The Pudsey loop was a railway line in the former West Riding of Yorkshire, England, which served the town of Pudsey and later offered a second connection between Bramley in the east and Laisterdyke and Dudley Hill in the west, in addition to the existing line between Leeds and Bradford Exchange station.
It was opened by the Great Northern Railway as a dead-end branch from Stanningley to Pudsey in 1877. However there was demand for a better connection with the main line network, and the line was extended to make a through route. Considerable earthworks and a tunnel made this a difficult work to execute. The line opened in 1895 and became used as a through route, as an alternative to the earlier line.
Declining use eventually led to closure in 1964.
The Great Northern Railway route between Leeds and Bradford had been built by the Leeds, Bradford and Halifax Junction Railway and opened in 1854. The GNR operated the trains from the outset, and took it over in 1863. There is a promontory at Pudsey rising to 577 feet above sea level, and the LB&HJR avoided the engineering difficulty, routing its line through Stanningley, a mile to the north.
Deputations from Pudsey had been protesting to the GNR and its predecessor since 1856 about the inconvenience arising from the remoteness of the railway station. By the 1870s Pudsey had a population of almost 15,000 and was a thriving centre for woollen manufacture, stone quarrying and coal working. The GNR decided that a railway connection to Pudsey was now essential, and on 24 July 1871 a short branch line was authorised. The authorised route was to make a triangular junction with the Leeds to Bradford line between Bramley and Stanningley. [1]
In fact the GNR were cautious about the commercial value of the branch, and at first only the curve towards Stanningley was made. Work started on 24 November 1876. [2] Land was taken for a double line and bridges made to suit that, but at first only a single line was installed. The line began in a dock platform at Stanningley, and was 1 mile 62 chains in length to a terminus at Pudsey Greenside. The connection was therefore west-facing. [2]
The intermediate station at Pudsey Lowtown (often spelt Low Town) was on a gradient of 1 in 50 falling towards Stanningley. The Board of Trade inspecting officer refused to sanction opening of the station until a second platform with a shelter, and a loop line with catch points had been provided. (In fact most of the branch was on a 1 in 50 gradient towards Pudsey). [3] Goods traffic on the line began in the summer of 1877, [note 1] and a service of 15 passenger trains each way on weekdays only between Stanningley and Pudsey Greenside began on 1 April 1878. The single line was worked on the train staff and ticket system. [4] [5] [2] [6]
The timetable had been printed before the company knew of the ban on use of Low Town, so it showed the trains as calling there. Pudsey Lowtown station was modified in accordance with the Inspecting Officer's requirements, and it opened in July 1878. [5] [2] Parliamentary estimates had been £44,771 but the actual expenditure was eventually reckoned at £103,044, the excess being attributed to extensions at Stanningley, work at Low Town, an extension of Greenside station, cost of the Bramley branch, and doubling the line. [2]
In 1882 the Great Northern Railway and the Lancashire and Yorkshire Railway came to an agreement to co-operate over routes and services in which they both had an interest. This made possible a scheme to provide a direct curve from Bramley to the Pudsey branch, an extension from Pudsey Greenside to a double junction with the Ardsley line north of Dudley Hill, and a link from Dudley Hill to Low Moor. This created a new route through Pudsey making a direct line to the Spen Valley Line, as well as a loop line providing an alternative Leeds to Bradford connection. [7] The authorising Act for the work was granted on 16 July 1885. [8]
Lack of capital delayed construction, and the Pudsey loop line became operative on 1 December 1893 with the opening of the new (east-facing) curve at Bramley and the extension to Cutlers Junction, near Laisterdyke. The construction ran through the 616 yard Greenside Tunnel and across what was claimed to be the highest embankment in the country. The Stanningley connection of the original branch was severed at the south (Pudsey) junction and the curve made into a siding from Stanningley; the line was accessed directly from the Leeds direction via Bramley. At the western end, the opening through to Low Moor took place on 1 December 1893, with the loop lienm itself. An unusual circular passenger service was introduced: from Leeds Central trains ran through Pudsey, Low Moor, the L&YR Spen Valley stations, Thornhill, and over the Headfield junction spur to Dewsbury Central and Batley. From here the journey returned to Leeds by means of the line to Beeston junction via Tingley. The service started with six trains in one direction and seven in the other, the GNR working nine of them and the L&YR the other four. They took up to 90 minutes to cover the 30 miles (48 km). [7] [5] [9]
The former Great Northern Railway network in West Yorkshire was reviewed in the early 1960s. Passenger and goods carryings had fallen substantially since the 1920s, and a decision was taken to close the Pudsey loop line. It closed completely on 15 June 1964. [10]
A park and ride station was later provided (on 6 March 1967) on the Leeds - Bradford main line; it was named "New Pudsey". [11]
Pudsey Loop | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
Any traces of the line between Bramley station and Mount Pleasant Road have been lost due to the construction of an industrial estate and of Stanningley Bypass. Sections of trackbed are preserved and can be walked between Mount Pleasant Road and Pudsey Lowtown and between the locations of the two Pudsey stations. The site of Pudsey Greenside station is occupied by warehouses. [12]
Tracks and ballast have been removed in the tunnel and along the whole line. Some bridges in the course of the embankment between Pudsey and Cutlers Junction have been removed, and the cutting below Arkwright Lane has been filled in. [12]
The Great Northern Railway (GNR) was a British railway company incorporated in 1846 with the object of building a line from London to York. It quickly saw that seizing control of territory was key to development, and it acquired, or took leases of, many local railways, whether actually built or not. In so doing, it overextended itself financially.
The Leeds–Bradford lines are two railway lines connecting the cities of Leeds and Bradford in West Yorkshire, both meeting in Leeds railway station and are included in the West Yorkshire Metro area system of lines.
New Pudsey railway station is in Farsley, West Yorkshire, England, on the Calder Valley line from Leeds to Bradford Interchange, Halifax, Huddersfield, Manchester Victoria, and Blackpool North. Lying 5.75 miles (9.25 km) west of Leeds, it serves as a commuter station for the western edge of the Leeds conurbation.
The West Riding and Grimsby Railway was a railway company that promoted a line between Wakefield and Doncaster, in Yorkshire, England. There was also a branch line connection from Adwick le Street to Stainforth, which gave access towards Grimsby. The company was promoted independently, but it was sponsored by the Manchester, Sheffield and Lincolnshire Railway and the Great Northern Railway, and became jointly owned by them.
The Queensbury lines was the name given to a number of railway lines in West Yorkshire, England, that linked Bradford, Halifax and Keighley via Queensbury. All the lines were either solely owned by the Great Northern Railway (GNR) or jointly by the GNR and the Lancashire and Yorkshire Railway (L&YR). The terrain was extremely challenging for railway construction, and the lines were very expensive to build. The lines were
Low Moor railway station serves the villages of Low Moor and Oakenshaw in the south of Bradford, West Yorkshire, England. The station is situated on the Calder Valley Line between Bradford Interchange and Halifax.
Laisterdyke railway station is a closed station in the city of Bradford, West Yorkshire, England, that served the suburb of the same name.
St Dunstans railway station is a closed station in the city of Bradford, West Yorkshire, England. The station was the location of a three-way junction with platforms on two of the lines.
The Shipley Great Northern Railway branch line was a railway line that ran east, south and then westwards from Shipley to Bradford in West Yorkshire. The route was opened in 1874 to goods traffic and then to passengers in 1875 by the Great Northern Railway (GNR) and looped around the eastern edge of Bradford. The GNR arrived after other railways had been established in the West Yorkshire area and many of their lines were heavily reliant on tunnels and grand viaducts, the Shipley and Windhill line being an exception to this, although it did have some steep gradients. The branch extended for 8.5 miles (13.7 km) between the two termini of Shipley Windhill and Bradford Exchange. The route as built from Laisterdyke to Shipley was actually only 6.5 miles (10.5 km) as the initial section from Bradford Exchange to Laisterdyke was already in existence as part of the Great Northern Railway's line to Leeds.
Greenside Tunnel is a former railway tunnel in Pudsey, West Yorkshire, England.
Stanningley railway station, also called Stanningley for Farsley, is a closed railway station in Stanningley, Pudsey, West Yorkshire, England, located about 5 mi (8 km) west of Leeds station. It also served Farsley and Pudsey, the latter namely until the Pudsey Loop was built.
The Leeds, Bradford and Halifax Junction Railway (LB&HJR) was an English railway company. It built a line between Bradford and Leeds, and had running powers over the Lancashire and Yorkshire Railway to Halifax. It opened its main line in 1854 and later built a number of branch lines.
Pudsey Greenside railway station is a closed railway station in Pudsey in the former West Riding of Yorkshire England, located about 6 mi (10 km) west of Leeds station. It served the central part and western parts of Pudsey.
Pudsey Lowtown railway station is a closed railway station in Pudsey, in the former West Riding of Yorkshire, located about 5 mi (8 km) west of Leeds station. It served the eastern parts of the town of Pudsey.
The Methley Joint Railway was a short English railway line constructed by the Bradford, Wakefield and Leeds Railway company, connecting its Leeds direction line with other companies' eastward routes to York, the north-east, and Goole. The line connected collieries along its route. The BW&LR changed its name to the West Yorkshire Railway at the same time. The line was double track, just over five miles in length, between junctions at Lofthouse and Methley.
The Lincolnshire lines of the Great Northern Railway are the railways, past and present, in the English county built or operated by the Great Northern Railway.
The Bradford, Wakefield and Leeds Railway was an independent railway company that built a line between Wakefield and a junction close to Leeds, in Yorkshire, England. It opened its main line in 1857, and was worked by the Great Northern Railway. The line shortened the GNR route to Leeds.
The East and West Yorkshire Union Railway was promoted in 1883 to connect the Hull and Barnsley Railway at Drax with Leeds. The company was unable to raise the money it needed to build the line, and it substantially reduced its scope to connecting collieries around Rothwell with the existing main line network nearby. This was successful, with trains running from 1890, but the company decided it would find a way to connect to Leeds and operate a much truncated passenger service, from Rothwell. It sponsored the South Leeds Junction Railway to make a connection from Rothwell to the Midland Railway at Stourton; the SLJR was soon re-absorbed by the E&WYUR. The passenger service started on 4 January 1904 but it was a disastrous failure, and it was soon withdrawn from 1 October 1904.
The Great Northern Railway developed an extensive network over time, having started in 1846 with the intention of connecting London and York, as well as other major Yorkshire towns. The Great Northern Railway in Yorkshire was a major part of that, although the GNR did not succeed in reaching York as it originally intended. By acquiring running powers it reached Leeds, Bradford and Halifax over other companies' lines, as well as Barnsley Sheffield and Grimsby, and then York too. After acquiring local companies it developed a network, chiefly in West Yorkshire. Later it built lines north and west of Bradford into hilly terrain, and these were very expensive to build, and never repaid the initial cost.
Woodkirk railway station was a Great Northern Railway (GNR) station on the Batley to Beeston line, which connected Batley to Leeds Central, in West Yorkshire, England. The station opened in July 1890 and was closed in September 1939 to passengers, but the line stayed open until 1964. The station was 1.75 miles (2.82 km) north of Batley railway station, and 6.75 miles (10.86 km) south of Leeds Central railway station.