South Salem station

Last updated

South Salem
General information
LocationOcean Avenue
Salem, Massachusetts
Coordinates 42°30′27″N70°53′53″W / 42.50762°N 70.89806°W / 42.50762; -70.89806
Line(s) Eastern Route
Platforms2 side platforms
Tracks2
Construction
AccessibleYes
Other information
StatusProposed
Proposed services
Preceding station MBTA.svg MBTA Following station
Swampscott Newburyport/​Rockport Line Salem
Location
South Salem station

South Salem station is a proposed MBTA Commuter Rail station in Salem, Massachusetts, which would be served by the Newburyport/Rockport Line.

Contents

Planning

In February 2001, the MBTA began two parallel planning processes for the North Shore region: a Draft Environment Impact Statement for the Blue Line Extension (DEIS), and a Major Investment Study (MIS) for other projects primarily north of Salem. The MIS, released in 2004, identified a number of possible improvements to the Newburyport/Rockport Line, including upgrades to current stations, grade crossing eliminations, signal system improvements, increased frequencies, a second Salem tunnel, a branch line to Danvers, and new stations at Revere and South Salem. [1] A South Salem station would serve Salem State University, the North Shore Medical Center, and residential areas south of downtown Salem — some of which were served by the pre-1987 station, but only by the 455 and 459 buses thereafter. The station was estimated to cost $12.2 to $13.8 million, with a single island platform serving the line's two tracks, and would draw about 600 daily riders. [1] Two possible locations were considered: one with access from Laurel Street and the platform running to the north, and one with access from Ocean Avenue and the platform running to the south. [2] [3]

None of the projects in the DEIS or MIS was actually built due to lack of funding, except for parking structures at Salem and Beverly which were mandated as Big Dig mitigation. A feasibility study, released in March 2016, analyzed four possible station locations, including three sites near the MIS locations plus one at Jefferson Avenue to the south. The station would have two side platforms and cost between $15 million and $20 million depending on the site. [4] The study received mixed reactions from Salem residents, including concerns about construction, lights, and trains idling near a residential area but also hope for improved transit accessibility and higher property values. [5] [6] By November 2016, a site off Canal Street near Lauren Street was considered the preferred alternative. Part or all of an adjacent industrial property could be purchased to provide pedestrian access and possibly a small parking lot on the west side of the tracks, improving access to the nearby North Shore Medical Center. [7] [8]

As of June 2024, the city is designing the Ocean Avenue West alternative, with side platforms rather than an island platform. Conceptual design is expected to be complete in November 2024. A layover yard slightly to the north, on the site of a former freight yard, is also proposed. [9] In June 2024, the city received a $2-million federal grant to complete design of the station. [10] [11]

Related Research Articles

<span class="mw-page-title-main">JFK/UMass station</span> Transit station in Boston, Massachusetts, US

JFK/UMass station is a Massachusetts Bay Transportation Authority (MBTA) intermodal transfer station, located adjacent to the Columbia Point area of Dorchester, Boston, Massachusetts. It is served by the rapid transit Red Line; the Greenbush Line, Kingston/Plymouth Line, and Middleborough/Lakeville Line of the MBTA Commuter Rail system, and three MBTA bus routes. The station is named for the John F. Kennedy Presidential Library and Museum and the University of Massachusetts Boston, both located nearby on Columbia Point.

<span class="mw-page-title-main">North Station</span> Train station in Boston, Massachusetts, US

North Station is a commuter rail and intercity rail terminal station in Boston, Massachusetts. It is served by four MBTA Commuter Rail lines – the Fitchburg Line, Haverhill Line, Lowell Line, and Newburyport/Rockport Line – and the Amtrak Downeaster intercity service. The concourse is located under the TD Garden arena, with the platforms extending north towards drawbridges over the Charles River. The eponymous subway station, served by the Green Line and Orange Line, is connected to the concourse with an underground passageway.

<span class="mw-page-title-main">MBTA Commuter Rail</span> Greater Boston commuter rail system

The MBTA Commuter Rail system serves as the commuter rail arm of the Massachusetts Bay Transportation Authority's (MBTA's) transportation coverage of Greater Boston in the United States. Trains run over 394 mi (634 km) of track to 135 stations. It is operated under contract by Keolis, which took over operations on July 1, 2014, from the Massachusetts Bay Commuter Railroad Company (MBCR).

<span class="mw-page-title-main">Oak Grove station</span> Transit station in Malden, Massachusetts, US

Oak Grove station is a Massachusetts Bay Transportation Authority (MBTA) intermodal transit station in the northern section of Malden, Massachusetts, just south of the Melrose border. It is the northern terminus of the rapid transit Orange Line and a stop on the Haverhill Line commuter rail service. The accessible station has a 788-space park and ride lot and is served by three MBTA bus routes.

<span class="mw-page-title-main">Ruggles station</span> Transit hub in Boston, Massachusetts, US

Ruggles station is an intermodal transfer station in Boston, Massachusetts. It serves Massachusetts Bay Transportation Authority (MBTA) rapid transit, bus, and commuter rail services and is located at the intersection of Ruggles and Tremont streets, where the Roxbury, Fenway–Kenmore, and Mission Hill neighborhoods meet. It is surrounded by the campus of Northeastern University. Ruggles is a station stop for the Orange Line subway, as well as the Providence/Stoughton Line, Franklin/Foxboro Line, and Needham Line of the MBTA Commuter Rail system. Thirteen MBTA bus routes stop at Ruggles.

<span class="mw-page-title-main">South Attleboro station</span> Railway station in Attleboro, Massachusetts, US

South Attleboro station is an MBTA Commuter Rail Providence/Stoughton Line station in Attleboro, Massachusetts. It is located under Newport Avenue in the South Attleboro neighborhood, just north of the Rhode Island border. The station has two side platforms serving the two tracks of the Northeast Corridor, formerly connected by a footbridge to a park-and-ride lot; only the north platform is in use.

<span class="mw-page-title-main">Indigo Line</span> Canceled Greater Boston regional rail service

The Indigo Line was a proposed rapid transit service of the Massachusetts Bay Transportation Authority that would have incorporated parts of the former Grand Junction Railroad, the Seaport District's Track 61, a spur to Riverside station and other MBTA Commuter Rail lines.

The Urban Ring was a proposed project of the Massachusetts Bay Transportation Authority and the Massachusetts Department of Transportation, to develop new public transportation routes that would provide improved circumferential connections among many existing transit lines that project radially from downtown Boston. The Urban Ring Corridor is located roughly one to two miles from downtown Boston, passing through the Massachusetts cities of Boston, Chelsea, Everett, Medford, Somerville, Cambridge, and Brookline. The project was expected to convert 41,500 car trips to transit trips daily.

<span class="mw-page-title-main">Quincy Center station</span> Transit station in Quincy, Massachusetts, US

Quincy Center station is an intermodal transit station in Quincy, Massachusetts. It is a transfer station between the MBTA Red Line subway, MBTA Commuter Rail's Old Colony Lines and Greenbush Line, and a number of MBTA bus routes. It is located between Hancock Street and Burgin Parkway in the Quincy Center district. Opened in 1971, the station was covered by a large parking garage which was closed in 2012 due to structural problems and removed several years later. The station is accessible on all modes.

<span class="mw-page-title-main">Wollaston station</span> Rapid transit station in Quincy, Massachusetts, US

Wollaston station is a rapid transit station in Quincy, Massachusetts. Located in the Wollaston neighborhood, it serves the MBTA's Red Line. It was opened in September 1971 as the second of three stations in the original South Shore Extension, replacing a mainline rail station which had been located there from 1845 to 1959. Wollaston station was closed from January 8, 2018, to August 16, 2019, for renovations to the station, including flood mitigation and accessibility improvements.

<span class="mw-page-title-main">Haverhill Line</span> MBTA Commuter Rail line

The Haverhill Line is a branch of the MBTA Commuter Rail system, running north from downtown Boston, Massachusetts to Haverhill. The service operates on the Western Route of the former Boston and Maine Railroad, which extends north to Portland, Maine, though MBTA commuter rail service has not continued north of Massachusetts since 1967.

<span class="mw-page-title-main">Newburyport/Rockport Line</span> Commuter rail service in Massachusetts, US

The Newburyport/Rockport Line is a branch of the MBTA Commuter Rail system, running northeast from downtown Boston, Massachusetts towards Cape Ann and the Merrimack Valley, serving the North Shore. The first leg, operating via the Eastern Route of the former Boston and Maine Railroad, serves Chelsea, Lynn, Swampscott, Salem, and Beverly. From there, a northern branch continues via the Eastern Route to serve Hamilton, Ipswich, Rowley, and Newburyport, while other trains operate east from Beverly via the Gloucester Branch, serving Manchester, Gloucester, and Rockport. A bicycle coach is offered on the Rockport branch during the summer. With over 11,000 daily riders in October 2022, the line is the second-busiest on the system.

<span class="mw-page-title-main">Bellingham Square station</span> Bus rapid transit station in Chelsea, Massachusetts, US

Bellingham Square station is a Massachusetts Bay Transportation Authority (MBTA) Silver Line bus rapid transit (BRT) station located near Bellingham Square slightly north of downtown Chelsea, Massachusetts. The station has two accessible side platforms for buses on the SL3 route. The Boston and Maine Railroad and predecessor Eastern Railroad served Chelsea station at the same location from the mid-1850s to 1958. The MBTA opened Chelsea station on the Newburyport/Rockport Line in 1985. Prior to its 2010 cancellation, the Urban Ring Project planned for a circumferential BRT line with a stop at Mystic Mall. Planning continued for the Chelsea segment; a Silver Line extension to Mystic Mall was announced in 2013. Construction began in 2015, and SL3 service to the renamed Bellingham Square station began on April 21, 2018. Commuter rail service moved to the newly constructed Chelsea station on November 15, 2021.

<span class="mw-page-title-main">Lynn station</span> MBTA rail station in Lynn, Massachusetts, US

Lynn station is an intermodal transit station in downtown Lynn, Massachusetts. It is a station on the MBTA Commuter Rail Newburyport/Rockport Line and a hub for the MBTA bus system.

<span class="mw-page-title-main">Salem station (MBTA)</span> Rail station in Salem, Massachusetts, US

Salem station is an MBTA Commuter Rail station served by the Newburyport/Rockport Line. The station is located off Bridge Street near its interchange with North Street at the north end of downtown Salem, Massachusetts. The station has a single accessible full-length high-level platform serving the single track of the Eastern Route. Just south of the station is the Salem Tunnel, which carries the line under Washington Street. Salem is a major park and ride center, with a 700-space parking garage, as well as an MBTA bus terminal. It is the busiest commuter rail station in the MBTA system outside of the central Boston stations, with an average of 2,326 daily boardings in a 2018 count.

<span class="mw-page-title-main">Beverly Depot</span> Train station in Beverly, Massachusetts, US

Beverly Depot is an MBTA Commuter Rail station in Beverly, Massachusetts. Located in Downtown Beverly, it serves the Newburyport/Rockport Line. It is the junction of the line's two branches to Newburyport and Rockport and is served by every train on both branches.

<span class="mw-page-title-main">Rockport station</span>

Rockport station is an MBTA Commuter Rail station in Rockport, Massachusetts. It is the terminus of the Rockport branch of the Newburyport/Rockport Line. The station complex consists of a single side platform with one revenue track plus 4 layover tracks for parked trains and a short stretch of auxiliary track.

<span class="mw-page-title-main">Winchester Center station</span> Train station in Winchester, Massachusetts, US

Winchester Center station is a temporarily closed MBTA Commuter Rail station in Winchester, Massachusetts, normally served by the Lowell Line. The station, located on a viaduct in downtown Winchester, was closed effective January 8, 2021 due to structural deterioration. Winchester Center station was not accessible prior to the closure, but accessible high-level platforms are being added during renovations taking place from December 2021 to December 2024. The first portion of the rebuilt station is expected to open in September 2024.

<span class="mw-page-title-main">Chelsea station (MBTA)</span> Intermodal transit station in Chelsea, Massachusetts, US

Chelsea station is a Massachusetts Bay Transportation Authority (MBTA) intermodal transit station located adjacent to the Mystic Mall in Chelsea, Massachusetts. It is the terminus of the SL3 route of the MBTA Silver Line bus rapid transit (BRT) network, and is served by the Newburyport/Rockport Line of the MBTA Commuter Rail. The accessible station has a loop with two small platforms for the Silver Line, and two full-length side platforms for commuter rail trains.

References

  1. 1 2 PB/DMJM+HARRIS, Joint Venture (March 2004). "Chapter 3: Project Definition & Assessment" (PDF). Draft North Shore Transit Improvements Project-MIS. Massachusetts Bay Transportation Authority. Archived from the original (PDF) on March 10, 2016. Retrieved March 25, 2016.
  2. PB/DMJM+HARRIS, Joint Venture (March 2004). "Figure 3-7: South Salem Station (North Option)" (PDF). Draft North Shore Transit Improvements Project-MIS. Massachusetts Bay Transportation Authority. Archived from the original (PDF) on December 20, 2016. Retrieved March 25, 2016.
  3. PB/DMJM+HARRIS, Joint Venture (March 2004). "Figure 3-8: South Salem Station (South Option)" (PDF). Draft North Shore Transit Improvements Project-MIS. Massachusetts Bay Transportation Authority. Archived from the original (PDF) on March 10, 2016. Retrieved March 25, 2016.
  4. "Conceptual Design Presentation: Public Meeting" (PDF). City of Salem. March 22, 2016. Archived from the original (PDF) on March 27, 2016. Retrieved March 25, 2016.
  5. Luca, Dustin (March 2016). "City to unveil plans for South Salem train stop". The Salem News. Retrieved March 25, 2016.
  6. Forman, Ethan (March 2016). "South Salem stop gets bumpy first ride". The Salem News. Retrieved March 25, 2016.
  7. "South Salem Stop: Conceptual Design Update" (PDF). The Salem Partnership. November 14, 2016.
  8. Luca, Dustin (November 14, 2016). "New train stop hinges on land access". The Salem News. Retrieved November 25, 2016.
  9. "MBTA South Salem Commuter Rail Stop Conceptual Design Neighborhood Meeting" (PDF). City of Salem. June 18, 2024.
  10. "Healey-Driscoll Administration Celebrates over $25 Million in Federal Funding for Three Critical Transportation Projects" (Press release). Massachusetts Bay Transportation Authority. June 26, 2024.
  11. Luczak, Marybeth (June 26, 2024). "First Look: Rail-Related RAISE Grantees for FY24". Railway Age . Retrieved June 29, 2024.