Putney to Wimbledon line

Last updated
Map of the Putney to Wimbledon line Putney - WImbledon line.gif
Map of the Putney to Wimbledon line

The Putney and Wimbledon line is a short railway route in south-west London. It was built by the London and South Western Railway as a collaborative arrangement with the Metropolitan District Railway. It was opened in 1889. The LSWR constructed Fulham Railway Bridge, although that was only ever used by District Railway trains. A spur connection from East Putney to the line from Barnes to Waterloo was used by LSWR trains.

Contents

The line was electrified for the District Railway trains in 1905, and the LSWR adopted the electrical system for its own trains on the line in 1916. The electrification proved very successful for the District Railway, although LSWR results were disappointing. In the first years of the twentieth century rapid residential development was stimulated alongside the line, and in the 1920s and 1930s this accelerated considerably, especially in the vicinity of the stations.

Use of the line by the LSWR and its successors has declined, and is limited to empty stock trains and occasional special excursions, but the District Line, as successor to the District Railway, continues in busy use.

History

Rival schemes

On 1 March 1880 the Metropolitan District Railway opened a line from West Brompton to a station in Fulham, named Putney Bridge and Fulham. The District did this through a nominally independent company called the Fulham Extension Railway. [1] [2] The alignment of the terminus made it obvious that the next step was to bridge the Thames and strike south. [3] [4]

The District company was contemplating the southward extension when a projected company calling itself the Guildford, Kingston and London Railway promoted the possibility of an independent line from Guildford through Surbiton and Kingston to Fulham. The promoters hoped to obtain running powers from there through the District Railway line to the City of London. This would have been in direct competition with the established routes of the LSWR; in addition the proposal presumed outer suburban main line steam trains mingling with the District Railway’s own traffic through the tunnels from Earl’s Court to Mansion House. Both the LSWR and the District Railway were violently against this, and they joined forces to oppose it. [5] [6] [1]

The scheme was considered in Parliament in the 1881 session. As part of the opposition tactics, the LSWR presented an alternative scheme for a new railway from Guildford to Surbiton only, joining its own network at that point. It was the LSWR that emerged successfully, and on 22 August 1881 its proposal was authorised; the LSWR line opened as the New Guildford Line in 1885. [5] [7] [1]

The Kingston company was still active and was proposing a shorter line from Surbiton to Putney Bridge, but the District and LSWR managed to kill that off, and secured an Act of 18 August 1882 which dissolved the Kingston scheme. [8] However the Putney to Surbiton route was still authorised, now to be built by the LSWR and the District together. Another Act of the same date authorised the Wimbledon and West Metropolitan Junction Railway; this was promoted by disappointed residents of Wimbledon in reaction to the abandonment of the Kingston line. It was to meet the intended Kingston line route a little to the south of Putney and run to Wimbledon; it too was reluctantly sponsored by the District and LSWR. [9] [7] [1]

Joint usage proposed

With an unwanted railway authorised, and money in short supply, a resolution emerged, in that the Kingston line was finally abandoned, and the short section at Putney required by the Wimbledon line was incorporated into that line's authorisation, by Act of 25 June 1886. Only the LSWR had the financial resources to build the line, so the whole project was passed into LSWR control. The termination at Wimbledon had been planned to cross the LSWR main line and join the Tooting line, but this was made more rational by arranging to run to terminal platforms on the north side of the LSWR station, with a junction for through trains. Mutual running powers existed, for the District to run to Wimbledon and for the LSWR to run to High Street Kensington or South Kensington. The LSWR would have had to make its own terminus at South Kensington due to the lack of space at the District station there, but in fact it never exercised its running powers and never built the station. [9] [7]

The 1886 Act formalised a number of agreements, including the abandonment of the Wimbledon and West Metropolitan Railway scheme. The Act also confirmed final abandonment of the Kingston line, and authorised the diversion at Wimbledon. The LSWR could work the finished lines alone or jointly with the District. The District was to run at least twenty passenger and coaching trains daily to Wimbledon, with the LSWR paying the running expenses and local passengers having indiscriminate use of both companies' trains. [10] [1]

LSWR shareholders were told on 11 August 1886 that the District "will not have any line of railway south of the Thames: the bridge will be ours; we shall join them at Fulham, and from that, including the bridge, will be bona fide South Western property". Works started in 1887; the bridge was the River Thames Fulham railway bridge at Putney; it had five spans of 153 feet (47 m) between cylinder centres and with 22 feet 6 inches (6.86 m) headway at high water. It was begun in April 1887, and completed by April 1889. [10] [1]

Opening for traffic

The Wimbledon station was described as the "North Station"; it had two new platforms with a central engine release road, and a separate booking office adjacent to the LSWR's platform 1. [11] The line between Wimbledon and Fulham opened on 3 June 1889, [2] with intermediate stations at Wimbledon Park, Southfields and East Putney, served only by District trains from Whitechapel. Thirty-one trains worked each way daily to the City, operated by the District's characteristic Beyer-Peacock 440T locomotives and trains of 4-wheeled coaches. LSWR trains started operating on 1 July 1889 between Wimbledon and Waterloo via the Putney Junction line, and therefore did not cross the river bridge. [10] [11] [12]

Putney Junction lines

To link the Richmond line at Point Pleasant Junction with the Fulham to Wimbledon line at East Putney Junction, the Putney Junction lines opened on 1 July 1889. [12] As authorised on 10 August 1882, both up and down lines were to have diverged from the Richmond line to the north, and then crossed high over that line turning south to join the Wimbledon line. The Richmond line was becoming congested, however, and quadrupling of it necessitated a grade-separated junction from Point Pleasant; the down line diverged on the south side to reach East Putney Junction. The change of plan was made within existing limits of deviation and no specific powers were taken, but Major-General Hutchinson on his inspection for the Board of Trade said that if doubts arose, formal powers should be obtained in a future Act. It seems was never done. [13]

The earlier half-hourly service of the District Railway had been enhanced to give a 15 minute frequency, and the addition of the LSWR trains on 1 July 1889 added 12 LSWR trains daily each way between Wimbledon and Waterloo. These trains used the double junction with the main lines at the London end of Wimbledon station, and ran to the main station there. [11]

Revenue

The District Railway found the new line very lucrative: Wimbledon generated a high proportion of first-class tickets. The District Railway chairman, J S Forbes, was able to say in 1896 that the line had increased the company's receipts by over 44% in six years. [11]

Electrification

District Railway

By 1899 the District Railway was working 47 trains a day each way, while the LSWR supplied 15 trains to and from Waterloo. The District electrified its line at 600 V DC third and fourth rail, as far as Putney Bridge on 23 July 1905; those trains worked to and from High Street Kensington. The District Railway wished to extend their operation to Wimbledon, and agreement was reached on 4 December 1903 for the LSWR to electrify its tracks in return for District payments of interest on the capital cost. District Railway electric working through to Wimbledon started on 27 August 1905, giving a significant increase in service frequency, most trains running through to East Ham. [14] [15]

LSWR

Third and fourth rail at Southfields station Southfields station.jpg
Third and fourth rail at Southfields station

The LSWR decided to instal electric traction in large areas of its suburban district, and the first line treated was from Waterloo to Wimbledon via East Putney. The District Railway used 600 V DC, so for compatibility the LSWR adopted that voltage. The District trains used a third and fourth rail, whereas the LSWR trains used a third rail only. To enable interoperability the fourth rail was electrically bonded to the running rails. A special isolating section was installed on the river crossing to prevent bridging of the section gap by the bus-lines of passing trains. The LSWR electric operation started on 25 October 1915 on weekdays only; there was a twenty-minute frequency, but patronage was very poor, and the service was soon considerably reduced. [16] [17]

Growth of traffic

There were 103 trains each way daily on the line in 1904, the last full year of steam operation on the District line to Wimbledon; about half were District workings. By 1911 the total had grown to 157, of which 93 were District. The route was operated by mechanical signalling, and it was at capacity. New intermediate signal boxes were opened at Cromer Road (Southfields) and Revelstoke Road (Wimbledon Park) to shorten the sections. The LSWR was in the habit of delaying District Railway trains during very busy times such as race days while the crowds cleared the stations. In 1911 there were 19 race days, and 85 District trains had to be cancelled. Meanwhile the District was carrying traffic which had increased by 76% since 1907. [14]

The LSWR as owner of the route was under pressure to quadruple the line, and in fact this was authorised by the Metropolitan District Railway Act of 1912. The LSWR would carry out the work, providing a western pair of tracks for the District's exclusive use; Wimbledon station would also be enlarged. However no work on the widening had been done before the conditions of World War I made a start impossible, although an extra terminal platform was provided at the Wimbledon North station by the LSWR. From 9 March 1914 the District operated a ten-minute all-day service to Wimbledon, increased to six minutes at rush hours. [14]

In the period from 1910 very heavy growth of suburban housing took place alongside the line, especially around the stations which acted as local centres. The incorporation of the line into the early LSWR electrification scheme encouraged interest in settling in the locality. This was the first part of the LSWR electrification to open, providing a 20-minute frequency on weekdays only from 25 October 1915 between Wimbledon and Waterloo via Wandsworth Town. Although frequency and journey time were excellent, patronage was poor, and in July 1919 when stock was required to augment busier electric services, all trains were withdrawn except for about half a dozen rush-hour workings, that missed calls between Wimbledon Park and East Putney inclusive, reaching Waterloo in 19 minutes. [14]

When regular electric working was resumed on 16 November 1919, trains ran only hourly (half-hourly at peak periods), and even with the low frequency, three-car sets were sufficient for the loading. The line occupation by these and the various freight and empty stock workings caused no great distress to the District, and the urgency was removed from the quadrupling plan. The powers were allowed to lapse, but when rebuilding Wimbledon station in 1929, the Southern Railway (as successor from 1923 to the LSWR) did provide a new four-bay station for the District with its own concourse below the main booking hall. [14]

After 1945 the Southern Region of British Railways, itself a successor to the Southern Railway, no longer made calls at Wimbledon Park, Southfields and East Putney. Steam-hauled freight and empty stock remained commonplace until the early 1960s. Through the 1950s and early 1960s, some fast electric services came this way, usually from the Alton line, and running non-stop between Surbiton and Waterloo. Summer Channel Islands boat trains also worked via East Putney every year from 1953 to 1962 and it was one of these, in the latter year, which formed the last ordinary steam passenger working on the line. [14]

Signalling characteristics

For many years London Transport drivers working south of West Brompton faced violent contrasts in signalling. Manually worked semaphore signals on the District's own line had been converted to electro-pneumatic automatic working with track circuits and train stops at the time of electrification, and were subsequently replaced by colour light signals on the same system. From East Putney to Wimbledon the line retained its Victorian manual signalling with Sykes lock-and-block working. In foggy weather Underground drivers had the unusual experience of guidance from manually-placed detonators on the rails. It was not until 1970 that the line was fully equipped with colour light signals. [14]

Up Point Pleasant Spur closed

The connection between East Putney and Point Pleasant Junction was built as a grade-separated junction. Bridges on the up line became structurally defective and it was closed on 4 April 1987, leaving the down line only. Infrastructure alterations were made to enable the remaining down line spur to be used bi-directionally, and this was brought into reversible use on 11 February 1991. [18]

Present day

There was an anomaly that the line and stations were controlled by the main line operator and infrastructure owner, while all the local passenger trains on the line were operated by the District Line. Station operation was transferred to London Transport, later Transport for London, from 1 April 1994. Currently (2023) there is a limited traffic of empty stock trains between Wimbledon Carriage Sidings and Waterloo. The dominant traffic on the line is the District Line service of Transport for London.

Locations

Related Research Articles

<span class="mw-page-title-main">London and South Western Railway</span> British pre-grouping railway company

The London and South Western Railway was a railway company in England from 1838 to 1922. Originating as the London and Southampton Railway, its network extended to Dorchester and Weymouth, to Salisbury, Exeter and Plymouth, and to Padstow, Ilfracombe and Bude. It developed a network of routes in Hampshire, Surrey and Berkshire, including Portsmouth and Reading.

<span class="mw-page-title-main">District Railway</span> Former underground railway in London (1868–1933)

The Metropolitan District Railway, also known as the District Railway, was a passenger railway that served London, England, from 1868 to 1933. Established in 1864 to complete an "inner circle" of lines connecting railway termini in London, the first part of the line opened using gas-lit wooden carriages hauled by steam locomotives. The Metropolitan Railway operated all services until the District Railway introduced its own trains in 1871. The railway was soon extended westwards through Earl's Court to Fulham, Richmond, Ealing and Hounslow. After completing the inner circle and reaching Whitechapel in 1884, it was extended to Upminster in Essex in 1902.

<span class="mw-page-title-main">Portsmouth Direct line</span> Railway line from London to Portsmouth, England

The Portsmouth Direct line is a railway route between Woking in Surrey and Portsmouth Harbour in Hampshire, England. It forms the principal route for passenger trains between London, Guildford and Portsmouth; connections are made to the ferry services which operate between Portsmouth and the Isle of Wight. The final section of line from Havant to Portsmouth is shared with other passenger routes.

<span class="mw-page-title-main">Southfields tube station</span> London Underground station

Southfields is a London Underground station in Southfields in the London Borough of Wandsworth. The station is on the District line between East Putney and Wimbledon Park stations. The station is located on Wimbledon Park Road at the junction with Augustus Road and Replingham Road. It is in Travelcard Zone 3.

<span class="mw-page-title-main">East Putney tube station</span> London Underground station

East Putney is a London Underground station in Putney in the London Borough of Wandsworth. It is on the Wimbledon branch of the District line, between Putney Bridge and Southfields, and is on the boundary between Travelcard Zones 2 and 3. The entrance to the station is on Upper Richmond Road (A205).

<span class="mw-page-title-main">Sutton and Mole Valley lines</span>

The Sutton and Mole Valley lines were constructed between 1847 and 1868 by the London, Brighton and South Coast Railway, the London and South Western Railway and the LBSCR-sponsored Horsham, Dorking and Leatherhead Railway.

<span class="mw-page-title-main">Leatherhead railway station</span> Railway station in Surrey, England

Leatherhead railway station is in Leatherhead, Surrey, England. It is managed by Southern, with services provided by them and South Western Railway. It is 18 miles 2 chains (29 km) from London Waterloo.

<span class="mw-page-title-main">New Guildford line</span>

The New Guildford line, presently operated by South Western Railway, is a commuter line between London Waterloo and Guildford. It branches off the South West Main Line at Hampton Court Junction, just south-west of Surbiton. On timetables, trains on this route are advertised as going to Guildford via Cobham.

<span class="mw-page-title-main">Chertsey branch line</span> Railway line in southern England

The Chertsey branch line is a 5-mile-40-chain (8.9 km) railway line in Surrey, England. It runs from the Waterloo–Reading line at Virginia Water station to a triangular junction with the South West Main Line near Weybridge. There are intermediate stations at Chertsey and Addlestone. All of the stations are managed by South Western Railway, which operates all passenger trains. Most services run between Weybridge and London Waterloo via Hounslow and Clapham Junction. For much of the day, passengers can change to faster services at Virginia Water and Weybridge to reach the capital more quickly.

<span class="mw-page-title-main">Hampton Court branch line</span> Railway branch line in Surrey, England

The Hampton Court branch line is a 1 mi 52 ch (2.7 km) railway branch line in north Surrey, England. It runs from its terminus, Hampton Court station in East Molesey, via an intermediate station at Thames Ditton to a junction on the South Western Main Line, near Surbiton. The line is double tracked and is electrified using the 750 V DC third-rail system.

<span class="mw-page-title-main">Kingston loop line</span>

The Kingston loop line is a railway line built by the London and South Western Railway (L&SWR) in South West London. It was built in two stages, the first of which was opened in 1863 and ran from Twickenham to Kingston. Travel from Kingston to London by that route was a rather circuitous trip. Later, the line was extended from Kingston to Wimbledon in 1869. The line ran independently alongside the Southampton main line from Malden to Wimbledon - where the line connected to other railway lines, which gave access to Ludgate Hill in the City of London, as well as to Waterloo.

<span class="mw-page-title-main">Shepperton branch line</span> Railway line in southeast England

The Shepperton branch line is a 6 mi 51 ch (10.7 km) railway branch line in Surrey and Greater London, England. It runs from its western terminus at Shepperton to a triangular junction with the Kingston loop line east of Fulwell. There are intermediate stations at Upper Halliford, Sunbury and Hampton. The branch also serves a dedicated station at Kempton Park racecourse. All six stations are managed by South Western Railway, which operates all passenger trains. Most services run between Shepperton and London Waterloo via Kingston, but during peak periods some run via Twickenham.

<span class="mw-page-title-main">LSWR suburban lines</span>

This article deals with the development of the London suburban railway lines of the London and South Western Railway (LSWR). For the wider view of the LSWR in general, see London and South Western Railway.

The Wimbledon and Dorking Railway (W&DR) was an early railway company in southern England. It was independently promoted with the intention of penetrating into West Sussex, but it only succeeded in getting authorisation as far as Epsom. It joined the Epsom and Leatherhead Railway there, and opened in 1859.

The Epsom and Leatherhead Railway (E&LR) was a railway company in Surrey, England. Promoted independently, it opened its short line in 1859 and was worked by the London and South Western Railway (LSWR). It was transferred to the joint ownership of the LSWR and the London, Brighton and South Coast Railway (LBSCR) in 1860. Those companies operated passenger trains to Waterloo and London Bridge station respectively. In 1867 the LBSCR built an extension line from Leatherhead to Dorking, with the declared intention of continuing to the Sussex coast. A new Leatherhead station was built on the new line, and the LSWR was obliged to build its own independent, new Leatherhead station; this was a terminus for some years.

The Horsham, Dorking and Leatherhead Railway (HD&LR) was an early railway company in southern England. It planned to fill in a gap in the network of the London, Brighton and South Coast Railway, shortening the route from London to coastal towns from Littlehampton to Portsmouth. It only obtained Parliamentary authorisation to build from Horsham to Dorking, and it sold its company to the LBSCR, which completed the construction, and itself built the remaining section from Dorking to Leatherhead.

The Mid-Sussex railways were a group of English railway companies that together formed what became the Mid-Sussex line, from Three Bridges through Horsham to Littlehampton, in southern England. After 1938 the Southern Railway operated a regular electric train service ran from London to Bognor Regis and Portsmouth using the marketing brand "Mid-Sussex Line", leading to an informal consensus. The Mid-Sussex Railway company ran from Horsham to Petworth, and the Mid-Sussex Junction line of the London, Brighton and South Coast Railway (LBSCR) extended from the Petworth line to Littlehampton. The Three Bridges to Horsham branch of the LBSCR was at first the sole access from the north to the Mid-Sussex railways, although a line from Leatherhead was used later.

<span class="mw-page-title-main">Electrification of the London and South Western Railway</span>

The Electrification of the LSWR refers to the installation of electric traction on the London and South Western Railway surface network, and its successor the Western Section of the Southern Railway, in England. The LSWR started a programme of electrification in response to rising costs and loss of traffic to street tramways; the first installation was to Kingston, Richmond, Hounslow, Hampton Court and Shepperton, starting in 1917. The third rail DC system was used, as it was assessed to be considerably cheaper to install and maintain than the overhead systems then in use. The rolling stock was constructed by the conversion of relatively new coaches built for suburban steam-hauled operation. The LSWR generated its own electric power at a new power station near Wimbledon. A frequent regular-interval timetable was implemented and the system was a considerable success.

<span class="mw-page-title-main">Kensington and Richmond line of the LSWR</span> Railway line in West London

The Kensington and Richmond line was a railway in West London, England. It was built by the London and South Western Railway, which already had a main line to Richmond from London. The Kensington line was chiefly a defensive measure to limit the incursion of rival railways into LSWR territory. It ran from Kensington on the West London Railway, by way of Hammersmith, Turnham Green, Gunnersbury and Kew; it opened in 1869. It had a separate station at Richmond, in keeping with the LSWR intention of preventing competitors from easily obtaining running powers to go further into the LSWR area.

<span class="mw-page-title-main">Windsor lines of the London and South Western Railway</span> Railways in south-west London, England

The Windsor lines of the London and South Western Railway ran from Waterloo to Windsor via Richmond, with a loop via Hounslow. They started as the Richmond Railway, a simple independent branch line, but they developed a distinct identity and had their own approach to Waterloo alongside the Main Lines, and a distinct section of Waterloo station. The Richmond Railway was extended to Windsor by the Windsor, Staines and South Western Railway; the company built a loop line via Hounslow in addition. Both independent companies were absorbed into the LSWR.

References

  1. 1 2 3 4 5 6 Alan A Jackson, London's Local Railways, David & Charles, Newton Abbot, 1978, ISBN 0 7153 7479 6, pages 351 to 353
  2. 1 2 Ernest F Carter, An Historical Geography of the Railways of the British Isles, Cassell, London, 1959, page 357
  3. M A C Horne, London's District Railway: volume 1: Nineteenth Century, Capital Transport Publishing Limited, 2018, ISBN 978 1 85414 425 6, pages 124 and 125
  4. R A Williams, The London and South Western Railway: volume 2: Growth and Consolidation, David and Charles, Newton Abbot, 1973, ISBN 0 7153 5940 1, page 28
  5. 1 2 Horne, volume 1, pages 134 and 135
  6. Williams, volume 2, page 54
  7. 1 2 3 Williams, volume 2, pages 30 to 32
  8. Donald J Grant, Directory of the Railway Companies of Great Britain, Matador, Kibworth Beauchamp, 2017, ISBN 978 1785893 537, page 617
  9. 1 2 Horne, volume 1, pages 136 and 137
  10. 1 2 3 Williams, volume 2, pages 35 to 37
  11. 1 2 3 4 Jackson, page 354
  12. 1 2 H P White, A Regional History of the Railways of Great Britain: volume 3: Greater London, David and Charles, Newton Abbot, 1963, new edition 1971, ISBN 0 7153 5337 3, page 58
  13. Williams, volume 2, page 44
  14. 1 2 3 4 5 6 7 Jackson, pages 355 to 358
  15. White, page 62
  16. Alan A Jackson, London's Local Railways, David & Charles, Newton Abbot, 1978, ISBN 0 7153 7479 6, pages 354 to 365
  17. David Brown, Southern Electric, volume 1, Development of the London Suburban Network and Its Trains, Capital Transport Publishing, Crowthorne, 2009, ISBN 978-1854143303, page 26
  18. Joe Brown, London Railway Atlas, Ian Allan Publishing, Hersham, 2013, ISBN 978 0 7110 3728 1, map 38
  19. M E Quick, Railway Passenger Stations in England, Wales and Scotland: A Chronology, version 5.04, September 2022, Railway and Canal Historical Society, electronic download