STS-30

Last updated

STS-30
Atlantis and Magellan (3).jpg
Magellan and its IUS in the payload bay of Atlantis
Names Space Transportation System-30
STS-30R
Mission type Magellan spacecraft deployment
Operator NASA
COSPAR ID 1989-033A OOjs UI icon edit-ltr-progressive.svg
SATCAT no. 19968
Mission duration4 days, 0 hours, 56 minutes, 27 seconds (achieved)
Distance travelled2,377,800 km (1,477,500 mi)
Orbits completed65
Spacecraft properties
Spacecraft Space Shuttle Atlantis
Launch mass118,441 kg (261,118 lb)
Landing mass87,296 kg (192,455 lb)
Payload mass20,833 kg (45,929 lb)
Crew
Crew size5
Members
Start of mission
Launch dateMay 4, 1989, 18:46:59  UTC
Rocket Space Shuttle Atlantis
Launch site Kennedy Space Center, LC-39B
Contractor Rockwell International
End of mission
Landing dateMay 8, 1989, 19:43:26 UTC
Landing site Edwards Air Force Base,
Runway 22
Orbital parameters
Reference system Geocentric orbit
Regime Low Earth orbit
Perigee altitude 361 km (224 mi)
Apogee altitude 366 km (227 mi)
Inclination 28.45°
Period 91.80 minutes
Instruments
  • Fluids Experiment Apparatus (FEA)
  • Mesoscale Lightning Experiment (MLE)
Sts-30-patch.png
STS-30 mission patch
Sts-30 crew.jpg
Ronald J. Grabe, David M. Walker, Norman Thagard, Mary L. Cleave, Mark C. Lee
  STS-29 (28)
STS-28 (30) 
 

STS-30 was the 29th NASA Space Shuttle mission and the fourth mission for Space Shuttle Atlantis. It was the fourth shuttle launch since the Challenger disaster and the first shuttle mission since the disaster to have a female astronaut on board. The mission launched from Kennedy Space Center, Florida, on May 4, 1989, and landed four days later on May 8, 1989. During the mission, Atlantis deployed the Venus-bound Magellan probe into orbit.

Contents

The mission was officially designated STS-30R as the original STS-30 designator belonged to STS-61-A, the 22nd Space Shuttle mission. Official documentation for that mission contained the designator STS-30 throughout. As STS-51-L was designated STS-33, future flights with the STS-26 through STS-33 designators would require the R in their documentation to avoid conflicts in tracking data from one mission to another.

Crew

Position Astronaut
Commander David M. Walker
Second spaceflight
Pilot Ronald J. Grabe
Second spaceflight
Mission Specialist 1 Mark C. Lee
First spaceflight
Mission Specialist 2 Norman Thagard
Third spaceflight
Mission Specialist 3 Mary L. Cleave
Second and last spaceflight

Crew seating arrangements

Seat [1] LaunchLanding Space Shuttle seating plan.svg
Seats 1–4 are on the Flight Deck. Seats 5–7 are on the Middeck.
S1WalkerWalker
S2GrabeGrabe
S3LeeCleave
S4ThagardThagard
S5CleaveLee

Shuttle processing

Atlantis spent three months in the Orbiter Processing Facility (OPF-2) after returning to the Kennedy Space Center at the end of STS-27. [2] During this period technicians got to work removing and replacing all of the damaged Thermal Protection System (TPS) tiles that Atlantis sustained during her prior flight. They also took detailed inspections of the shuttle while simultaneously preparing Atlantis for STS-30R. The shuttle was rolled over to the Vehicle Assembly Building and mated with ET-29 and an SRB set on March 11, 1989. Eleven days later on March 22, 1989, Atlantis was rolled out to launch pad 39B. [3]

Mission summary

The launch of Atlantis on STS-30 STS-30 launch.jpg
The launch of Atlantis on STS-30
Atlantis deploys its landing gear before landing at the end of STS-30. Atlantis is landing after STS-30 mission.jpg
Atlantis deploys its landing gear before landing at the end of STS-30.

Space Shuttle Atlantis lifted off from Launch Complex 39B at Kennedy Space Center (KSC), Florida, at 14:46:59 EDT on May 4, 1989. [3] The primary payload, the Magellan spacecraft with its attached Inertial Upper Stage (IUS), was successfully deployed later that day. [4] Magellan was the first American planetary mission in 11 years.

The launch was originally scheduled for April 28, 1989, the first day of a 31-day launch period when Earth and Venus were properly aligned. However, the liftoff was scrubbed at T-31 seconds because of a problem with the liquid hydrogen recirculation pump on Space Shuttle Main Engine (SSME) No. 1, and a vapor leak in the liquid hydrogen recirculation line between the orbiter and external tank (ET). [4] On the rescheduled liftoff date of May 4, 1989, the launch was again delayed until the final five minutes of the launch window due to cloud cover and excessive crosswinds at KSC's Shuttle Landing Facility (SLF). [4] Good landing conditions were required at the SLF in case of a Return To Launch Site (RTLS) abort early in the flight.

The only major glitch during the flight occurred on May 7, 1989, when one of the four general-purpose computers programmed to operate the orbiter failed. [5] The shuttle crew replaced the computer, part of a redundant set, with a backup one. It was the first time a computer had been replaced while in orbit. [5] The glitch had no impact on the crew's safety or the primary objectives of the mission, although some of the activities involved in conducting experiments had to be canceled while the crew was replacing the computer. There also was no impact to the mission when one of the three thrusters on Atlantis' aft right-hand Orbital Maneuvering System (OMS) pod failed during ascent. [6]

However, the STS-30 crew experienced several minor annoyances. A Hasselblad camera used to photograph sites on Earth had to be stowed for the remainder of the mission after a shutter stuck during the crew's third day in space. The Text and Graphics Systems (TAGS), a device to send images and graphics to the orbiter from Mission Control Center, had to be turned off on Flight Day 2 because of a paper jam. Commander Walker and Pilot Grabe had problems with a device used to take measurements of central venous pressure to determine the effects of microgravity on the cardiovascular system. On the second full day in space, the water dispensing system in the galley malfunctioned, causing some difficulties for the crew in preparing meals.

Atlantis touched down at Runway 22, Edwards Air Force Base, California, on May 8, 1989, at 15:43:27 EDT. Minutes before landing, the runway had to be switched from 17 to 22 due to high crosswinds. The mission lasted a total of 4 days, 0 hours, 56 minutes, and 28 seconds.

Payload and experiments

The Magellan spacecraft was deployed from the shuttle's payload bay six hours and 14 minutes into the mission. [6] Two successive IUS propulsion burns placed the spacecraft on its trajectory to Venus about an hour later. Magellan arrived at Venus in August 1990 and began a 243-day mission of mapping the planet's surface with radar.

Three mid-deck experiments were included on the mission. All had flown before. Mission Specialist Cleave used a portable laptop computer to operate and monitor the Fluids Experiment Apparatus (FEA). [6] An 8 mm (0.31 in) video camcorder, flown for the first time on the Shuttle, provided the opportunity for the crew to record and downlink on-orbit activities such as the FEA, which was a joint endeavor between Rockwell International and NASA. Payload bay video cameras were used to record storm systems from orbit as part of the Mesoscale Lightning Experiment. [6]

Wake-up calls

NASA began a tradition of playing music to astronauts during the Project Gemini, and first used music to awaken a flight crew during Apollo 15. [7] Each track is specially chosen, often by the astronauts' families, and usually has a special meaning to an individual member of the crew, or is applicable to their daily activities.

Flight DaySongArtist/Composer
Day 2Theme from the film "Superman"
Day 3 Anchors Aweigh

The Wild Blue Yonder
Colorado State University Fight Song
Florida State University Fight Song

Day 4"Gonna Fly Now" - Theme from Rocky Bill Conti
Day 5 "A Hard Day's Night" The Beatles

See also

Related Research Articles

Space Shuttle <i>Atlantis</i> Retired NASA orbiter shuttle (1985–2011)

Space Shuttle Atlantis is a retired Space Shuttle orbiter vehicle which belongs to NASA, the spaceflight and space exploration agency of the United States. Atlantis was manufactured by the Rockwell International company in Southern California and was delivered to the Kennedy Space Center in Eastern Florida in April 1985. Atlantis is also the fourth operational and the second-to-last Space Shuttle built. Its maiden flight was STS-51-J made from October 3 to 7, 1985.

<span class="mw-page-title-main">STS-9</span> 1983 American crewed spaceflight and first flight with Spacelab

STS-9 was the ninth NASA Space Shuttle mission and the sixth mission of the Space Shuttle Columbia. Launched on 28 November 1983, the ten-day mission carried the first Spacelab laboratory module into orbit.

<span class="mw-page-title-main">STS-31</span> 1990 American crewed spaceflight to deploy the Hubble Space Telescope

STS-31 was the 35th mission of NASA's Space Shuttle program. The primary purpose of this mission was the deployment of the Hubble Space Telescope (HST) into low Earth orbit. The mission used the Space Shuttle Discovery, which lifted off from Launch Complex 39B on April 24, 1990, from Kennedy Space Center, Florida.

<span class="mw-page-title-main">STS-8</span> 1983 Space Shuttle Challenger mission

STS-8 was the eighth NASA Space Shuttle mission and the third flight of the Space Shuttle Challenger. It launched on August 30, 1983, and landed on September 5, 1983, conducting the first night launch and night landing of the Space Shuttle program. It also carried the first African-American astronaut, Guion Bluford. The mission successfully achieved all of its planned research objectives, but was marred by the subsequent discovery that a solid-fuel rocket booster had almost malfunctioned catastrophically during the launch.

<span class="mw-page-title-main">Jerry L. Ross</span> NASA astronaut and engineer (born 1948)

Jerry Lynn Ross is a retired United States Air Force officer, engineer, and a former NASA astronaut. Ross is a veteran of 7 Space Shuttle missions, making him the joint record holder for most spaceflights.

<span class="mw-page-title-main">STS-27</span> 1988 near-disastrous American crewed spaceflight to deploy Lacrosse 1

STS-27 was the 27th NASA Space Shuttle mission, and the third flight of Space Shuttle Atlantis. Launching on December 2, 1988, on a four-day mission, it was the second shuttle flight after the Space Shuttle Challenger disaster of January 1986. STS-27 carried a classified payload for the U.S. Department of Defense (DoD), ultimately determined to be a Lacrosse surveillance satellite. The vessel's heat shielding was substantially damaged during lift-off, and crew members thought that they would die during reentry. This was a situation that was similar to the one that would prove fatal 15 years later on STS-107. Compared to the damage that Columbia sustained on STS-107, Atlantis experienced more extensive damage. However, this was over less critical areas and the missing tile was over an antenna which gave extra protection to the spacecraft structure. The mission landed successfully, although intense heat damage needed to be repaired.

<span class="mw-page-title-main">STS-29</span> 1989 American crewed spaceflight to deploy TDRS-4

STS-29 was the 28th NASA Space Shuttle mission, during which Space Shuttle Discovery inserted a Tracking and Data Relay Satellite (TDRS) into Earth orbit. It was the third shuttle mission following the Challenger disaster in 1986, and launched from Kennedy Space Center, Florida, on March 13, 1989. STS-29R was the eighth flight of Discovery and the 28th Space Shuttle mission overall; its planned predecessor, STS-28, was delayed until August 1989.

<span class="mw-page-title-main">STS-28</span> 1989 American crewed spaceflight for the Department of Defense

STS-28 was the 30th NASA Space Shuttle mission, the fourth shuttle mission dedicated to United States Department of Defense (DoD) purposes, and the eighth flight of Space Shuttle Columbia. The mission launched on August 8, 1989, and traveled 3,400,000 km (2,100,000 mi) during 81 orbits of the Earth, before landing on runway 17 of Edwards Air Force Base, California, on August 13, 1989. STS-28 was also Columbia's first flight since January 1986, when it had flown STS-61-C, the mission directly preceding the Challenger disaster of STS-51-L. The mission details of STS-28 are classified, but the payload is widely believed to have been the first SDS-2 relay communications satellite. The altitude of the mission was between 295 km (183 mi) and 307 km (191 mi).

<span class="mw-page-title-main">STS-34</span> 1989 American crewed spaceflight to deploy Galileo

STS-34 was a NASA Space Shuttle mission using Atlantis. It was the 31st shuttle mission overall, and the fifth flight for Atlantis. STS-34 launched from Kennedy Space Center, Florida, on October 18, 1989, and landed at Edwards Air Force Base, California, on October 23, 1989. During the mission, the Jupiter-bound Galileo probe was deployed into space.

<span class="mw-page-title-main">STS-33</span> 1989 American crewed spaceflight for the Department of Defense

STS-33 was a NASA Space Shuttle mission, during which Space Shuttle Discovery deployed a payload for the United States Department of Defense (DoD). It was the 32nd shuttle mission overall, the ninth flight of Discovery, the fifth shuttle mission in support of the DoD, the seventh post-Space Shuttle Challenger disaster mission and the last Shuttle mission of the 1980s. Due to the nature of the mission, specific details remain classified. Discovery lifted off from Launch Complex 39B at Kennedy Space Center (KSC), Florida, on November 22, 1989, at 7:23:30 p.m. EST; it landed at Edwards Air Force Base, California, on November 27, 1989, at 7:30:16 p.m. EST.

<span class="mw-page-title-main">STS-36</span> 1990 American crewed spaceflight for the Department of Defense

STS-36 was a NASA Space Shuttle mission, during which Space Shuttle Atlantis carried a classified payload for the U.S. Department of Defense (DoD) into orbit. STS-36 was the 34th shuttle mission overall, the sixth flight for Atlantis, and the fourth night launch of the shuttle program. It launched from Kennedy Space Center, Florida, on February 28, 1990, and landed on March 4, 1990.

<span class="mw-page-title-main">STS-38</span> 1990 American crewed spaceflight for the Department of Defense

STS-38 was a Space Shuttle mission by NASA using the Space Shuttle Atlantis. It was the 37th shuttle mission, and carried a classified payload for the U.S. Department of Defense (DoD). It was the seventh flight for Atlantis and the seventh flight dedicated to the Department of Defense. The mission was a 4-day mission that traveled 3,291,199 km (2,045,056 mi) and completed 79 revolutions. Atlantis landed at Kennedy Space Center's Shuttle Landing Facility's runway 33. The launch was originally scheduled for July 1990, but was rescheduled due to a hydrogen leak found on Space ShuttleColumbia during the STS-35 countdown. During a rollback to the Orbiter Processing Facility Atlantis was damaged during a hail storm. The eventual launch date of November 15, 1990, was set due to a payload problem. The launch window was between 18:30 and 22:30 EST. The launch occurred at 18:48:13 EST.

<span class="mw-page-title-main">STS-35</span> 1990 American crewed spaceflight

STS-35 was the tenth flight of Space Shuttle Columbia, the 38th shuttle mission. It was devoted to astronomical observations with ASTRO-1, a Spacelab observatory consisting of four telescopes. The mission launched from Kennedy Space Center in Florida on December 2, 1990.

<span class="mw-page-title-main">STS-37</span> 1991 American crewed spaceflight to deploy the Compton Gamma Ray Observatory

STS-37, the thirty-ninth NASA Space Shuttle mission and the eighth flight of the Space Shuttle Atlantis, was a six-day mission with the primary objective of launching the Compton Gamma Ray Observatory (CGRO), the second of the Great Observatories program which included the visible-spectrum Hubble Space Telescope (HST), the Chandra X-ray Observatory (CXO) and the infrared Spitzer Space Telescope. The mission also featured two spacewalks, the first since 1985.

<span class="mw-page-title-main">Norman Thagard</span> American astronaut, scientist, and Marine Corps officer (born 1943)

Norman Earl Thagard, is an American scientist and former U.S. Marine Corps officer and naval aviator and NASA astronaut. He is the first American to ride to space on board a Russian vehicle, and can be considered the first American cosmonaut. He did this on March 14, 1995, in the Soyuz TM-21 spacecraft for the Russian Mir-18 mission.

<span class="mw-page-title-main">Mary L. Cleave</span> American astronaut and engineer (1947–2023)

Mary Louise Cleave was an American engineer and NASA astronaut. She also served from 2005 to 2007 as NASA Associate Administrator for the Science Mission Directorate.

Space Shuttle missions designated STS-3xx were rescue missions which would have been mounted to rescue the crew of a Space Shuttle if their vehicle was damaged and deemed unable to make a successful reentry. Such a mission would have been flown if Mission Control determined that the heat shielding tiles and reinforced carbon-carbon panels of a currently flying orbiter were damaged beyond the repair capabilities of the available on-orbit repair methods. These missions were also referred to as Launch on Demand (LOD) and Contingency Shuttle Crew Support. The program was initiated following loss of Space Shuttle Columbia in 2003. No mission of this type was launched during the Space Shuttle program.

<span class="mw-page-title-main">STS-126</span> 2008 American crewed spaceflight to the ISS

STS-126 was the one hundred and twenty-fourth NASA Space Shuttle mission, and twenty-second orbital flight of the Space Shuttle Endeavour (OV-105) to the International Space Station (ISS). The purpose of the mission, referred to as ULF2 by the ISS program, was to deliver equipment and supplies to the station, to service the Solar Alpha Rotary Joints (SARJ), and repair the problem in the starboard SARJ that had limited its use since STS-120. STS-126 launched on 15 November 2008 at 00:55:39 UTC from Launch Pad 39A (LC-39A) at NASA's Kennedy Space Center (KSC) with no delays or issues. Endeavour successfully docked with the station on 16 November 2008. After spending 15 days, 20 hours, 30 minutes, and 30 seconds docked to the station, during which the crew performed four spacewalks, and transferred cargo, the orbiter undocked on 28 November 2008. Due to poor weather at Kennedy Space Center, Endeavour landed at Edwards Air Force Base on 30 November 2008 at 21:25:09 UTC.

<span class="mw-page-title-main">STS-400</span>

STS-400 was the Space Shuttle contingency support flight that would have been launched using Space ShuttleEndeavour if a major problem occurred on Space ShuttleAtlantis during STS-125, the final Hubble Space Telescope servicing mission.

<span class="mw-page-title-main">STS-135</span> 2011 American crewed spaceflight to the ISS and final flight of the Space Shuttle program

STS-135 was the 135th and final mission of the American Space Shuttle program. It used the orbiter Atlantis and hardware originally processed for the STS-335 contingency mission, which was not flown. STS-135 launched on July 8, 2011, and landed on July 21, 2011, following a one-day mission extension. The four-person crew was the smallest of any shuttle mission since STS-6 in April 1983. The mission's primary cargo was the Multi-Purpose Logistics Module (MPLM) Raffaello and a Lightweight Multi-Purpose Carrier (LMC), which were delivered to the International Space Station (ISS). The flight of Raffaello marked the only time that Atlantis carried an MPLM.

References

  1. Becker, Joachim. "Spaceflight mission report: STS-30". SPACEFACTS. Archived from the original on June 16, 2020. Retrieved February 26, 2014.
  2. "STS-30 Press Kit" (PDF). NASA. April 1989. Archived (PDF) from the original on January 6, 2021.PD-icon.svg This article incorporates text from this source, which is in the public domain .
  3. 1 2 "STS-30 Atlantis, OV-104, lifts off from KSC LC Pad 39B". NASA. May 4, 1989. Archived from the original on January 6, 2021. Retrieved January 6, 2021.PD-icon.svg This article incorporates text from this source, which is in the public domain .
  4. 1 2 3 Legler, Robert D.; Floyd V., Bennett (September 2011). "Space Shuttle Missions Summary" (PDF). Scientific and Technical Information (STI) Program Office. NASA. pp. 2–32. Archived from the original (PDF) on May 12, 2020.PD-icon.svg This article incorporates text from this source, which is in the public domain .
  5. 1 2 Neumann, Peter G. (1994). Computer-Related Risks. Addison-Wesley Professional. p. 47. ISBN   978-0-321-70316-3.
  6. 1 2 3 4 Office of Safety, Reliability, Maintainability and Quality Assurance (August 25, 1989). "Misson Safety Evaluation Report for STS-30 - Postflight Edition" (PDF). Washington, D.C.: NASA. Archived (PDF) from the original on January 6, 2021.{{cite web}}: CS1 maint: multiple names: authors list (link)PD-icon.svg This article incorporates text from this source, which is in the public domain .
  7. Fries, Colin (March 13, 2015). "Chronology of Wakeup Calls" (PDF). History Division. NASA. Archived (PDF) from the original on January 5, 2021. Retrieved January 5, 2021.PD-icon.svg This article incorporates text from this source, which is in the public domain .