Peak 2 Peak Gondola

Last updated
One of the 28 cabins on the Peak 2 Peak Gondola Telepherique-Canada-Vancouver-Whistler-Blackcomb-200907.jpg
One of the 28 cabins on the Peak 2 Peak Gondola

The Peak 2 Peak Gondola is a tricable gondola lift at Whistler Blackcomb Resort in Whistler, British Columbia, linking Whistler Mountain's Roundhouse Lodge with Blackcomb Mountain's Rendezvous Lodge. It is the first lift to join the two side-by-side mountains. It held the world record for the longest free span between ropeway towers at 3.03 kilometres (1.88 miles) until 2017 when the Eibsee Cable Car exceeded it by 189 metres. [1] It is still the highest point above the ground in a gondola at 436 metres (1,430 feet), [2] although a temporary aerial tramway in Switzerland used between 1979 and 1986 had larger span. The gondola was built by the Doppelmayr Garaventa Group in 2007 and 2008 at a cost of CDN$51 million. [3] The Gondola is the first Doppelmayr "3S" tri-cable lift in North America; there are four similar but smaller lifts in Europe which were built in 1991, 1994, 2002, 2004 and 2010 in Switzerland, Austria, France and Germany. [4] Whistler Blackcomb promotes the gondola as an attraction and uses it to transport skiers in the winter months, as well as sightseers year-round.

Contents

History and planning

Whistler Mountain was opened by the Garibaldi Lift Company in 1965 and Blackcomb opened under separate ownership in 1980. [5] It was not until 1997 when Intrawest, the owner of Blackcomb Mountain, bought Whistler Mountain and brought both mountains together on a single lift ticket. Ever since, many skiers wanted a way to be able to ski both mountains in one day without having to ski down to the village and ride multiple lifts to get back to the alpine. In 1997, Whistler-Blackcomb's Director of Mountain Operations, Hugh Smythe, and Paul Mathews, president of Ecosign Mountain Resort Planners, took a trip to Zermatt, Switzerland. After seeing the number of lifts connecting resorts around the Matterhorn, they got the idea of connecting Whistler and Blackcomb Mountains with a ropeway.

A number of problems prevented a connection for years. Fitzsimmons Creek and the steep faces on either side were unsuitable as ski terrain and are protected land. A traditional chairlift or gondola would have had to go all the way down one mountain, across Fitzsimmons Creek, and up the other side, resulting in a long lift ride and environmental impacts. A gondola that could cross the valley without going to the bottom was the best option. Whistler-Blackcomb had to consider the extremely high cost of building such a lift. The resort conducted research that indicated 92% of winter visitors and 86% of summer visitors would use the gondola at least once. [6] HSBC Bank Canada and Scotia Capital agreed to provide Intrawest with financing for the project, allowing it to move forward.

Intrawest announced the gondola project to employees and the Resort Municipality of Whistler's Council on September 19, 2005, and held a community open house shortly thereafter. At the time, construction was expected to start in the summer of 2006 and continue for 2 years for an opening for the 2007-2008 ski season. On March 30, 2006, it was announced that construction would be delayed by one year. Whistler Blackcomb announced on April 17, 2007, that groundbreaking would occur in May 2007.

Construction

The Peak 2 Peak Gondola's Blackcomb Terminal under construction in July 2008. Peak 2 Peak Construction Blackcomb Terminal.JPG
The Peak 2 Peak Gondola's Blackcomb Terminal under construction in July 2008.
The Peak 2 Peak Gondola's Whistler Terminal under construction in July 2008. Peak 2 Peak Gondola Construction Whistler Terminal.JPG
The Peak 2 Peak Gondola's Whistler Terminal under construction in July 2008.

Whistler Blackcomb broke ground for the Peak 2 Peak Gondola in a ceremony on May 21, 2007. [7] The Doppelmayr Garaventa Group would supply the gondola itself, with Timberline Construction as the general contractor and Glotman Simpson as the Consulting Engineers. [8] Fatzer AG of Switzerland would supply the four track cables and one haul rope that would carry the gondolas across the valley while CWA, also of Switzerland, would build the 28 gondola cabins. [9] [10]

80 workers from Whistler Blackcomb, Doppelmayr Garaventa, Timberline Construction and North Construction worked throughout the summer of 2007. Work completed on the Blackcomb side by that summer included the relocation of the top terminals of the Solar Coaster Express and Catskinner chairlifts on Blackcomb, excavation of both terminal locations, foundations for both terminals, foundations for all four intermediate towers, and steel erection of towers 2 and 3. Construction stopped for the winter in November 2007.

During the winter, the remaining two gondola towers and each terminal's machinery were built at the Garaventa factory in Goldau, Switzerland and the Doppelmayr factories in Wolfurt, Austria and Saint-Jérôme, Quebec. Fatzer AG manufactured the four track cables and haul rope that would suspend the gondola cabins. [9] The five spools of cable left Europe by ship on April 10, 2008. By the time construction started again in the spring of 2008, ten feet of snow still covered the mountains and concrete had to be transported up the mountain by helicopter. [11] Towers 4 and 1 were completed in early spring using mobile cranes.

The five cables arrived in the Port of Vancouver, Washington, USA on June 9 and were shipped to Whistler via train, arriving on June 16. [12] Vancouver, Washington was used because it owns the largest mobile harbour crane on the West Coast of North America. [13] To handle the 90-tonne reels, a German-made Goldhofer heavy-haulage trailer and tractor made its way from Montreal, QC to Whistler to take care of the transport from the train yard up the mountain. The Goldhofer trailer has four sections with six axles, and each axle having eight wheels. The trailer also features a hydraulic sliding system, which enabled the reels to be unloaded from the railcars in Whistler without a crane. Since there is no crane to lift each reel onto the truck, this trailer features sliding steel plates that essentially scoop the load from the train and set it onto the trailer deck. The five cables were trucked up Blackcomb Mountain for pulling across the valley starting June 19. Their entire 18,000-mile (29,000 km) journey from Switzerland to the top of Blackcomb Mountain was coordinated by OmniTrans Corporation. [9]

Each track cable was winched down Blackcomb Mountain to the valley floor, then up Whistler Mountain. While the cables were pulled for twelve straight weeks, terminal construction continued with the gondola machinery being mounted on concrete foundations. The drive terminal on Whistler Mountain had the gondola's motors installed in an underground vault. After the gondola machinery was installed, steel enclosures were constructed and covered with a blue, translucent material.

On August 29 and 30, the two ends of the haul rope were spliced together in a 220-foot (67 m) braid to form a continuous loop that could pull the cabins. The splice was performed by Norm Duke of Wyoming, who is one of only a few splicers in North America. The splicing process took 14 workers from Whistler-Blackcomb and Doppelmayr Garaventa over 15 hours to complete. [14] The 28 sky cabins arrived in Whistler starting on August 26. [15] The first twelve cabins crossed the span on September 19, 2008 with a single Doppelmayr engineer, Mathias Zudrell, aboard. [16] The remaining cabins were put on line and the system underwent extensive testing until its Grand Opening on December 12, 2008.

Criticism

Inside the Peak 2 Peak Gondola's Blackcomb Terminal Peak 2 Peak Terminal.JPG
Inside the Peak 2 Peak Gondola's Blackcomb Terminal

The impact of such an expensive project on lift ticket prices was always a concern[ who? ], especially because the gondola would not open any new ski terrain. When the project was announced in 2005, residents were promised that Peak 2 Peak access would be an optional add-on to a lift ticket or season pass. In a 2005 open house, the resort estimated the additional cost on a season pass would be CDN $59. At the time, Whistler-Blackcomb was attempting to secure a tax exemption from the Resort Municipality of Whistler for the increased assessments caused by the new terminal buildings. [17] When season pass prices were announced for the Peak 2 Peak's inaugural season in August 2008, only early bird passes were allowed to decline the Peak 2 Peak option. Whistler Blackcomb said it was "not specific" about the Spirit Pass when it had said the Peak 2 Peak access would be optional. [18]

In May 2007, Whistler Blackcomb announced the naming rights to the gondola were for sale for an undisclosed price, [19] however the gondola has retained the Peak 2 Peak name.

Features

Statistics

Cables

The cables were manufactured by Fatzer AG, a Swiss company that develops, manufactures and markets wire ropes worldwide. [9] The Peak 2 Peak cables include four stationary track ropes, two in each direction, which act like railroad tracks for the cabins. Each track rope weighs approximately 90 metric tonnes. There is a single haul rope which moves in a continuous loop and pulls the cabins. This cable weighs more than 80 metric tonnes. There are a total of 26.5 kilometres (87,000 ft) of cable on the Peak 2 Peak Gondola. [12]

Terminals

The Peak 2 Peak Gondola terminal buildings are the two largest lift terminals in the world. [21] To create the concrete footings, platforms, masts, and columns, 4,000 cubic metres (5,200 cu yd) of concrete had to be trucked and helicoptered up the mountains. The 12,000-square-foot (1,100 m2) Whistler terminal, which houses the drive motors and backup engines in an underground vault is 26 metres (85 feet) wide and 42 metres (138 feet) long and has 228 tonnes of steel. The 14,000-square-foot (1,300 m2) Blackcomb Terminal is 26 metres (85 feet) wide and 48 metres (158 feet) long and contains 279 tonnes of steel. [20] The Blackcomb terminal can house 15 cabins, the Whistler terminal 13 cabins in a cabin parking area when the system is not in use.

Towers

The second tower on the Blackcomb end of the gondola Peak 2 Peak Tower.JPG
The second tower on the Blackcomb end of the gondola

There are four intermediate towers, two on Whistler Mountain and two on Blackcomb Mountain that support the cables, which range in height from 30 to 65 metres (100 to 210 feet). [20] Combined, they contain 400 metric tonnes of steel.

Cabins

One of the 28 carriers on the Peak 2 Peak Gondola Peak 2 Peak Carrier.JPG
One of the 28 carriers on the Peak 2 Peak Gondola

The 28 CWA-manufactured gondola cabins hold 28 people each, with 22 seated and 6 standing. [2] Twenty-six of the cabins are painted red and white, while the remaining two are painted blue, and have glass floors.

Safety systems

The Peak 2 Peak Gondola has a number of unique safety systems beyond what a normal ski lift features. The gondola has high wind stability and is designed to operate in winds up to 80 km/h. Whistler-Blackcomb has called the Peak 2 Peak Gondola the most wind tolerant lift on Whistler Blackcomb. Testing at other Doppelmayr 3S installations have measured sustained winds at 120 km/h (75 mph) with no decrease in performance.

The lift is powered by an electric motor on Whistler Mountain; however an auxiliary diesel engine can take over in the case of primary engine failure or if there is a power outage. The lift also has a redundant braking system. Both bullwheels have emergency brakes to stop the gondola if there is a primary braking system failure.

In the event of a catastrophic failure, an evacuation can be performed. For cabins that are near the terminals, passengers are lowered down by rope from the cabins. For cabins that are too high off the ground for a rope evacuation, cabins are winched along the track cables to towers 2 and 3 where passengers are then lowered to the ground by rope by Ski Patrol members.

In addition, the gondola is equipped with a state of the art Obstacle Collision Avoidance System that uses radar to alert aircraft of the gondola as an obstacle. Strobe lights and loud noises over all radio frequencies are used to alert pilots who come too close to the gondola. [22]

In the media

The grand opening ceremony on December 12, 2008 featured Steve Podborski as emcee and Red Bull Air Force members BASE jumping from the middle of the gondola.

The Peak 2 Peak Gondola was the subject of a 2009 Discovery Channel documentary. Crews began filming the project during groundbreaking in May 2007. The documentary aired at 9 pm on December 23 and at 2 am on December 24, 2009, on Discovery Channel Canada. It was titled "Peak 2 Peak: Building the Worlds Biggest Gondola". The gondola was also featured in the History Channel's show Modern Marvels in the episode "Winter Tech", which showed the technology behind the Vancouver 2010 Winter Olympic Games.

On February 6, 2014, Graham Dickinson [23] carried out an illegal BASE jump from the highest point of the Peak 2 Peak Gondola and landed safely in the valley below. [24] In order to exit the gondola, Dickinson and a female accomplice (Kathleen Adams) had to pry open the doors causing an estimated $10,000 worth of damage. [25] They posted a video of the jump on YouTube as a tribute to Shane McConkey. [24] On February 13, 2014, the RCMP announced that they had arrested the woman and recommended charges of obstruction and mischief over $5,000. [25] One day later, BASE jumper Mike Douglas condemned the stunt saying "This guy seems to have gone about it in all the wrong ways. He caused a lot of damage in the process which I think is not cool." [26]

See also

Related Research Articles

<span class="mw-page-title-main">Aerial tramway</span> Aerial lift in which the cars are permanently fixed to the cables

An aerial tramway, aerial tram, sky tram, aerial cablecar, aerial cableway, telepherique, or seilbahn is a type of aerial lift which uses one or two stationary ropes for support while a third moving rope provides propulsion. With this form of lift, the grip of an aerial tramway cabin is fixed onto the propulsion rope and cannot be decoupled from it during operations. In comparison to gondola lifts, aerial tramways generally provide lower line capacities and higher wait times.

Whistler Blackcomb is a ski resort located in Whistler, British Columbia, Canada. By many measures, it is the largest ski resort in North America and has the greatest uphill lift capacity. It features the Peak 2 Peak Gondola for moving between Whistler and Blackcomb mountains at the top. With its capacity, Whistler Blackcomb is a busy ski resort, often surpassing two million visitors a year.

<span class="mw-page-title-main">Heavenly Mountain Resort</span> Ski resort in California, United States

Heavenly Mountain Resort is a ski resort located on the California–Nevada border in southeastern Lake Tahoe in the Sierra Nevada Mountain Range. It opened for business on December 15, 1955 and has 97 runs and 30 lifts that are spread between California and Nevada and four base facilities. The resort has 4,800 acres (1,900 ha) within its permit area, with approximately 33% currently developed for skiing, boasting the highest elevation of the Lake Tahoe area resorts with a peak elevation of 10,067 ft (3,068 m), and a peak lift-service elevation of 10,040 ft (3,060 m).

<span class="mw-page-title-main">Gondola lift</span> Aerial transport by cable

A gondola lift is a means of cable transport and type of aerial lift which is supported and propelled by cables from above. It consists of a loop of steel wire rope that is strung between two stations, sometimes over intermediate supporting towers. The cable is driven by a bullwheel in a terminal, which is typically connected to an engine or electric motor. It is often considered a continuous system since it features a haul rope which continuously moves and circulates around two terminal stations. In contrast, an aerial tramway operates solely with fixed grips and simply shuttles back and forth between two end terminals.

<span class="mw-page-title-main">Detachable chairlift</span> Type of high-speed chairlift

A detachable chairlift or high-speed chairlift is a type of passenger aerial lift, which, like a fixed-grip chairlift, consists of numerous chairs attached to a constantly moving wire rope that is strung between two terminals over intermediate towers. They are now commonplace at all but the smallest of ski resorts. Some are installed at tourist attractions as well as for urban transportation.

<span class="mw-page-title-main">Doppelmayr/Garaventa Group</span> Austrian manufacturing company

Doppelmayr/Garaventa Group is an international manufacturer of ropeways and people movers for ski areas, urban transport, amusement parks, and material handling systems. As of 2023, the group had produced over 15,400 installations in 96 countries. Their annual revenue in 2022/2023 was 946 million euros. The Doppelmayr/Garaventa Group was formed in 2002 when Doppelmayr of Wolfurt, Austria merged with Garaventa AG of Switzerland to form the world's largest ropeway manufacturer.

<span class="mw-page-title-main">Aerial lift</span> Method of cable transport

An aerial lift, also known as a cable car or ropeway, is a means of cable transport in which cabins, cars, gondolas, or open chairs are hauled above the ground by means of one or more cables. Aerial lift systems are frequently employed in a mountainous territory where roads are relatively difficult to build and use, and have seen extensive use in mining. Aerial lift systems are relatively easy to move and have been used to cross rivers and ravines. In more recent times, the cost-effectiveness and flexibility of aerial lifts have seen an increase of gondola lift being integrated into urban public transport systems.

<span class="mw-page-title-main">Doppelmayr USA</span> Aerial lift manufacturer in Salt Lake City

Doppelmayr USA, Inc is an aerial lift manufacturer based in Salt Lake City, Utah, and a subsidiary of the worldwide Doppelmayr Garaventa Group. The United States company was formed in 2002 after the merger of Garaventa of Goldau, Switzerland, and Doppelmayr of Wolfurt, Austria. Between 2002 and 2010, the company was named Doppelmayr CTEC. From 2011 the company has operated using the Doppelmayr brand name, in common with most other Doppelmayr Garaventa Group subsidiaries.

<span class="mw-page-title-main">Deer Valley</span> Ski resort in Park City, Utah, United States

Deer Valley is an alpine ski resort in the Wasatch Range, located 36 miles (58 km) east of Salt Lake City, in Park City, Utah, United States. The resort, known for its upscale amenities, is consistently ranked among the top ski resorts in North America.

<span class="mw-page-title-main">Klein Matterhorn</span> Peak of the Pennine Alps

The Klein Matterhorn is a peak of the Pennine Alps, overlooking Zermatt in the Swiss canton of Valais. At 3,883 metres (12,740 ft) above sea level, it is the highest place in Europe that can be reached by aerial tramway or gondola lift, as well as by any other means of transport. The Klein Matterhorn is part of the Breithorn massif and overlooks on its south side the almost equally high flat glacier named Breithorn Plateau, just north of the international border with Italy. The name "Klein Matterhorn" is a reference to its much larger neighbour, the Matterhorn, which lies 7 km (4.3 mi) away across the Theodul Pass.

<span class="mw-page-title-main">Banff Sunshine</span> Ski resort in Alberta, Canada

Banff Sunshine Village is a ski resort in western Canada, located on the Continental Divide of the Canadian Rockies within Banff National Park in Alberta and Mount Assiniboine Provincial Park in British Columbia. It is one of three major ski resorts located in the Banff National Park. Because of its location straddling the Continental Divide, Sunshine receives more snow than the neighbouring ski resorts. The Sunshine base area is located 15 km (9 mi) southwest of the town of Banff. By car, it is about a ninety-minute drive from the city of Calgary; the Sunshine exit on the Trans Canada Highway is 8 km (5 mi) west of the town of Banff.

<span class="mw-page-title-main">Copper Mountain (Colorado)</span> Mountain and ski resort in Colorado, USA

Copper Mountain is a mountain and ski resort located in Summit County, Colorado, about 75 miles (120 km) west of Denver on Interstate 70. The resort has 2,465 acres of in-bounds terrain under lease from the U.S. Forest Service, White River National Forest, Dillon Ranger District. It is operated by POWDR.

Poma, incorporated as Pomagalski S.A., and sometimes referred to as the Poma Group, is a French company which manufactures cable-driven lift systems, including fixed and detachable chairlifts, gondola lifts, funiculars, aerial tramways, people movers, and surface lifts. Poma has installed about 7800 devices for 750 customers worldwide.

<span class="mw-page-title-main">Tricable gondola lift</span> Cable car system introduced in 1991

The tricable gondola lift, also known as the 3S gondola lift, is a cable car system that was developed by the Swiss company Von Roll transport systems in Thun to unite the benefits of a gondola lift with those of a reversible cable car system. '3S' is an abbreviation of the German word dreiseil, meaning 'tricable'.

<span class="mw-page-title-main">Vail Ski Resort</span> Ski resort in Colorado, USA

Vail Ski Resort is a ski resort in the western United States, located near the town of Vail in Eagle County, Colorado. At 5,289 acres, it is the third-largest single-mountain ski resort in the U.S., behind Big Sky and Park City, featuring seven bowls and intermediate gladed terrain in Blue Sky Basin.

<span class="mw-page-title-main">Snow King Mountain</span> Resort in Wyoming

Snow King Mountain is a summer and winter resort in the western United States, in Jackson, Wyoming. The mountain is Jackson's original 1936 ski hill, located on the southeast edge of the city, and was the first ski area in Wyoming. Locals sometimes refer to Snow King as "The Town Hill," and it offers skiing, hiking, an alpine slide, and many other attractions. The ski season runs from December to late March, and has a summer season that runs from June to October. Skiing is offered after the closure of lifts, until the snow is gone thanks to a boot pack trail on the west side of the resorts Runs. Hiking trails are offered all over the mountain.

<span class="mw-page-title-main">Hybrid lift</span> Type of ski lift

A hybrid lift is a type of ski lift that combines the elements of a chairlift and a gondola lift. First introduced by Poma, who refers to them as Telemix, they have since been built by most lift manufacturers who refer to them by a variety of names; Doppelmayr refers to them as a combined lift, Bartholet refers to them with the French name, téléporté mixte, while the more generic terms chondola and telecombi are common in North America.

<span class="mw-page-title-main">Nippon Cable</span> Comercial company

Nippon Cable Co., Ltd. is a Japanese corporation headquartered in Chiyoda, Tokyo, and is engaged in the design, production and installation of jig-back and material ropeways, gondola lifts, funiculars, chairlifts, car parking systems, ramp elevators and amusement park rides. The company also owns and operates resorts in Japan and Canada, including a 25% interest in Whistler Blackcomb, the largest ski resort in North America and host of alpine and nordic skiing events during the 2010 Winter Olympics, and Sun Peaks Resort.

References

  1. "Zugspitze-Eibsee Cable Car — One Ropeway, Three World Records". Gondola Project. Retrieved 22 December 2017.
  2. 1 2 "Technical Details". Whistler Blackcomb. Archived from the original on 2014-04-27. Retrieved 2014-02-17.
  3. "Getting high and staying high, Whistler's Peak 2 Peak gondola". Blackcomb Peaks. 2013-01-19. Retrieved 2014-02-17.
  4. "Lift Database". Lift World. Retrieved 2014-02-17.
  5. "History, from fishing to freeskiing". Whistler Blackcomb. Archived from the original on 2014-02-21. Retrieved 2014-02-17.
  6. "All about the Whistler Peak 2 Peak 3S gondola". Skiing BC. 2005-10-18. Retrieved 2014-02-17.
  7. "Peak 2 Peak Gondola Opens at Whistler". Great Outdoors. 2007-12-14. Retrieved 2014-02-17.
  8. "WHISTLER Peak 2 Peak Gondola Terminal Buildings - Glotman Simpson". glotmansimpson.com. 15 March 2016. Retrieved 23 February 2024.
  9. 1 2 3 4 Griff, Martin (2008-06-19). "18 miles of cable arrive for Whistler Blackcomb's Peak 2 Peak gondola". The Times. Retrieved 2014-02-17.
  10. "Question of the week". Whistler Blackcomb. Archived from the original on 2014-02-21. Retrieved 2014-02-17.
  11. "Peak 2 Peak Gondola - Tower Construction". Whistler Blackcomb. 2013-06-04. Archived from the original on 2021-12-21. Retrieved 2014-02-17.
  12. 1 2 "Peak 2 Peak Gondola - Cable Installation". Whistler Blackcomb. 2013-06-04. Archived from the original on 2021-12-21. Retrieved 2014-02-17.
  13. "Whistler Blackcomb - PEAK 2 PEAK Gondola - PEAK2PEAK Gondola - Construction Blog » Blog Archive » PEAK 2 PEAK GONDOLA CABLE REELS TOUCH NORTH AMERICAN SOIL". 2009-08-24. Archived from the original on 2009-08-24. Retrieved 2020-01-03.
  14. "Swiss ropes shipped across the Atlantic" (PDF). Fatzer AG. Retrieved 2014-02-17.[ permanent dead link ]
  15. "Peak 2 Peak Gondola - Construction Blog". Whistler Blackcomb. 2008-08-27. Archived from the original on 2008-08-31. Retrieved 2014-02-17.
  16. Lomax, Becky (2008-10-14). "When Can Public Ride Whistler Blackcomb's New Gondola?". On The Snow. Retrieved 2014-02-17.
  17. Jackson, Kristin (2007-04-20). "Coming to Whistler: gondola on an epic scale". The Seattle Times. Retrieved 2014-02-17.
  18. Mitchell, Andrew (2008-08-29). "Pass prices up, but Peak 2 Peak included". Pique. Retrieved 2014-02-17.
  19. Constantineau, Bruce (2007-05-10). "Whistler to sell naming rights to new gondola". The Vancouver Sun. Archived from the original on 2014-02-21. Retrieved 2014-02-17.
  20. 1 2 3 Nowlin, Mark (2007-04-19). "The Peak to Peak Gondola" (PDF). The Seattle Times. Retrieved 2014-02-17.
  21. "Peak 2 Peak Gondola - Facts and Figures". Whistler Blackcomb. 2013-06-04. Archived from the original on 2021-12-21. Retrieved 2014-02-17.
  22. "Peak 2 Peak FAQ" (PDF). Whistler Blackcomb. Retrieved 2014-02-17.
  23. "Kathleen Adams, accused in Whistler Peak 2 Peak BASE jump, apologizes".
  24. 1 2 Sheppard, Jenni (2014-02-12). "Illegal BASE jump from Whistler Peak 2 Peak Gondola probed". CBC News. Retrieved 2014-02-18.
  25. 1 2 Sheppard, Jenni (2014-02-13). "Whistler Peak 2 Peak BASE jump leads to woman's arrest". CBC News. Retrieved 2014-02-18.
  26. Sheppard, Jenni (2014-02-14). "BASE jumpers condemn illegal Whistler Peak 2 Peak stunt". CBC News. Retrieved 2014-02-18.

50°04′10″N122°56′45″W / 50.06944°N 122.94583°W / 50.06944; -122.94583