Line 10 (Chongqing Rail Transit)

Last updated

Line 10
CRT10023-Changhe.jpg
A train of Chongqing Rail Transit Line 10
Overview
Native name重庆轨道交通10号线
StatusOperational
Line number10
Locale Chongqing, China
Termini
Stations27
Service
Type Rapid transit
System Chongqing Rail Transit
Operator(s)Chongqing Rail Transit (Group) Co., Ltd.
History
Opened28 December 2017;7 years ago (2017-12-28)
Technical
Line length43.26 km (26.88 miles) (operational)
Number of tracks2
Track gauge 1,435 mm (4 ft 8+12 in)
Electrification 1500 V DC overhead line
Operating speed100 km/h (62 mph) (Peak)
Route map

Contents

BSicon utKBHFa.svg
Lanhualu
BSicon uextKDSTaq.svg
BSicon uetABZgr+r.svg
Lanhualu depot
BSicon utSTRc2.svg
BSicon utABZg3.svg
BSicon utSTRc2.svg
BSicon utABZ3+1l.svg
BSicon MSTR.svg
BSicon utpBHF.svg
BSicon utSTRc4.svg
BSicon utkSTR2+r.svg
BSicon utkSTRc3.svg
Nanhu
BSicon MFADEf.svg
BSicon utLSTR+1.svg
BSicon utSTRc4.svg
BSicon utSTR.svg
BSicon MFADEf.svg
BSicon utkLSTR+4.svg
BSicon utBHF.svg
Wanshoulu
BSicon uetBHF.svg
Nanping
3
BSicon utpBHF.svg
Houbao
BSicon WCONTfaq.svg
BSicon hPORTALf.svg
BSicon hPORTALg.svg
BSicon uhKRZW.svg
BSicon WCONTgeq.svg
BSicon utBHF.svg
Qixinggang
1
BSicon utpBHF.svg
Chongqing People's Auditorium
BSicon utBHF.svg
Zengjiayan
2
BSicon WCONTfaq.svg
BSicon hPORTALf.svg
BSicon hPORTALg.svg
BSicon uhKRZW.svg
BSicon WCONTgeq.svg
BSicon utSTR+l.svg
BSicon utTBHFt.svg
BSicon utCONTfq.svg
Liyuchi
9
BSicon MFADEg.svg
BSicon utLSTR.svg
BSicon MFADEf.svg
BSicon utLSTR.svg
BSicon utBHF.svg
BSicon MFADEg.svg
BSicon utLSTR.svg
Hongtudi
6
BSicon utkSTR2.svg
BSicon utpBHF.svg
BSicon utkSTR3.svg
Longtousi Park
BSicon utkSTRc1.svg
BSicon utkSTRl+4.svg
BSicon utkINTr+1.svg
BSicon utSTR.svg
BSicon utkSTRc4.svg
Chongqing N. Station
South Square
 
BSicon utCONT4+2.svg
BSicon utv-STR+4.svg
BSicon utSTR+tc3.svg
BSicon utSTRc1.svg
BSicon utv-STR2.svg
BSicon lINT.svg
BSicon utSTRc3.svg
BSicon utKRZ2+4t.svg
BSicon utSTRc3.svg
Chongqing N. Station
North Square
Bus-logo.svg China Railways.svg 4
BSicon utSTRc1.svg
BSicon utSTRc1.svg
BSicon utABZg+4.svg
BSicon utCONT4.svg
BSicon utpBHF.svg
Minxinjiayuan
BSicon MFADEg.svg
BSicon utLSTR.svg
BSicon utpBHF.svg
Sanyawan
BSicon utKRWgl+l.svg
BSicon utKRWgr+r.svg
BSicon utBHF2.svg
BSicon XPLTaq.svg
BSicon utSTRc3.svg
BSicon utXBHF-R.svg
Shangwanlu
9
BSicon utSTRc1.svg
BSicon utKRZ2+4t.svg
BSicon utSTRc3.svg
BSicon uhtSTRe@f.svg
BSicon utSTRc1.svg
BSicon utpBHF.svg
BSicon MFADEf.svg
BSicon utLSTR+4.svg
Huanshan Park
BSicon uhpBHF.svg
Changhe
BSicon lhSTRa@fq.svg
BSicon uKDSTaq.svg
BSicon hPORTALf.svg
BSicon uhABZgr.svg
Zhujiawan depot
BSicon PORTALf.svg
BSicon utSTRe.svg
BSicon uhtSTRea.svg
BSicon utINT.svg
Jiangbei Airport
Terminal 3
BSicon FLUG.svg
BSicon utINT.svg
Jiangbei Airport
Terminal 2
BSicon FLUG.svg Bus-logo.svg 3
BSicon utpBHF.svg
Yubei Square
BSicon utpBHF.svg
BSicon MFADEg.svg
BSicon utLSTR.svg
Lushan
BSicon utCONTgq.svg
BSicon utpBHF.svg
BSicon utcSTRq.svg
BSicon utcSTRq.svg
BSicon utSTRr.svg
Central Park East
9
BSicon utpkBHF3.svg
Central Park
BSicon utkBHF+1.svg
Central Park West
5
BSicon uhtSTRea.svg
BSicon utCONT1+f.svg
Line 6
Int'l Expo branch
to Lijia
BSicon utpBHF-L.svg
BSicon utBHF-R.svg
Yuelai
BSicon utABZgl.svg
BSicon utKRZt.svg
BSicon ulDST.svg
Wangjiazhuang depot
BSicon utKXBHFe-L.svg
BSicon utXBHF-R.svg
Wangjiazhuang
BSicon utCONTf.svg
Line 6
Int'l Expo branch
to Shaheba

Line 10 of Chongqing Rail Transit is a rapid transit line that opened on 28 December 2017. [1] Rapid trains started operating on Line 10 in June 2020. [2]

The trains on Line 10, which links Jiangbei Airport and Chongqing North railway station, are equipped with a luggage rack on each car. [3]

Interior of CRT10 100015 (20191224214400).jpg
Interior of a Line 10 train
Luggage Handler of CRT Line 10.jpg
Luggage rack

Opening timeline

SegmentCommencementLengthStation(s)Name
Wangjiazhuang Liyuchi28 December 201733.7 km (20.94 mi)18Phase 1
Chongqing North Station South Square28 December 2018infill station1
Liyuchi Houbao [4] 18 January 20236 km (3.7 mi) [4] 4Phase 2 (initial section)
Houbao Lanhualu30 November 2023 [5] 4.75 km (2.95 mi)4Phase 2 (remain section)

Stations (north to south)

Service
routes
Station
Station nameConnectionsDistance
km
Location
RLEnglish [6] Chinese
CRT SB W 1.svgCRT SB W 0.svg
CRT SB W 2.svgCRT SB W 7.svg
Wangjiazhuang 王家庄      Line 6 -0 Yubei
|
CRT SB W 1.svgCRT SB W 0.svg
CRT SB W 2.svgCRT SB W 6.svg
Yuelai 悦来      Line 6 2.042.04
CRT SB W 1.svgCRT SB W 0.svg
CRT SB W 2.svgCRT SB W 5.svg
Central Park West 中央公园西      Line 5 2.714.75
|
CRT SB W 1.svgCRT SB W 0.svg
CRT SB W 2.svgCRT SB W 4.svg
Central Park 中央公园1.095.84
|
CRT SB W 1.svgCRT SB W 0.svg
CRT SB W 2.svgCRT SB W 3.svg
Central Park East 中央公园东      Line 9 0.826.66
|
CRT SB W 1.svgCRT SB W 0.svg
CRT SB W 2.svgCRT SB W 2.svg
Lushan 鹿山1.648.30
|
CRT SB W 1.svgCRT SB W 0.svg
CRT SB W 2.svgCRT SB W 1.svg
Yubei Square 渝北广场2.0510.35
CRT SB W 1.svgCRT SB W 0.svg
CRT SB W 2.svgCRT SB W 0.svg
Terminal 2 of Jiangbei Airport 江北机场T2航站楼      Line 3 BSicon FLUG.svg CKG 0.7411.09
CRT SB W 1.svgCRT SB W 0.svg
CRT SB W 1.svgCRT SB W 9.svg
Terminal 3 of Jiangbei Airport 江北机场T3航站楼  15   BSicon FLUG.svg CKG 2.2213.31
|
CRT SB W 1.svgCRT SB W 0.svg
CRT SB W 1.svgCRT SB W 8.svg
Changhe 长河5.3118.62
|
CRT SB W 1.svgCRT SB W 0.svg
CRT SB W 1.svgCRT SB W 7.svg
Huanshan Park 环山公园1.8520.47
CRT SB W 1.svgCRT SB W 0.svg
CRT SB W 1.svgCRT SB W 6.svg
Shangwanlu 上湾路      Line 9 1.6722.14
|
CRT SB W 1.svgCRT SB W 0.svg
CRT SB W 1.svgCRT SB W 5.svg
Sanyawan 三亚湾2.7424.88
|
CRT SB W 1.svgCRT SB W 0.svg
CRT SB W 1.svgCRT SB W 4.svg
Minxinjiayuan 民心佳园2.0826.96
CRT SB W 1.svgCRT SB W 0.svg
CRT SB W 1.svgCRT SB W 3.svg
Chongqing North Station North Square [a] 重庆北站北广场      Line 4
  YW   China Railways.svg CUW
2.6129.57
CRT SB W 1.svgCRT SB W 0.svg
CRT SB W 1.svgCRT SB W 2.svg
Chongqing N. Station S. Square [a] 重庆北站南广场      Line 3       Loop line
  YW   China Railways.svg CUW
0.6030.17
|
CRT SB W 1.svgCRT SB W 0.svg
CRT SB W 1.svgCRT SB W 1.svg
Longtousi Park 龙头寺公园0.8731.04
CRT SB W 1.svgCRT SB W 0.svg
CRT SB W 1.svgCRT SB W 0.svg
Hongtudi 红土地      Line 6 1.6332.67 Jiangbei
CRT SB W 1.svgCRT SB W 0.svg
CRT SB W 0.svgCRT SB W 9.svg
Liyuchi 鲤鱼池      Line 9 1.0933.76
CRT SB W 1.svgCRT SB W 0.svg
CRT SB W 0.svgCRT SB W 8.svg
Zengjiayan 曾家岩      Line 2 0.8234.58 Yuzhong
|
CRT SB W 1.svgCRT SB W 0.svg
CRT SB W 0.svgCRT SB W 7.svg
Chongqing People's Auditorium 大礼堂0.9235.5
CRT SB W 1.svgCRT SB W 0.svg
CRT SB W 0.svgCRT SB W 6.svg
Qixinggang 七星岗      Line 1   18  0.8936.39
|
CRT SB W 1.svgCRT SB W 0.svg
CRT SB W 0.svgCRT SB W 5.svg
Houbao [4] 后堡2.1238.51 Nan'an
||
CRT SB W 1.svgCRT SB W 0.svg
CRT SB W 0.svgCRT SB W 4.svg
Nanping 南坪      Line 3   27  1.2239.73
CRT SB W 1.svgCRT SB W 0.svg
CRT SB W 0.svgCRT SB W 3.svg
Wanshoulu 万寿路0.9840.71
|
CRT SB W 1.svgCRT SB W 0.svg
CRT SB W 0.svgCRT SB W 2.svg
Nanhu 南湖      Loop line 1.2741.98
CRT SB W 1.svgCRT SB W 0.svg
CRT SB W 0.svgCRT SB W 1.svg
Lanhualu 兰花路1.2843.26

Notes

  1. 1 2 The former translation is North/South Square of Chongqingbei Railway Station, which has been replaced since the opening of Line 10's station

References

  1. "重庆市主城形成多层次立体交通体系". May 16, 2017.
  2. "轨道交通将跨线运行 唐家沱到重图不到40分钟-新华网". m.xinhuanet.com. Retrieved August 27, 2020.
  3. Jiang, Yan; Hu, Jie (December 18, 2017). 轨道也将有"超车道"! 五号线十号线将分"快慢车"-上游新闻 汇聚向上的力量. Chongqing Morning Paper (in Chinese (China)). Retrieved February 24, 2018.
  4. 1 2 3 "重庆轨道交通10号线二期通过竣工验收". January 9, 2023. 重庆轨道交通10号线二期(鲤鱼池至后堡)呈南北走向,线路全长6公里
  5. "重庆轨道5号线、10号线剩余路段30日开通初期运营". www.cqcb.com. November 29, 2023. Retrieved November 29, 2023.
  6. "重庆轨道交通线网图". Archived from the original on June 9, 2022.