| Parc Cynog | |
|---|---|
|   | |
|   Location of Parc Cynog within Wales | |
| Country | Wales, United Kingdom | 
| Coordinates | 51°45′29″N4°31′34″W / 51.758°N 4.526°W | 
| Status | Operational | 
| Commission date | 2001 | 
| Owner | Vattenfall | 
| Operator | Nuon Renewables | 
| Wind farm | |
| Type | Onshore | 
| Power generation | |
| Units operational | 11 | 
| Nameplate capacity | 8.4 MW | 
Parc Cynog is a wind farm operated by Nuon Renewables in Wales. [1] [2]
Parc Cynog Windfarm was built in 2001, and currently consists of eleven wind turbines.
There were originally five turbines on site which are Micon M1800-750/48 turbines built in 2001, by 2009, a further six turbines were installed by Enercon Wind Energy. The turbine type used was Enercon E48/800KW.
The windfarm is owned by Vattenfall. [3]