Line 27 (Chongqing Rail Transit)

Last updated
Line 27
Overview
Termini
Stations15 [1]
Service
Type Rapid transit
System Chongqing Rail Transit
Operator(s)Chongqing Rail Transit Corporation Limited
Technical
Line length56 km (35 mi) [1] (Bishan to Huimin)
Electrification 25kV AC [2]
Operating speed140 km/h (87 mph) [2]
Route map

Contents

Bitong line
BSicon lhSTRa@f.svg
BSicon KDSTa.svg
Tongliang depot
BSicon hBHF.svg
Tongliangxi
BSicon hBHF.svg
Tongliang Longcheng Paradise Walk
BSicon hTUNNEL2.svg
BSicon lhSTRea.svg
BSicon BHF.svg
Sci-Tech Innovation Center
BSicon hSTR.svg
BSicon lhSTRea.svg
BSicon BHF.svg
Qinglong
BSicon lGIPl.svg
BSicon htSTRae.svg
BSicon lhSTRea.svg
BSicon BHF.svg
Dalu
BSicon hSTR.svg
BSicon lhSTRea.svg
BSicon eBHF.svg
Qinglonghu
BSicon hTUNNEL2.svg
BSicon lhSTRea.svg
BSicon BHF.svg
Hebian
BSicon TUNNEL2;ha.svg
BSicon exCONTg+2.svg
BSicon exSTRc3.svg
BSicon TUNNEL2.svg
Dazu line
BSicon exSTRc1.svg
BSicon exBHF2+4.svg
BSicon XPLTaq.svg
BSicon XBHF-R.svg
BSicon exSTRc3.svg
Bicheng
BSicon exSTRc1.svg
BSicon lhSTRa@f.svg
BSicon eABZg+4.svg
Line 27
BSicon lhSTRa@f.svg
BSicon uKDSTa.svg
BSicon hABZg+l.svg
BSicon lhSTRe@gq.svg
BSicon KDSTeq.svg
Bishan depot
BSicon uhBHF.svg
BSicon exBLaq.svg
BSicon hBHF.svg
BSicon exBLeq.svg
Bishan
1
BSicon MSHI4l.svg
BSicon uhKRWl.svg
BSicon exhKRW+l.svg
BSicon MSHI4+r.svg
BSicon uhKRW+r.svg
BSicon exhKRWr.svg
BSicon lGIPl.svg
BSicon exhtSTRa@g.svg
BSicon uhtSTRa@g.svg
BSicon utSTRc1.svg
BSicon extBHF.svg
BSicon MFADEf.svg
BSicon utLSTR.svg
Huxi
BSicon extBHF.svg
Daxuechengnan
BSicon extBHF.svg
Zhaishanping
BSicon extBHF.svg
Xiyong
BSicon lGIPl.svg
BSicon extSTR.svg
BSicon MFADEg.svg
BSicon uhLSTR.svg
BSicon extBHF.svg
BSicon exBLaq.svg
BSicon uhtBHFa@f.svg
BSicon exBLeq.svg
Ciqikou
1
BSicon utLKRW+l.svg
BSicon extKRWl.svg
BSicon utLKRWr.svg
BSicon extKRW+r.svg
BSicon utLKRWl.svg
BSicon extKRW+l.svg
BSicon utLKRW+r.svg
BSicon extKRWr.svg
BSicon extBHF.svg
BSicon exBLaq.svg
BSicon utBHF.svg
BSicon exBLeq.svg
Shapingba
China Railways.svg Loop 1 9
BSicon utLKRW+l.svg
BSicon extKRWl.svg
BSicon utLKRWr.svg
BSicon extKRW+r.svg
BSicon utLKRWl.svg
BSicon extKRW+l.svg
BSicon utLKRW+r.svg
BSicon extKRWr.svg
BSicon extBHF.svg
BSicon exBLaq.svg
BSicon utBHF.svg
BSicon exBLeq.svg
Shiqiaopu
1 5
BSicon extCONT4+f.svg
BSicon extBHF.svg
BSicon utLSTR.svg
Chongqing Medical University
BSicon extKRWgl+l.svg
BSicon extKRWgr+r.svg
BSicon exBLc2.svg
BSicon utBHF.svg
BSicon exBL3.svg
Lianglukou
1 3
BSicon extXINT-L.svg
BSicon extXINT-R.svg
BSicon exKBL1.svg
BSicon utSTR.svg
BSicon exBLc4.svg
Chongqing
Railway Station
China Railways.svg
BSicon extKRWgl+l.svg
BSicon extKRWgr+r.svg
BSicon utCONT2+g.svg
BSicon extSTRl.svg
BSicon extKRZt.svg
BSicon extCONTfq.svg
BSicon WCONTfaq.svg
BSicon extKRZW.svg
BSicon WCONTgeq.svg
BSicon extBHF.svg
Nanbinlu
BSicon extBHF.svg
Nanping
3 10
BSicon lGIPl.svg
BSicon extSTR.svg
BSicon extBHF.svg
Guangfu Avenue
BSicon extINT.svg
Chongqingdong
Railway Station
China Railways.svg
BSicon extBHF.svg
Huimin
BSicon exKDSTCCaq.svg
BSicon extABZgr.svg
Huimin depot
BSicon extCONTf.svg
Nanchuan line

Line 27 of Chongqing Rail Transit is a rapid transit line in Chongqing, China.

Line 27 (Bishan to Huimin section) will be 56 kilometres (35 mi) long, all stations except Bishan will be located underground. [1] Trains will run at a maximum speed of 140 kilometres per hour (87 mph). [2] [3] Line 27 trains will through operate with the Bitong Line and continue to Tongliangxi in Tongliang District. [4] [5] The line will feature passing loops for express services. [6]

History

Construction started in February 2022. [2]

Construction of the Yangtze River Tunnel of Line 27 (about 800 meters long) started in May 2024. [1]

Stations

Line nameStation
No.
Station name [7] Connections Location
EnglishChinese
Bitong line Tongliangxi 铜梁西 Tongliang
Tongliang Longcheng Paradise Walk 铜梁龙城天街
Sci-Tech Innovation Center 科创新城
Qinglong 庆隆
Dalu 大路 Bishan
Qinglonghu (under construction)青龙湖
Hebian 河边
Bicheng 璧城
Bitong line /
Line 27
Bishan 璧山      Line 1
  Bishan Tram   [a]
Line 27 Huxi 虎溪  17   Shapingba
Daxuechengnan 大学城南  15  
Zhaishanping 寨山坪
Xiyong 西永  7  
Ciqikou 磁器口      Line 1
Shapingba 沙坪坝      Line 1       Line 9       Loop line China Railways.svg CYW
Shiqiaopu 石桥铺      Line 1       Line 5 Jiulongpo
Chongqing Medical University 重医 [8] [9] Yuzhong
Chongqing Station 重庆站  18   China Railways.svg CQW
Nanbinlu 南滨路 [10] Nan'an
Nanping 南坪      Line 3   10  
Guangfu Ave. 广福大道
Chongqingdong Railway Station 重庆东站  6    24   China Railways.svg Chongqingdong
Line 27 East ext. Huimin 惠民 [1] [11]
  1. Out of system transfer

References

  1. 1 2 3 4 5 6 "重庆轨道交通首座穿江隧道预计本月正式穿江". 2024-05-07. Archived from the original on 2024-05-07.
  2. 1 2 3 4 "重庆轨道交通27号线开工".
  3. "设14座车站建设工期72个月 重庆轨道27号线将这样建" [The construction of 14 stations will take 72 months and Chongqing Rail Transit Line 27 will be built in this way]. cq.xinhuanet.com (in Chinese). 4 November 2020. Archived from the original on January 24, 2022. Retrieved 31 January 2021.
  4. "璧铜线开工 | 璧铜线设站9座 新型快线车从铜梁一小时飙拢解放碑-上游新闻 汇聚向上的力量". www.cqcb.com. Retrieved 2022-01-24.
  5. "国内首个PPP+TOD轨道交通项目亮相璧铜线_铜梁". www.sohu.com. Retrieved 2022-01-24.
  6. "苏交科丨重庆轨道交通27号线工程土建工点项目初步设计通过评审". jsti.com. Retrieved 2022-02-27.
  7. 铜梁发布. "来!带你们试乘市郊铁路璧铜线!".
  8. "王靛赴城轨快线27号线工程现场检查指导春节前安全工作". 2023-01-16. Archived from the original on 2023-01-29.
  9. "重庆轨道交通15号线一期、27号线工程人防工程防护设备设计、制造及安装(标包二)招标公告". 2023-01-17. Archived from the original on 2023-01-29.
  10. "重庆城轨快线27号线首个车站附属结构开挖完成". 2022-12-26. Archived from the original on 2023-01-24.
  11. "重庆轨道交通27号线土建工程12标项目开工建设". 2022-12-20. Archived from the original on 2023-01-29.