Orbiter Boom Sensor System

Last updated
Shuttle Remote Manipulator System (RMS) holding OBSS boom on STS-114 STS-114 robot arm extension.jpg
Shuttle Remote Manipulator System (RMS) holding OBSS boom on STS-114
Astronaut Scott Parazynski at the end of the OBSS boom making repairs to the P6 solar array STS-120 OBSS repair.jpg
Astronaut Scott Parazynski at the end of the OBSS boom making repairs to the P6 solar array

The Orbiter Boom Sensor System (OBSS) was a 50-foot (15.24 m) boom carried on board NASA's Space Shuttles. The boom was grappled by the Canadarm and served as an extension of the arm, doubling its length to a combined total of 100 feet (30 m). [1] At the far end of the boom was an instrumentation package of cameras and lasers used to scan the leading edges of the wings, the nose cap, and the crew compartment after each lift-off and before each landing. If flight engineers suspected potential damage to other areas, as evidenced in imagery captured during lift-off or the rendezvous pitch maneuver, then additional regions could be scanned.

Contents

The OBSS was introduced to the shuttle fleet with STS-114, the "Return to Flight" mission executed by Discovery , and was flown on every mission after that until the retirement of the Space Shuttle fleet in 2011. It was used to inspect the shuttle for damage to the heat shield, officially called the Thermal Protection System (TPS), that could jeopardize the shuttle during re-entry. The decision to perform focused inspections of the TPS was prompted by the Space Shuttle Columbia disaster, in which Columbia was destroyed due to damage inflicted to its TPS during launch. The OBSS was central to focused inspections of the TPS, not only because it carried all the instruments necessary for detailed measurements and observations, but also because without it, the Canadarm was too short to reach to all the areas that needed to be surveyed.

Description

The boom was essentially the same design as the Canadarm itself, except that the articulatory joints are fixed. [2] OBSS arms for the three remaining orbiters were manufactured relatively quickly, primarily because some spare parts for the Canadarm system were used.

Two instrumentation packages are installed at the far end of the OBSS. Sensor package 1 consists of the Laser Dynamic Range Imager (LDRI) and an Intensified Television Camera (ITVC). Sensor package 2 is the Laser Camera System (LCS) and a digital camera (IDC). The sensors can record at a resolution of a few millimeters, and can scan at a rate of about 2.5 inches (64 mm) per second.

It is also fitted with handrails, so that the boom could be used to provide spacewalkers with access to the shuttle's underbelly in case in-flight repairs were required.

STS-120 ISS repair

During STS-120 the OBSS was used as an extension boom for the space station's Canadarm2, something it was never designed to do. During this mission the P6 solar array had become damaged during the redeploy. Canadarm2 grabbed the arm on its center Flight-Releasable Grapple Fixture and then astronaut Scott E. Parazynski was mounted at the end of the boom to make the repair. [3] Because Canadarm2 was unable to power the OBSS, it was without power many hours more than it was designed to handle, but because it was heated up considerably before the start of the repair it stayed undamaged.

Enhanced ISS boom assembly

Due to the benefits for spacewalkers from the extended range provided by connecting an OBSS to the International Space Station (ISS)'s robotic arm, NASA implemented a plan for STS-134 to leave its OBSS behind on the ISS, where it would permanently remain. [4] The plan resulted in a number of modifications to the OBSS, now known as the Enhanced ISS Boom Assembly, including the addition of a Power Data and Grapple Fixture which enables mating to the robotic arm on the end of the boom with a Canadarm2-compatible grapple fixture to favor station use. The boom was stowed on the ISS S1 Integrated Truss Structure on the fourth spacewalk of STS-134 on May 27, 2011. The OBSS sensors were disconnected during the EVA, and are not designed to withstand thermal conditions outside the ISS without power to keep them warm. However, the modification of the grapple fixture could enable such equipment to be mounted onto the OBSS in the future. [5]

Related Research Articles

Mobile Servicing System Robotic system on board the International Space Station

The Mobile Servicing System (MSS), is a robotic system on board the International Space Station (ISS). Launched to the ISS in 2001, it plays a key role in station assembly and maintenance; it moves equipment and supplies around the station, supports astronauts working in space, and services instruments and other payloads attached to the ISS and is used for external maintenance. Astronauts receive specialized training to enable them to perform these functions with the various systems of the MSS.

STS-114 First Space Shuttle mission following the Columbia disaster

STS-114 was the first "Return to Flight" Space Shuttle mission following the Space Shuttle Columbia disaster. Discovery launched at 10:39 EDT, 26 July 2005. The launch, 907 days after the loss of Columbia, was approved despite unresolved fuel sensor anomalies in the external tank that had prevented the shuttle from launching on 13 July, its originally scheduled date.

Canadarm Robotic arm used to manoeuvre and capture mission payloads on the Space Shuttle

Canadarm or Canadarm1 is a series of robotic arms that were used on the Space Shuttle orbiters to deploy, manoeuvre, and capture payloads. After the Space Shuttle Columbia disaster, the Canadarm was always paired with the Orbiter Boom Sensor System (OBSS), which was used to inspect the exterior of the shuttle for damage to the thermal protection system.

STS-121 2006 American crewed spaceflight to the ISS

STS-121 was a 2006 NASA Space Shuttle mission to the International Space Station (ISS) flown by Space ShuttleDiscovery. The main purposes of the mission were to test new safety and repair techniques introduced following the Columbia disaster of February 2003 as well as to deliver supplies, equipment and German European Space Agency (ESA) astronaut Thomas Reiter to the ISS.

STS-115 2006 American crewed spaceflight to the ISS

STS-115 was a Space Shuttle mission to the International Space Station (ISS) flown by Space ShuttleAtlantis. It was the first assembly mission to the ISS after the Columbia disaster, following the two successful Return to Flight missions, STS-114 and STS-121. STS-115 launched from LC-39B at the Kennedy Space Center on 9 September 2006 at 11:14:55 EDT.

Dextre Robotic Arm

Dextre, also known as the Special Purpose Dexterous Manipulator (SPDM), is a two armed robot, or telemanipulator, which is part of the Mobile Servicing System on the International Space Station (ISS), and does repairs otherwise requiring spacewalks. It was launched March 11, 2008 on mission STS-123.

STS-117 2007 American crewed spaceflight to the ISS

STS-117 was a Space Shuttle mission flown by Space Shuttle Atlantis, launched from pad 39A of the Kennedy Space Center on 8 June 2007. Atlantis lifted off from the launch pad at 19:38 EDT. Damage from a hail storm on 26 February 2007 had previously caused the launch to be postponed from an originally-planned launch date of 15 March 2007. The launch of STS-117 marked the 250th orbital human spaceflight.

STS-119 2009 American crewed spaceflight to the ISS

STS-119 was a Space Shuttle mission to the International Space Station (ISS) which was flown by space shuttle Discovery during March 2009. It delivered and assembled the fourth starboard Integrated Truss Segment (S6), and the fourth set of solar arrays and batteries to the station. The launch took place on 15 March 2009, at 19:43 EDT. Discovery successfully landed on 28 March 2009, at 15:13 pm EDT.

STS-122 2008 American crewed spaceflight to the ISS

STS-122 was a NASA Space Shuttle mission to the International Space Station (ISS), flown by the Space ShuttleAtlantis. STS-122 marked the 24th shuttle mission to the ISS, and the 121st Space Shuttle flight overall.

STS-133 2011 American crewed spaceflight to the ISS and final flight of Space Shuttle Discovery

STS-133 was the 133rd mission in NASA's Space Shuttle program; during the mission, Space Shuttle Discovery docked with the International Space Station. It was Discovery's 39th and final mission. The mission launched on 24 February 2011, and landed on 9 March 2011. The crew consisted of six American astronauts, all of whom had been on prior spaceflights, headed by Commander Steven Lindsey. The crew joined the long-duration six person crew of Expedition 26, who were already aboard the space station. About a month before lift-off, one of the original crew members, Tim Kopra, was injured in a bicycle accident. He was replaced by Stephen Bowen.

STS-123 2008 American crewed spaceflight to the ISS

STS-123 was a Space Shuttle mission to the International Space Station (ISS) which was flown by Space Shuttle Endeavour. STS-123 was the 1J/A ISS assembly mission. The original launch target date was 14 February 2008 but after the delay of STS-122, the shuttle was launched on 11 March 2008. It was the twenty-fifth shuttle mission to visit the ISS, and delivered the first module of the Japanese laboratory, Japanese Experiment Module (Kibō), and the Canadian Special Purpose Dexterous Manipulator, (SPDM) Dextre robotics system to the station. The mission duration was 15 days and 18 hours, and it was the first mission to fully utilize the Station-to-Shuttle Power Transfer System (SSPTS), allowing space station power to augment the shuttle power systems. The mission set a record for a shuttle's longest stay at the ISS.

STS-129 2009 American crewed spaceflight to the ISS

STS-129 was a NASA Space Shuttle mission to the International Space Station (ISS). Atlantis was launched on November 16, 2009 at 14:28 EST, and landed at 09:44 EST on November 27, 2009 on runway 33 at the Kennedy Space Center's Shuttle Landing Facility. It was also the last shuttle launch of the 2000s.

STS-130 2010 American crewed spaceflight to the ISS

STS-130 was a NASA Space Shuttle mission to the International Space Station (ISS). Space ShuttleEndeavour's primary payloads were the Tranquility module and the Cupola, a robotic control station with six windows around its sides and another in the center, providing a 360-degree view around the station. Endeavour launched at 04:14 EST on 8 February 2010 and landed at 22:22 EST on 21 February 2010 on runway 15 at the Kennedy Space Center's Shuttle Landing Facility.

STS-131 2010 American crewed spaceflight to the ISS

STS-131 was a NASA Space Shuttle mission to the International Space Station (ISS). Space ShuttleDiscovery launched on 5 April 2010 at 6:21 am from LC-39A, and landed at 9:08 am on 20 April 2010 on runway 33 at the Kennedy Space Center's Shuttle Landing Facility. The mission marked the longest flight for Space Shuttle Discovery.

STS-132 2010 American crewed spaceflight to the ISS

STS-132 was a NASA Space Shuttle mission, during which Space Shuttle Atlantis docked with the International Space Station on 16 May 2010. STS-132 was launched from the Kennedy Space Center on 14 May 2010. The primary payload was the Russian Rassvet Mini-Research Module, along with an Integrated Cargo Carrier-Vertical Light Deployable (ICC-VLD). Atlantis landed at the Kennedy Space Center on 26 May 2010.

Grapple fixture

Grapple fixtures are used on spacecraft or other objects to provide a secure connection for a robotic arm.

STS-134 2011 American crewed spaceflight to the ISS and final flight of Space Shuttle Endeavour

STS-134 was the penultimate mission of NASA's Space Shuttle program and the 25th and last spaceflight of Space ShuttleEndeavour. This flight delivered the Alpha Magnetic Spectrometer and an ExPRESS Logistics Carrier to the International Space Station. Mark Kelly served as the mission commander. STS-134 was expected to be the final Space Shuttle mission if STS-135 did not receive funding from Congress. However, in February 2011, NASA stated that STS-135 would fly "regardless" of the funding situation. STS-135, flown by Atlantis, took advantage of the processing for STS-335, the Launch on Need mission that would have been necessary if the STS-134 crew became stranded in orbit.

STS-135 135th and final mission of the American Space Shuttle program

STS-135 was the 135th and final mission of the American Space Shuttle program. It used the orbiter Atlantis and hardware originally processed for the STS-335 contingency mission, which was not flown. STS-135 launched on 8 July 2011, and landed on 21 July 2011, following a one-day mission extension. The four-person crew was the smallest of any shuttle mission since STS-6 in April 1983. The mission's primary cargo was the Multi-Purpose Logistics Module (MPLM) Raffaello and a Lightweight Multi-Purpose Carrier (LMC), which were delivered to the International Space Station (ISS). The flight of Raffaello marked the only time that Atlantis carried an MPLM.

Neptec Design Group Canadian vision systems company

Neptec Design Group is an Ottawa-based Canadian vision systems company that provides machine vision solutions for space, industrial, and military applications. Privately owned and founded in 1990, Neptec supplies operational systems to NASA's Space Shuttle and International Space Station programs as one of their prime contractors. In 2000, Neptec expanded its technology to include active 3D imaging systems and 3D processing software. This led to the development of the Laser Camera System, an operational system used by NASA to inspect a shuttle's external surfaces during flight. Neptec also used this system to develop the TriDAR, a 3D imaging and tracking system designed for automated on-orbit rendezvous, inspection, and docking. It combines the LCS with a long range LIDAR sensor into the same optical path.

TriDAR, or Triangulation and LIDAR Automated Rendezvous and Docking, is a relative navigation vision system developed by Neptec Design Group and funded by the Canadian Space Agency and NASA. It provides guidance information that can be used to guide an unmanned vehicle during rendezvous and docking operations in space. TriDAR does not rely on any reference markers positioned on the target spacecraft. Instead, TriDAR relies on a laser based 3D sensor and a thermal imager. TriDAR's proprietary software uses the geometric information contained in successive 3D images to match against the known shape of the target object and calculate its position and orientation.

References

  1. NASA: Shuttle in Shipshape: Part II
  2. CSA: Inspection Boom by MDA: One of critical Canadian tools that serves the return to flight [ permanent dead link ]
  3. Greaves, Sarah; Boyle, Keith; Doshewnek, Nik (2005). "Orbiter Boom Sensor System and Shuttle Return to Flight: Operations Analyses". AIAA Guidance, Navigation, and Control Conference and Exhibit. doi:10.2514/6.2005-5986. ISBN   978-1-62410-056-7.
  4. "STS-134 – Endeavour". Archived from the original on 2011-07-15.
  5. "NASA approve funding to leave OBSS permanently on the ISS". January 27, 2009. Retrieved 2009-02-15.