History | |
---|---|
United States | |
Name | New England |
Namesake | New England |
Owner | USSB |
Builder | Submarine Boat Corp., Newark [1] |
Yard number | 112 [2] |
Laid down | 21 October 1919 |
Launched | 31 January 1920 [3] |
Christened | New England Iron |
Completed | April 1920 [2] |
Homeport | Newark |
Identification |
|
Fate | broken up, 1929 |
General characteristics | |
Type | Cargo ship |
Tonnage | |
Length | 324.0 ft (98.8 m) registry length [4] |
Beam | 46.2 ft (14.1 m) [4] |
Draft | 25 ft (7.6 m) [1] |
Depth | 25.0 ft (7.6 m) [4] |
Installed power | 386 NHP |
Propulsion |
|
Speed | 10.5 kn (19.4 km/h; 12.1 mph) |
Range | 10,080 nmi (18,670 km; 11,600 mi) |
Crew | 37 [4] |
SSNew England was a Design 1023 cargo ship built for the United States Shipping Board immediately after World War I.
She was laid down as yard number 112 at the Newark, New Jersey shipyard of the Submarine Boat Corporation (SBC), one of 132 Design 1023 cargo ships built for the United States Shipping Board (there were 154 ships of the class built in total). [1] She was launched on 31 January 1920, [3] completed in April 1920, [2] and named the New England. [2] [3] In 1929, she was broken up at the Baltimore, Maryland shipyard of Union Shipbuilding. [2]
The United States Shipping Board (USSB) was established as an emergency agency by the 1916 Shipping Act, on September 7, 1916. The United States Shipping Board’s task was to increase the number of US ships supporting the World War I efforts. United States Shipping Board program ended on March 2, 1934.
SS Cotopaxi was an Emergency Fleet Corporation (EFC) Design 1060 bulk carrier built for the United States Shipping Board (USSB) under the World War I emergency shipbuilding program. The ship, launched 15 November 1918, was named after the Cotopaxi stratovolcano of Ecuador. The ship arrived in Boston, 22 December 1918, to begin operations for the USSB, through 23 December 1919, when Cotopaxi was delivered to the Clinchfield Navigation Company under terms of sale.
USS Refuge (AH-11), was a hospital ship of the United States Navy during World War II. The ship was built in 1921 by the New York Shipbuilding Corp., of Camden, New Jersey, as SS Blue Hen State, but was renamed President Garfield in 1923 and then SS President Madison in 1940 for service with American President Lines. Acquired by the Navy from the War Shipping Administration on 11 April 1942 the ship was commissioned as the transport USS Kenmore until conversion to a hospital ship.
SS President Cleveland was originally built as Golden State for the United States Shipping Board (USSB), one of the planned World War I troop transports converted before construction into passenger and cargo vessels launched as Emergency Fleet Corporation Design 1029 ships first known, along with the smaller Design 1095 versions, in the trade as "State" ships due to names assigned for the nicknames of states and later as "535s" for their length overall. Almost all ships of both designs were renamed for United States presidents by May 1921, with Golden State being renamed President Cleveland. As one of the USSB-owned ships operated by agents of the board, President Cleveland was allocated to and operated by the Pacific Mail Steamship Company until sold by the USSB to the Dollar Steamship Line in 1925. After the demise of that line and creation of a new, replacement line, American President Lines, the ship remained with that line until government acquisition for the Second World War.
St. Mihiel was a troopship built for the United States Shipping Board by the American International Shipbuilding Corporation at Hog Island, Pennsylvania. The ship was operated from 1922 until mid-1940 as USAT St. Mihiel by the Army Transport Service. In July 1941 the ship was transferred to the Navy which commissioned her USS St. Mihiel with the hull number AP-32. In November 1943, she was transferred back to the Army and converted into the hospital ship, USAHS St. Mihiel.
The Design 1013 ship, also known as the Robert Dollar type, was a steel-hulled cargo ship design approved for mass production by the United States Shipping Board's Emergency Fleet Corporation (EFT) in World War I. Like many of the early designs approved by the EFT, the Design 1013 did not originate with the EFT itself but was based on an existing cargo ship design, in this case one developed by the Skinner & Eddy Corporation of Seattle, Washington.
President Taylor was a cargo-liner, ex President Polk, ex Granite State, requisitioned for war service in December 1941 and allocated by the War Shipping Administration (WSA) to the U.S. Army and operating as a troopship in the Pacific Ocean in World War II when grounded and eventually lost on 14 February 1942.
The Design 1095 ship was an Emergency Fleet Corporation (EFC) design for a troop transport to be built at New York Shipbuilding Corporation and delivered to the United States Shipping Board (USSB) that, at the end of World War I hostilities, was modified to a combined passenger and cargo vessel. The contract was for thirteen ships, EFC hulls 2579 though 2591, but later adjusted to seven ships with the remainder being changed during construction to the slightly larger ships of EFC Design 1029 built from the start as passenger and cargo ships rather than being modified from the troop ship plan.
SS Managua was a Nicaraguan Cargo ship that the German submarine U-67 torpedoed on 16 June 1942 in the Straits of Florida while she was travelling from Charleston, South Carolina, United States to Havana, Cuba with a cargo of Potash. The ship was built as Glorieta, a Design 1049 ship in 1919, operated by the United States Shipping Board (USSB) until sold to the Munson Line in 1920 and renamed Munisla. The ship was sold foreign to a Honduran company, Garcia, in 1937 and renamed Neptuno. In 1941 the ship was re-flagged in Nicaragua with the name Managua.
The Design 1023 ship was a steel-hulled cargo ship design approved for mass production by the United States Shipping Board's (USSB) Emergency Fleet Corporation (EFC) in World War I. Like many of the early designs approved by the EFC, the Design 1023 did not originate with the EFC itself but was based on an existing cargo ship designed by Theodore E. Ferris for the United States Shipping Board (USSB). The ships, to be built by the Submarine Boat Corporation of Newark, New Jersey, were the first to be constructed under a standardized production system worked out by Ferris and approved by the USSB.
The Design 1019 ship was a steel-hulled cargo ship design approved for mass production by the United States Shipping Board's Emergency Fleet Corporation (EFT) in World War I.
SSCapillo was a Design 1022 cargo ship built for the United States Shipping Board immediately after World War I.
Suremico was a Design 1023 cargo ship built for the United States Shipping Board (USSB) immediately after World War I. She was later named the Nisqually and converted into a barge and later a scow. She was bombed and sunk during the Battle of Wake Island.
The Design 1014 ship was a steel-hulled cargo ship design approved for production by the United States Shipping Board's Emergency Fleet Corporation (EFT) in World War I. They were referred to as the "Cascade"-type. They were all built by Todd Shipyards, then part of Todd Drydock and Construction Company, at their Tacoma, Washington shipyard. 20 ships were completed for the USSB in 1919 and 1920; and additional 2 were completed in 1920 for private companies. 12 ships was cancelled.
The Design 1025 ship was a steel-hulled cargo ship design approved for production by the United States Shipping Board's Emergency Fleet Corporation (EFT) in World War I. They were referred to as the "Harriman-type" as the majority of ships were built in the Harriman section of Bristol, Pennsylvania. A total of 62 ships were ordered and built at three shipyards: 40 ships at Merchant Shipbuilding Corporation, Bristol, Pennsylvania; 12 ships at Newburgh Shipyards in Newburgh, New York; and 10 ships at Pensacola Shipbuilding Company in Pensacola, Florida.
The Design 1027 ship was a steel-hulled cargo ship design approved for production by the United States Shipping Board's Emergency Fleet Corporation (EFT) in World War I. They were referred to as the Oscar Daniels-type as all the ships were built at the Oscar Daniels Shipbuilding Company, Tampa, Florida. A total of 10 ships were ordered and built from 1919–1921.
SSSuedco was a Design 1023 cargo ship built for the United States Shipping Board immediately after World War I.
SSSuboatco was a Design 1023 cargo ship built for the United States Shipping Board immediately after World War I.
SSSuportco was a Design 1023 cargo ship built for the United States Shipping Board immediately after World War I.
SSCambridge was a Design 1023 cargo ship built for the United States Shipping Board immediately after World War I.