Academic Pashin in 2021 | |
History | |
---|---|
Russia | |
Name | Academic Pashin |
Namesake | Valentin Pashin |
Owner | Russian Federation |
Operator | Russian Navy |
Port of registry | Murmansk |
Builder | Nevsky Shipyard |
Cost | RUB3.08 billion (US$85 million) [1] |
Yard number | 901 |
Laid down | 26 April 2014 |
Launched | 26 May 2016 |
Commissioned | 21 January 2020 |
In service | 2020–present |
Identification |
|
Status | Active |
General characteristics | |
Class and type | Project 23130 replenishment oiler |
Tonnage | 9,000 DWT |
Displacement |
|
Length | 130 m (430 ft) |
Beam | 21.5 m (71 ft) |
Draught | 7 m (23 ft) |
Propulsion | 2 × 6310 hp diesels, 1 × bow thruster |
Speed | 16 kn (30 km/h; 18 mph) |
Range | 8,000 nmi (15,000 km; 9,200 mi) |
Endurance | 60 days |
Capacity | 7,350 tons |
Complement | 24 |
Academic Pashin is a replenishment oiler of Project 23130 and the lead vessel of the class. Developed by the Spetssudoproect JSC, it is the first replenishment oiler commissioned with the Russian Navy since the end of the Cold War. [1] The ship is named after the Hero of the Russian Federation Valentin Pashin. [2] She is assigned to the Northern Fleet.
The construction of Academic Pashin was carried out under a state contract for the Russian Defence Ministry, signed in November 2013. [1] The ship was laid down on 26 May 2014, during a keel lying ceremony at the Nevsky Shipyard in Saint Petersburg. It was first scheduled for delivery by late 2016. [3]
On 18 March 2016, the ship's hull was rolled out of the construction hall, to start pre-finishing works before its launching on the water. [4] It was launched on 26 May 2016. [5]
On 17 May 2018, it has started first stage of its sea trials in the Ladoga Lake. [6] In September 2018, the ship arrived in Kronstadt, where it was to join the Russian Navy by the year end. [7] [8]
In early 2019, the trials continued in the Baltic Sea, where the ship's interaction with deck helicopters was worked out. The Ka-27PS helicopters were delivering various cargoes onto the ship and back to shore. [9] Academic Pashin successfully completed the trials in late June 2019, [10] and was commissioned on 21 January 2020. [11]
In April 2020, Academic Pashin was spotted in the Channel off Cherbourg during the first sea trials of the French Navy's submarine Suffren . [12]
On 23 August 2022, she entered the Mediterranean. [13] In December 2022 the ship positioned herself above the TAP pipeline, off the coast of Otranto, Italy. The Italian Navy and other NATO ships immediately moved next to the Academic Pashin ship. [14]
In June 2024, Academic Pashin was part of a flotilla of four Russian vessels that will visit Havana from June 12 to June 17. It sailed close to the East Coast of the United States, while remaining in international waters. [15]
The Kilo-class submarines are a group of diesel-electric attack submarines designed by the Rubin Design Bureau in the Soviet Union in the 1970s and built originally for the Soviet Navy.
The Borei class, alternate transliteration Borey, Russian designation Project 955 Borei and Project 955A Borei-A, are a series of nuclear-powered ballistic missile submarines being constructed by Sevmash for the Russian Navy. The class has been replacing the steadily retiring Russian Navy Delta III and Delta IV classes and fully retired Typhoon, all three classes being Soviet-era submarines.
The Neustrashimy class, Soviet designation Project 11540 Yastreb (hawk), is a series of large frigates built for the Soviet Navy and currently in service with the Russian Navy. Seven ships were planned for the Soviet Navy, but the fall of the Soviet Union disrupted those plans. Two ships were completed, both currently in active service with the Russian Baltic Fleet.
The Steregushchiy class, Russian designation Project 20380, is a class of corvettes being built for the Russian Navy. Designed by the Almaz Central Marine Design Bureau, subsequent vessels were built to an improved design, incorporating the Zaslon-Redut SAM system. The ship full displacement and dimensions are large for a corvette, thus it is designated as a frigate by NATO. The Steregushchiy class has been further developed into the Gremyashchiy class and Project 20386 subclasses. The export variant is known as Project 20382 Tigr.
Admiral Nakhimov is the third battlecruiser of the Russian Navy's Kirov class. The ship was originally commissioned into service with the Soviet Navy in 1988, known back then as Kalinin (Калинин), a name the ship kept until 1992 when it was renamed for Pavel Nakhimov. From 1997 Admiral Nakhimov is undergoing a repair and a refit to receive new and improved weaponry and had been scheduled to re-enter service with the Russian Navy in around 2022. The date for the ship's return to service is uncertain. In 2021 it was reported that the ship's return to service would be delayed until "at least" 2023 while in February 2022 it was reported that Sevmash CEO Mikhail Budnichenko noted that the warship was planned for delivery in 2022. Later in the year it was again reported that the vessel's return to service might be delayed as late as 2024, with this being eventually confirmed by the head of United Shipbuilding Corporation Alexei Rakhmanov.
The Buyan class, Russian designations Project 21630 Buyan and Project 21631 Buyan-M, are series of corvettes developed by Zelenodolsk Design Bureau for the Russian Navy. Since 2010, all subsequent vessels are being constructed as improved Project 21631 subclass, incorporating greater tonnage, stealth technology and the 3S14 vertical launching system for either Kalibr or Oniks anti-ship cruise missiles, significantly enhancing combat capabilities. The ships are primarily designed for operations within littoral zones to protect Russia's vast coastal areas. Due to the small tonnage, they can operate even within shallow parts of oceans and seas and Russia's extensive inland waterway system. The export variant is known as Project 21632 Tornado.
Vice-Admiral Kulakov is an Udaloy-class destroyer of the Russian Navy. As of 2022, the ship was in active service. She is named after Soviet naval officer Nikolai Kulakov.
Admiral Flota Sovetskogo Soyuza Gorshkov is an Admiral Gorshkov class frigate of the Russian Navy and the lead ship of the class.
Admiral Flota Kasatonov is an Admiral Gorshkov class frigate of the Russian Navy and the second ship of the class.
The Alexandrit class, Russian designation Project 12700 Aleksandrit, is the newest class of Russian minesweepers designed by Almaz and being built by the Sredne-Nevsky Shipyard for the Russian Navy. The first ship was laid down on 22 September 2011 and was launched in June 2014. Anywhere between 30 and 50+ ships have been described as envisaged.
The Dyugon-class landing craft, Russian designation Project 21820, is a class of five air-cavity landing craft in service with the Russian Navy.
The Altay class, Soviet designation Project 160, is a class of replenishment oiler built for the Soviet Navy between 1967 and 1972.
Zvezda Shipbuilding Complex is a Russian shipbuilding company that operates the country's largest shipyard in the town of Bolshoy Kamen in Primorsky Krai across the bay from Vladivostok. Established in 2015 by a consortium of investors led by the Russian oil company Rosneft, the company has since attracted a large number of orders for oil tankers, LNG carriers and icebreakers.
The Karakurt class, Russian designation Project 22800 Karakurt, is a class of Russian Navy corvettes first commissioned in 2018.
Sovershennyy is a corvette in the Steregushchy-class in service with the Russian Navy. The ship was laid down in 2006 and launched in 2015. She commenced sea trials in early 2017 and joined the Russian Pacific Fleet on 20 July 2017. She was the first large surface warship to join the Pacific Fleet in 25 years.
Project 23131 is a series of replenishment oilers, developed by the Spetssudoproect JSC and being constructed by the Zaliv shipyard for the Russian Navy since December 2014. It is a heavier version and further development of Project 23130 replenishment oiler Academic Pashin.
Project 23130 is a series of medium-size replenishment oilers developed by the Spetssudoproect JSC and built by Nevsky Shipyard for the Russian Navy. Initially, it was to be limited only by one vessel, Akademik Pashin, however in January 2020, a decision was made to build five more vessels of the class. in parallel with Project 23130, larger Project 23131 oilers are being constructed by Zaliv shipyard in Crimea. It was indicated that the Russian Navy planned to create an "Arctic Group" to operate some of these ships within the Northern Fleet.
Stoikiy is a Steregushchiy-class corvette of the Russian Navy.
Gromkiy is a Steregushchiy-class corvette of the Russian Navy.