The Leonardo Permanent Multipurpose Module (PMM) is a module of the International Space Station. It was flown into space aboard the Space Shuttle Discovery on STS-133 on 24 February 2011 and installed on 1 March. Leonardo is primarily used for storage of spares, supplies and waste on the ISS, which was until then stored in many different places within the space station. It is also the personal hygiene area for the astronauts who live in the US Orbital Segment. The Leonardo PMM was a Multi-Purpose Logistics Module (MPLM) before 2011, then was modified into its current configuration. It was formerly one of two MPLM used for bringing cargo to and from the ISS with the Space Shuttle. The module was named for Italian polymath Leonardo da Vinci.

Contents

Like the other Multi-Purpose Logistics Modules, it was constructed by the Italian Space Agency, who chose to name it after Leonardo da Vinci. [1] Construction began in April 1996, and the module was delivered to NASA at the Kennedy Space Center in August 1998 by an Airbus Beluga aircraft. [2]

Previous proposals

A European proposal suggested equipping the Donatello MPLM with enhanced micrometeoroid/orbital debris protection and cooling systems, and leaving it attached to the ISS after the Space Shuttle fleet was retired. Costs for such MPLM modifications were estimated at $20M to $40M per unit. The MPLM would then be called a Permanent Multipurpose Module (PMM), and it would house spare parts and supplies, allowing longer times between resupply missions. The proposal was rejected by NASA because it would require changes to existing plans and would entail additional costs. [3] Internal discussions continued [4] and managers considered the possibility of STS-133, which at that time was planned to be the last Shuttle flight, leaving its MPLM permanently attached. [5] The United Launch Alliance also published a proposal for a system that could allow additional ISS modules to be launched on an EELV even after the retirement of the Shuttle. [6]

On August 5, 2009 it was announced that STS-133 would indeed leave one MPLM permanently attached to the station. [7] In October 2009, it was confirmed that Leonardo would be the MPLM converted to a PMM. [8] It was launched on February 24, 2011. The PMM was transferred to the station using the Shuttle robotic arm and mated to the nadir (Earth) facing port of Unity.

On May 27, 2015, at 13:08 UTC, the PMM was relocated from the nadir port of the Unity module to the forward-facing port of the Tranquility module. This was done in order to allow Unity's nadir port to serve as a berthing port for resupply craft, which in turn frees up Harmony 's zenith port for future U.S. Commercial Crew Development spacecraft. [9]

After the re-location of Leonardo from the Unity module to the Tranquility module (which is where the toilet is located) in addition to its function as a storage module it is now the personal hygiene area for the ISS astronauts in the US Orbital Segment. Astronauts have much privacy in Leonardo and do sponge baths and change their clothes here. [10]

Leonardo might also be used on Axiom Station after the ISS is decommissioned. [11]

Modifications

PMM Leonardo at the Space Station Processing Facility (SSPF). STS 133 PMM Leonardo.jpg
PMM Leonardo at the Space Station Processing Facility (SSPF).

After returning to Earth on April 20, 2010 at the end of the STS-131 mission, the Leonardo MPLM was moved to the Space Station Processing Facility (SSPF) at the Kennedy Space Center in Florida to undergo modifications. To convert the Leonardo MPLM into the PMM, NASA made the following modifications: removal of +Y grapple fixture (Flight Releasable Grapple Fixture, or FRGF), removal of ROFU (Remotely Operated Fluid Umbilical) components, replacement of CBM seal, installation of new forward end cone MMOD shields, feed through seal replacement, and installation of visiting vehicle retro-reflectors.

In addition, the Multi-layer insulation (MLI) blankets from the never-flown Donatello MPLM were cannibalized for use on Leonardo. The blankets were removed and returned to Italy where they were reinforced with Nextel/Kevlar to provide better protection against micro-meteorites. The upgraded blankets were then installed on about two-thirds of Leonardo's surface area. [12]

The Leonardo PMM mass is 21,817 pounds (9,896 kg). [13]

As an MPLM

Leonardo
MPLM Leonardo is moved to the payload canister.jpg
Leonardo being prepared for flight on STS-105
Module statistics
Part of International Space Station
Launch date 21:53:24,February 24, 2011(UTC) (2011-02-24T21:53:24Z)
Launch vehicle Space Shuttle/STS-133
Berthed March 1, 2011
Mass 4,082 kg (8,999 lb) [1]
Length6.6 m (22 ft)
Diameter4.57 m (15.0 ft)
Pressurised volume 31 m3 (1,100 cu ft)
References: NASA MPLM
10 March 2001 - The Leonardo Multi Purpose Logistics Module rests in Discovery's payload bay in this view taken from the ISS by a crew member using a digital still camera during STS-102. Mplm in shuttle.jpg
10 March 2001 – The Leonardo Multi Purpose Logistics Module rests in Discovery 's payload bay in this view taken from the ISS by a crew member using a digital still camera during STS-102.

The Leonardo MPLM, also known as MPLM-1, was one of three Multi-Purpose Logistics Modules which were operated by NASA to transfer supplies and equipment to and from the International Space Station. Leonardo was used for eight of the twelve MPLM flights to the space station, with Raffaello being used for the other four. It was the first MPLM to be launched, making its first flight in March 2001, aboard Space Shuttle Discovery on STS-102.

Flights

MissionOrbiterLaunch (UTC) [14] Landing (UTC)Remarks
STS-102 Discovery8 March 200121 March 2001
STS-105 Discovery10 August 200122 August 2001
STS-111 Endeavour5 June 200219 June 2002
STS-121 Discovery4 July 200617 July 2006
STS-126 Endeavour15 November 200830 November 2008
STS-128 Discovery29 August 200911 September 2009
STS-131 Discovery5 April 201020 April 2010
STS-133 Discovery24 February 2011N/ALeonardo was left on-station to become the PMM.

See also

Related Research Articles

<span class="mw-page-title-main">International Space Station</span> Largest Modular space station in low Earth orbit

The International Space Station (ISS) is the largest modular space station currently in low Earth orbit. It is a multinational collaborative project involving five participating space agencies: NASA, Roscosmos (Russia), JAXA (Japan), ESA (Europe), and CSA (Canada). The ownership and use of the space station is established by intergovernmental treaties and agreements. The station serves as a microgravity and space environment research laboratory in which scientific research is conducted in astrobiology, astronomy, meteorology, physics, and other fields. The ISS is suited for testing the spacecraft systems and equipment required for possible future long-duration missions to the Moon and Mars.

<span class="mw-page-title-main">STS-105</span> 2001 American crewed spaceflight to the ISS

STS-105 was a mission of the Space Shuttle Discovery to the International Space Station, launched from Kennedy Space Center, Florida, 10 August 2001. This mission was Discovery's final mission until STS-114, because Discovery was grounded for a refit, and then all Shuttles were grounded in the wake of the Columbia disaster. The refit included an update of the flight deck to the glass cockpit layout, which was already installed on Atlantis and Columbia.

<span class="mw-page-title-main">Multi-Purpose Logistics Module</span> Large pressurized container for cargo resupply of the International Space Station

A Multi-Purpose Logistics Module (MPLM) is a large pressurized container that was used on Space Shuttle missions to transfer cargo to and from the International Space Station (ISS). Two MPLMs made a dozen trips in the Shuttle cargo bay and initially berthed to the Unity module and later the Harmony module on the ISS. From there, supplies were offloaded, and finished experiments and waste were reloaded. The MPLM was then reberthed in the Shuttle for return to Earth. Three modules were built by the Italian Space Agency (ASI): Leonardo, Raffaello, and Donatello.

<span class="mw-page-title-main">STS-121</span> 2006 American crewed spaceflight to the ISS

STS-121 was a 2006 NASA Space Shuttle mission to the International Space Station (ISS) flown by Space ShuttleDiscovery. The main purposes of the mission were to test new safety and repair techniques introduced following the Columbia disaster of February 2003 as well as to deliver supplies, equipment and German European Space Agency (ESA) astronaut Thomas Reiter to the ISS.

<i>Unity</i> (ISS module) American module of the International Space Station

The Unity connecting module, also known as Node 1, is the first U.S.-built component of the International Space Station (ISS). It connects the Russian and United States segments of the station, and is where crew eat meals together.

<i>Destiny</i> (ISS module) Primary US ISS module

The Destiny module, also known as the U.S. Lab, is the primary operating facility for U.S. research payloads aboard the International Space Station (ISS). It was berthed to the Unity module and activated over a period of five days in February, 2001. Destiny is NASA's first permanent operating orbital research station since Skylab was vacated in February 1974.

<i>Harmony</i> (ISS module) American module of the International Space Station

Harmony, also known as Node 2, is the "utility hub" of the International Space Station. It connects the laboratory modules of the United States, Europe and Japan, as well as providing electrical power and electronic data. Sleeping cabins for four of the crew are housed here.

<i>Tranquility</i> (ISS module) American module of the International Space Station

Tranquility, also known as Node 3, is a module of the International Space Station (ISS). It contains environmental control systems, life support systems, a toilet, exercise equipment, and an observation cupola.

<span class="mw-page-title-main">STS-133</span> 2011 American crewed spaceflight to the ISS and final flight of Space Shuttle Discovery

STS-133 was the 133rd mission in NASA's Space Shuttle program; during the mission, Space Shuttle Discovery docked with the International Space Station. It was Discovery's 39th and final mission. The mission launched on 24 February 2011, and landed on 9 March 2011. The crew consisted of six American astronauts, all of whom had been on prior spaceflights, headed by Commander Steven Lindsey. The crew joined the long-duration six person crew of Expedition 26, who were already aboard the space station. About a month before lift-off, one of the original crew members, Tim Kopra, was injured in a bicycle accident. He was replaced by Stephen Bowen.

<span class="mw-page-title-main">STS-128</span> 2009 American crewed spaceflight to the ISS

STS-128 was a NASA Space Shuttle mission to the International Space Station (ISS) that launched on August 28, 2009. Space ShuttleDiscovery carried the Multi-Purpose Logistics Module Leonardo as its primary payload. Leonardo contained a collection of experiments for studying the physics and chemistry of microgravity. Three spacewalks were carried out during the mission, which removed and replaced a materials processing experiment outside ESA's Columbus module, and returned an empty ammonia tank assembly.

<span class="mw-page-title-main">STS-130</span> 2010 American crewed spaceflight to the ISS

STS-130 was a NASA Space Shuttle mission to the International Space Station (ISS). Space ShuttleEndeavour's primary payloads were the Tranquility module and the Cupola, a robotic control station with six windows around its sides and another in the center, providing a 360-degree view around the station. Endeavour launched at 04:14 EST on 8 February 2010 and landed at 22:22 EST on 21 February 2010 on runway 15 at the Kennedy Space Center's Shuttle Landing Facility.

<span class="mw-page-title-main">STS-131</span> 2010 American crewed spaceflight to the ISS

STS-131 was a NASA Space Shuttle mission to the International Space Station (ISS). Space ShuttleDiscovery launched on 5 April 2010 at 6:21 am from LC-39A, and landed at 9:08 am on 20 April 2010 on runway 33 at the Kennedy Space Center's Shuttle Landing Facility. The mission marked the longest flight for Space Shuttle Discovery.

<i>Raffaello</i> MPLM Large pressurized container for cargo resupply of the International Space Station

The Raffaello MPLM, also known as MPLM-2, was one of three Multi-Purpose Logistics Modules which were operated by NASA to transfer supplies and equipment to and from the International Space Station. Raffaello was used for four of twelve MPLM flights to the space station, with Leonardo being used for the remainder. It was first launched on 19 April 2001, aboard the STS-100 mission flown by Space ShuttleEndeavour, and made its third flight in July 2005, aboard Discovery on STS-114. Raffaello's final flight was aboard Space ShuttleAtlantis on the STS-135 mission, the last flight of the Space Shuttle. As of June 2015, it is now being stored at the Kennedy Space Center.

<span class="mw-page-title-main">Pressurized Mating Adapter</span> Spacecraft docking adapter

The Pressurized Mating Adapter (PMA) is a class of spacecraft adapters that convert the Common Berthing Mechanism (CBM) used on the US Orbital Segment to APAS-95 docking ports. There are three PMAs located on the International Space Station (ISS); the first two were launched with the Unity connecting module in 1998 aboard STS-88, and the third was launched in 2000 aboard STS-92. All three of the PMAs are now used to permanently connect parts of the ISS, so they are no longer available as docking ports for visiting spacecraft.

<span class="mw-page-title-main">Assembly of the International Space Station</span> Process of assembling the International Space Station

The process of assembling the International Space Station (ISS) has been under way since the 1990s. Zarya, the first ISS module, was launched by a Proton rocket on 20 November 1998. The STS-88 Space Shuttle mission followed two weeks after Zarya was launched, bringing Unity, the first of three node modules, and connecting it to Zarya. This bare 2-module core of the ISS remained uncrewed for the next one and a half years, until in July 2000 the Russian module Zvezda was launched by a Proton rocket, allowing a maximum crew of three astronauts or cosmonauts to be on the ISS permanently.

<span class="mw-page-title-main">STS-134</span> 2011 American crewed spaceflight to the ISS and final flight of Space Shuttle Endeavour

STS-134 was the penultimate mission of NASA's Space Shuttle program and the 25th and last spaceflight of Space ShuttleEndeavour. This flight delivered the Alpha Magnetic Spectrometer and an ExPRESS Logistics Carrier to the International Space Station. Mark Kelly served as the mission commander. STS-134 was expected to be the final Space Shuttle mission if STS-135 did not receive funding from Congress. However, in February 2011, NASA stated that STS-135 would fly "regardless" of the funding situation. STS-135, flown by Atlantis, took advantage of the processing for STS-335, the Launch on Need mission that would have been necessary if the STS-134 crew became stranded in orbit.

<span class="mw-page-title-main">STS-135</span> 2011 American crewed spaceflight to the ISS and final flight of the Space Shuttle program

STS-135 was the 135th and final mission of the American Space Shuttle program. It used the orbiter Atlantis and hardware originally processed for the STS-335 contingency mission, which was not flown. STS-135 launched on 8 July 2011, and landed on 21 July 2011, following a one-day mission extension. The four-person crew was the smallest of any shuttle mission since STS-6 in April 1983. The mission's primary cargo was the Multi-Purpose Logistics Module (MPLM) Raffaello and a Lightweight Multi-Purpose Carrier (LMC), which were delivered to the International Space Station (ISS). The flight of Raffaello marked the only time that Atlantis carried an MPLM.

<span class="mw-page-title-main">Kounotori 2</span> 2011 Japanese resupply spaceflight to the ISS

Kounotori 2, also known as HTV-2, was launched in January 2011 and was the second flight of the Japanese H-II Transfer Vehicle to resupply the International Space Station (ISS). It was launched by the H-IIB Launch Vehicle No. 2 manufactured by Mitsubishi Heavy Industries (MHI) and JAXA. After the supplies were unloaded, Kounotori 2 was loaded with waste material from ISS, including used experiment equipment and used clothes. Kounotori 2 was then unberthed and separated from the ISS and burned up upon reentering the atmosphere on 30 March 2011.

<span class="mw-page-title-main">US Orbital Segment</span> US components of the International Space Station

The US Orbital Segment (USOS) is the name given to the components of the International Space Station (ISS) constructed and operated by the United States National Aeronautics and Space Administration (NASA), European Space Agency (ESA), Canadian Space Agency (CSA) and Japan Aerospace Exploration Agency (JAXA). The segment currently consists of eleven pressurized components and various external elements, all of which were delivered by the Space Shuttle.

<span class="mw-page-title-main">Space Shuttle retirement</span> End of NASAs Space Shuttle spacecraft system in 2011

The retirement of NASA's Space Shuttle fleet took place from March to July 2011. Discovery was the first of the three active Space Shuttles to be retired, completing its final mission on March 9, 2011; Endeavour did so on June 1. The final shuttle mission was completed with the landing of Atlantis on July 21, 2011, closing the 30-year Space Shuttle program.

References

  1. 1 2 "What is MPLM?". NASA Marshall Space Flight Center. Archived from the original on 27 May 2010. Retrieved 17 May 2010.
  2. "Multi-Purpose Logistics Modules". International Space Station. NASA. Retrieved 17 May 2010.
  3. Coppinger, Rob (2008-04-02). "NASA rejects European ISS logistics project". Flightglobal.com. Retrieved 2009-01-24.
  4. Coppinger, Rob (2008-06-24). "NASA: MPLM may stay on orbit, docking rules to change and launch-on-need re-designated?". Flightglobal.com. Retrieved 2009-02-27.
  5. Bergin, Chris (2009-05-05). "ISS considering the permanent attachment MPLM, advancement of STS-134". NASAspaceflight.com.
  6. Foster, Mark. "System-of-Space Systems Architecture Utilizing Existing Space Assets to Complete and Re-Supply the International Space Station" (PDF).
  7. Gebhardt, Chris (2009-08-05). "STS-133 refined to a five crew, one EVA mission – will leave MPLM on ISS". NASAspaceflight.com.
  8. "Shuttle Q&A Part 5". NASASpaceflight.com. September 27, 2009. Retrieved October 14, 2009.
  9. "Module Relocated Prepping Station for Commercial Crew | Space Station". blogs.nasa.gov. Retrieved 2015-05-27.
  10. https://www.youtube.com/watch?v=Snn1k_qEx20&t=34m11s . Courtesy of the European Space Agency, ESA. Retrieved 12 December 2020
  11. "Axiom Space Builds the World's First Commercial Space Station" . Retrieved November 2, 2022.
  12. "Spaceflight Now | STS-133 Shuttle Report | Roomy addition for space station ready to launch".
  13. "STS-133 Press Kit" (PDF). NASA. Retrieved 4 December 2011.
  14. McDowell, Jonathan. "Launch Log". Jonathan's Space Page. Retrieved 17 May 2010.