South African Railways Class 8M | |
---|---|
Stock type | Electric multiple unit |
In service | 1987-present |
Manufacturer | Nissho Iwai Corporation DCD Group (body and bogies) Hitachi (electrical equipment) |
Constructed | 1987-1992 |
Number built | 96 cars |
Formation | 4 cars |
Capacity | 64 (motor) 56 (trailer) 4,464 (crush load; full set) |
Operators | |
Specifications | |
Car length | 22,940 mm (75 ft 3 in) |
Maximum speed | 110 km/h (68 mph) |
Weight | Motor: 47.4 t (46.7 long tons; 52.2 short tons) Trailer: 32.4 t (31.9 long tons; 35.7 short tons) |
Power output | 245 kW (329 hp) per motor |
Acceleration | 0.8 m/s (2.6 ft/s) (to 50 km/h (31 mph)) |
Electric system(s) | 3000 V DC overhead |
Current collector(s) | Pantograph |
Wheels driven | 48 |
Track gauge | 3 ft 6 in (1,067 mm) Cape gauge |
Notes/references | |
[1] |
The Class 8M are electric multiple units used by the South African Railways and later Metrorail. There are also three EMU classes that are related to the 8M: the prototypical Classes6M and 7M, and the proposed Class9M. [2]
Since the 1950s, the South African Railways had been using the Class 5M2 on commuter and suburban routes, but by the 1980s, they were due for replacement. It was decided to import carriages from foreign manufacturers that used thyristor chopper control, which was more energy efficient than the resistor control used in the 5M2 class. Two prototype EMU classes, the 6M and the 7M, were introduced in 1983. [3] [4]
12 cars were built by Hitachi in Japan. These were formed into three car sets (two motors and one trailer) and could be mashed up into a 9-car set. The front of the train has an asymmetrical structure with the cab on the left and the destination board on the right. The body is made of lightweight stainless steel structure developed in-house by Hitachi, and is designed to withstand the UIC-regulated 200 ton end-of-car compressive load. Each carriage was four metres longer than a 5M2 car, increasing the passenger capacity, and the interior had air-conditioning installed, improving comfort. [3] [5]
The chopper control device used in the control system has been developed in-house to suit South African Railways' 3000 V DC voltage, which uses the M6 type, and is capable of controlling eight traction motors with a rated output of 245 kW, four of which are installed in each motor car. In addition, continuous control using frequency modulated waves is used as the control command from the cab, realizing completely stepless control. [6] [5]
After introduction, a comparative experiment was conducted between the 6M type electric train (12-car train with eight motors and four trailers) and the 5M2 type electric train (14-car train with four motors and 10 trailers). It was found that, although the number of passengers and the length of the train increased, the power consumption and maintenance costs were less compared to the 5M2 class, and it was reported that the amount of energy consumed could be reduced by 28.4%. [7]
Siemens of Germany built twelve cars, known as the Class 7M. Structurally, they were similar to the Class 6M, but the train consists of four cars (two motors and two trailers), and other differences present such as the absence of the small window to the right of the destination indicator that was present on the 6M series. [4]
The chopper control is equipped with a monitoring system that records signals emitted from the equipment and monitors for faults. It also reduces the number of components, improving manufacturing costs and reliability. Each motor car is equipped with four electric motors with an output of 290 kW. [4] [8]
Experience from the 6M and 7M classes lead South African Railways to order an electric multiple unit model with thyristor chopper control from Nissho Iwai in 1985. While DCD Group constructed the carbody and bogies, Hitachi provided the electrical equipment. The resulting Class 8M shared the body and bogie designs as the 6M, but consists of two motor cars and two trailers, much like the 7M. In addition, the equipment on the 8M, including the control device, required less maintenance. [9] [10]
96 cars (24 four-car sets) were built between 1987 and 1992, and saw use primarily on the Western Cape lines in Cape Town. Since 2003, in order to improve reliability, reduce energy consumption, and extend the lifespan, refurbishment has been carried out to replace the control devices with variable-frequency drive using IGBT technology. [10]
As of 2019, two of the trains are in service on the Central Line, being affectionately nicknamed "uSilver" by Khayelitsha commuters. [11] [ better source needed ]
The Class 9M was going to be introduced in 1997 as a derivative of the Class 8M, but due to the economic downturn in South Africa at the time, construction of these units was dropped in favour of refurbishing the existing Class 5M2 in order to reduce costs. [9]
A multiple-unit train is a self-propelled train composed of one or more carriages joined, and where one or more of the carriages have the means of propulsion built in. By contrast, a locomotive-hauled train has all of the carriages unpowered.
The Hitachi was an electric multiple unit train that operated on the Melbourne suburban railway network between 1972 and 2014. Electrical equipment was supplied by Commonwealth Engineering, to designs by Hitachi of Japan, leading to their official name today, although no Hitachi-supplied components were used in their construction. They were the last suburban trains in Melbourne without air conditioning. A total of 355 carriages were built between 1972 and 1981, including a replacement carriage for one written off while the fleet was still being delivered.
The British Rail Class 310 was a slam-door, alternating current (AC) electric multiple-unit passenger train (EMU) introduced in 1965 as part of the West Coast Main Line electrification project. They were initially classified as Class AM10 units before the introduction of the TOPS classification system. Constructed at BR's Derby Carriage and Wagon Works. They consisted of four carriages - a second class driving trailer, a second class trailer, a second class motor car and a composite driving trailer. The maximum speed was 75 miles per hour (121 km/h). A glass partition behind the driver's cab enabled passengers in the leading and rear coaches to view the line ahead or behind.
The C sets were a class of electric multiple units that operated on Sydney's suburban rail network from 1986 up until 2021. Built by A Goninan & Co between 1986 and 1987, they were introduced into service by the State Rail Authority, before later being operated under CityRail and Sydney Trains. A total of 56 carriages were built, with the last sets being withdrawn from service in February 2021, having been gradually replaced by Waratah A & B set trains.
An electric multiple unit (EMU) is an electric self-powered train, capable of operating in multiple with other EMUs and without the need for a locomotive; these are typically passenger trains with accommodation in every vehicle and a driving position at each end. The term can also be used to describe a train that is a permanent formation with a non-driving power car, such as the Advanced Passenger Train. As of December 2010, two-thirds of the passenger carriages in Great Britain are formed in EMUs.
Metrorail is an operator of commuter rail services in the major urban areas of South Africa. It is a division of the Passenger Rail Agency of South Africa (PRASA), a state-owned enterprise which is responsible for most passenger rail services in South Africa. The Metrorail system consists of 471 stations, 2,228 kilometres (1,384 mi) of track, and carries an average of 1.7 million passengers per weekday.
The New South Wales V sets are a class of electric multiple units (EMU) currently operated by Sydney Trains on its intercity routes. Built by Comeng between 1970 and 1989, the sets are of stainless steel construction, and are currently the oldest in the electric fleet of NSW. First delivered under the Department of Railways, only sets from 1977 and onwards remain in service, now operating on Intercity services to Lithgow and Newcastle.
Metrorail Western Cape is a network of commuter and suburban rail services in the City of Cape Town Metropolitan Municipality and in the surrounding towns of Malmesbury, Paarl, Stellenbosch and Wellington in the Western Cape province of South Africa.
The TRTA/Tokyo Metro 05 series is an electric multiple unit (EMU) train type operated on the Tokyo Metro Tozai Line and Tokyo Metro Chiyoda Line Ayase Branch in Japan by the subway operator Tokyo Metro. Some sets have also been shipped to Indonesia, where they operate on the KRL Commuterline system in Jakarta.
The Class 5M2 and Class 5M2A are electric multiple units that are used to provide commuter rail services by Metrorail in the major cities of South Africa. The original Class 5M2 trainsets were built for the South African Railways by Metro-Cammell between 1958 and 1960. Most of those in use today, however, are of Class 5M2A, built to the same design by Union Carriage & Wagon (UCW) from 1962 to 1985; a total of 4,447 coaches were built by UCW.
The Rhaetian Railway Be 4/4 is a class of 11 kV 16.7 Hz AC metre gauge railcars operating under the traffic numbers 511–516 on the so-called core network of the Rhaetian Railway (RhB), which is the main railway network in the Canton of Graubünden, Switzerland.
The Central Line is a commuter rail service in Cape Town, South Africa, operated by Metrorail Western Cape. Central Line services operate along two routes from central Cape Town to Langa, and then along three branches from Langa to various areas in the south-east of the city. The first branch runs to Mitchell's Plain, the second to Khayelitsha, and the third passes through Belhar to terminate in Bellville.
The Northern Line is a commuter rail service in South Africa that in the Cape Town metropolitan area and its surroundings and is operated by Metrorail Western Cape. Northern Line services operate from central Cape Town to Bellville, and then from Bellville along three different routes. The first route runs along the main Cape Town–De Aar railway line to Paarl and Wellington. The second route passes through Stellenbosch to terminate at Muldersvlei station on the main line, while the third also passes through Somerset West to terminate in Strand.
The Spoornet Class 7E4 of 2001 is a South African electric locomotive.
The ALe 582 is an Italian electric multiple unit train designed for commuter and medium-distance services, developed in the mid-1980s to replace pre-war and immediately post-war EMUs and locomotive-hauled trains on various lines in Sicily and Southern Italy, although they later diffused on the whole FS network. They're part of the "ALe Elettroniche" or "G.A.I." family, together with their predecessors ALe 724 and their successors, the ALe 642.
The Indian locomotive class WAG-6A is a class of 25 kV AC electric locomotives that was developed in the 1988 by Allmänna Svenska Elektriska Aktiebolaget (ASEA) for Indian Railways. The model name stands for broad gauge (W), AC Current (A), Goods (G) engine, 6th generation (6) First variant (A). They entered service in 1988. A total of 6 WAG-6A were built at ASEA, Sweden between 1987 and 1988. they were the most powerful locomotives in India until the arrival of the WAG-9 class.
The Indian locomotive class WAG-6B/C is a class of 25 kV AC electric locomotives that was developed in the 1988 by Hitachi for Indian Railways. The model name stands for broad gauge (W), AC Current (A), Goods (G) engine, 6th generation (6) Second/Third variant (B/C). They entered service in 1988. A total of 12 WAG-6 were built at Hitachi, Japan between 1987 and 1988. they along with WAG-6A were the most powerful locomotives in India until the arrival of the WAG-9 class.
The MI 84, also known as the Class Z 8100 is a dual-voltage electric multiple unit trainset that is operated on line B of the Réseau Express Régional (RER), a hybrid suburban commuter and rapid transit system serving Paris and its Île-de-France suburbs.
The MI 79, also known as the Class Z 8100 is a dual-voltage electric multiple unit trainset that is operated on line B of the Réseau Express Régional (RER), a hybrid suburban commuter and rapid transit system serving Paris and its suburbs. The MI 79, designed in the 1970s for the RER B which needed dual-voltage (interconnection) trainsets. They were followed by a derivative version, the MI 84, designed in the 1980s to meet the needs of the RER A line, before reassigned to the RER B in the 2010s.
The PNR EM10000 class is an electric multiple unit commuter trainset that will be operated by the Philippine National Railways on the North–South Commuter Railway. Prior to the reveal of its numbering scheme in October 2021, the train was known as the PNR Sustina Commuter. Set to enter service by 2028, it will be PNR's first trainset to be run on standard gauge and powered by electric traction. The trains are also designed to be interoperable with the Metro Manila Subway.