Line 4 (Chongqing Rail Transit)

Last updated

Line 4
CRT Train Line 4.jpg
A train of Chongqing Rail Transit Line 4
Overview
Native name重庆轨道交通4号线
StatusOperational
Line number4
Locale Chongqing, China
Termini
Stations24
Service
Type Rapid transit
System Chongqing Rail Transit
Operator(s)Chongqing Rail Line 4 Construction Operation Co., Ltd.
History
Opened28 December 2018;6 years ago (2018-12-28)
Technical
Line length48.5 km (30.1 miles)
Number of tracks2
Track gauge 1,435 mm (4 ft 8+12 in)
Electrification 1500 V DC overhead line
Route map

Contents

BSicon uextKBHFa.svg
Shunshuisi Park
BSicon uextABZg+l.svg
BSicon uextKDSTeq.svg
Hongfan depot
BSicon uextBHF.svg
Shimahelijiao
BSicon utSTR+l.svg
BSicon uextTBHFtu.svg
BSicon utSTR+r.svg
Yudaishan
BSicon MFADEf.svg
BSicon utLSTR.svg
BSicon uextBHF.svg
BSicon MFADEf.svg
BSicon utLSTR.svg
Panxi
BSicon uextBHF.svg
Dashiba
5
BSicon uextBHF.svg
Daqingcun
BSicon uextBHF.svg
Huahuiyuan
6
BSicon uextBHF.svg
Longxi
BSicon uextBHF.svg
BSicon MFADEg.svg
BSicon utLSTR.svg
Jiazhoulu
3
BSicon uxtKRWg+l.svg
BSicon utKRWgr.svg
BSicon MFADEg.svg
BSicon utLSTR.svg
BSicon utXBHF-L.svg
BSicon utXBHF-R.svg
Min'an Ave.
BSicon utSTRl.svg
BSicon utKRZtu.svg
BSicon utSTRr.svg
BSicon utCONTgq.svg
BSicon utTINTtu.svg
BSicon utdSTRc2.svg
BSicon utcdSTR3+l.svg
BSicon utCONTf@Fq.svg
Chongqing N. Station
N. Square
10
China Railways.svg
BSicon POINTERg@g.svg
BSicon utdABZg+1.svg
BSicon POINTERg@f.svg
BSicon utSTRc4.svg
BSicon utCONT4+f.svg
BSicon utSTR.svg
BSicon utBHF-L.svg
BSicon utBHF-R.svg
Toutang
9
BSicon utKRWgl+l.svg
BSicon utKRWgr+r.svg
BSicon utXBHF-L.svg
BSicon utpBHF.svg
BSicon dXPLTeq.svg
Baoshuigang
9
BSicon utSTRl.svg
BSicon utKRZto.svg
BSicon utCONTfq.svg
BSicon uhtpBHFea.svg
Cuntan
BSicon utpBHF.svg
Heishizi
BSicon uhtpBHFe@g.svg
Gangcheng
BSicon uhtpBHFa@f.svg
Taipingchong
BSicon utKDSTa@fq.svg
BSicon utABZgr.svg
Tangjiatuo depot
BSicon utBHF.svg
Tangjiatuo
BSicon utBHF.svg
Tieshanping
BSicon lGIPl.svg
BSicon uhtSTRe@f.svg
BSicon uhBHF.svg
Luqi
BSicon uhtBHFa@g.svg
Guoyuan Logistics Hub
BSicon utBHF.svg
Yuzui
BSicon utBHF.svg
Yanping
BSicon utBHF.svg
Shiheqing
BSicon utINT.svg
Fusheng
China Railways.svg
BSicon utBHF.svg
Sanbanxi
BSicon utBHF.svg
Longyi Ave.
BSicon utBHF.svg
Longxing
BSicon utBHF.svg
Gaoshita
BSicon uhtBHFe@f.svg
Pufu
BSicon uhBHF.svg
Tongzilin
BSicon uhBHF.svg
Shichuan
BSicon uhBHF.svg
Huangling
BSicon uhKDSTe.svg
Shichuan depot

Line 4 of Chongqing Rail Transit is a rapid transit line in Chongqing, China. [1]

Since June 2020, some Express trains through operate from Line 4 into the Loop line. [2]

The line is nicknamed the 'Basket Line' by some locals, as rural, mostly elderly, residents use the line to bring baskets of vegetables into the city to sell at marketplaces. [3]

Interior of a Line 4 train Zhong Qing Gui Dao Jiao Tong 4Hao Xian Che Xiang .jpg
Interior of a Line 4 train

Opening timeline

SegmentCommencementLengthStation(s)Name
Chongqing North Station North Square Tangjiatuo28 December 201815.7 km (9.8 mi) [4] 7Phase 1
Min'an Ave. Chongqing North Station North Square11 January 20191
Tangjiatuo Huangling18 June 2022 [5] 32.8 km (20.4 mi)15Phase 2
Gangcheng7 October 2023infill station1

Stations

Phases 1 and 2

Phase 1 (Min'an Ave. Tangjiatuo) is 15.754 km (9.789 mi) in length (underground section is 11.075 km (6.882 mi), elevated section is 4.679 km (2.907 mi)). [4] In June 2018, debugging of the first segment of Phase I commenced. [6] Phase 1 of Line 4 began operating on December 28, 2018.

Phase 2 (Tangjiatuo Huangling) is 32.8 km (20.4 mi) in length (21.25 km (13.20 mi) underground and 11.55 km (7.18 mi) elevated [7] ) with 15 stations (10 underground stations and 5 elevated stations). [8] In 2022, debugging of this segment commenced. [9] The segment opened on June 18, 2022. [10]

Service
routes
Station
No.
Station name [9] ConnectionsDistance
km
Location
ELEnglishChinese
Through-service to/from Tiaodeng via Loop line
CRT SB W 4.svg
/
CRT SB W 0.svgCRT SB W 1.svg
Min'an Ave. 民安大道      Loop line -0.00 Liangjiang
CRT SB W 4.svg
/
CRT SB W 0.svgCRT SB W 2.svg
Chongqing North Station North Square [a] 重庆北站北广场      Line 10 2.272.27
CRT SB W 4.svg
/
CRT SB W 0.svgCRT SB W 3.svg
Toutang 头塘      Line 9 2.364.63
CRT SB W 4.svg
/
CRT SB W 0.svgCRT SB W 4.svg
Baoshuigang 保税港      Line 9 1.365.99
CRT SB W 4.svg
/
CRT SB W 0.svgCRT SB W 5.svg
Cuntan 寸滩2.598.58
CRT SB W 4.svg
/
CRT SB W 0.svgCRT SB W 6.svg
Heishizi 黑石子1.5310.11
CRT SB W 4.svg
/
CRT SB W 0.svgCRT SB W 7.svg
Gangcheng 港城1.2911.4
CRT SB W 4.svg
/
CRT SB W 0.svgCRT SB W 8.svg
Taipingchong 太平冲2.1313.53
CRT SB W 4.svg
/
CRT SB W 0.svgCRT SB W 9.svg
Tangjiatuo 唐家沱1.8215.35
CRT SB W 4.svg
/
CRT SB W 1.svgCRT SB W 0.svg
Tieshanping 铁山坪1.3816.73
CRT SB W 4.svg
/
CRT SB W 1.svgCRT SB W 1.svg
Luqi 鹿栖5.3022.03
CRT SB W 4.svg
/
CRT SB W 1.svgCRT SB W 2.svg
Guoyuan Logistics Hub 果园物流枢纽2.6024.63
CRT SB W 4.svg
/
CRT SB W 1.svgCRT SB W 3.svg
Yuzui 鱼嘴2.7327.36
CRT SB W 4.svg
/
CRT SB W 1.svgCRT SB W 4.svg
Yanping 雁坪1.4528.81
CRT SB W 4.svg
/
CRT SB W 1.svgCRT SB W 5.svg
Shiheqing 石河清2.6931.50
CRT SB W 4.svg
/
CRT SB W 1.svgCRT SB W 6.svg
Fusheng 复盛 China Railways.svg Fusheng 2.1633.66
CRT SB W 4.svg
/
CRT SB W 1.svgCRT SB W 7.svg
Sanbanxi 三板溪1.3234.98
CRT SB W 4.svg
/
CRT SB W 1.svgCRT SB W 8.svg
Longyi Ave. 龙驿大道2.5237.50
CRT SB W 4.svg
/
CRT SB W 1.svgCRT SB W 9.svg
Longxing 龙兴1.5639.06
CRT SB W 4.svg
/
CRT SB W 2.svgCRT SB W 0.svg
Gaoshita 高石塔1.1340.19
CRT SB W 4.svg
/
CRT SB W 2.svgCRT SB W 1.svg
Pufu 普福1.9642.15
CRT SB W 4.svg
/
CRT SB W 2.svgCRT SB W 2.svg
Tongzilin 桐梓林1.9144.06
CRT SB W 4.svg
/
CRT SB W 2.svgCRT SB W 3.svg
Shichuan 石船2.6446.70
CRT SB W 4.svg
/
CRT SB W 2.svgCRT SB W 4.svg
Huangling 黄岭1.5748.27
  1. The former translation is North Square of Chongqingbei Railway Station, which has been replaced since the opening of Line 10's station

Western Extension

The Western extension of Line 4 started construction in March 2021. It will add 9 more stations west of Min'an Ave. station. The extension is 11 km (6.8 mi) in length. [11]

Station
No.
Station nameConnectionsDistance
km
Location
EnglishChinese
Shunshuisi Park [12] 顺水寺公园 [12] [13] Liangjiang
Shimahelijiao [12] 石马河立交 [12] [13]
Yudaishan 玉带山      Loop line
Panxi 盘溪
Dashiba 大石坝      Line 5
Daqingcun 大庆村
Huahuiyuan 花卉园      Line 6
Longxi 龙溪
Jiazhoulu 嘉州路      Line 3

References

  1. "轨道交通4号线、5号线、10号线和环线 明年部分线路有望建成通车". May 17, 2016. Archived from the original on August 27, 2017. Retrieved August 29, 2017.
  2. "轨道交通将跨线运行 唐家沱到重图不到40分钟-新华网". m.xinhuanet.com. Retrieved August 27, 2020.
  3. "有人建议禁止带菜筐上地铁?"背篓专线"这样回应→". www.xhby.net. Retrieved February 14, 2025.
  4. 1 2 "重庆轨道交通四号线一期工程".
  5. "重庆轨道交通4号线二期今日将开通运营". cq.cqnews.net.
  6. "轨道4号线不载客试运行,有望年内投用". June 21, 2018.
  7. "重庆轨道交通4号线二期、18号线、5号线跳蹬至江津段、市域快线璧山至铜梁线PPP项目". Archived from the original on June 9, 2022. 线路全长约32.8km(地下段长约21.25km,高架段长约11.55km)
  8. "重庆轨道交通4号线进入全面主体结构施工阶段".
  9. 1 2 "轨道4号线二期通过验收 28日进行不载客试运行". January 26, 2022.
  10. "重庆轨道交通4号线二期今日中午12时开通运营". Archived from the original on June 18, 2022.
  11. "重庆新开工4条轨道线路 看看这些站有没有经过你家". March 2, 2021.
  12. 1 2 3 4 "重庆轨道交通线网图" (PDF). March 5, 2025. Archived (PDF) from the original on June 26, 2025. Retrieved June 26, 2025. 顺水寺公园 Shunshuisi Park 石马河立交 Shimahelijiao
  13. 1 2 "重庆轨道交通4号线西延伸段土建1标项目"江源二十五号"复合式TBM顺利始发".