STS-71

Last updated

STS-71
Atlantis docked to MIR - GPN-2000-001315.jpg
Atlantis docked to Mir, photographed from the departing Soyuz-TM spacecraft Uragan
Names Space Transportation System-71
Mission type Shuttle-Mir
Operator NASA
COSPAR ID 1995-030A OOjs UI icon edit-ltr-progressive.svg
SATCAT no. 23600
Mission duration9 days, 19 hours, 23 minutes, 9 seconds
Distance travelled6,600,000 kilometres (4,100,000 mi)
Orbits completed153
Spacecraft properties
Spacecraft Space Shuttle Atlantis
Payload mass12,191 kilograms (26,877 lb)
Crew
Crew size7 up
8 down
Members
Launching
Landing
Start of mission
Launch dateJune 27, 1995, 19:32:19 (1995-06-27UTC19:32:19Z) UTC
Launch site Kennedy LC-39A
End of mission
Landing dateJuly 7, 1995, 14:55:28 (1995-07-07UTC14:55:29Z) UTC
Landing site Kennedy SLF Runway 15
Orbital parameters
Reference system Geocentric
Regime Low Earth
Perigee altitude 342 kilometres (213 mi)
Apogee altitude 342 kilometres (213 mi)
Inclination 51.6 degrees
Period 88.9 min
Docking with Mir
Docking port Kristall  forward
Docking dateJune 29, 1995, 13:00:16 UTC
Undocking dateJuly 4, 1995, 11:09:42 UTC
Time docked4 days, 22 hours, 9 minutes 26 seconds
Sts-71-patch.png STS-71 crew.jpg
Left to right – Seated: Dezhurov, Gibson, Solovyev; Standing: Thagard, Strekalov, Harbaugh, Baker, Precourt, Dunbar, Budarin
  STS-67 (68)
STS-70 (70) 
 

STS-71 was the third mission of the US/Russian Shuttle-Mir Program and the first Space Shuttle docking to Russian space station Mir . It started on June 27, 1995, with the launch of Space Shuttle Atlantis from launchpad 39A at the Kennedy Space Center in Florida. The Shuttle delivered a relief crew of two cosmonauts Anatoly Solovyev and Nikolai Budarin to the station and recovered Increment astronaut Norman Thagard. Atlantis returned to Earth on July 7 with a crew of eight. It was the first of seven straight missions to Mir flown by Atlantis, and the second Shuttle mission to land with an eight-person crew after STS-61-A in 1985.

Contents

For the five days the Shuttle was docked to Mir they were the largest spacecraft in orbit at the time. STS-71 marked the first docking of a Space Shuttle to a space station, the first time a Shuttle crew switched members with the crew of a station, and the 100th crewed space launch by the United States. The mission carried Spacelab and included a logistical resupply of Mir. Together the Shuttle and station crews conducted various on-orbit joint US/Russian life science investigations with Spacelab along with the Shuttle Amateur Radio Experiment-II (SAREX-II) experiment.

Crew

Position Launching Crew MemberLanding Crew Member
Commander Flag of the United States.svg Robert L. Gibson
Fifth and last spaceflight
Pilot Flag of the United States.svg Charles J. Precourt
Second spaceflight
Mission Specialist 1 Flag of the United States.svg Ellen S. Baker
Third and last spaceflight
Mission Specialist 2 Flag of the United States.svg Gregory J. Harbaugh
Third spaceflight
Mission Specialist 3 Flag of the United States.svg Bonnie J. Dunbar
Fourth spaceflight
Mission Specialist 4 Flag of Russia.svg Anatoly Solovyev, RKA
EO-19
Fourth spaceflight
Flag of Russia.svg Gennady Strekalov, RKA
EO-18
Fifth and last spaceflight
Mission Specialist 5 Flag of Russia.svg Nikolai Budarin, RKA
EO-19
First spaceflight
Flag of Russia.svg Vladimir Dezhurov, RKA
EO-18
First spaceflight
Mission Specialist 6None Flag of the United States.svg Norman E. Thagard
EO-18
Fifth and last spaceflight

Mission highlights

Space Shuttle Atlantis launches on mission STS-71 KSC-95EC-0911.jpg
Space Shuttle Atlantis launches on mission STS-71

The primary objectives of this flight were to rendezvous and perform the first docking between the Space Shuttle and the Russian Space Station Mir on June 29. In the first U.S.-Russian (Soviet) docking in twenty years, Atlantis delivered a relief crew of two cosmonauts Anatoly Solovyev and Nikolai Budarin to Mir. [1]

Other prime objectives were on-orbit joint United States of America-Russian life sciences investigations aboard SPACELAB/Mir, logistical resupply of the Mir and recovery of US astronaut Norman E. Thagard.

Secondary objectives included filming with the IMAX camera and the Shuttle Amateur Radio Experiment-II (SAREX-II) experiment. [1]

STS-71 was the 100th U.S. human space launch conducted from Cape Canaveral, the first U.S. Space Shuttle-Russian Space Station docking and joint on-orbit operations; largest spacecraft ever in orbit; and the first on-orbit changeout of Shuttle crew.

The rendezvous sequence began at 15:32:19 EDT with a lift-off in-plane with Mir's orbit, at the opening of the 10 minute 19 second launch window. Ascent was nominal with no OMS 1 burn required. [1] The OMS 2 burn, initiated at 42 minutes 58 seconds Mission Elapsed Time, adjusted the orbit to 160 x 85.3 nautical miles. It was the lowest ever perigee altitude flown by an orbiter. [2] This facilitated a very rapid initial catch up rate with Mir of about 880 nautical miles per orbit. [3] Almost three hours later the orbit was raised to more typical values of 210 x 159 nautical miles by the OMS 3 burn.

Docking occurred at 9 am EDT, June 29, using R-Bar or Earth radius vector approach, with Atlantis closing in on Mir from directly below. R-bar approach allows natural forces to brake the orbiter's approach more than would occur along standard approach directly in front of the space station; also, an R-bar approach minimizes the number of orbiter jet firings needed for approach. The manual phase of the docking began with Atlantis about a half-mile (800 m) below Mir, with Gibson at the controls on aft flight deck. Stationkeeping was performed when the orbiter was about 75 metres (246 ft) from Mir, pending approval from Russian and U.S. flight directors to proceed. Gibson then maneuvered the orbiter to a point about 10 metres (33 ft) from Mir before beginning the final approach to station. Closing rate was close to the targeted 0.1 foot per second (30 mm/s), being approximately 0.107 foot per second (33 mm/s) at contact. Interface contact was nearly flawless: less than 25 millimetres (0.98 in) lateral misalignment and an angular misalignment of less than 0.5 degrees per axis. No braking jet firings had been required. [4] Docking occurred about 216 nautical miles (400 kilometres (250 mi)) above Lake Baikal region of the Russian Federation. The Orbiter Docking System (ODS) with Androgynous Peripheral Docking System served as the actual connection point to a similar interface on the docking port on Mir's Kristall module. ODS, located in the forward payload bay of Atlantis, performed flawlessly during the docking sequence.

When linked, Atlantis and Mir formed the largest spacecraft ever in orbit, with a total mass of about 225 metric tons (almost one-half million pounds), orbiting some 218 nautical miles (404 kilometres (251 mi)) above the Earth. After hatches on each side opened, STS-71 crew passed into Mir for a welcoming ceremony. On the same day, the Mir 18 crew officially transferred responsibility for the station to the Mir 19 crew, and the two crews switched spacecraft.

Vladimir Dezhurov and "Hoot" Gibson shake hands in orbit, a homage to the Apollo-Soyuz Test Project (ASTP). Later that day, President Bill Clinton announced that this handshake was a major breakthrough towards the end of the Cold War. S71e0003.jpg
Vladimir Dezhurov and "Hoot" Gibson shake hands in orbit, a homage to the Apollo-Soyuz Test Project (ASTP). Later that day, President Bill Clinton announced that this handshake was a major breakthrough towards the end of the Cold War.

For the next five days, about 100 hours in total, joint U.S.-Russian operations were conducted, including biomedical investigations, and transfer of equipment to and from Mir. Fifteen separate biomedical and scientific investigations were conducted, using the Spacelab module installed in the aft portion of Atlantis's payload bay, and covering seven different disciplines: cardiovascular and pulmonary functions; human metabolism; neuroscience; hygiene, sanitation and radiation; behavioral performance and biology; fundamental biology; and microgravity research. The Mir 18 crew served as test subjects for investigations. Three Mir 18 crew members also carried out an intensive programme of exercise and other measures to prepare for re-entry into gravity environment after more than three months in space.

Numerous medical samples as well as disks and cassettes were transferred to Atlantis from Mir, including more than 100 urine and saliva samples, about 30 blood samples, 20 surface samples, 12 air samples, several water samples and numerous breath samples taken from Mir 18 crew members. Also moved was a broken Salyut-5 computer. Transferred to Mir were more than 450 kilograms (990 lb) of water generated by the orbiter for waste system flushing and electrolysis; specially designed spacewalking tools for use by the Mir 19 crew during a spacewalk to repair a jammed solar array on the Spektr module; and transfer of oxygen and nitrogen from Shuttle's environmental control system to raise air pressure on the station, to improve Mir's consumables margin.

Atlantis lands at the Kennedy Space Center at the end of STS-71. STS-71 chute deploy.jpg
Atlantis lands at the Kennedy Space Center at the end of STS-71.

The spacecraft undocked on July 4, following a farewell ceremony, with the Mir hatch closing at 3:32 pm EDT. July 3 and hatch on Orbiter Docking System shut 16 minutes later. Gibson compared separation sequence to a "cosmic" ballet: Prior to the Mir-Atlantis undocking, the Mir 19 crew temporarily abandoned station, flying away from it in their Soyuz spacecraft so they could record images of Atlantis and Mir separating. Soyuz unlatched at 6:55 am EDT, and Gibson undocked Atlantis from Mir at 7:10 am EDT. Whilst both spacecraft were undocked from Mir, the station suffered a computer malfunction and started to drift in attitude. The Mir 19 crew performed a hasty re-docking, monitored by Atlantis. They subsequently replaced computer hardware allowing them to regain attitude control.

The returning crew of eight equaled the largest crew (STS-61-A, October 1985) in Shuttle history. To ease their re-entry into gravity environment after more than 100 days in space, Mir 18 crew members Thagard, Dezhurov and Strekalov lay supine in custom-made recumbent seats installed prior to landing in the orbiter middeck.

Inflight problems included a glitch with General Purpose Computer 4 (GPC 4), which was declared failed when it did not synchronize with GPC 1; subsequent troubleshooting indicated it was an isolated event, and GPC 4 operated satisfactorily for the remainder of mission.

During the SAREX portion of the flight, the crew contacted several schools. One was Redlands High School in Redlands, California. Charlie Precourt was able to contact students, former students and technicians that built the communications package. A cross polarized, dual band yagi antenna array and automatic rotor was installed on the roof of the electronics classroom. A dual band radio was installed inside the radio room of the classroom. The contact window lasted about 10 minutes, during which time, about twelve people were able to ask questions. While most were basic or technical questions, one was peculiar. "What would happen of you sneezed inside your helmet?" Precourt answered that you'd probably, "spray your face shield a little bit.." and carry on.

External tank

The external tank used on this mission (ET-70) [5] was involved in a historic marine salvage court case. [6] The tank was being delivered by barge in November 1994, when the tow vehicle encountered issues in Hurricane Gordon. Their mayday signal was picked up by the oil tanker Cherry Valley, which responded and towed the tug and its cargo to safety. [7] Under the tradition of marine salvage, NASA offered $5 million to the crew of the tanker as a reward, but the United States Department of Justice reduced the offer to $1 million. [7] The tanker company and crew sued and were awarded $6.4 million, believed to be the largest such award in U.S. history. [7] This was reduced to $4.125 million on appeal. [6] The crew split the award with their employer. At least one crew member was able to use his cut of the proceeds to buy a house, which he calls "the house that NASA bought." [7]

See also

Related Research Articles

<span class="mw-page-title-main">Space Shuttle</span> Partially reusable launch system and space plane

The Space Shuttle is a retired, partially reusable low Earth orbital spacecraft system operated from 1981 to 2011 by the U.S. National Aeronautics and Space Administration (NASA) as part of the Space Shuttle program. Its official program name was Space Transportation System (STS), taken from a 1969 plan for a system of reusable spacecraft where it was the only item funded for development.

<i>Mir</i> Soviet/Russian space station that operated in low Earth orbit from 1986 to 2001

Mir was a space station that operated in low Earth orbit from 1986 to 2001, operated by the Soviet Union and later by Russia. Mir was the first modular space station and was assembled in orbit from 1986 to 1996. It had a greater mass than any previous spacecraft. At the time it was the largest artificial satellite in orbit, succeeded by the International Space Station (ISS) after Mir's orbit decayed. The station served as a microgravity research laboratory in which crews conducted experiments in biology, human biology, physics, astronomy, meteorology, and spacecraft systems with a goal of developing technologies required for permanent occupation of space.

<span class="mw-page-title-main">Nikolai Budarin</span> Russian cosmonaut (born 1953)

Nikolai Mikhailovich Budarin is a retired Russian cosmonaut, a veteran of three extended space missions aboard the Mir Space Station and the International Space Station. He has also performed eight career spacewalks with a total time of 44 hours.

<span class="mw-page-title-main">Norman Thagard</span> American astronaut, scientist, and Marine Corps officer

Norman Earl Thagard, is an American scientist and former U.S. Marine Corps officer and naval aviator and NASA astronaut. He is the first American to ride to space on board a Russian vehicle, and can be considered the first American cosmonaut. He did this on March 14, 1995, in the Soyuz TM-21 spacecraft for the Russian Mir-18 mission.

<span class="mw-page-title-main">STS-66</span> 1994 American crewed spaceflight

STS-66 was a Space Shuttle program mission that was flown by the Space Shuttle Atlantis. STS-66 launched on November 3, 1994, at 11:59:43.060 am EDT from Launch Pad 39-B at NASA's Kennedy Space Center. Atlantis landed at Edwards Air Force Base on November 14, 1994, at 10:33:45 am EST.

<span class="mw-page-title-main">STS-74</span> 1995 American crewed spaceflight to Mir

STS-74 was the fourth mission of the US/Russian Shuttle-Mir Program, and the second docking of the Space Shuttle with Mir. Space Shuttle Atlantis lifted off from Kennedy Space Center launch pad 39A on 12 November 1995. The mission ended 8 days later with the landing of Atlantis back at Kennedy. It was the second in a series of seven straight missions to the station flown by Atlantis.

<span class="mw-page-title-main">STS-76</span> 1996 American crewed spaceflight to Mir

STS-76 was NASA's 76th Space Shuttle mission, and the 16th mission for Atlantis. STS-76 launched on 22 March 1996 at 08:13:04 UTC from Kennedy Space Center, launch pad 39B. STS-76 lasted over 9 days, traveled about 6,100,000 km (3,800,000 mi) while orbiting Earth an estimated 145 times, and landing at 13:28:57 UTC on 31 March 1996 at Edwards Air Force Base, runway 22.

<span class="mw-page-title-main">STS-84</span> 1997 American crewed spaceflight to Mir

STS-84 was a crewed spaceflight mission by Space Shuttle Atlantis to the Mir space station.

<span class="mw-page-title-main">STS-86</span> 1997 American crewed spaceflight to Mir

STS-86 was a Space Shuttle Atlantis mission to the Mir space station. This was the last Atlantis mission before it was taken out of service temporarily for maintenance and upgrades, including the glass cockpit.

<span class="mw-page-title-main">Charles J. Precourt</span> American astronaut

Charles Joseph Precourt is a retired NASA astronaut. His career in flight began at an early age, and spans his entire lifetime. He served in the US Air Force, piloted numerous jet aircraft, and piloted and commanded the Space Shuttle. Notably, he piloted or commanded several missions which involved docking with the Russian Mir space station and was heavily involved in Russian/US Space relations as well as the International Space Station collaboration. He also served as Chief of the Astronaut Office from 1998 to 2002. He retired from the USAF with the rank of colonel.

<span class="mw-page-title-main">Soyuz TM-21</span> 1995 Russian crewed spaceflight to Mir

Soyuz TM-21 was a crewed Soyuz spaceflight to Mir. The mission launched from Baikonur Cosmodrome, atop a Soyuz-U2 carrier rocket, at 06:11:34 UTC on March 14, 1995. The flight marked the first time thirteen humans were flying in space simultaneously, with three aboard the Soyuz, three aboard Mir and seven aboard Space Shuttle Endeavour, flying STS-67.

<span class="mw-page-title-main">Soyuz TM-22</span> 1995 Russian crewed spaceflight to Mir

Soyuz TM-22 was a Soyuz spaceflight to the Soviet space station Mir. It launched from Baikonur Cosmodrome Launch Pad 1 on September 3, 1995. After two days of free flight, the crew docked with Mir to become Mir Principal Expedition 20 and Euromir 95. Mir 20 was a harbinger of the multinational missions that would be typical of the International Space Station. After 179 days, 1 hour and 42 minutes on orbit, Reiter obtained the record for spaceflight duration by a Western European.

<span class="mw-page-title-main">Soyuz TM-23</span> 1996 Russian crewed spaceflight to Mir

Soyuz TM-23 was a Soyuz spaceflight which launched on February 21, 1996, to Mir. The spacecraft launched from Baikonur Cosmodrome, and after two days of flight, Yuri Onufrienko and Yury Usachov docked with Mir and became the 21st resident crew of the Station. On September 2, 1996, after 191 days docked with Mir, the ship undocked with the launch crew and Claudie André-Deshays onboard, before eventually landing 107 km (66 mi) south west of Akmola, Kazakhstan.

<span class="mw-page-title-main">Expedition 2</span> 2nd expedition to the International Space Station

Expedition 2 was the second long-duration spaceflight aboard the International Space Station, immediately following Expedition 1. Its three-person crew stayed aboard the station from March to August 2001. In addition to station maintenance, the crew assisted in several station assembly missions, welcomed the first space tourist Dennis Tito, and conducted some scientific experiments.

Shuttle–<i>Mir</i> program 1993–1998 collaborative Russia–US space program

The Shuttle–Mir program was a collaborative 11-mission space program between Russia and the United States that involved American Space Shuttles visiting the Russian space station Mir, Russian cosmonauts flying on the Shuttle, and an American astronaut flying aboard a Soyuz spacecraft to engage in long-duration expeditions aboard Mir.

<span class="mw-page-title-main">STS-132</span> 2010 American crewed spaceflight to the ISS

STS-132 was a NASA Space Shuttle mission, during which Space Shuttle Atlantis docked with the International Space Station on May 16, 2010. STS-132 was launched from the Kennedy Space Center on May 14, 2010. The primary payload was the Russian Rassvet Mini-Research Module, along with an Integrated Cargo Carrier-Vertical Light Deployable (ICC-VLD). Atlantis landed at the Kennedy Space Center on May 26, 2010.

<span class="mw-page-title-main">Pressurized Mating Adapter</span> Spacecraft docking adapter

A Pressurized Mating Adapter (PMA) is a spacecraft adapter used on the International Space Station (ISS) to convert a Common Berthing Mechanism (CBM) interface to an APAS-95 docking port. Three PMAs are connected to the US Orbital Segment of ISS. PMA-1 and PMA-2 were launched with the Unity module in 1998 aboard STS-88; PMA-3 was launched in 2000 aboard STS-92. PMA-1 permanently connects the Unity and Zarya modules. IDA adapters have been installed on PMA-2 and PMA-3 which convert them to IDSS docking ports.

<span class="mw-page-title-main">STS-135</span> 2011 American crewed spaceflight to the ISS and final flight of the Space Shuttle program

STS-135 was the 135th and final mission of the American Space Shuttle program. It used the orbiter Atlantis and hardware originally processed for the STS-335 contingency mission, which was not flown. STS-135 launched on July 8, 2011, and landed on July 21, 2011, following a one-day mission extension. The four-person crew was the smallest of any shuttle mission since STS-6 in April 1983. The mission's primary cargo was the Multi-Purpose Logistics Module (MPLM) Raffaello and a Lightweight Multi-Purpose Carrier (LMC), which were delivered to the International Space Station (ISS). The flight of Raffaello marked the only time that Atlantis carried an MPLM.

<span class="mw-page-title-main">NASA Astronaut Group 10</span>

NASA Astronaut Group 10 was a group of 17 astronauts that were announced on May 23, 1984 and consisted of seven pilots and ten mission specialists. Although selected in 1984, no member of the group would fly until 1988 due to the Challenger disaster and the resulting grounding of the Space Shuttle fleet.

<span class="mw-page-title-main">Mir EO-19</span> Nineteenth expedition to Mir space station

Mir EO-19 was the nineteenth crewed expedition to the space station Mir, lasting from June to September 1995. The crew, consisting of Russian cosmonauts Anatoly Solovyev and Nikolai Budarin, launched on June 27, 1995 aboard the Space Shuttle Atlantis on the STS-71 mission. After remaining aboard Mir for approximately 75 days, Solovyev and Budarin returned aboard the Soyuz TM-21 spacecraft on September 11, 1995.

References

  1. 1 2 3 PD-icon.svg This article incorporates public domain material from Dumoulin, Jim. STS-71 (69). National Aeronautics and Space Administration. (June 29, 2001).
  2. STS-71 Space Shuttle Mission Report (Report). NASA. 1995. p. 3.
  3. "STS-71 Day 1 Highlights". NASA. 1995.
  4. STS-71 Space Shuttle Mission Report (Report). NASA. 1995. p. 5.
  5. Fricke, Robert W. Jr. (August 1995). "STS-71 Space Shuttle Mission Report" (PDF). NASA.
  6. 1 2 Margate Shipping Co. v. M/V JA Orgeron, US 143 F.3d 976 (5th Cir. 1998) (July 1, 1998).
  7. 1 2 3 4 "Rescues at sea, and how to make a fortune". Planet Money. NPR. January 26, 2024. Retrieved February 3, 2024.