023, the United States Space Force announced that it was leasing SLC-6 to SpaceX for Falcon 9 and Falcon Heavy launches. [39] [40] SpaceX expects to begin Falcon 9 launches from SLC-6 in 2025 and Falcon Heavy launches in 2026. [41] Since then, SpaceX has started reconfiguring the launch pad. [42]
No. | Date/Time (UTC) | Type | Serial-no. | Payload | Type of payload | Orbit | Outcome | Remarks |
---|---|---|---|---|---|---|---|---|
1 | 1995-08-15 22:30 | Athena I | DLV | GemStar 1 | Communications | LEO | Failure | First launch from SLC-6 |
2 | 1997-08-23 06:51:01 | Athena I | LM-002 | Lewis | Science | LEO | Success | |
3 | 1999-04-27 18:22:01 | Athena II | LM-005 | IKONOS 1 | Imaging | LEO | Failure | Payload fairing failed to separate and satellite did not achieve orbit |
4 | 1999-09-24 18:21:08 | Athena II | LM-007 | IKONOS 2 | Earth observation | LEO | Success | |
5 | 2006-06-28 03:33 | Delta IV Medium+ (4,2) | 317 | USA-184 (NROL-22) | ELINT | Molniya | Success | First Delta IV launch from Vandenberg [43] |
6 | 2006-11-04 13:53 | Delta IV Medium | 320 | USA-192 (DMSP F17) | Weather | SSO | Success | First Delta IV launch into a LEO/SSO |
7 | 2011-01-20 21:10 | Delta IV Heavy | 352 | USA-224 (NROL-49) | Optical imaging | LEO | Success [44] | First Delta IV Heavy launch from Vandenberg [44] |
8 | 2012-04-02 23:04 | Delta IV Medium+ (5,2) | 359 | USA-234 (NROL-25) | Radar imaging | LEO | Success | First Delta IV Medium+ (5,2) launch |
9 | 2013-08-28 18:03 | Delta IV Heavy | 364 | USA-245 (NROL-65) | Reconnaissance satellite | LEO | Success [45] | |
10 | 2016-02-10 11:40 | Delta IV Medium+ (5,2) | 373 | USA-267 (NROL-45) | Radar imaging | LEO | Success [46] | |
11 | 2018-01-12 22:11 | Delta IV Medium+ (5,2) | 379 | USA-281 (NROL-47) | Reconnaissance | LEO | Success | Final flight of Delta IV Medium+(5,2) |
12 | 2019-01-19 11:10 | Delta IV Heavy | 382 | USA-290 (NROL-71) | Reconnaissance | LEO | Success | |
13 | 2021-04-26 20:47 | Delta IV Heavy | 386 | USA-314 (NROL-82) | Reconnaissance | LEO | Success | |
14 | 2022-09-24 22:25 | Delta IV Heavy | 387 | USA-338 (NROL-91) | Reconnaissance | LEO | Success | Final flight of a Delta rocket from Vandenberg |
Titan was a family of United States expendable rockets used between 1959 and 2005. The Titan I and Titan II were part of the US Air Force's intercontinental ballistic missile (ICBM) fleet until 1987. The space launch vehicle versions contributed the majority of the 368 Titan launches, including all the Project Gemini crewed flights of the mid-1960s. Titan vehicles were also used to lift US military payloads as well as civilian agency reconnaissance satellites and to send interplanetary scientific probes throughout the Solar System.
Vandenberg Space Force Base, previously Vandenberg Air Force Base, is a United States Space Force Base in Santa Barbara County, California. Established in 1941, Vandenberg Space Force Base is a space launch base, launching spacecraft from the Western Range, and also performs missile testing. The United States Space Force's Space Launch Delta 30 serves as the host delta for the base, equivalent to an Air Force air base wing. In addition to its military space launch mission, Vandenberg Space Force Base also hosts space launches for civil and commercial space entities, such as NASA and SpaceX.
Cape Canaveral Space Force Station (CCSFS) is an installation of the United States Space Force's Space Launch Delta 45, located on Cape Canaveral in Brevard County, Florida.
Delta IV was a group of five expendable launch systems in the Delta rocket family. It flew 45 missions from 2002 to 2024. Originally designed by Boeing's Defense, Space and Security division for the Evolved Expendable Launch Vehicle (EELV) program, the Delta IV became a United Launch Alliance (ULA) product in 2006. The Delta IV was primarily a launch vehicle for United States Air Force (USAF) military payloads, but was also used to launch a number of United States government non-military payloads and a single commercial satellite.
Titan IV was a family of heavy-lift space launch vehicles developed by Martin Marietta and operated by the United States Air Force from 1989 to 2005. Launches were conducted from Cape Canaveral Air Force Station, Florida and Vandenberg Air Force Base, California.
The Boeing X-37, also known as the Orbital Test Vehicle (OTV), is a reusable robotic spacecraft. It is boosted into space by a launch vehicle, then re-enters Earth's atmosphere and lands as a spaceplane. The X-37 is operated by the Department of the Air Force Rapid Capabilities Office, in collaboration with United States Space Force, for orbital spaceflight missions intended to demonstrate reusable space technologies. It is a 120-percent-scaled derivative of the earlier Boeing X-40. The X-37 began as a NASA project in 1999, before being transferred to the United States Department of Defense in 2004. Until 2019, the program was managed by Air Force Space Command.
Space Launch Complex 3 (SLC-3) is a launch site at Vandenberg Space Force Base that consists of two separate launch pads. SLC-3E (East) was used by the Atlas V launch vehicle before it was decommissioned in August 2021 with the final launch taking place on November 10, 2022 at 09:49, while SLC-3W (West) has been demolished.
Before the Apollo 11 Moon landing in 1969, NASA began studies of Space Shuttle designs as early as October 1968. The early studies were denoted "Phase A", and in June 1970, "Phase B", which were more detailed and specific. The primary intended use of the Phase A Space Shuttle was supporting the future space station, ferrying a minimum crew of four and about 20,000 pounds (9,100 kg) of cargo, and being able to be rapidly turned around for future flights, with larger payloads like space station modules being lifted by the Saturn V.
United Launch Alliance, LLC (ULA) is an American launch service provider formed in December 2006 as a joint venture between Lockheed Martin Space and Boeing Defense, Space & Security. The company designs, assembles, sells and launches rockets, but the company subcontracts out the production of rocket engines and solid rocket boosters.
Space Launch Complex 40 (SLC-40), sometimes referred to as "Slick Forty," is a launch pad located at Cape Canaveral Space Force Station in Florida. Initially opened as Launch Complex 40 (LC-40) and used by the United States Air Force for 55 launches of rockets from the Titan family between 1965 and 2005. In 2007, SpaceX acquired a lease for SLC-40 and has since transformed the complex into a high-volume launch site for the Falcon 9 rocket. As of August 2024, the pad has hosted over 200 Falcon 9 launches.
The United States Air Force's 4th Space Launch Squadron was a space launch unit located at Vandenberg Air Force Base, California. It was active at Vandenberg from 1994 to 1998 and again from 2003 to 2019. It launched various satellites into orbit from the complex of launch pads at Vandenberg.
Space Launch Complex 4 (SLC-4) is a launch and landing site at Vandenberg Space Force Base, California, U.S. It has two pads, both of which are used by SpaceX for Falcon 9, one for launch operations, and the other as Landing Zone 4 (LZ-4) for SpaceX landings.
The Athena I, known as the Lockheed Launch Vehicle (LLV) at the time of its first flight and Lockheed Martin Launch Vehicle (LMLV) at the time of its second flight, was an American small expendable launch system which was used for four launches between 1995 and 2001. It is a member of the Athena family of rockets, along with the larger Athena II.
The Athena II is an American small expendable launch system which was used for three launches between 1998 and 1999, and which was scheduled to return to service in 2012 but has not been flown again as of 2024. It is a member of the Athena family of rockets, along with the smaller Athena I.
The 6555th Aerospace Test Group is an inactive United States Air Force unit. It was last assigned to the Eastern Space and Missile Center and stationed at Patrick Air Force Base, Florida. It was inactivated on 1 October 1990.
USA-184, also known as NRO Launch 22 or NROL-22, is an American signals intelligence satellite, operated by the National Reconnaissance Office. Launched in 2006, it has been identified as the first in a new series of satellites which are replacing the earlier Trumpet spacecraft.
OmegA was a medium-lift to heavy-lift launch vehicle concept that spent several years in development by Northrop Grumman during 2016–2020, with that development substantially funded by the U.S. government. OmegA was intended for launching U.S. national security satellites, as part of the U.S. Department of the Air Force National Security Space Launch (NSSL) replacement program.
Firefly Alpha is a two-stage orbital expendable small lift launch vehicle developed by the American company Firefly Aerospace to compete in the commercial small satellite launch market. Alpha is intended to provide launch options for both full vehicle and rideshare customers.
Media related to Vandenberg Space Force Base Space Launch Complex 6 at Wikimedia Commons