The Southeastern Pennsylvania Transportation Authority (SEPTA) operates a 25 Hz traction power system in the vicinity of Philadelphia, that it inherited from the Reading Company. This system is separate from, but similar to, the system built by the Pennsylvania Railroad (PRR), which is now operated by Amtrak. SEPTA's trains can run over either system because the voltage and frequency presented to the locomotive are essentially identical. However, the ex-Reading system is not electrically connected to the ex-PRR system.
SEPTA owns all of the substations described herein. Although SEPTA also owns former PRR substations along the Media/Wawa Line and the Chestnut Hill West Line, as well as a new substation just north of 30th Street Station, those facilities are electrically part of Amtrak's 25 Hz traction power system.
The Reading Company electrified its lines between Reading Terminal in Philadelphia, Pennsylvania, and Norristown, Doylestown, Chestnut Hill, Hatboro and West Trenton in 1931. The electrification was extended to include the Fox Chase Line in September 1966. Electrification was again extended from Hatboro to Warminster in the early 1970s. [1] [ page needed ]
The Reading's system used catenary electrified at 12 kV 25 Hz like the competing Pennsylvania Railroad's 1915 initial electrification and 1930s mainline expansion. Unlike the PRR's system, which included multiple power sources and an extensive high-voltage transmission network, the Reading's electrification was supplied solely by the rotary converter station at Wayne Junction. Although ownership and operation of the system has changed, the system has remained essentially unchanged with the exception of the replacement of the rotary converter station at Wayne Junction with a solid-state cycloconverter in 1986.
The Reading electrification system was designed for suburban MU operations and did not have to support the main line passenger or through freight operations of the rival Pennsylvania Railroad. While a complex system of high-voltage transmission lines was not necessary, the system was large enough to require the use of distribution feeders from the 25 Hz power supply at Wayne Junction. The feeders were set at 24 kV, double the traction voltage. Most of the rail lines would carry one or two feeders attached to the top of the catenary support masts. These 24 kV substation feeders can be distinguished from 12 kV traction feeders by the use of four-segment insulators as opposed to three-segment ones.
The 24 kV lines feed a network of 11 substations (12 including the Wayne Junction switchyard) located every 8 to 10 miles (13 to 16 km) along the electrified rail lines. Most branches are short enough to only require a single substation near the end of the line, but the Main and West Trenton lines are long enough to require intermediate substations. At each substation the 24 kV feeders are fed through autotransformers to be reduced to the traction voltage of 12 kV, which is then passed through circuit breakers before being fed into the overhead catenary wires.
Power is transmitted, effectively, at 36 kV because the 24 kV and 12 kV components are 180° out of phase. This design has several advantages over the PRR's more traditional transmission and distribution scheme. The highest voltage, with respect to ground, within the system is 24 kV. This is significantly less than the 69 kV seen in the PRR's system, which required much larger 80 feet (24 m) towers and larger insulators and transformers. On a small system such as the Reading's, transmission infrastructure of this scale was unnecessary. Secondly, the system uses the 12 kV catenary wire for both transmission and distribution. This dual use of the catenary wire allows performing both functions with only two wires. The PRR's system in contrast required three wires: two for the single phase 138 kV transmission component and one for the 12 kV catenary feeder. In both systems, the rail is used as a return path for traction current.
All 25 Hz power on the ex-Reading system is generated at the Wayne Junction static converter plant. This plant was built between 1985 and 1990 and consists of three 15 MVA solid-state, cycloconverter-based modules. The system was built by ASEA and is similar technically to the converter later installed at Amtrak's Jericho Park converter.
The inverters replaced two ca. 1928 Westinghouse Electric motor generators that were each rated at 21.4 MVA. The capability also formerly existed to supply power from PECO Energy's Somerset Substation, which had three motor-generators normally used to supply the Pennsylvania Railroad's electrification system. This capability has been removed, as have the Somerset motor-generators. The ex-Reading system now operates completely independently from Amtrak's power system.
Wayne Junction receives 230 kV 60 Hz power from two redundant lines that connect to PECO substations at Waneeta, Tabor and Pulaski. Two 60 MVA 230/13.2 kV transformers reduce voltage for the static frequency converters. Cross-ties allow removing portions of the supply system from service for maintenance.
In March 2015 a contract worth $4,656,321 was awarded to STV Incorporated, for the provision of architectural and engineering services for the rehabilitation of static frequency converters at Wayne Junction, with services to be performed over a period of 60 months scheduled to commence in April 2015 (per Proposal No. 14-233-JHC). [3]
25 Hz Power Supplies on the ex-Reading System | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Legend | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Each of the former Reading Railroad substations was equipped with transformers and circuit breakers from American Brown Boveri. Most transformers are rated to supply about 2 MVA of power each (a few 4 MVA transformers exist). Each substation also contained a number of oil-filled circuit breakers to disconnect both the 12 kV and 24 kV lines under load. The larger substations also have a small equipment and maintenance building to house any control equipment or secondary transformers for generating the 100 Hz signal power.
Due to the robustness and simplicity of the components, until 2010 all the SEPTA substations were equipped with their original equipment, then approaching 80 years in service.
Callowhill substation was the first targeted for replacement, to eliminate the need to maintain the overhead wires over the abandoned Reading Viaduct rail line as feeders to the active tracks. Its replacement, Fairmount substation, was commissioned in the 3rd quarter of 2010, [4] featuring two 12/24 kV 25 Hz, single-phase 5 MVA autotransformers as well as trolley breakers and other switchgear. [5]
Norristown substation received new transformers, trolley breakers, feeders, substation switchgear, protective relaying and a structural overhaul in a stimulus project. [6]
In July 2012, the US Department of Transportation awarded SEPTA a $12.8 million Tiger IV grant to help refurbish Wayne Junction Substation. [7] In the words of SEPTA General Manager Joseph M. Casey, "We intend to use these resources to replace equipment that should be on display in a museum of transit history."
The grant was announced at ceremony at the substation which was attended by Transportation Secretary Ray LaHood, who said "It's not the sexiest, it's not the prettiest, but it's one of the most important projects." [8]
Renewal of Wayne Junction's three static frequency converters is expected to occur during the 2010s, in three stages in order to maintain redundancy. A fourth converter is to be added for system security. [9] [S 1]
In October 2014 SEPTA requested interested contractors to submit bids for the rehabilitation of the static frequency converters at Wayne Junction. [10]
In September 2014 SEPTA requested interested contractors to submit bids for the rehabilitation of Ambler substation. [11] In October 2014 SEPTA awarded a $7.99 million contract to Carr & Duff, Inc. [12] for the work. [13]
On October 31, 2016, one of the substation's two main transformers burned out, and was replaced ahead of schedule a week later with one of the new transformers already on hand for the substation renewals at both Lansdale and Ambler. [14]
In the 1990s a fire at the Doylestown substation rendered it inoperable. Until the substation was repaired in 2013, the Doylestown Branch east of Lansdale had to be powered exclusively from the Lansdale substation. This "single-end feeding" of a 10-mile (16 km) section of track limited the number of MUs that could run simultaneously on the branch and also limited their maximum speed and acceleration.
The substation received a new 12/24 kV autotransformer in April 2015. [15]
With the passage of a source of dedicated transportation funding by the Commonwealth of Pennsylvania, SEPTA announced in December 2013 a capital budget plan that includes renewal or replacement of all remaining former Reading substations, in five phases. The first phase involves replacement of Jenkintown substation and the renewal of Ambler substation's active components, projects for which final design had been completed by the end of 2013. [9] [16]
In November 2014 SEPTA requested interested contractors to submit bids for the rehabilitation of four substations (Lansdale, Bethayres, Chestnut Hill East and Hatboro). [17] The engineering design work is expected to take two years, and the construction a further three years.
SEPTA also plans to build a new substation near Woodbourne station by Fall 2020, as the distance between Neshaminy Falls and Yardley substations is nearly twice the optimal 5-mile (8.0 km) distance between substations on a 12 kV 25 Hz system. [S 2]
Name | Transformers | Line Served | Coordinates | Notes |
---|---|---|---|---|
Ambler | 1 | Main Line | 40°09′02″N75°13′21″W / 40.15056°N 75.22250°W | Designed for two transformers, but only one was ever installed. Renewal designed and funded [16] Scheduled to be renewed by Summer 2016. [S 3] |
Bethayres | 1 | West Trenton Line | 40°06′57″N75°04′07″W / 40.11583°N 75.06861°W | Scheduled to be renewed by Spring 2018. [S 4] |
Callowhill (Reading Terminal) | 2 | Main Line | 39°57′31″N75°09′26″W / 39.95861°N 75.15722°W | Replaced by Fairmount substation in 2010. Abandoned. |
Chestnut Hill East | 1 | Chestnut Hill East Line | 40°04′51″N75°12′20″W / 40.08083°N 75.20556°W | Originally had 2 transformers. Scheduled to be renewed by Summer 2018. [S 5] |
Doylestown | 1 | Doylestown Branch | 40°18′09″N75°08′04″W / 40.30250°N 75.13444°W | Renewed Spring 2015. [S 6] |
Fairmount | 2 | Main Line | 39°57′55″N75°09′07″W / 39.96528°N 75.15194°W | Built 2010, replaced Callowhill Substation. |
Hatboro | 1 | Warminster Line | 40°10′30″N75°06′11″W / 40.17500°N 75.10306°W | Scheduled to be renewed by Winter 2020. [S 7] |
Jenkintown | 2 | West Trenton and Main Lines | 40°05′50″N75°08′17″W / 40.09722°N 75.13806°W | Replacement under construction; scheduled completion Fall 2016. [S 8] |
Lansdale | 2 | Main Line | 40°14′38″N75°17′07″W / 40.24389°N 75.28528°W | Scheduled to be renewed by Summer 2017. [S 9] |
Neshaminy Falls | 2 | West Trenton Line | 40°08′45″N74°57′54″W / 40.14583°N 74.96500°W | Scheduled to be renewed by Summer 2019. [S 10] |
Norristown | 2 | Manayunk/Norristown Line | 40°06′48″N75°20′48″W / 40.11333°N 75.34667°W | Feeders re-oriented 180° in 1970 for line relocation due to Dannehower Bridge (US 202) construction. All substation components replaced 2012. |
Wayne Junction | 3 (step-up) | All | 40°01′31″N75°09′23″W / 40.02528°N 75.15639°W | Design work is being undertaken to renew the electrical equipment at this site [7] |
Woodbourne | 2 | West Trenton Line | 40°11′34″N74°53′21″W / 40.19278°N 74.88917°W | New substation scheduled to be built by Fall 2020. [S 2] |
Yardley | 2 | West Trenton Line | 40°14′03″N74°49′55″W / 40.23417°N 74.83194°W | Scheduled to be renewed by Summer 2019. [S 11] |
The EMD AEM-7 is a twin-cab four-axle 7,000 hp (5.2 MW) B-B electric locomotive built by Electro-Motive Division (EMD) and ASEA between 1978 and 1988. The locomotive is a derivative of the Swedish SJ Rc4 designed for passenger service in the United States. The primary customer was Amtrak, which bought 54 for use on the Northeast Corridor and Keystone Corridor. Two commuter operators, MARC and SEPTA, also purchased locomotives, for a total of 65.
Railway electrification is the use of electric power for the propulsion of rail transport. Electric railways use either electric locomotives, electric multiple units or both. Electricity is typically generated in large and relatively efficient generating stations, transmitted to the railway network and distributed to the trains. Some electric railways have their own dedicated generating stations and transmission lines, but most purchase power from an electric utility. The railway usually provides its own distribution lines, switches, and transformers.
The New York Connecting Railroad or NYCR is a rail line in the borough of Queens in New York City. It links New York City and Long Island by rail directly to the North American mainland. Amtrak, CSX, Canadian Pacific Kansas City, Providence and Worcester Railroad and New York and Atlantic Railway (NYAR) currently use the line. It runs from the Hell Gate Bridge over the East River to Fresh Pond Junction yard in Glendale in Queens. It was completed in 1917. Amtrak uses the northernmost section of the line from Sunnyside Junction in the Woodside section of Queens to the Hell Gate Bridge into the Bronx from which it follows the line north to Boston.
The SEPTA Regional Rail system is a commuter rail network owned by SEPTA and serving the Philadelphia metropolitan area. The system has 13 branches and more than 150 active stations in Philadelphia, Pennsylvania, its suburbs and satellite towns and cities. It is the sixth-busiest commuter railroad in the United States, and the busiest outside of the New York, Chicago, and Boston metropolitan areas. In 2016, the Regional Rail system had an average of 132,000 daily riders and 118,800 daily riders as of 2019.
A traction network or traction power network is an electricity grid for the supply of electrified rail networks. The installation of a separate traction network generally is done only if the railway in question uses alternating current (AC) with a frequency lower than that of the national grid, such as in Germany, Austria and Switzerland.
Railway electrification systems using alternating current (AC) at 25 kilovolts (kV) are used worldwide, especially for high-speed rail. It is usually supplied at the standard utility frequency, which simplifies traction substations. The development of 25 kV AC electrification is closely connected with that of successfully using utility frequency.
Railway electrification using alternating current (AC) at 15 kilovolts (kV) and 16.7 hertz (Hz) are used on transport railways in Germany, Austria, Switzerland, Sweden, and Norway. The high voltage enables high power transmission with the lower frequency reducing the losses of the traction motors that were available at the beginning of the 20th century. Railway electrification in late 20th century tends to use 25 kV, 50 Hz AC systems which has become the preferred standard for new railway electrifications but extensions of the existing 15 kV networks are not completely unlikely. In particular, the Gotthard Base Tunnel still uses 15 kV, 16.7 Hz electrification.
The Keystone Corridor is a 349-mile (562 km) railroad corridor between Philadelphia and Pittsburgh, Pennsylvania, that consists of two rail lines: Amtrak and SEPTA's Philadelphia-to-Harrisburg main line, which hosts SEPTA's Paoli/Thorndale Line commuter rail service, and Amtrak's Keystone Service and Pennsylvanian inter-city trains; and the Norfolk Southern Pittsburgh Line. The corridor was originally the Main Line of the Pennsylvania Railroad.
The SEPTA Main Line is the section of the SEPTA Regional Rail system from the Zoo Interlocking in West Philadelphia to Lansdale Station in Lansdale, Pennsylvania. The line is 26.25 miles (42.25 km) long, and serves all 13 SEPTA Regional Rail lines.
Lansdale station, also known as the Lansdale Transportation Center, is a SEPTA Regional Rail station in Lansdale, Pennsylvania. Located at Main Street and Green Street, it serves the Lansdale/Doylestown Line. It was originally built in 1902 by the Reading Company, opening on February 7, 1903; a freight house was added in 1909. Historically, the station hosted the Interstate Express and the Scranton Flyer. Additionally, the station served commuter trains on the Reading's branch to Bethlehem until service was ended in 1981. The historic station building was listed on the National Register of Historic Places in 2021.
Railroad electrification in the United States began at the turn of the 20th century and comprised many different systems in many different geographical areas, few of which were connected. Despite this situation, these systems shared a small number of common reasons for electrification.
The Schuylkill Branch was a rail line owned and operated by the former Pennsylvania Railroad (PRR) in Pennsylvania. The line ran from the Philadelphia to Harrisburg Main Line at 52nd Street in Philadelphia north via Norristown, Reading, and Pottsville to Delano Junction, about 2.5 mi (4.0 km) northeast of Delano. From Delano Junction, the PRR had trackage rights over the Lehigh Valley Railroad's Hazleton Branch and Tomhicken Branch to Tomhicken, where the PRR's Catawissa Branch began.
The Shellpot Branch is a former Pennsylvania Railroad/Penn Central through-freight railroad owned and operated by Norfolk Southern since its acquisition, along with CSX Transportation, of Conrail in 1999. The branch allows Norfolk Southern, since the opening of a new bridge in 2001, to bypass the city of Wilmington, Delaware and allows direct access to both the Port of Wilmington and the New Castle Secondary, which connects to the Delmarva Subdivision of the Delmarva Central Railroad that runs to Central Delaware, Maryland, and Virginia's Eastern Shore. Both ends of the branch connect with Amtrak's Northeast Corridor and, like all of the PRR's through-freight lines, was electrified from 1935 until the Conrail era. The line was originally built doubly tracked, but was subsequently converted to single track.
Amtrak's 25 Hz traction power system is a traction power network for the southern portion of the Northeast Corridor (NEC), the Keystone Corridor, and several branch lines between New York City and Washington D.C. The system was constructed by the Pennsylvania Railroad between 1915 and 1938 before the North American power transmission grid was fully established. This is the reason the system uses 25 Hz, as opposed to 60 Hz, which is the standard frequency for power transmission in North America. The system is also known as the Southend Electrification, in contrast to Amtrak's 60 Hz traction power system that runs between Boston and New Haven, which is known as the Northend Electrification system.
Pulse code cab signaling is a form of cab signaling technology developed in the United States by the Union Switch and Signal corporation for the Pennsylvania Railroad in the 1920s. The 4-aspect system widely adopted by the PRR and its successor railroads has become the dominant railroad cab signaling system in North America with versions of the technology also being adopted in Europe and rapid transit systems. In its home territory on former PRR successor Conrail owned lines and on railroads operating under the NORAC Rulebook it is known simply as Cab Signaling System or CSS.
The Lansdale/Doylestown Line is a SEPTA Regional Rail line connecting Center City Philadelphia to Doylestown in Bucks County, Pennsylvania. Until 1981, diesel-powered trains continued on the Bethlehem Branch from Lansdale to Quakertown, Bethlehem, and Allentown.
The Paoli/Thorndale Line, commonly known as the Main Line, is a SEPTA Regional Rail service running from Center City Philadelphia through Montgomery County and Delaware County to Thorndale in Chester County. It operates along the far eastern leg of Amtrak's Philadelphia to Harrisburg Main Line, which in turn was once the Main Line of the Pennsylvania Railroad and is now part of the Keystone Corridor, a federally-designated high-speed rail corridor.
Amtrak’s 60 Hz traction power system operates along the Northeast Corridor between New Haven, Connecticut, and Boston, Massachusetts. This system was built by Amtrak in the late 1990s and supplies locomotives with power from an overhead catenary system at 25 kV alternating current with at 60 Hz, the standard frequency in North America. The system is also known as the Northend Electrification, in contrast to Amtrak's 25 Hz traction power system that runs between New York City and Washington, D.C., which is known as the Southend Electrification system.
The New York, New Haven and Hartford Railroad pioneered electrification of main line railroads using high-voltage, alternating current, single-phase overhead catenary. It electrified its mainline between Stamford, Connecticut, and Woodlawn, New York, in 1907 and extended the electrification to New Haven, Connecticut, in 1914. While single-phase AC railroad electrification has become commonplace, the New Haven's system was unprecedented at the time of construction. The significance of this electrification was recognized in 1982 by its designation as a Historic Mechanical Engineering Landmark by the American Society of Mechanical Engineers (ASME).
The Reading electric multiple units were a fleet of electric multiple units operated by the Reading Company on its Philadelphia commuter rail lines. The majority were constructed by Bethlehem Steel in 1931–1933; American Car and Foundry delivered additional cars in 1949. Some cars, rebuilt in 1964–1965 and christened "Blueliners", remained in service with Conrail and later the SEPTA until 1990. Several have been preserved.