Terminal 3 of Jiangbei Airport station

Last updated
Terminal 3 of Jiangbei Airport

江北机场T3航站楼
Terminal 3 of Jiangbei Airport Station Line 10.jpg
General information
Location Yubei District, Chongqing
China
Operated byChongqing Rail Transit Corp., Ltd
Line(s)      Line 10
  15   Line 15 (under construction)
Platforms4 (2 island platforms)
ConnectionsGTC (Ground Traffic Center of Terminal 3)
Construction
Structure typeUnderground
Accessible6 accessible elevators
Other information
Station code
CRT SB W 1.svgCRT SB W 0.svg
CRT SB W 1.svgCRT SB W 9.svg
History
Opened28 December 2017;7 years ago (2017-12-28)
Services
Preceding station Chongqing Rail Transit Following station
Changhe
towards Lanhualu
Line 10 Terminal 2 of Jiangbei Airport
towards Wangjiazhuang
Chongqing North Station North Square
towards Lanhualu
Line 10
Rapid

Terminal 3 of Jiangbei Airport is a metro station of Line 10 of Chongqing Rail Transit in Yubei District of Chongqing Municipality, China. [1] [2]

Contents

It serves the airport terminal in which the station's name derived from (Terminal 3A of Chongqing Jiangbei International Airport) and its surrounding area, including office buildings for Chongqing Airport Group and other facilities used by both airlines and the airport.

The station opened 4 months after the inauguration of Terminal 3A of the airport, [3] before this public transportation to the terminal was served solely by airport buses and long-distance coaches. Free terminal shuttle buses were also arranged by the airport for passengers transferring between Terminals 2A & 2B and Terminal 3A [4] partially to compensate the lack of the 2 Line 10 stations linking the terminals. The shuttle buses remain in service to this day as an alternative to the metro line.

A LCD screen on a Line 10 train displaying its approach to the station LCD screen, Chongqing Rail Transit Line 10.jpg
A LCD screen on a Line 10 train displaying its approach to the station

Station structure

Line 10 platforms

Platform Layout

A total of 2 island platforms is used for Line 10 trains travelling in both directions.

Normal Line 10 services (stopping at all stations along the line) run through the 2 outer tracks whereas the 2 inner tracks are reserved for future Line 10 services with alternate route plans.

To       Line 10 Houbao 10/19
Island Platform

Doors open on the left

Track reserved10/19Track reservedFor alternate       Line 10 routing
For alternate       Line 10 routingTrack reserved10/19Track reserved
Island Platform

Doors open on the left

10/19To       Line 10 Wangjiazhuang

Exits

There are a total of 6 entrances/exits for the station.

ExitTo
1Taxis
2Domestic Departures, International Departures
3Domestic Departures, International Departures
4Domestic Arrivals, International Arrivals
5Car park
6Airport buses

Surroundings

GTC

Situated inside the Ground Traffic Center (GTC) of Terminal 3, the station is transferable with other modes of ground transportation at the terminal, including terminal shuttle buses, airport buses, long-distance coaches, taxis, car pooling services and private cars. Intercity railway services operated by CRH will also be available when its construction is complete.

Nearby Stations

See also

References

  1. "Chongqing Rail Transit network map". Archived from the original on 2019-05-11. Retrieved 2019-06-17.
  2. Transportation in Chongqing
  3. CRT Line 10 starting trial operations on December 28th, 2017(Source in Chinese)
  4. From The Chongqing Morning Post: Terminal shuttle buses operating at full capacity 2 days after the inauguration of Terminal 3 with nearly 700 trips made so far(Source in Chinese)