Scottish and Southern Electricity Networks

Last updated
Scottish and Southern Electricity Networks
Scottish and Southern Energy Power Distribution Limited
Scottish Hydro Electric Transmission plc
Scottish Hydro Electric Power Distribution plc
Southern Electric Power Distribution plc
Company type Public Limited Company
IndustryElectricity Distribution and Transmission
Founded2000
HeadquartersNo.1 Forbury Place, 43 Forbury Road, Reading, RG1 3JH,
Reading
,
United Kingdom
Area served
North Scotland (SHEPD)
Scotland (SHET)
Central Southern England (SEPD)
Key people
Alistair Phillips-Davies (Chief Executive SSE PLC)
Chris Burchell (Managing Director, SSEN Distribution)
Rob McDonald (Managing Director, SSEN Transmission)
Number of employees
3500
Parent SSE plc
Website https://www.ssen.co.uk/

Scottish and Southern Electricity Networks (the trading name of Scottish and Southern Energy Power Distribution Limited, Scottish Hydro Electric Transmission plc, Scottish Hydro Electric Power Distribution plc and Southern Electric Power Distribution plc) is one of two energy companies in the UK to be involved both in electricity transmission and distribution.

Contents

The company forms part of the SSE plc group, which is listed on the London Stock Exchange and is a constituent of the FTSE 100 Index.

Scottish and Southern Electricity Networks manages two distribution networks and one transmission network. The company manages two of the fourteen distribution licenses in Great Britain. The company's electricity distribution and transmission networks carry electricity to over 3.7 million homes and businesses across the north of the Central Belt of Scotland, as well as Central Southern England. The company operates in the United Kingdom with head offices in Perth, Scotland and Reading, England.

History

Origins

The company has its origins in two public sector electricity supply authorities. Scottish Hydroelectric, founded as the North of Scotland Hydro-Electric Board in 1943, was established to design, construct and manage hydroelectricity projects in the Highlands of Scotland, and took over a further generation and distribution responsibilities when the UK's electricity industry was nationalized in 1948. Southern Electric, founded as Southern Electricity Board in 1948, was created to distribute electricity in Southern England. While the Southern Electricity Board was a distribution-only authority with no power generation capacity of its own, the North of Scotland Hydro-Electric Board was a broader spectrum organisation which did have power-generating capabilities. Because of its history and location, the Hydroelectric Board was responsible for most of the UK's hydroelectric generating capacity.

Both authorities were privatized and re-branded in 1990/91, initially retaining their pre-privatization geographic and functional bases.

Post-privatization

In 1998, Scottish and Southern Energy was formed following a merger between Scottish Hydroelectric and Southern Electric. This part of the SSE plc group is now referred to as Scottish and Southern Electricity Networks. [1]

Rebranding

A Scottish and Southern Electricity Networks van, 2016 Scottish and Southern Electricity Networks Van.jpg
A Scottish and Southern Electricity Networks van, 2016

In September 2016, the well-known trading names of Scottish and Southern Energy Power Distribution (SSEPD), Scottish Hydro Electric Power Distribution (SHEPD), Scottish Hydro Electric Transmission (SHET), and Southern Electric Power Distribution (SEPD), merged into a single trading entity known as the Scottish and Southern Electricity Networks. The licensee names of the four did not change.

As part of the rebranding, Scottish and Southern Electricity Networks changed their logo, color scheme, imagery set, social media channels, and website. They also introduced a new company motto centred around being a part of the community they serve: "Powering our Community."

Partnerships

In November 2022, SSE sold a 25% stake in SSEN Transmission (the trading name for Scottish Hydro Electric Transmission) [2] to Ontario Teachers' Pension Plan. [3]

Operations

Scottish and Southern Electricity Networks operate the economically regulated electricity distribution and transmission networks across the north of the Central Belt of Scotland and also Central Southern England, delivering power to 3.7 million homes. With a workforce of over 4,000 working from 85 depots and offices, they look after a network that consists of:

Scottish and Southern Electricity Networks—Central Southern England

The Central Southern England network is the larger of two distribution networks and delivers electrical supplies to over 12.9 million customers across central southern England. The operational region ranges from rural communities in Hampshire, Dorset, Wiltshire, Gloucestershire and Oxfordshire to towns and cities including Bournemouth, Oxford, Portsmouth, Reading, Southampton, Slough, Swindon and in parts of West London. They also distribute electricity to and across the Isle of Wight.

Scottish and Southern Electricity Networks—Northern Scotland

The Northern Scotland network is the smaller of the two, and delivers electricity to some 740,000 customers. This operating region covers a quarter of the UK landmass, and has challenges both regarding distance and location. As well as the major towns and cities of Aberdeen, Dundee, Inverness and Perth, they connect to most Scottish islands with over 100 subsea cable links, including the Inner and Outer Hebrides, Arran and the Orkney Islands. They also serve the Shetland Islands, which runs as a separate electrical system without a connection to the mainland.

Scottish Hydro Electric Transmission (SHE Transmission)

Scottish Hydro Electric Transmission owns and maintains the 132 kV and 275 kV electricity transmission network in the north of Scotland, in some of the UK's most challenging geographical terrains. Some of their circuits are situated over 750 meters above sea level and or up to 250 km long. The operating area contains a vast renewable energy resource, utilized in forms such as wind and marine generation. These generators are all dependent on SHE Transmission for transportation to the load centers to the south.

Independent distribution network operator

In addition to the distribution network operators who are licensed for a specific geographic area, there are also independent distribution network operators (IDNOs). IDNOs own and operate electricity distribution networks, which are predominantly network extensions connected to an existing distribution network. Scottish and Southern Electricity Networks also provides distribution services in South Scotland as an IDNO and in all other English and Welsh areas.

Services

Scottish and Southern Electricity Networks provides a number of services across its distribution areas.

In the event of a power outage, it is the responsibility of Scottish and Southern Electricity Networks to repair the fault and get power back on for affected areas. Scottish and Southern Electricity Networks also has a Priority Services Register to support customers with disabilities or particular vulnerabilities in the event of a power outage.

Scottish and Southern Electricity Networks has a team dedicated to dealing with non-emergency electricity network jobs in central southern England and northern Scotland. These services range from shrouding overhead power cables to locating underground electricity cables so that those cables can be worked around safely.

A spokesperson for the Energy Networks Association said “The charges for connection applications have been introduced following a recent government consultation, which found that the majority of industry supported the change."

Controversy

Scottish and Southern Electricity Networks are responsible for a controversial plan to expand Scotland’s electrical infrastructure network, with a new network of pylons, substations and associated infrastructure across much of rural Scotland. [4]

See also

Related Research Articles

<span class="mw-page-title-main">Scottish Power</span> British energy company

Scottish Power Limited is a vertically integrated energy company based in Glasgow, Scotland. It is a subsidiary of Spanish utility firm Iberdrola.

<span class="mw-page-title-main">National Grid (Great Britain)</span> High-voltage electric power transmission network in Great Britain

The National Grid is the high-voltage electric power transmission network serving Great Britain, connecting power stations and major substations, and ensuring that electricity generated anywhere on the grid can be used to satisfy demand elsewhere. The network serves the majority of Great Britain and some of the surrounding islands. It does not cover Northern Ireland, which is part of the Irish single electricity market.

<span class="mw-page-title-main">Tenaga Nasional</span> Malaysian electricity company

Tenaga Nasional Berhad, also known as Tenaga Nasional or simply Tenaga, is the Malaysian multinational electricity company and is the only electric utility company in Peninsular Malaysia and also the largest publicly listed power company in Southeast Asia with MYR 182.60 billion worth of assets. It serves over 10.3 million customers throughout Peninsular Malaysia and the East Malaysian state of Sabah through Sabah Electricity Sdn Bhd.

National Grid plc is a British multinational electricity and gas utility company headquartered in London, England. Its principal activities are in the United Kingdom, where it owns and operates electricity and natural gas transmission networks, and in the Northeastern United States, where as well as operating transmission networks, the company produces and supplies electricity and gas, providing both to customers in New York and Massachusetts.

Public electricity suppliers (PES) were the fourteen electricity companies created in Great Britain when the electricity market in the United Kingdom was privatised following the Electricity Act 1989. The Utilities Act 2000 subsequently split these companies between distribution network operators and separate supply companies.

<span class="mw-page-title-main">Falls of Foyers</span> Waterfall in Highland, Scotland

The Falls of Foyers are two waterfalls on the River Foyers, which feeds Loch Ness, in Highland, Scotland. They are located on the lower portion of the River Foyers, and consist of the upper falls, with a drop of 46 feet (14 m) and the lower falls, which drop 98 feet (30 m).

Southern Electric plc was a public limited energy company in the United Kingdom between 1990 and 1998, when it merged with Scottish Hydro-Electric plc to form Scottish and Southern Energy plc. The company had its origins in the southern England region of the British nationalised electricity industry. Created in 1948 as the Southern Electricity Board, in 1990 it was privatised by being floated on the London Stock Exchange.

A distribution network operator (DNO), also known as a distribution system operator (DSO), is the operator of the electric power distribution system which delivers electricity to most end users. Each country may have many local distribution network operators, which are separate from the transmission system operator.

<span class="mw-page-title-main">Scottish Nuclear</span> Nuclear energy company (1990-1996)

Scottish Nuclear was formed as a precursor to the privatisation of the electricity supply industry in Scotland on 1 April 1990. A purpose-built headquarters was built in 1992 in the new town of East Kilbride.

<span class="mw-page-title-main">Scottish Hydro Electric</span>

Scottish Hydro plc was a public electricity supplier formed on 1 August 1989 after a change of name from North of Scotland Electricity plc on that date. It was listed on the London Stock Exchange and was once a constituent of the FTSE 100 Index but merged with Southern Electric in 1998.

<span class="mw-page-title-main">SSE plc</span> British energy company

SSE plc is a multinational energy company headquartered in Perth, Scotland. It is listed on the London Stock Exchange, and is a constituent of the FTSE 100 Index. SSE operates in the United Kingdom and Ireland.

<span class="mw-page-title-main">SSE Renewables</span>

SSE Renewables is a renewable energy subsidiary of SSE plc, which develops and operates onshore and offshore wind farms and hydroelectric generation in the United Kingdom and Ireland.

<span class="mw-page-title-main">Electricity Act 1989</span> United Kingdom legislation

The Electricity Act 1989 provided for the privatisation of the electricity supply industry in Great Britain, by replacing the Central Electricity Generating Board in England and Wales and by restructuring the South of Scotland Electricity Board and the North of Scotland Hydro-Electric Board. The Act also established a licensing regime and a regulator for the industry called the Office of Electricity Regulation (OFFER), which has since become the Office of Gas and Electricity Markets (OFGEM).

Shetland HVDC Connection is a high-voltage direct current submarine power cable under construction to connect Shetland to the British mainland.

<span class="mw-page-title-main">Copperbelt Energy Corporation</span>

Copperbelt Energy Corporation Plc (CEC) is a Zambian electricity generation, transmission, distribution and supply company with operations in Zambia and Nigeria. The company is listed on the Lusaka Stock Exchange

<span class="mw-page-title-main">Stornoway power station</span> Power station in Outer Hebrides, Scotland, UK

Stornoway power station, also known as Battery Point Power Station, is an electrical generation facility in Stornoway, Scotland. It was commissioned in 1954 to supply power to the Western Isles and currently comprises eight Mirrlees Blackstone, medium speed, diesel generators with a combined output of 25.5MW. The station is owned and operated by Scottish and Southern Electricity Networks (SSEN) part of SSE plc. The Western Isles power network was originally operated independently of the Scottish mainland network.

The Western Isles HVDC connection is a proposed 1.8GW HVDC submarine power cable to connect the Isle of Lewis to the Scottish mainland.

Eastern HVDC and Eastern HVDC projects are the names used by Ofgem for two planned HVDC submarine power cables from the East coast of Scotland to Northeast England to strengthen the National Grid. The two links combined will deliver 4 GW of renewable energy from Scottish wind farms to England.

<span class="mw-page-title-main">Inver Hydro-Electric Scheme</span> Power station on Jura, Inner Hebrides, Scotland

Inver Hydro-Electric Scheme is a remote hydro-electric plant on the Scottish island of Jura, part of the Inner Hebrides. Construction began in 2011, and it was operational by June 2012. It is the third scheme built on the Inver Estate, but the first to be connected to the National Grid. It can produce 2 MW of electric power.

References

  1. "Where we came from". sse.com. Retrieved 20 September 2017.
  2. "What we do". SSEN Transmission. Retrieved 27 November 2022.
  3. Dias Marins, Lena (25 November 2022). "SSEN Transmission sells 25% stake for £1.465 billion as SSE extends partnering approach". Current. Retrieved 27 November 2022.
  4. "Skye to Fort Augustus power line: Campaigners ask Highland Council to change their mind and object to pylons". Press and Journal. 16 June 2023. Retrieved 24 February 2023.