STS-130

Last updated

STS-130
STS-130 EVA3 Nicholas Patrick 1.jpg
Patrick during EVA 3, preparing the Cupola for operational use following its installation on the ISS
Names Space Transportation System-130
Mission typeISS assembly
Operator NASA
COSPAR ID 2010-004A OOjs UI icon edit-ltr-progressive.svg
SATCAT no. 36394
Mission duration13 days, 18 hours, 6 minutes, 24 seconds [1] [2] [3]
Distance travelled9,250,000 kilometres (5,750,000 mi)
Orbits completed217
Spacecraft properties
Spacecraft Space Shuttle Endeavour
Launch mass2,051,127 kilograms (4,521,961 lb) (total) [4]
121,320 kilograms (267,470 lb) (orbiter)
Landing mass91,033 kilograms (200,694 lb)
Payload mass19,000 kilograms (42,000 lb)
Crew
Crew size6
Members
Start of mission
Launch dateFebruary 8, 2010, 09:14 (2010-02-08UTC09:14Z) UTC [5] [6]
Launch site Kennedy, LC-39A
End of mission
Landing dateFebruary 22, 2010, 03:22:10 (2010-02-22UTC03:22:11Z) UTC
Landing siteKennedy, SLF Runway 15
Orbital parameters
Reference system Geocentric
Regime Low Earth
Perigee altitude 341 kilometres (212 mi)
Apogee altitude 356 kilometres (221 mi)
Inclination 51.6 degrees
Period 92 minutes
Docking with ISS
Docking port PMA-2
(Harmony forward)
Docking dateFebruary 10, 2010, 05:26 UTC
Undocking dateFebruary 20, 2010, 00:54 UTC
Time docked9 days, 19 hours, 28 minutes
STS-130 patch.png STS-130 Official Crew Photo.jpg
Seated (l–r) Virts and Zamka. Standing (l–r) are Patrick, Behnken, Hire and Robinson.
  STS-129
STS-131  

STS-130 (ISS assembly flight 20A) [7] was a NASA Space Shuttle mission to the International Space Station (ISS). Space Shuttle Endeavour's primary payloads were the Tranquility module and the Cupola , a robotic control station with six windows around its sides and another in the center, providing a 360-degree view around the station. [8] Endeavour launched at 04:14 EST (09:14 UTC) on February 8, 2010 [5] and landed at 22:22 EST on February 21, 2010, on runway 15 at the Kennedy Space Center's Shuttle Landing Facility.

Contents

Crew

Position [9] Astronaut
Commander George D. Zamka
Second and last spaceflight
Pilot Terry W. Virts Jr.
First spaceflight
Mission Specialist 1 Kathryn P. Hire
Second and last spaceflight
Mission Specialist 2
Flight Engineer
Stephen K. Robinson
Fourth and last spaceflight
Mission Specialist 3 Nicholas Patrick
Second and last spaceflight
Mission Specialist 4 Robert L. Behnken
Second spaceflight

Crew seat assignments

Seat [10] LaunchLanding Space Shuttle seating plan.svg
Seats 1–4 are on the flight deck.
Seats 5–7 are on the mid-deck.
1Zamka
2Virts
3Hire
4Robinson
5Patrick
6Behnken
7Unused

Mission payload

LocationCargoMass
Bays 1–2Orbiter Docking System
EMU 3004 / EMU 3005
1,800 kilograms (4,000 lb)
~260 kilograms (570 lb)
Bay 3PShuttle Power
Distribution Unit (SPDU)
~17 kilograms (37 lb)
Bay 7PAPC/SPDU18 kilograms (40 lb)
Bay 7Cupola1,805 kilograms (3,979 lb)
Bays 8–12Tranquility Node13,004 kilograms (28,669 lb)
Starboard Sill Orbiter Boom Sensor System ~382 kilograms (842 lb)
Port Sill Canadarm 201410 kilograms (900 lb)
Total:17,696 kilograms (39,013 lb)

STS-130 carried Tranquility and the Cupola to the International Space Station. [11] Tranquility was manufactured at the Thales Alenia Space factory in Turin, Italy, and transported by aircraft to Florida. It arrived at the Kennedy Space Center Space Station Processing Facility on May 21, 2009. It is also known as Node 3, and was named by a NASA poll as Tranquility. [12]

Shuttle processing

Endeavour arrives at Pad 39A on January 6, 2010, for the STS 130 mission. STS-130 Endeavour Rollout 6.jpg
Endeavour arrives at Pad 39A on January 6, 2010, for the STS 130 mission.

Space Shuttle Endeavour was moved from her hangar in the Orbiter Processing Facility 2 to the Vehicle Assembly Building High bay 1 on December 11, 2009. [13] [14] Roll over began at 13:00 EST and was completed 1 hour and 5 minutes later at 14:05 EST.

Endeavour moved from the Vehicle Assembly Building to launch pad 39A. The process started at 04:13 EST on January 6, 2010. Before rolling out to the launch pad, engineers at Kennedy Space Center had an extended preparation time to get Endeavour ready to move to the launch pad due to the unusually cold weather. The 3.4 miles (5.5 km) was completed at 10:37 EST. The trip took 6hrs 24min.

Launch attempts

The first launch attempt was scheduled for 04:39:00 EST February 7, 2010, with forecasters originally predicting a 70% chance of favorable launch weather conditions at the Kennedy Space Center, [15] but that degraded to 30% hours before the planned launch due to low clouds. [16] The launch was scrubbed. The second launch attempt was successful at 04:14:08 EST (9:14:08 UTC) February 8, 2010.

AttemptPlannedResultTurnaroundReasonDecision pointWeather go (%)Notes
17 Feb 2010, 9:39:50 amScrubbedWeather7 Feb 2010, 9:30 am (T−9:00 Hold)70% [17] – 30% [16] Clouds at RTLS abort landing site.
28 Feb 2010, 9:14:08 amSuccess0 days 23 hours 34 minutes60% [17] [18]

Mission milestones

Mission poster Sts130 mission poster.jpg
Mission poster

The mission marked: [19]

Mission timeline

February 8 (Flight Day 1: Launch)

Launch video (10 min 12 secs)

Endeavour launched successfully at 4:14:08 EST (9:14:08 UTC). When Endeavour lifted off, the space station was traveling about 212 miles over western Romania. [20] Once in orbit the crew opened the payload bay doors, activated the radiators and deployed the Ku band antenna. Nick Patrick and Kay Hire then proceeded to activate, did a check out of the Shuttle Robotic Arm (SRMS) and then conducted a survey of the payload bay. The crew was also successful in down-linking imagery and video of the external tank to the ground.

February 9 (Flight Day 2)

Most of the crew day was spent on conducting the standard inspection of the thermal protection system (TPS). [21] All six of the crew members participated at one point during this task. Once the inspection process had moved to the port wing, astronauts Bob Behnken and Nick Patrick began working on checking out and preparing the spacesuits that will be used during the mission's three spacewalks. Once the survey of the TPS was complete, Stephen Robinson and Kay Hire, with Bob Behnken joining once his spacesuit tasks were complete, began checking out and preparing the tools that will be used during the rendezvous with the International Space Station (ISS). These tools include a hand-held LIDAR gun used for finding out the closing rate of the shuttle and distance from the ISS, the Orbiter Docking System (ODS) which is the part of the shuttle that connects to the space station and a centerline camera in the ODS to assist the commander George Zamka during docking.

February 10 (Flight Day 3: Rendezvous with ISS)

During the first part of the crew's workday, they performed a series of burns to catch up and dock with the International Space Station (ISS). Once the shuttle was 600 feet (180 m) below the ISS, commander George Zamka began what is known as the Rendezvous Pitch Maneuver (RPM). During the maneuver, ISS commander Jeff Williams and flight engineer Oleg Kotov took photos of the shuttle's thermal protection system (TPS). Space Shuttle Endeavour docked with the ISS at 5:26 UTC (00:06 EST). After completing leak checks the hatches between both vehicles were opened at 6:26 UTC (1:26 EST). The joint Expedition 22/STS-130 crew conducted the standard welcome ceremony and then conducted their safety brief. Once that was complete commander George Zamka, Bob Behnken and Steve Robinson began transferring the spacesuits Behnken and Nick Patrick will use for the three spacewalks. Also during this time Nick Patrick and ISS flight engineer T.J. Creamer picked up the OBSS boom and handed it off to the Space Shuttle robot arm using the station's SSRMS or Canadarm2. The shuttle arm was operated by Kay Hire and pilot Terry Virts.

February 11 (Flight Day 4: Spacewalk 1 preparation)

Flight day 4 saw Nick Patrick and Bob Behnken get all the tools they need ready for their spacewalk on flight day 5. While Patrick and Behnken were getting the tools ready, commander George Zamka and ISS flight engineer Soichi Noguchi swapped out the Hard Upper Torso (HUT) on Bob Behnken's suit, since the original HUT had developed a problem with a wire harness and was not powering the Wireless Video System (WVS) or the heaters in his gloves and boots. Once the swap was complete, Zamka and Noguchi tested the suit successfully. The crew also performed a number of transfer related activities during the morning of their work day. After a joint meal together, the crew of STS-130 and ISS commander Jeff Williams and flight engineer T.J. Creamer conducted a PAO event with television stations in Sacramento, California, Mobile, Alabama and a radio station in St. Louis, Missouri. Once the PAO event was finished, the joint crews had some off duty time for the rest of the day. Before the two crews went to bed they conducted a spacewalk procedures review, then got Nick Patrick and Bob Behnken into the Quest Airlock. [22] Behnken and Patrick spent the night there at 10.2 psi instead of at the station's 14.6 psi, breathing pure oxygen for an hour before and after their sleep period in order to prevent decompression sickness.

February 12 (Flight Day 5: Spacewalk 1)

Astronauts Behnken and Patrick participate in the first spacewalk. STS-130 EVA1 Robert Behnken and Nicholas Patrick 1.jpg
Astronauts Behnken and Patrick participate in the first spacewalk.

Flight day 5 saw astronauts Nick Patrick and Bob Behnken perform the mission's first spacewalk, [23] which began on time at 02:17 UTC. Their first task was to move the payload bay of Endeavour and prepare and release launch locks on the Tranquility module and Cupola. Once Behnken and Patrick were clear of its path, the Tranquility module was moved to the port side of the Unity node using the space station's robot arm. Before Tranquility was installed the spacewalkers removed Dextre's ORU platform and secured it to one of the truss segments to function as a backup for a platform to be installed on STS-132. Once the new module was in place, the spacewalkers proceeded to connect temporary heater and data cables between Unity and Tranquility. Behnken and Patrick were ahead of the timeline so they were also able to complete some get-ahead tasks. The spacewalk was completed six and a half hours later, on Friday, 08:49 UTC. After the spacewalk, other crew members completed transfer-related tasks. The transfers are now over halfway complete.

February 13 (Flight Day 6: Spacewalk 2 preparation)

On flight day 6 members of the joint crew opened the hatches to the new Tranquility module for the first time. STS-130 crew-members George Zamka, Terry Virts, Stephen Robinson and Kay Hire all helped in the initial outfitting of the node. During the initial outfitting, Terry Virts and Kay Hire prepared the Cupola for its move from the end of Node 3. While that was going on spacewalkers Bob Behnken and Nick Patrick re-sized and repaired Bob Behnken's original suit for use by Nick Patrick, after a small problem with a fan was discovered. Once that task was complete the pair began getting their tools ready for the second of three spacewalks. Throughout the day there were 2 PAO events, the first was a special event conducted by Capcom Mike Massimino. Massimino asked Bob Behnken and Nick Patrick questions he received through his Twitter account. Later in the day Kay Hire and Terry Virts took questions from the Associated Press, CBS News and Reuters. [24] At the end of the day the whole crew conducted another EVA procedures review in preparation for EVA2.

February 14 (Flight Day 7: Spacewalk 2)

Robert Behnken participates in the second spacewalk. STS-130 EVA2 Robert Behnken 3.jpg
Robert Behnken participates in the second spacewalk.

The second of three spacewalks was completed on flight day 7. [25] Bob Behnken and Nick Patrick were able to complete all their planned tasks in 5 hours and 54 minutes. [26] The tasks included installing ammonia coolant loops, thermal blankets to protect the ammonia hoses, outfitting the Earth-facing port of Tranquility for the Cupola, install handrails and a non-propulsive vent valve (NPV). During the connection of one of the ammonia hoses, a small amount of ammonia leaked out of a quick disconnect valve and floated towards Nick Patrick. Procedures called for a "bake-out" while Patrick worked during the sunlit portion of the orbit, and a contamination test in the airlock. The bake-out happened at the end of the spacewalk. While the spacewalk was happening, Terry Virts and Kay Hire along with ISS commander Jeff Williams, Soichi Noguchi and T.J. Creamer, continued outfitting the Tranquility module. This included setting up the ventilation system, connecting electrical and computer cables and configuring racks. They confirmed lights and computers were on in the node once the ammonia cooling system had been activated. The crew also received word the mission had been extended by one day in the morning.

February 15 (Flight Day 8)

Cupola was moved by Canadarm2 from the forward port to the nadir port of Tranquility Canadarm2 Cupola Relocation STS 130.jpg
Cupola was moved by Canadarm2 from the forward port to the nadir port of Tranquility
The first photograph taken in the Cupola, one of two ISS modules installed during STS-130 Cupola ISS open shutters.jpg
The first photograph taken in the Cupola, one of two ISS modules installed during STS-130

On flight day 8, the Cupola was successfully moved from its launch location to its permanent location on the Earth-facing side of Tranquility. [27] Cupola was moved by the space station robot arm (SSRMS), which was operated by Kay Hire and Terry Virts. ISS commander Jeff Williams assisted them by releasing the bolts and hooks that held the Cupola in place and then securing it to its new home. The process was slightly delayed due to some bolts that were torqued tighter than expected on the ground, but flight controllers were able to increase the torque to release the bolts. Once the move of the Cupola was complete, outfitting continued to get the cupola ready. The crew will be able to ingress it tomorrow, but the window covers will not be opened until after the third and final spacewalk. While the Cupola relocation was going on, some of the crew members participated in transferring items between the shuttle and station. Also during this time Bob Behnken and Nick Patrick prepared the tools that they will use during the final spacewalk scheduled for flight day 10. During this time the pair re-sized another spacesuit on station for use by Behnken. This was done because the suit Behnken had been using had some problems with its communications equipment.

February 16 (Flight Day 9: Spacewalk 3 preparation)

Relocation of PMA-3 to the end of Tranquility STS-130 PMA-3 relocation 1.jpg
Relocation of PMA-3 to the end of Tranquility

Flight day 9 saw the relocation of Pressurized Mating Adapter 3 (PMA-3) from the Harmony node, where it was temporarily located, to the end of Tranquility, where it remained until 2017. [28] The PMA will provide protection from micro-meteoroids and orbital debris. PMA-3 was moved by Bob Behnken and Nick Patrick, with help from Jeff Williams and Soichi Noguchi to release the PMA-3. During the PMA-3 relocation, Kay Hire and Terry Virts continued work on outfitting the Cupola. The joint Expedition 22/STS-130 crews enjoyed a meal together and had some off-duty time in the 2nd half of their day. Before the scheduled bedtime the entire crew conducted another EVA procedures review for the third and final EVA of the mission.

February 17 (Flight Day 10: Spacewalk 3)

Expedition 22 member Soichi Noguchi photographs the interior of the newly installed Cupola module STS-130 Soichi Noguchi photographs through Cupola.jpg
Expedition 22 member Soichi Noguchi photographs the interior of the newly installed Cupola module

On flight day 10, astronauts Bob Behnken and Nick Patrick completed the third and final spacewalk of the STS-130 mission. Their tasks included hooking up heater and data cables for PMA-3, removing thermal covers and launch locks on Cupola, and installing handrails on Tranquility and a video cable for another base to be installed on the Russian segment of the ISS. [29] Bob Behnken also connected the second ammonia cooling loop and disconnected a temporary power cable on Tranquility. Once the launch locks were removed, pilot Terry Virts opened the windows on Cupola for the first time. [30] During the day Kay Hire and Terry Virts hooked up and transferred the Cupola robotics station for its use in the future. Terry Virts also completed some transfer tasks in the morning.

February 18 (Flight Day 11)

On flight day 11, the joint Expedition 22/STS-130 crew received a phone call from U.S. President Barack Obama and several school children. After the conference with President Obama and the children, the crew members began transferring Environmental control and life support system (ECLSS) racks to the Tranquility module. These transfers were done by ISS commander Jeff Williams, flight engineer T.J. Creamer, Shuttle commander George Zamka and mission specialist Stephen Robinson and took most of the day. Also during the day pilot Terry Virts continued working on getting the Cupola set-up for the robotics work station. He had a small problem installing some corner panels which are needed to hold the workstation. Spacewalkers Bob Behnken and Nick Patrick were busy reconfiguring the airlock for use by the station crew and later flights. They also transferred their spacesuits and tools back to the shuttle for the return trip home. After the rack transfers were done the crew completed some more transfers and passed the 75% complete mark. The Space Shuttle commanded by commander George Zamka and pilot Terry Virts completed a reboost of the station using its vernier thrusters. [31] [32]

February 19 (Flight Day 12)

The STS-130 crew completed their remaining transfer tasks on flight day 12. The joint STS-130/Expedition 22 crew held a joint press conference with reports at NASA centers and in Japan. ISS commander Jeff Williams and shuttle commander George Zamka held a ribbon cutting ceremony to officially open the Cupola for use. [33] After the conference and ribbon cutting ceremony the crews gathered one last time for a meal together in the Unity module. After their meal the crews conducted a farewell ceremony and closed the hatches between the two vehicles. [34] The latter part of the STS-130 crew's day was spent stowing items and getting their rendezvous tools out and checking them out to ensure they are ready for undocking.

February 20 (Flight Day 13: Undocking)

Space Shuttle Endeavour successfully undocked with the ISS at 00:54 UTC (19:54 EST) on flight day 13. After undocking, pilot Terry Virts backed Endeavour to a distance of 400 feet (120 m) and began conducting a fly around of the ISS. After the fly around was complete, Virts used Endeavour's jets to move the shuttle to a point behind the station. Once the separation burns were complete, the crew conducted the late inspection of the shuttles thermal protection system. The inspection took up most of the crews afternoon with crew members rotating in and out to help with it. [35] Commander George Zamka performed a waste water and condensate water dump, with the help of Terry Virts.

February 21 (Flight Day 14: Landing Prep)

The crew of STS-130 began preparing the Space Shuttle Endeavour for landing. [36] During the day commander George Zamka and pilot Terry Virts, with help from mission specialist and flight engineer Stephen Robinson checked out the Flight Control System (FCS) and did a hot fire test of the Reaction Control System (RCS). Commander Zamka also did communications checks with mission control through the tracking stations at Merit Island, White Sands Space Harbor and Edwards Air Force Base. These checks are routine for the day before landing and were all successful. While all the system checkouts were going on, the rest of the crew were stowing items no longer needed during the flight. During the early part of the day Stephen Robinson and Terry Virts also stowed and deactivated the Space Shuttle robotic arm. The entire crew also took time out of their day to conduct an in-flight interview with CNN, CNN Español and Univision. [37]

February 22 (Flight Day 15: Landing)

Landing video (2 mins 57 secs)

Space Shuttle Endeavour and her STS-130 crew awoke on flight day 15 to begin getting ready for landing. The landing preparations included closing the payload bay doors, activating the Auxiliary Power Units and getting into their launch and entry suits. Commander George Zamka and pilot Terry Virts fired Endeavours 2 OMS engines for 2 mins 38 secs, this slowed Endeavour by about 200 ft/s (140 mph). The decision to go ahead with the de-orbit burn was made 25 min prior to the burn occurring. Landing occurred at 22:22:10 EST at the Kennedy Space Center's Shuttle Landing Facility runway 15. [38] [39] The crew exited the orbiter and inspected it about two hours after landing. All six crew members spoke to the press on the runway before heading back to the Operations and Check-out building. [40]

Spacewalks

EVA [41] SpacewalkersStart (UTC)End (UTC)Duration
EVA 1 Robert L. Behnken
Nicholas Patrick
February 12, 2010
2:17 UTC
February 12, 2010
8:49 UTC
6 hours 32 minutes
Behnken and Patrick removed a protective cover on a port on the Unity node where Tranquility will be berthed halfway through the spacewalk. They then moved on to release launch locks and connects on Tranquility that connected it to the shuttle. The pair then removed a spare parts platform from Special Purpose Dexterous Manipulator or Dextre that will be replaced by a new one on a future mission. Once that task was completed Behnken and Patrick then made several connections on the newly installed Tranquility node to bring it to life.
EVA 2Robert L. Behnken
Nicholas Patrick
February 14, 2010
2:20 UTC
February 14, 2010
8:14 UTC
5 hours 54 minutes
Behnken and Patrick installed ammonia plumbing and connectors between Unity, Destiny , and Tranquility and cover them with thermal insulation. When turned on, the ammonia will provide cooling to Tranquility. They then prepared a port on the Earth-facing side of Tranquility for the flight day 8 relocation and attachment of the Cupola.
EVA 3Nicholas Patrick
Robert L. Behnken
February 17, 2010
2:15 UTC
February 17, 2010
8:03 UTC
5 hours 48 minutes
Behnken and Patrick turned on the ammonia cooling lines between Unity and Tranquility, installed heater and data cables on Tranquility, removed insulation and launch locks from the newly installed Cupola, and installed handrails on the outside of Tranquility.

Wake-up calls

NASA began a tradition of playing music to astronauts during the Gemini program, which was first used to wake up a flight crew during Apollo 15. Each track is specially chosen, often by their families, and usually has a special meaning to an individual member of the crew, or is applicable to their daily activities. [42] [43]

Flight DaySongArtistPlayed forLinks
Day 2"Give Me Your Eyes" Brandon Heath Terry Virts WAV, MP3
TRANSCRIPT
Day 3"Katmandu" Bob Seger George Zamka WAV, MP3
TRANSCRIPT
Day 4"Also sprach Zarathustra" Richard Strauss Nicholas Patrick WAV, MP3
TRANSCRIPT
Day 5"Beautiful Day" U2 Kathryn Hire WAV, MP3
TRANSCRIPT
Day 6"The Ballad of Serenity" (Opening theme to Firefly ) Sonny Rhodes Robert Behnken WAV, MP3
TRANSCRIPT
Day 7"Too Much Stuff" Delbert McClinton Stephen Robinson WAV, MP3
TRANSCRIPT
Day 8"Forty Years On (Harrow School song)" Edward Ernest Bowen & John Farmer Nicholas Patrick WAV, MP3
TRANSCRIPT
Day 9"Parabola" Tool Robert Behnken WAV, MP3
TRANSCRIPT
Day 10"Window on the World" Jimmy Buffett Kathryn Hire WAV, MP3
TRANSCRIPT
Day 11"Oh Yeah" Johnny A. Stephen Robinson WAV, MP3
TRANSCRIPT
Day 12"I'm Gonna Be (500 Miles)" Steven Curtis Chapman Terry Virts WAV, MP3
TRANSCRIPT
Day 13"In Wonder" Newsboys Terry Virts WAV, MP3
TRANSCRIPT
Day 14"The Distance" Cake The entire crew WAV, MP3
TRANSCRIPT
Day 15"The Marines Hymn"United States Marine Corps Band George Zamka WAV, MP3
TRANSCRIPT

See also

Related Research Articles

<span class="mw-page-title-main">Yury Lonchakov</span> Russian cosmonaut (born 1965)

Yury Valentinovich Lonchakov is a Russian former cosmonaut and a veteran of three space missions. He has spent 200 days in space and has conducted two spacewalks. From 2014 to 2017, Lonchakov served as head of the Yuri Gagarin Cosmonaut Training Center.

<span class="mw-page-title-main">STS-88</span> First Space Shuttle mission to the International Space Station

STS-88 was the first Space Shuttle mission to the International Space Station (ISS). It was flown by Space Shuttle Endeavour, and took the first American module, the Unity node, to the station.

<span class="mw-page-title-main">STS-97</span> 2000 American crewed spaceflight to the ISS

STS-97 was a Space Shuttle mission to the International Space Station (ISS) flown by Space Shuttle Endeavour. The crew installed the first set of solar arrays to the ISS, prepared a docking port for arrival of the Destiny Laboratory Module, and delivered supplies for the station's crew. It was the last human spaceflight of the 20th century.

<span class="mw-page-title-main">STS-108</span> 2001 American crewed spaceflight to the ISS

STS-108 was a Space Shuttle mission to the International Space Station (ISS) flown by Space Shuttle Endeavour. Its primary objective was to deliver supplies to and help maintain the ISS.

<i>Cupola</i> (ISS module) Observation module of the International Space Station

The Cupola is an ESA-built observatory module of the International Space Station (ISS). Its name derives from the Italian word cupola, which means "dome". Its seven windows are used to conduct experiments, dockings and observations of Earth. It was launched aboard Space Shuttle Endeavour's mission STS-130 on 8 February 2010, and attached to the Tranquility module. With the Cupola attached, ISS assembly reached 85 percent completion. The Cupola's central window has a diameter of 80 cm (31 in).

<i>Tranquility</i> (ISS module) American module of the International Space Station

Tranquility, also known as Node 3, is a module of the International Space Station (ISS). It contains environmental control systems, life support systems, a toilet, exercise equipment, and an observation cupola.

<span class="mw-page-title-main">STS-116</span> 2006 American crewed spaceflight to the ISS

STS-116 was a Space Shuttle mission to the International Space Station (ISS) flown by Space Shuttle Discovery. Discovery lifted off on December 9, 2006 for her 33rd flight at 20:47:35 EST. A previous launch attempt on December 7 had been canceled due to cloud cover. It was the first night launch of a Space Shuttle since STS-113 in November 2002.

<span class="mw-page-title-main">STS-117</span> 2007 American crewed spaceflight to the ISS

STS-117 was a Space Shuttle mission flown by Space Shuttle Atlantis, launched from pad 39A of the Kennedy Space Center on June 8, 2007. Atlantis lifted off from the launch pad at 19:38 EDT. Damage from a hail storm on February 26, 2007, had previously caused the launch to be postponed from an originally-planned launch date of March 15, 2007. The launch of STS-117 marked the 250th orbital human spaceflight. It was also the heaviest flight of the Space Shuttle.

<span class="mw-page-title-main">STS-118</span> 2007 American crewed spaceflight to the ISS

STS-118 was a Space Shuttle mission to the International Space Station (ISS) flown by the orbiter Endeavour. STS-118 lifted off on August 8, 2007, from launch pad 39A at Kennedy Space Center (KSC), Florida and landed at the Shuttle Landing Facility at KSC on August 21, 2007.

<span class="mw-page-title-main">Nicholas Patrick</span> British-American astronaut and engineer (born 1964)

Nicholas James MacDonald Patrick, is a British-American engineer and a former NASA astronaut. His flight on the 2006 Discovery STS-116 mission made him the fourth person born in the United Kingdom to go into space.

<span class="mw-page-title-main">Terry W. Virts</span> American astronaut

Terry W. Virts is a retired NASA astronaut, International Space Station Commander and colonel in the United States Air Force.

<span class="mw-page-title-main">STS-123</span> 2008 American crewed spaceflight to the ISS

STS-123 was a Space Shuttle mission to the International Space Station (ISS) which was flown by Space Shuttle Endeavour. STS-123 was the 1J/A ISS assembly mission. The original launch target date was February 14, 2008, but after the delay of STS-122, the shuttle was launched on March 11, 2008. It was the twenty-fifth shuttle mission to visit the ISS, and delivered the first module of the Japanese laboratory, Japanese Experiment Module (Kibō), and the Canadian Special Purpose Dexterous Manipulator, (SPDM) Dextre robotics system to the station. The mission duration was 15 days and 18 hours, and it was the first mission to fully utilize the Station-to-Shuttle Power Transfer System (SSPTS), allowing space station power to augment the shuttle power systems. The mission set a record for a shuttle's longest stay at the ISS.

<span class="mw-page-title-main">STS-124</span> 2008 American crewed spaceflight to the ISS

STS-124 was the 35th mission of Space Shuttle Discovery. She went to the International Space Station on this mission. Discovery launched on May 31, 2008, at 17:02 EDT, moved from an earlier scheduled launch date of May 25, 2008, and landed safely at the Kennedy Space Center's Shuttle Landing Facility, at 11:15 EDT on June 14, 2008. Its objective was to deliver the largest module of the space station – Kibō, the Japanese Experiment Module pressurized section. The mission is also referred to as ISS-1J by the ISS program.

<span class="mw-page-title-main">STS-131</span> 2010 American crewed spaceflight to the ISS

STS-131 was a NASA Space Shuttle mission to the International Space Station (ISS). Space ShuttleDiscovery launched on April 5, 2010, at 6:21 am from LC-39A, and landed at 9:08 am on April 20, 2010, on runway 33 at the Kennedy Space Center's Shuttle Landing Facility. The mission marked the longest flight for Space Shuttle Discovery and its 38th and penultimate flight.

<span class="mw-page-title-main">Christopher Cassidy</span> Retired NASA astronaut (born 1970)

Christopher John "Chris" Cassidy is a retired NASA astronaut and United States Navy SEAL. Chris Cassidy achieved the rank of captain in the U.S. Navy. His first spaceflight was on a Space Shuttle mission in 2009. He was the Chief of the Astronaut Office at NASA from July 2015 until June 2017.

<span class="mw-page-title-main">Bob Behnken</span> US Air Force officer, NASA astronaut and former Chief of the Astronaut Office (born 1970)

Robert Louis Behnken is an American engineer, a former NASA astronaut, and former Chief of the Astronaut Office.

<span class="mw-page-title-main">Pressurized Mating Adapter</span> Spacecraft docking adapter

A Pressurized Mating Adapter (PMA) is a component used on the International Space Station (ISS) to convert the Common Berthing Mechanism (CBM) interface used to connect ISS modules to an APAS-95 spacecraft docking port. Three PMAs are attached to the US Orbital Segment of ISS. PMA-1 and PMA-2 were launched along with the Unity module in 1998 aboard STS-88; PMA-3 was launched in 2000 aboard STS-92. PMA-1 permanently connects the Unity and Zarya modules. International Docking Adapters were permanently installed on PMA-2 and PMA-3 in 2017 to convert them from the APAS-95 standard to the newer International Docking System Standard (IDSS).

<span class="mw-page-title-main">STS-134</span> 2011 American crewed spaceflight to the ISS and final flight of Space Shuttle Endeavour

STS-134 was the penultimate mission of NASA's Space Shuttle program and the 25th and last spaceflight of Space ShuttleEndeavour. This flight delivered the Alpha Magnetic Spectrometer and an ExPRESS Logistics Carrier to the International Space Station. Mark Kelly served as the mission commander. STS-134 was expected to be the final Space Shuttle mission if STS-135 did not receive funding from Congress. However, in February 2011, NASA stated that STS-135 would fly "regardless" of the funding situation. STS-135, flown by Atlantis, took advantage of the processing for STS-335, the Launch on Need mission that would have been necessary if the STS-134 crew became stranded in orbit.

<span class="mw-page-title-main">STS-135</span> 2011 American crewed spaceflight to the ISS and final flight of the Space Shuttle program

STS-135 was the 135th and final mission of the American Space Shuttle program. It used the orbiter Atlantis and hardware originally processed for the STS-335 contingency mission, which was not flown. STS-135 launched on July 8, 2011, and landed on July 21, 2011, following a one-day mission extension. The four-person crew was the smallest of any shuttle mission since STS-6 in April 1983. The mission's primary cargo was the Multi-Purpose Logistics Module (MPLM) Raffaello and a Lightweight Multi-Purpose Carrier (LMC), which were delivered to the International Space Station (ISS). The flight of Raffaello marked the only time that Atlantis carried an MPLM.

<span class="mw-page-title-main">NASA Astronaut Group 18</span> 2000 human spaceflight selection of seventeen; "The Bugs"

NASA Astronaut Group 18. The group saw the training of seven pilots and ten mission specialists to become NASA astronauts. These 17 astronauts began training in August 2000.

References

PD-icon.svg This article incorporates public domain material from websites or documents of the National Aeronautics and Space Administration .

  1. NASA (September 2009). "Remaining Space Shuttle Missions" (PDF). NASA. Archived from the original (PDF) on March 24, 2010. Retrieved December 8, 2009.
  2. Chris Bergin (December 4, 2009). "STS-130: ET-134 Intertank tested – Mission duration change requested". NASASpaceFlight.com. Retrieved December 4, 2009.
  3. Gebhardt, Chris (February 13, 2010). "EVA-2 continues Node 3 outfitting-Additional docked day option taken". NASASpaceflight.com. Retrieved February 13, 2010.
  4. NASA (January 29, 2010). "NASA STS-130 Press Kit" (PDF). NASA. Archived from the original (PDF) on February 2, 2010. Retrieved January 31, 2010.
  5. 1 2 NASA (November 27, 2009). "NASA's Shuttle and Rocket Missions". NASA . Retrieved November 29, 2009.
  6. Chris Gebhardt and Chris Bergin (January 27, 2010). "STS-130: Agency FRR approves February 7 launch date for Endeavour". NASASpaceFlight.com. Retrieved January 27, 2010.
  7. NASA (September 24, 2009). "Consolidated Launch Manifest". NASA. Archived from the original on March 7, 2009. Retrieved October 16, 2009.
  8. NASA (2008). "NASA Sets Launch Dates for Remaining Space Shuttle Missions". NASA . Retrieved October 25, 2008.
  9. NASA (2008). "NASA Assigns Astronaut Crews for Future Space Shuttle Missions". NASA. Retrieved December 6, 2008.
  10. "STS-130". Spacefacts. Retrieved April 25, 2024.
  11. "Node 3 and Cupola Information Kit" (PDF). European Space Agency. November 2009. Retrieved December 8, 2009.
  12. Station Module Named 'Tranquility' to Honor Apollo 11 Archived August 8, 2009, at the Wayback Machine NASA. Retrieved February 10, 2010.
  13. Bergin, Chris (December 11, 2009). "STS-130: Endeavour arrives in the VAB for mating". NASAspaceflight.com. Retrieved December 14, 2009.
  14. Bergin, Chris (November 30, 2009). "STS-130: Endeavour Set For Christmas Stay in VAB For Feb. 6 Mission". NASASpaceFlight.com. Retrieved December 1, 2009.
  15. "STS-130 coverage". CBS News Space Place. CBS News. Retrieved February 7, 2010.
  16. 1 2 @NASA (February 7, 2010). "STS-130 launch weather now is 30 percent "go." Those clouds to the north of KSC no longer are scattering" (Tweet). Retrieved February 7, 2010 via Twitter.
  17. 1 2 "Launch Weather Forecast" (PDF). United States Airforce, 45th Weather Squadron. Archived from the original (PDF) on February 15, 2010. Retrieved February 7, 2010.
  18. @NASA (February 7, 2010). "STS-130 updated weather forecast for Monday's 4:14a EST launch - 60 percent "go" with a chance once again for a low cloud ceiling" (Tweet). Retrieved February 7, 2010 via Twitter.
  19. Harwood, William (December 16, 2009). "CBS News Space Place Quicklook". CBS News. Retrieved January 6, 2010.
  20. NASA (February 8, 2010). "STS-130 MCC Status Report #01". Archived from the original on February 12, 2010. Retrieved February 18, 2010.
  21. NASA (February 9, 2010). "STS-130 MCC Status Report #03". Archived from the original on February 16, 2010. Retrieved February 25, 2010.
  22. NASa (February 11, 2010). "STS-130 MCC Status Report #07". Archived from the original on February 14, 2010. Retrieved February 18, 2010.
  23. Chris Gebhardt (February 12, 2010). "STS-130: EVA-1 complete as Node-3/Tranquility is installed on Station". NASAspaceflight.com. Retrieved February 17, 2010.
  24. NASA (February 12, 2010). "STS-130 MCC Status Report #10" . Retrieved February 18, 2010.
  25. William Harwood (February 14, 2010). "Spacewalking plumbers make Tranquility cooler". spaceflight.com. Retrieved February 17, 2010.
  26. NASA (February 14, 2010). "STS-130 MCC Status Report #13". Archived from the original on February 15, 2010. Retrieved February 18, 2010.
  27. William Harwood (February 15, 2010). "Space station's new bay window bolted into place". spaceflightnow.com. Retrieved February 18, 2010.
  28. William Harwood (February 15, 2010). "Astronauts shuffle location of station docking adapter". spaceflightnow.com. Retrieved February 17, 2010.
  29. NASA (February 17, 2010). "STS-130 MCC Status Report #19". Archived from the original on February 20, 2010. Retrieved February 17, 2010.
  30. William Harwood (February 17, 2010). "Cupola windows unwrapped on mission's last spacewalk". spaceflightnow.com. Retrieved February 17, 2010.
  31. Clark, Stephen (February 17, 2010). "Obama places phone call to space station astronauts". spaceflightnow.com. Retrieved February 20, 2010.
  32. Bergin, Chris (February 19, 2010). "STS-130 prepares for undocking – MMOD impact on hatch cleared". NASAspaceflight.com. Retrieved February 20, 2010.
  33. Tariq Malik (February 18, 2010). "Shuttle Astronauts Pack Up to Leave Space Station". space.com. Retrieved February 20, 2010.
  34. William Harwood (February 19, 2010). "Apparent urine leak in station's recycling system". spaceflightnow.com. Retrieved February 20, 2010.
  35. Bergin, Chris (February 19, 2010). "Endeavour Undocks and completes late inspection – Another MMOD strike". NASASpaceflight.com. Retrieved February 20, 2010.
  36. NASA (February 21, 2010). "STS-130 MCC Status Report No. 27". Archived from the original on February 22, 2010. Retrieved February 25, 2010.
  37. Chris Gebhardt (February 20, 2010). "STS-130 EOM-1: Endeavour carries out FCS checks; TPS Clearance Overview". NASASpaceflight.com. Retrieved February 23, 2010.
  38. William Harwood (February 21, 2010). "Endeavour beats the weather and lands on schedule". Spaceflightnow.com. Retrieved February 25, 2010.
  39. Robert Z. Pearlman (February 21, 2010). "Space Shuttle Endeavour Lands Safely in Florida". space.com. Retrieved February 25, 2010.
  40. Chris Bergin (February 21, 2010). "STS-130: Endeavour beats the weather and returns to KSC". NASASpaceflight.com. Retrieved February 23, 2010.
  41. NASA (February 2010). "STS-130 Mission Summary" (PDF). NASA. Archived from the original (PDF) on January 11, 2010. Retrieved January 12, 2012.
  42. "Chronology of Wakeup Calls". NASA. August 2, 2005. Retrieved February 14, 2010.
  43. "STS-130 Wakeup Calls". NASA. February 14, 2010. Archived from the original on March 2, 2010. Retrieved February 14, 2010.