Sanmenxia Dam | |
---|---|
Location | Sanmenxia |
Coordinates | 34°49′46″N111°20′41″E / 34.82944°N 111.34472°E |
Construction began | 1957 |
Opening date | 1960 |
Dam and spillways | |
Type of dam | Gravity |
Impounds | Yellow River |
Height | 106 m (348 ft) |
Length | 713 m (2,339 ft) |
Reservoir | |
Creates | Sanmenxia Reservoir |
Total capacity | 16,200,000,000 m3 (13,133,554 acre⋅ft) |
Catchment area | 688,400 km2 (265,793 sq mi) |
Surface area | 2,350 km2 (907 sq mi) |
Maximum length | 246 km (153 mi) |
Power Station | |
Commission date | 1973–1975 |
Turbines | 5 x 50 MW, 2 x 75 MW Francis-type |
Installed capacity | 400 MW |
The Sanmenxia Dam is a concrete gravity dam on the middle-reaches of the Yellow River near Sanmenxia Gorge on the border between Shanxi province and Henan Province, China. The dam is multi-purpose and was constructed for flood and ice control along with irrigation, hydroelectric power generation and navigation. Construction began in 1957 and was completed in 1960. It is the first major water control project on the Yellow River and was viewed as a major achievement of the new People's Republic of China. Subsequently, its image was printed on the country's bank notes. However, due to sediment accumulation in the reservoir, the dam later had to be re-engineered and renovated. The effects from sediment, which include flooding upstream, have placed the dam at the center of controversy and criticism-related arrests by the Chinese government.
In response to centuries of flooding on the Yellow River, engineers initially proposed the Sanmenxia Dam in early 1935. [1] In 1954, the Yellow River Planning Board was established and oversaw a survey of the river with help from Soviet engineers. The Soviet engineers recommended a dam at the Sanmenxia site. Original plans for the dam called for a maximum reservoir level 360 m (1,181 ft) above sea level (ASL). This would have required the relocation of 870,000 people and the flooding of 3,500 km2 (1,351 sq mi). The design was revised to a maximum level of 340 m (1,115 ft) ASL which required the relocation of 400,000 people and flooded much less area. [2] In 1955 the Comprehensive River Basin Planning Report officially proposed the project. The report was submitted to the National People's Congress and swiftly approved that same year while preliminary construction began soon after. Under Soviet Union supervision, construction ceremoniously began on 13 April 1957. Construction on the left-bank cofferdam began in June 1957 and excavation was completed a year later along with the pouring of the left-bank foundation. In October 1958, construction on the right-bank cofferdam was initiated and the river was closed by November 1958. In June 1960, the reservoir was at full pool and the dam crest reached its design elevation of 353 m (1,158 ft) ASL in April 1961. [1] [3] [4] The dam's generators were commissioned between 1973 and 1975. [5] The dam was the first major water project on the Yellow River and constructed with manual labor. Upon completion, it was hailed as an engineering success for the new republic and its image was printed on Chinese banknotes. [6] [7] [8]
Soon after completion, sediment-accumulation threatened the benefits of the dam. The Yellow River carries more sediment than any other in the world. [1] [2] During the 18 months after the river was closed, 1.8 billion metric tons of sediment had accumulated in the reservoir. Only 7% of the sediment-load was released downstream and the reservoir lost 17% of its capacity below a 335 m (1,099 ft) ASL elevation. Navigation and farmland were threatened upstream along with the relocation of an additional one million people. Despite the dam's 12 deep-sluices and alterations in the release of water, silt continued to build in the reservoir, particularly in the back waters. Responding to the potential crisis, a meeting was held in December 1964 with Premier Zhou Enlai. At the meeting, it was decided to reconstruct the dam's outlet works for improved discharges and silt control. The renovation was carried out immediately and in two stages. The first stage included the installation of two tunnels on the dam's left bank at an elevation of 290 m (951 ft) ASL along with converting four penstocks into flushing pipes. The flushing pipes began operating in 1966 and the tunnels in 1967 and 1968. In the second stage, eight bottom sluices were added to the left side of the dam which became operational between 1970 and 1971. Silt balance was achieved in 1970. Two more bottom sluices began operating in 1990 along with another in 1999 and the final in 2000. [1] [2]
Impacts from sediment accumulation continued after renovation and also drew increasing criticism. The sediment has caused severe flooding on the Wei River upstream. Chinese engineer Zhang Guangdou described the project as a "mistake" in 2004 and remarked how hydrologist Huang Wanli had been sent to hard labour for opposing the project. Other engineers oppose the dam's existence but their silence is attributed to government reprisals. [6] In August 2010, Chinese journalist Xie Chaoping was detained for writing The Great Migration, a book that criticized the dam and the government's handling of it. The next month, the book's printer, Zhao Shun, was also arrested. [9] Xie was later released on bail. [10]
The dam is a 106 m (348 ft) tall and 713 m (2,339 ft) long concrete gravity type. It sits at the head of a 688,400 km2 (265,793 sq mi) catchment area and withholds a reservoir with a 16,200,000,000 m3 (13,133,554 acre⋅ft) capacity. The reservoir covers a surface area of 2,350 km2 (907 sq mi) and stretches 246 km (153 mi) upstream to Longmen. [4] The dam supports a power station that can hold up to eight turbines but currently only seven are installed. Five 50 MW and 75 MW Francis turbine-generators make up the arrangement for a total installed capacity of 400 MW. [5]
The Yellow River is the second-longest river in China, after the Yangtze River, and the sixth-longest river system on Earth at the estimated length of 5,464 km (3,395 mi). Originating at an elevation above 15,000 feet in the Bayan Har Mountains, it empties into the Bohai Sea. The Yellow River basin was the birthplace of ancient Chinese civilization. Its yellow sediments are carried downstream from the Loess Plateau. The river experiences frequent devastating floods and course changes produced by the continual elevation of the river bed, sometimes above the level of its surrounding farm fields.
A dam is a barrier that stops or restricts the flow of surface water or underground streams. Reservoirs created by dams not only suppress floods but also provide water for activities such as irrigation, human consumption, industrial use, aquaculture, and navigability. Hydropower is often used in conjunction with dams to generate electricity. A dam can also be used to collect or store water which can be evenly distributed between locations. Dams generally serve the primary purpose of retaining water, while other structures such as floodgates or levees are used to manage or prevent water flow into specific land regions.
The Three Gorges Dam is a hydroelectric gravity dam that spans the Yangtze River near Sandouping in Yiling District, Yichang, Hubei province, central China, downstream of the Three Gorges. The world's largest power station in terms of installed capacity (22,500 MW), the Three Gorges Dam generates 95±20 TWh of electricity per year on average, depending on the amount of precipitation in the river basin. After the extensive monsoon rainfalls of 2020, the dam's annual production reached nearly 112 TWh, breaking the previous world record of ~103 TWh set by Itaipu Dam in 2016.
Grand Coulee Dam is a concrete gravity dam on the Columbia River in the U.S. state of Washington, built to produce hydroelectric power and provide irrigation water. Constructed between 1933 and 1942, Grand Coulee originally had two powerhouses. The third powerhouse ("Nat"), completed in 1974 to increase energy production, makes Grand Coulee the largest power station in the United States by nameplate capacity at 6,809 MW.
The Banqiao Reservoir Dam is a dam on the River Ru (汝河), a tributary of the Hong River in Zhumadian City, Henan province, China. The Banqiao dam and Shimantan Reservoir Dam are among 62 dams in Zhumadian that failed catastrophically in 1975 during Typhoon Nina. The dam was subsequently rebuilt.
Nagarjuna Sagar Dam is a masonry dam across the Krishna River at Nagarjuna Sagar which straddles the border between Palnadu district in Andhra Pradesh and Nalgonda district in Telangana. The dam provides irrigation water to the districts of Palnadu, Guntur, Nalgonda, Prakasam, Khammam, Krishna, and parts of West Godavari. It is also a source of electricity generation for the national grid.
Gavins Point Dam is a 1.9-mile-long (3 km) embankment rolled-earth and chalk-fill dam which spans the Missouri River and impounds Lewis and Clark Lake. The dam joins Cedar County, Nebraska with Yankton County, South Dakota a distance of 811.1 river miles (1,305 km) upstream of St. Louis, Missouri, where the river joins the Mississippi River. The dam and hydroelectric power plant were constructed as the Gavins Point Project from 1952 to 1957 by the United States Army Corps of Engineers as part of the Pick-Sloan Plan. The dam is located approximately 4 miles (6.4 km) west or upstream of Yankton, South Dakota.
Salal Dam, also known as Salal Hydroelectric Power Station, is a run-of-the-river hydropower project on the Chenab River in the Reasi district of the Jammu and Kashmir. It was the first hydropower project built by India in Jammu and Kashmir under the Indus Water Treaty regime. After having reached a bilateral agreement with Pakistan in 1978, with significant concessions made to Pakistan in the design of the dam, reducing its height, eliminating operating pool, and plugging the under-sluices meant for sediment management, India completed the project in 1987. The concessions made in the interest of bilateralism damaged the long-term sustainability of the dam, which silted up in five years. It currently runs at 57% capacity factor. Its long-term future is uncertain.
The Bakhtiari Dam is an arch dam currently under construction on the Bakhtiari River within the Zagros Mountains on the border of Lorestan and Khuzestan Provinces, Iran. At a planned height of 325 metres (1,066 ft), it will be the world's tallest dam once completed and withhold the second largest reservoir in Iran after the Karkheh reservoir. The main purpose of the dam is hydroelectric power production and it will support a 1,500 MW power station. By trapping sediment, the dam is also expected to extend the life of the Dez Dam 50 km (31 mi) downstream.
Victoria Dam is an arch dam located 130 mi (209 km) upstream of the Mahaweli River's mouth and 4 mi (6 km) from Teldeniya. It is named in honor of Queen Victoria of the United Kingdom.
Shihmen Dam is a major rock fill dam across the Dahan River in northern Taoyuan City. It forms the Shihmen Reservoir (石門水庫), Taiwan's third largest reservoir or artificial lake. It provides irrigation in Taoyuan, flood control for the Taipei Basin, and hydroelectricity and domestic water supply for more than three million people in northern Taiwan.
J. Strom Thurmond Dam, also known in Georgia as Clarks Hill Dam, is a concrete-gravity and embankment dam located 22 miles (35 km) north of Augusta, Georgia on the Savannah River at the border of South Carolina and Georgia, creating Lake Strom Thurmond. U.S. Route 221 cross it. The dam was built by the U.S. Army Corps of Engineers between 1946 and 1954 for the purposes of flood control, hydroelectricity and downstream navigation. The concrete structure of the dam spans 1,096 feet (334 m) and rises 204 feet (62 m) above the riverbed, housing a power plant with an installed 380 MW capacity. The Dam has prevented over $3.1 million in estimated flood damage annually and also provides recreation, water quality, water supply, along with fish and wildlife management.
Zengwen Dam, also spelled Tsengwen Dam, is a major earthen dam in Dapu Township, Chiayi County, Taiwan on the Zengwen River. It is the third tallest dam in Taiwan, and forms Zengwen Reservoir (曾文水庫), the biggest reservoir in Taiwan by volume. The dam stores water for irrigation of the Chianan Plain, Taiwan's most productive agricultural region, and provides flood control along the Zengwen River which flows through Tainan City. The dam supports a 50 megawatt hydroelectric power station.
The Xinfengjiang Dam is a gravity dam on the Xinfeng River, 8 km (5 mi) upstream of its confluence with the Dong River, and just west of Heyuan City in Guangdong Province, China. The dam's power station has a 292.5 MW installed capacity and its reservoir supplies water for farming along with drinking water to Guangzhou, Shenzhen and Hong Kong. Construction on the dam began in 1958, the first generator was operational in 1960 and the dam complete in 1962. The dam's reservoir-filling is attributed to several earthquakes within the project area including a 6.1-magnitude (Mw) on March 19, 1962.
The Boysen Dam is a rockfill dam on the Wind River in the U.S. state of Wyoming. The dam lies at the head of Wind River Canyon through the Owl Creek Mountains in western Wyoming and creates Boysen Reservoir. It is owned by the U.S. Bureau of Reclamation and furnishes irrigation water supply to the Bighorn Basin as well as providing flood control and hydroelectric power.
The Roseires Dam is a dam on the Blue Nile at Ad Damazin, just upstream of the town of Er Roseires, in Sudan. It consists of a concrete buttress dam 1 km wide with a maximum height of 68 m, and an earth dam on either side. The earth dam on the eastern bank is 4 km long, and that on the western bank is 8.5 km long. The reservoir has a surface area of about 290 km2.
Lake Cachi is an artificial lake in central Costa Rica created by the Cachí Dam, an arch dam north of Tapantí National Park, to the east-southeast of Cartago in Cartago Province. The main town is Cachí, away from the east bank of the lake. Built in the 1970s, it was one of the first hydroelectric projects in Costa Rica. It has an installed capacity of 102 MW with three units of 34 MW capacity each.
The Huanglongtan Dam is a concrete gravity dam located on the Du River, a tributary of the Han River. It is located 25 km (16 mi) west of Shiyan in Hubei Province, China. The main purpose of the dam is hydroelectric power generation but it also provides for flood control. It was constructed between 1969 and 1976 and support a 510 MW power station.
The Kishanganga Hydroelectric Project is a run-of-the-river hydroelectric scheme in Jammu and Kashmir, India. Its dam diverts water from the Kishanganga River to a power plant in the Jhelum River basin. It is located near Dharmahama Village, 5 km (3 mi) north of Bandipore in the Kashmir valley and has an installed capacity of 330 MW.
Matilija Dam is a concrete arch dam in Ventura County, California, completed in 1947. Designed for water storage and flood control, it impounds Matilija Creek to create the Matilija Reservoir in the Los Padres National Forest, south of the Matilija Wilderness and north of Ojai.
{{cite book}}