Senoko Power Station

Last updated

Senoko Power Station
Senoko Power Station located on the northern coast of Singapore.jpg
Senoko Power Station located on the northern coast of Singapore.
Senoko Power Station
Official nameSenoko Power Station
CountrySingapore
Location Senoko, Sembawang
Coordinates 1°28′N103°48′E / 1.467°N 103.800°E / 1.467; 103.800 Coordinates: 1°28′N103°48′E / 1.467°N 103.800°E / 1.467; 103.800
StatusOperational
Commission date 1976 (1976)
Construction cost SGD 1.2 billion
Owner(s) Lion Power Holdings (Senoko Energy)
Thermal power station
Primary fuel Natural gas
Secondary fuel Fuel Oil
Tertiary fuelNone
Combined cycle?Yes
Cogeneration?No
Power generation
Units operational7
Make and model Hitachi Deregistered
Siemens
Alstom
MHI
Nameplate capacity 2800 MW (authorised)
External links
Website senokoenergy.com

2x Hitachi Thermal power plant has been Deregistered since 2018 and is scheduled for decommission.

The Senoko Power Station is the largest power station in Singapore. It is located in Senoko, Sembawang and was commissioned in 1976. It is owned by Senoko Energy Pte Ltd, formerly known as Senoko Power Ltd.

Contents

Description

The Senoko Power Station is located at a former British Naval Base in Sembawang, Singapore. [1]

The Steam Plant Stage I, which was completed in 1976, comprised three steam thermal plants with 120 MW of capacity each. The Steam Plant Stage II, which was completed in 1979, comprised three steam thermal plants with 250 MW of capacity each. The Steam Plant Stage III which was completed in 1983 comprises another two steam thermal plants with 250 MW of capacity each. In 1992, Stage III 250 MW boilers were modified with gas burners to enable it to fire both Natural Gas and Fuel Oil.

In the 1990s, it was converted from a gas turbine power plant to a combined cycle plant. [2] The combined cycle plants include combined cycle plants 1 and 2, combined cycle plants 3 to 5 and combined cycle plants 6 and 7. The Gas Plant Stage I was an open cycle plant with 4 open cycle gas turbines with 131 MW capacity when commissioned in 1991. In 1994, the 4 open cycle gas turbines were converted into two blocks of combined cycle plants with 425 MW of capacity each and renamed CCP 1 and 2. In 2010, Gas Turbine GT22 of CCP 2 was upgraded with new vanes and blades for its stage 1 and 2

The combined cycle plants 3 to 5 were completed and fully operational by 2004 with 365 MW of capacity each, which involved the repowering of the Stage I oil-fired steam thermal plant. The combined cycle plants 6 and 7 were completed and commissioned by 2012 with 431 MW of capacity each, which involved the repowering of the Stage II oil-fired steam thermal plant.

In its early years, the plant used crude oil as fuel to power its turbines; however, this was replaced by natural gas piped from Terengganu on the east coast of Peninsular Malaysia after 1992. Oil, however, is still used as a back-up.

History

The Senoko Power Station originally began operations in 1976. [3] It was built by PUB with plans starting as early as 1971. [1] Two additional stages of construction were conducted with it being officially completed in 1983 as Singapore's largest power station. [1]

In the 1990s, the Senoko Power Station was converted from an open-cycle gas turbine power plant to Singapore's first combined cycle plant. [2]

In 1992, a fire broke out at one of its plants resulting in a major power outage in the island. [4]

Based on a mutual agreement between Malaysia and Singapore on electricity, the plant is linked by a submarine cable to the Sultan Iskandar Power Station in Pasir Gudang, Johor. In the event of a power outage in Peninsular Malaysia, the plant would supply electricity to the Johor plant. Likewise, if there is a power outage in Singapore, the Johor plant would supply electricity to Senoko.

The plant's only standing concrete chimney which belongs to Stage 3, at 182 metres high, is the tallest structure in the northern part of Singapore and one of the tallest structures on the island. It is clearly visible across the Tebrau Straits and in most parts of Johor Bahru. The plant's second chimney which belongs to Stage 2 was demolished in July 2010 as part of the repowering process.

On 5 September 2008, Temasek Holdings sold Senoko Energy Pte Ltd to Lion Power Holdings for S$3.65 billion. Lion Power is owned by a consortium led by Japan's Marubeni Corporation. Other members of the consortium are GDF Suez of France, The Kansai Electric Power Company, Kyūshū Electric Power Company and Japan Bank for International Cooperation. [5]

Plant development stageCommission dateStatusInstallation cost (in S$)CapacityPlant typeTurbine manufacturer
Steam Stage I1976Decommissioned
Repowered to CCP 3 – 5
600,000,0003 x 120 MW Steam Thermal Plant Hitachi
Steam Stage IIOctober 1978

April 1979

September 1979

Decommissioned

Repowered to CCP 6 – 7

600,000,0003 x 250 MWSteam Thermal PlantHitachi
Steam Stage IIIJune 1983
November 1983
Operational400,000,0002 x 250 MWSteam Thermal PlantHitachi
Gas Stage I1990
1991
Upgraded to

CCP 1 & 2

4 x 131 MWOpen Cycle Plant Siemens
CCP 1 & 21994Operational2 x 425 MW Combined-Cycle Plant Siemens
CCP 3 – 5February 2002
July 2004
December 2004
Operational3 x 365 MWCombined-Cycle Plant Alstom
CCP 6 – 72012Operational1,000,000,0002 x 431 MWCombined-Cycle Plant MHI

Related Research Articles

<span class="mw-page-title-main">Power station</span> Facility generating electric power

A power station, also referred to as a power plant and sometimes generating station or generating plant, is an industrial facility for the generation of electric power. Power stations are generally connected to an electrical grid.

<span class="mw-page-title-main">Combined cycle power plant</span> Assembly of heat engines that work in tandem from the same source of heat

A combined cycle power plant is an assembly of heat engines that work in tandem from the same source of heat, converting it into mechanical energy. On land, when used to make electricity the most common type is called a combined cycle gas turbine (CCGT) plant. The same principle is also used for marine propulsion, where it is called a combined gas and steam (COGAS) plant. Combining two or more thermodynamic cycles improves overall efficiency, which reduces fuel costs.

<span class="mw-page-title-main">Cogeneration</span> Simultaneous generation of electricity, and/or heating, or cooling, or industrial chemicals

Cogeneration or combined heat and power (CHP) is the use of a heat engine or power station to generate electricity and useful heat at the same time.

<span class="mw-page-title-main">Poolbeg Generating Station</span> Power generating station in Dublin, Ireland

Poolbeg Generating Station, colloquially known as The Poolbeg Stacks, is a power station owned and operated by the Electricity Supply Board of Ireland (ESB). There are two stations on the site, the older thermal station containing units 1, 2, and 3 and the combined cycle gas station containing units CG14, CG15 and ST16, which is located toward the eastern end of the site. The six units have a total installed capacity of 1020 MW.

<span class="mw-page-title-main">Peterhead Power Station</span>

Peterhead Power Station is a 2,177 MW multi unit station owned and operated by SSE plc near Boddam and the A90, just south of Peterhead, in Aberdeenshire in the north east of Scotland. It stands next to the circa-1800-built Sandford Lodge. Originally an oil fired and then a fossil gas power station, the plant also has been the site of experimental hydrogen generation capacity as well.

<span class="mw-page-title-main">Eshkol Power Station</span>

The Eshkol Power Station is a power station supplying electrical power to the Shephelah region in Israel. It is located in north industrial zone of Ashdod near the mouth of the Lakhish River, close to the port of Ashdod and the Ashdod Oil Refineries which provided the plant with fuel oil prior to its conversion to use natural gas. The power station is also close to the sea since its cooling system uses sea water.

<span class="mw-page-title-main">New Plymouth Power Station</span>

The New Plymouth Power Station (NPPS) was a 600 MW thermal power station at New Plymouth, New Zealand. Located at Port Taranaki, it was dual fuelled on natural gas and fuel oil. Constructed at a time of major hydro and HV transmission developments, it was New Zealand's first big thermal power station planned for continuous base load operation.

Carrington Power Station is a combined cycle gas turbine power station, which was completed in Autumn 2016 and began commercial operation on 18 September 2016. It is located on the site of a former coal-fired power station, close to the villages of Carrington and Partington in the Greater Manchester Area and 12 km (7.5 mi) southwest of Manchester City Centre. The Manchester Ship Canal and the River Mersey run alongside the site, in Trafford, Greater Manchester, in North West England.

Martin Next Generation Solar Energy Center is the solar parabolic-trough component of an integrated solar combined cycle (ISCC) 1150 MW plant, in western Martin County, Florida, United States, just north of Indiantown. The project was built by Florida Power & Light Company (FPL). Lauren Engineers & Constructors (Abilene, TX) was the EPC contractor for the project. Its construction began in 2008 and was completed by the end of 2010.

<span class="mw-page-title-main">Kashima Power Station</span>

Kashima Power Station is a large oil-fired and gas-fired power station in Kamisu, Ibaraki, Japan. The facility operates with an installed capacity of 5,660 MW, making it one of the largest fossil-fueled power station in the world. The plant includes four oil-fired steam turbines rated at 600 MW, two oil-fired steam turbines rated at 1,000 MW, and three advanced combined cycle gas turbines rated at 420 MW added in 2014. As of April 2016, the four oil-fired 600 MW turbines have been suspended indefinitely. The plant features 3 lattice stacks, including the tallest steel chimney in the world at 231m.

Rajasthan Rajya Vidyut Utpadan Nigam Ltd (RVUNL) is the electricity generation company of the Government of Rajasthan state in India.

Repowering is the process of replacing older power stations with newer ones that either have a greater nameplate capacity or more efficiency which results in a net increase of power generated. Repowering can happen in several different ways. It can be as small as switching out and replacing a boiler, to as large as replacing the entire system to create a more powerful system entirely. There are many upsides to repowering.

<span class="mw-page-title-main">Takoradi Thermal Power Station</span>

The Takoradi Power Station is a thermal power station at Aboadze, 17 kilometres (11 mi) east of Sekondi-Takoradi, Ghana. It consists of three power plants.

Tuas Power Ltd is one of the largest power generation companies and a key provider of energy solutions, multi-utilities and environmental services in Singapore.

Phú Mỹ Power Plants is a power generation complex located in Phú Mỹ, Tân Thành District, Bà Rịa–Vũng Tàu province, Vietnam. The complex is located next to Thị Vải River. Its combined generation capacity is 3,900 MW providing about 40% of Vietnam's total electricity. The complex consist of Phú Mỹ 1, 2-1, 2-2, 3 and 4 power plants.

<span class="mw-page-title-main">Tatan Power Plant</span> Power plant in Guanyin, Taoyuan City, Taiwan

The Tatan Power Plant, Dah-Tarn Power Plant or Ta-Tan Power Plant is a gas-fired power plant in Guanyin District, Taoyuan City, Taiwan. At the capacity of 4,384 MW, the plant is the world's largest gas turbine combined cycle power plant and Taiwan's largest gas-fired power plant.

<span class="mw-page-title-main">PacificLight</span>

PacificLight is a Singapore-based power generator and electricity retailer. It runs an 800MW plant, operated by PacificLight Power Pte Ltd, which uses Liquefied Natural Gas (LNG) as its primary fuel. In 2015, PacificLight generated 9% of Singapore’s total electricity needs.

<span class="mw-page-title-main">Senoko Energy</span>

Senoko Energy is a Singaporean electric utility company and retailer. It is the largest power generation company in Singapore, accounting for approximately 20% of the nation's electricity supply. It also operates the Senoko Power Station, the nation's largest power plant by generation capacity. Since 2008, it has been owned by Lion Power, a consortium led by Japanese trading company, Marubeni.

Fenchuganj Combined Cycle Power Plant or Fenchuganj Combined Cycle Gas also known as Fenchuganj Power Plant is a gas-turbine and steam turbine based power station in Fenchuganj Upazila, Sylhet District of Bangladesh. This station is governed by Bangladesh Power Development Board.

GIPCL Vadodara Gas based Power Station is Gas turbine based combined cycle power plant. It is located at Dhanora village in Vadodara, Gujarat. The power plant is run by state-owned Gujarat Industrial Power Corporation Limited (GIPCL). The primary electricity generation is through the Gas turbines. Waste heat from the gas turbine is recovered by a heat recovery steam generator (HRSG) to power a conventional steam turbine. The HRSG recovers heat from a hot gas stream and produces steam, the steam utilized to power the steam turbines.

References

  1. 1 2 3 "Senoko Power Station Opens". History SG. Retrieved 6 February 2020.
  2. 1 2 "Environmental innovations seen in 1997 Project of the Year winners". Power Engineering International. 1 November 1997. Retrieved 6 February 2020.
  3. Global Water Security: Lessons Learnt and Long-Term Implications. Springer. 2018. ISBN   9789811079139 . Retrieved 6 February 2020.
  4. "1992" . Retrieved 28 November 2018.
  5. Nicholas Fang (5 September 2008). "Temasek sells Senoko Power to Marubeni-led group for S$3.65b". Channel NewsAsia . Retrieved 5 September 2008.