Phase 3 metro station

Last updated

RMRG logo.svg
DLF Phase 3
General information
Coordinates 28°29′37″N77°05′37″E / 28.493512°N 77.093676°E / 28.493512; 77.093676
Owned byHaryana Mass Rapid Transport Corporation Limited (HMRTC) [1]
Operated by Delhi Metro Rail Corporation (DMRC)
Platforms
Platform-1 → Sector 55–56
Tracks2
Construction
Structure typeElevated
Platform levels2
AccessibleYes Wheelchair symbol.svg
Other information
Station codeDL3
History
Opened14 November 2013;12 years ago (2013-11-14)
Electrified750 V, DC via third rail
Services
Preceding station RMRG logo.svg Rapid Metro Gurgaon Following station
Moulsari Avenue
One-way operation
Line 1 Terminus
Phase 2
Location
Location map India Delhi EN.svg
Red pog.svg
Phase 3
Location within Delhi
India Haryana location map.svg
Red pog.svg
Phase 3
Phase 3 (Haryana)
Underconstruction phase 3 metro station. RapidMetroGurgaon(3).jpg
Underconstruction phase 3 metro station.

DLF Phase 3 is a station of the Rapid Metro Gurgaon opened in November 2013. It is owned by Haryana Mass Rapid Transport Corporation Limited (HMRTC) and operated by Delhi Metro Rail Corporation (DMRC). [2] Earlier it was operated by Rapid Metro Gurgaon Limited (RMGL).

References

  1. "Rapid Metro Gurugram".
  2. "Welcome to Delhi Metro Rail Corporation(DMRC) | Official Website". www.delhimetrorail.com. Retrieved 25 April 2022.