Philadelphia, Wilmington and Baltimore Railroad Bridge No. 1

Last updated
Philadelphia, Wilmington and Baltimore Railroad Bridge No. 1
Grays Ferry Crescent.jpg
2011 photo
Coordinates 39°56′26″N75°12′18″W / 39.9406°N 75.2050°W / 39.9406; -75.2050
Crosses Schuylkill River
Locale Philadelphia, Pennsylvania
Other name(s)Grays Ferry Railroad Bridge, PRR South Philadelphia Branch Bridge
OwnerPhiladelphia, Wilmington and Baltimore Railroad; Philadelphia, Baltimore and Washington Railroad; Penn Central; Conrail; City of Philadelphia
Characteristics
Design Through truss swing bridge
MaterialSteel
Total length387.5 feet (118.1 m)
Longest span226.6 feet (69.1 m)
No. of spans3
History
Constructed by American Bridge Company
Construction start1901
Opened1902
Closed1976
Replaces Newkirk Viaduct
Location
Philadelphia, Wilmington and Baltimore Railroad Bridge No. 1

Philadelphia, Wilmington and Baltimore Railroad Bridge No. 1 was a swing steel through truss that spanned the Schuylkill River between Philadelphia, Pennsylvania's Kingsessing and Grays Ferry neighborhoods.

Contents

Part of a long succession of ferry and bridge crossings at this location, the bridge was built in 1901 for the Philadelphia, Wilmington and Baltimore Railroad by American Bridge Company. [1] Over the decades, ownership of the bridge passed to PW&B successor railroads: the Philadelphia, Baltimore & Washington Railroad, then to Penn Central, then to Conrail, which formally placed it out of operation in 1976.

In 2017, Conrail conveyed the bridge to the City of Philadelphia, part of a plan to extend the multiuse Schuylkill River Trail. [2] [3] The bridge's truss and superstructure were demolished in August 2018, with the pilings spared to serve as a foundation for a planned bike-pedestrian bridge. [4]

Background (to 1901)

The bridge's location has been a major crossing point since the establishment of a ferry here as early as 1673 and certainly by 1696. [5] In 1777, British troops built a pontoon bridge here during their occupation of Philadelphia, and the newly independent Americans subsequently kept it up, replacing parts as necessary after floods. In 1838, the PW&B built the first permanent bridge here to complete the first direct rail link from Philadelphia to Wilmington, Delaware, and Baltimore, Maryland. Called the Newkirk Viaduct, it was a covered wooden bridge that carried a road as well as one track. The bridge did not initially allow locomotives to pass so the cars were (at least until 1844) pulled by horses over the river and northward along three miles of track to the terminus of the PW&B. A new draw span was constructed in 1891, but maintenance remained difficult for the rest of the decade. [1]

In 1901, when the city of Philadelphia opened an adjacent highway bridge, it absolved the PW&B of the responsibility of carrying the road traffic, and the railroad promptly began building the PW&B Bridge No. 1.

Design and construction (1901–1902)

The bridge had a 226-foot-7-inch (69.1 m) swing span pivoting on a cylindrical stone pier at mid-stream. A wooden pile fender protects the pivot pier and the opened swing span from collisions with boat traffic on the river. The American Bridge Company built the swing span on the fender in its open position, avoiding interference with river traffic. [1] The swing span sat between two 97-foot-9+38-inch (29.8 m) approach spans. [6] "The mechanism, located on the swing span and driven by steam, is typical of movable bridge construction at the turn of the twentieth century," wrote historian Justin Spivey. [1]

It was completed and opened in 1902.

Operation and abandonment (1902–1976)

Maximum speed over the bridge was 15 miles per hour (24 km/h). [7]

In 1976, Conrail abandoned the bridge shortly after it acquired the Pennsylvania Railroad properties, and left it permanently open.

Post-abandonment (1977–present)

An unknown party purchased the bridge in 1987. [1]

In 2012, Philadelphia Mayor Michael Nutter proposed to return the bridge to service as a part of the Schuylkill River Trail, a bike trail. [8] Under the proposal, the bridge would be raised some 33 feet (10 m) so that boats in particular, a towboat used to bring oil barges to the Trigen power plant upstream could pass without swinging it open. [6]

In May 2016, councilmember Kenyatta Johnson introduced a bill in Philadelphia City Council to allow the city to acquire the bridge and some surrounding land from Conrail. [2]

In November 2017, Conrail transferred ownership of the bridge to the City of Philadelphia, which planned a $13 million project to replace the truss with a bike-trail structure. [9] To be named "Conrail Crossing", the new bridge would be erected under the direction of architecture and engineering firm Amman & Whitney. As originally proposed in 2012, the approaches would be raised so that the trail bridge would leave clearance for river traffic. The new bridge was to be completed in 2018. [10]

On August 23, 2018, the bridge's truss and superstructure were demolished, leaving the pilings as a foundation for the planned bike-pedestrian bridge. [11] The anticipated completion of the bridge shifted to 2019. [12] More delays followed. Keisha McCarty-Skelton, a spokesperson for the city government's Department of Streets, told the Philadelphia Inquirer that the delays were caused by “typical construction issues,” truss design and fabrication issues, and pandemic-related supply chain delays that “affected procurement of project materials such as truss steel and movable bridge steel machinery.” In 2020, a barge collided with the bridge, causing a legal fight over liability. Later, several parts fabricated for the bridge in Coatesville, Pennsylvania, were damaged by wind in a storm. [12]

As of June 2023, completion was expected in summer 2024. [12]

See also

Related Research Articles

<span class="mw-page-title-main">Swing bridge</span> Bridge which pivots around the mid-point

A swing bridge is a movable bridge that has as its primary structural support a vertical locating pin and support ring, usually at or near to its center of gravity, about which the swing span can then pivot horizontally as shown in the animated illustration to the right. Small swing bridges as found over canals may be pivoted only at one end, opening as would a gate, but require substantial underground structure to support the pivot.

The Junction Railroad was a railroad created in 1860 to connect lines west of downtown Philadelphia, Pennsylvania, and allow north-south traffic through the metropolitan area for the first time. The railroad consisted of 3.56 miles of double track and 5.3 miles of sidings. It owned no locomotives or rolling stock. The line connected the Philadelphia and Reading Rail Road line at the west end of the Columbia Bridge over the Schuylkill River, crossed the Pennsylvania Railroad line, ran parallel to Market Street, and turned south to connect with the Philadelphia, Wilmington and Baltimore Railroad at Gray's Ferry.

<span class="mw-page-title-main">Philadelphia, Wilmington and Baltimore Railroad</span> Railway company, later part of the Pennsylvania Railroad

The Philadelphia, Wilmington and Baltimore Railroad (PW&B) was an American railroad that operated independently from 1836 to 1881. Headquartered in Philadelphia, it was greatly enlarged in 1838 by the merger of four state-chartered railroads in three Mid-Atlantic states to create a single line between Philadelphia and Baltimore.

The Baltimore and Philadelphia Railroad was a railroad line built by the Baltimore and Ohio Railroad (B&O) from Philadelphia, Pennsylvania, to the Maryland-Delaware state line, where it connected with the B&O's Philadelphia Branch to reach Baltimore, Maryland. It was built in the 1880s after the B&O lost access to its previous route to Philadelphia, the Philadelphia, Wilmington and Baltimore Railroad (PW&B). The cost of building the new route, especially the Howard Street Tunnel on the connecting Baltimore Belt Line, led to the B&O's first bankruptcy. Today, the line is used by CSX Transportation for freight trains.

<span class="mw-page-title-main">Delair Bridge</span> Bridge in and Pennsauken Township, NJ

The Delair Bridge is a railroad bridge with a vertical-lift section that crosses the Delaware River between Philadelphia, Pennsylvania, and Pennsauken Township, New Jersey, just south of the Betsy Ross Bridge. The two-track bridge is part of Conrail Shared Assets Operations and is jointly used by Norfolk Southern Railway and CSX Transportation freight trains, as well as by the New Jersey Transit Atlantic City Line service.

<span class="mw-page-title-main">Amtrak Susquehanna River Bridge</span> Bridge in Havre de Grace and Perryville, Maryland

The Amtrak Susquehanna River Bridge is a Howe deck truss structure, opened in 1906, that carries two tracks of Amtrak's Northeast Corridor line across the Susquehanna River between Havre de Grace and Perryville, Maryland.

<span class="mw-page-title-main">CSX Susquehanna River Bridge</span> Bridge in Maryland and Perryville, Maryland

The CSX Susquehanna River Bridge is a railroad bridge that carries CSX's Philadelphia Subdivision across the Susquehanna River between Havre de Grace and Perryville, Maryland, via Garrett Island. It was built in 1907-10 by the Baltimore and Ohio Railroad (B&O) on the same alignment as an 1886 B&O bridge. Like its predecessor, it was the longest continuous bridge on the B&O system.

<span class="mw-page-title-main">Fourteenth Street Bridge (Ohio River)</span> Railroad bridge over the Ohio River between Louisville, Kentucky, and Clarksville, Indiana

The Fourteenth Street Bridge, also known as the Ohio Falls Bridge, Pennsylvania Railroad Bridge, Conrail Railroad Bridge or Louisville and Indiana (L&I) Bridge, is a truss drawbridge that spans the Ohio River, between Louisville, Kentucky and Clarksville, Indiana.

<span class="mw-page-title-main">Schuylkill River Trail</span> Multi-use trail in Pennsylvania, United States

The Schuylkill River Trail is a multi-use trail along the banks of the Schuylkill River in southeastern Pennsylvania. Partially complete as of 2018, the trail is ultimately planned to run about 140 miles (230 km) from the river's headwaters in Schuylkill County to Fort Mifflin in Philadelphia.

<span class="mw-page-title-main">Harrisburg Subdivision</span> Rail line in Pennsylvania, US

The Harrisburg Subdivision is a railroad line owned by CSX Transportation in Pennsylvania. The line is located in Philadelphia, and connects Greenwich Yard and the Philadelphia Subdivision with the Trenton Subdivision along a former Pennsylvania Railroad line. Much of the Harrisburg Subdivision is the High Line' or West Philadelphia Elevated along 31st Street over the 30th Street Station area.

The Delaware Extension was a rail line owned and operated by the Pennsylvania Railroad in Philadelphia, Pennsylvania.

<span class="mw-page-title-main">P.W. & B. Railroad Bridge</span> Bridge in United States of America

The P.W. & B. Railroad Bridge was the first bridge over the Susquehanna River, built by the Philadelphia, Wilmington and Baltimore Railroad in 1866, as part of the first mainline railroad between Philadelphia and Baltimore. The bridge was replaced by the Susquehanna River Movable Bridge in 1906.

<span class="mw-page-title-main">Wilmington Rail Viaduct</span> United States historic place

The Wilmington Rail Viaduct is a series of fills and bridges, about 4 miles (6.4 km) long, that carries the Northeast Corridor through the city of Wilmington, Delaware, above street level. Constructed between 1902 and 1908, the structure consists principally of fills supported by heavy stone retaining walls, punctuated with plate girder bridges over streets, and augmented by a few sections of brick arch viaduct. Its construction is typical of the Pennsylvania Railroad's architectural practices at the time, and the viaduct has been documented by the Historic American Engineering Record and listed on the National Register of Historic Places. Built by the Pennsylvania Railroad (PRR) as part of a series of grade crossing eliminations along the Northeast Corridor, the elevation of the rail line necessitated several other changes to rail infrastructure in Wilmington, including the construction of the Wilmington Shops at the east end of the viaduct, and the construction of the Wilmington Station and adjacent Pennsylvania Railroad Office Building along the elevated right-of-way.

<span class="mw-page-title-main">Gray's Ferry Bridge</span> Vehicle and railroad bridges in Philadelphia, Pennsylvania

Gray's Ferry Bridge has been the formal or informal name of several floating bridges and four permanent ones that have carried highway and rail traffic over the Schuylkill River in Philadelphia. The bridge today is a four-lane divided highway bridge, built in 1976, that carries Grays Ferry Avenue from the Grays Ferry neighborhood on the east bank, over the river and the Northeast Corridor railroad tracks, to the Southwest Philadelphia neighborhood of Kingsessing.

<span class="mw-page-title-main">Newkirk Viaduct Monument</span> Sculpture by Thomas Ustick Walter

The Newkirk Viaduct Monument is a 15-foot (4.6 m) white marble obelisk in the West Philadelphia neighborhood of Philadelphia, Pennsylvania. It was installed in 1839 to mark the completion of the Newkirk Viaduct, the first permanent railroad bridge over the Schuylkill River. It is inscribed with the names of 51 railroad builders and executives, among other information.

<span class="mw-page-title-main">Spring Garden Street Bridge</span> Bridge in Pennsylvania, United States

Spring Garden Street Bridge is a highway bridge in Philadelphia, Pennsylvania. It crosses the Schuylkill River below Fairmount Dam and connects West Philadelphia to the Philadelphia Museum of Art and Benjamin Franklin Parkway. It is the fourth bridge at this location.

<span class="mw-page-title-main">B&O Railroad Bridge</span> Bridge in Grays Ferry neighborhood in Philadelphia, Pennsylvania

The B&O Railroad Bridge is a 1910 swing bridge across the Schuylkill River from Bartram's Garden on the west bank to the east bank Grays Ferry neighborhood of Philadelphia, Pennsylvania. It carries CSX Philadelphia Subdivision rail lines over the river, and sits upstream from the Passyunk Avenue Bridge and downstream from the Grays Ferry Bridge.

<span class="mw-page-title-main">Schuylkill Arsenal Railroad Bridge</span> Bridge in in Philadelphia, Pennsylvania

Schuylkill Arsenal Railroad Bridge is a wrought iron, two-track, deck truss swing bridge across the Schuylkill River between the University City and Grays Ferry neighborhoods of Philadelphia, Pennsylvania. It was built in 1885–86 by the Pennsylvania Railroad. Today, its swing span has been fixed shut, and the electrical catenary de-energized.

<span class="mw-page-title-main">Fall River, Warren and Providence Railroad</span> Defunct railroad branch in Massachusetts and Rhode Island

The Fall River, Warren and Providence Railroad was a branch of the Providence, Warren and Bristol Railroad that ran through the states of Rhode Island and Southeastern Massachusetts. The 8-mile (12.9 km) railroad branch formerly connected the city of Fall River, Massachusetts and Providence, Rhode Island via Warren, Rhode Island.

References

  1. 1 2 3 4 5 Spivey, Justin M. (April 2000). "Philadelphia, Wilmington & Baltimore Railroad, Bridge No. 1" (PDF). Historic American Engineering Record. Washington, D.C.: Library of Congress. Archived (PDF) from the original on 2017-02-15. Retrieved 2017-12-15.
  2. 1 2 Saksa, Jim (May 5, 2016). "City set to acquire Schuylkill River Swing Bridge from Conrail, clearing path for bike and ped trail river crossing". Plan Philly. Archived from the original on August 11, 2016. Retrieved August 27, 2016.
  3. "Bridging the Schuylkill River Trail". NBC 10 Philadelphia. Archived from the original on 2017-11-14. Retrieved 2017-11-14.
  4. "Schuylkill Crossing". Schuylkill Banks. 2016-07-21. Archived from the original on 2019-02-16. Retrieved 2019-03-06.
  5. Scharf, John Thomas (1884). History of Philadelphia, 1609-1884, Volume 3. L. H. Everts & Company.
  6. 1 2 Amman & Whitney (February 2012). "Grays Ferry Pedestrian Bridge Conceptual Design Report" (PDF). Schuylkill River Development Corporation. p. 174. Archived from the original (PDF) on September 22, 2013. Retrieved November 23, 2012.
  7. "Grays Ferry Moveable Br. (track schematic)". 1969. Archived from the original on January 31, 2013. Retrieved November 24, 2012.
  8. Hill, Miriam (November 20, 2012). "Proposed bike trail would cross Schuylkill, access Bartram's Garden". Philadelphia Inquirer . Archived from the original on 2016-03-14. Retrieved 2012-11-23.
  9. "Schuylkill River Swing Bridge Transfer To City Complete | Hidden City Philadelphia". hiddencityphila.org. Archived from the original on 2017-12-15. Retrieved 2017-12-15.
  10. "Schuylkill River Swing Bridge Transfer To City Complete". Hidden City Philadelphia. 2017-11-01. Archived from the original on 2017-12-15. Retrieved 2023-09-13.
  11. "Schuylkill Crossing". Schuylkill Banks. 2016-07-21. Archived from the original on 2019-02-16. Retrieved 2019-03-06.
  12. 1 2 3 Conde, Ximena (2023-06-26). "Why the completion of the Schuylkill River Crossing bridge has been delayed for years". Philadelphia Inquirer. Archived from the original on 2023-09-13. Retrieved 2023-09-13.