Line 5 (Chongqing Rail Transit)

Last updated

Line 5
CRT Huachenglu - platform.jpg
Overview
Native name重庆轨道交通5号线
StatusOperational
Line number5
Locale Chongqing, China
Termini
Stations31
Service
Type Rapid transit
System Chongqing Rail Transit
Operator(s)Chongqing Rail Transit (Group) Co., Ltd.
History
Opened28 December 2017;7 years ago (2017-12-28)
Technical
Line length48.7 km (30.3 miles)
Number of tracks2
Track gauge 1,435 mm (4 ft 8+12 in)
Electrification 1500 V DC overhead line
Operating speed100 km/h (62 mph) (Peak)
Route map

Contents

BSicon utENDEa.svg
BSicon utBHF.svg
Yuegangbeilu
BSicon uKDSTCCaq.svg
BSicon utABZg+r.svg
Shizishan depot
BSicon utBHF.svg
Yuegang Avenue
BSicon utBHF.svg
Chunxuan Avenue
BSicon utBHF.svg
Central Park West
10
BSicon utBHF.svg
Lujiagou
BSicon utBHF.svg
Ganyue Avenue
BSicon uetBHF.svg
Yuhegou
BSicon utBHF.svg
The EXPO Garden Center
Norwegian-road-sign-792.14-alpha.svg 3
BSicon utBHF.svg
Danhe
BSicon utBHF.svg
Huxiajie
BSicon utBHF.svg
Chongguang
BSicon utBHF.svg
Hemulu
BSicon utBHF.svg
Renhe
BSicon uKDSTCCaq.svg
BSicon utABZg+r.svg
Dazhulin depot
BSicon utCONT4+f.svg
BSicon utBHF.svg
Xingfu Square
BSicon utXBHF-L.svg
BSicon utSTRc3.svg
BSicon HUBrg-R.svg
BSicon utXBHF-R.svg
BSicon HUBlg-L.svg
Ranjiaba
BSicon utkSTRc2.svg
BSicon utSTR.svg
BSicon utkSTR3+l.svg
BSicon ulBHF~L.svg
BSicon HUBl-R.svg
BSicon utSTR.svg
BSicon utkSTR2+r.svg
BSicon ulBHF~R.svg
BSicon HUBr-L.svg
BSicon POINTERf@f.svg
BSicon utkSTRc3.svg
BSicon utkSTR+1.svg
BSicon utKRWl+l.svg
BSicon utKRWr+r.svg
BSicon utkSTR+4.svg
BSicon MFADEf.svg
BSicon utLSTR.svg
BSicon utXBHF-L.svg
BSicon utXBHF-R.svg
BSicon MFADEf.svg
BSicon utLSTR.svg
Dalongshan
6
BSicon utBHF.svg
BSicon utCONT2+g.svg
Dashiba
BSicon uhtBHFe@g.svg
Zhongshutuo
BSicon WCONTfaq.svg
BSicon uhKRZW.svg
BSicon WCONTgeq.svg
BSicon uhtBHFa@g.svg
BSicon utCONT1+f.svg
Hongyancun
9
BSicon utBHF.svg
BSicon exBLaq.svg
BSicon exBLeq.svg
BSicon uetBHF.svg
BSicon exBL+r.svg
BSicon uexlBHF~R.svg
Xietaizi
1
BSicon utSTR+l.svg
BSicon utKRZt.svg
BSicon utKRZt.svg
BSicon exBLe.svg
BSicon ulBHF.svg
BSicon utCONTf@Fq.svg
BSicon utKRWg+l.svg
BSicon utKRWgr.svg
BSicon MFADEf.svg
BSicon utLSTR.svg
BSicon utBHF-L.svg
BSicon utBHF-R.svg
Shiqiaopu
1
BSicon utCONT3+g.svg
BSicon utBHF.svg
Shixinlu
BSicon utBHF.svg
Bashan
BSicon MFADEg.svg
BSicon utLSTR.svg
BSicon utBHF.svg
Fengxilu
BSicon utABZgl.svg
BSicon utABZg+r.svg
BSicon MFADEg.svg
BSicon utLSTR.svg
BSicon utXINT-L.svg
BSicon utXINT-R.svg
BSicon utkSTR3.svg
Chongqing W
Railway Station
BSicon utSTRl.svg
BSicon utKRZt.svg
BSicon utkSTRr+1.svg
BSicon POINTERg@g.svg
BSicon utkSTRc4.svg
BSicon utpBHF.svg
Huayan Temple
BSicon utpBHF.svg
BSicon MFADEg.svg
BSicon uhLSTR.svg
Huachenglu
BSicon uhtSTRe@f.svg
BSicon utpBHF.svg
BSicon uhSTR2.svg
BSicon uhSTRc3.svg
Banshan
BSicon uhpBHF.svg
BSicon uhSTRc1.svg
BSicon uhSTR+4.svg
Zhongliangshan
BSicon uhBHF.svg
BSicon uexhENDEa.svg
BSicon uhSTR.svg
Jinjianlu
BSicon uhSTR.svg
BSicon lhKRZh(l)(g).svg
BSicon uexXBHF-L.svg
BSicon lhBHF(r).svg
BSicon lhKRZh(r)(g).svg
BSicon uXBHF-R.svg
BSicon lhBHF(l).svg
Jin'aoshan
BSicon uhBHF.svg
BSicon lhSHI4+l(l).svg
BSicon uexKRWg+l.svg
BSicon lhSTR(r).svg
BSicon lhSTR(l).svg
BSicon ueKRWgr.svg
BSicon lhKRWgr(r)(f).svg
Huayan Center
BSicon lhSTRa@fq.svg
BSicon uKDSTaq.svg
BSicon uhABZgr.svg
BSicon uexhtSTRae.svg
BSicon uhtSTRae.svg
Zhongliangshan depot
BSicon lhSHI4l(l).svg
BSicon uKRWgl.svg
BSicon lhSTR(r).svg
BSicon lhSTR(l).svg
BSicon uxKRWg+r.svg
BSicon lhKRWg+r(r)(g).svg
BSicon uhSTR.svg
Jiangtiao line
BSicon lhKRZh(l)(f).svg
BSicon uXBHF-L.svg
BSicon lhBHF(r).svg
BSicon lhBHF(l).svg
BSicon lhKRZh(r)(f).svg
BSicon uXBHF-R.svg
BSicon BLaq.svg
BSicon uhBHF.svg
BSicon BLeq.svg
Tiaodeng
18
BSicon uhENDEe.svg
BSicon uhBHF.svg
BSicon uhCONT2+g.svg
Shilinsi
BSicon uWECHSEL.svg
BSicon lhSTR.svg
DC 1.5 kV
AC 25 kV
BSicon lGIPl.svg
BSicon htSTRa@g.svg
BSicon htBHFe@g.svg
Jiulongyuan
BSicon hBHF.svg
Shuangfu
BSicon hBHF.svg
Xiangtang
BSicon lhSTRa@fq.svg
BSicon KDSTaq.svg
BSicon hABZg+r.svg
Shuangfu Depot
BSicon lHST.svg
BSicon hINT.svg
Jiangjin High-speed Railway
BSicon hKBHFxe.svg
Shengquansi
BSicon WCONTfaq.svg
BSicon exhKRZW.svg
BSicon WCONTgeq.svg
BSicon exhtBHFa@f.svg
Jijiang
BSicon extBHF.svg
Dingshan
BSicon extENDEe.svg
Norwegian-road-sign-792.14-alpha.svg =
Virtual interchange: transport
card only, re-entry required.

Line 5 of CRT is a rapid transit line in Chongqing, China, which opened on 28 December 2017. [1]

History

Phase 1

Phase 1 of the line (from The EXPO Garden Center station to Tiaodeng station) began construction on 3 December 2013. [2]

The north section from The EXPO Garden Center to Dalongshan started operation on 28 December 2017, and it extended to Dashiba on 24 December 2018. The south section from Shiqiaopu to Tiaodeng started operation on 20 January 2021. Due to difficults on bridge building, the central section from Dashiba to Shiqiaopu is opened several years later, on 30 November 2023. [3]

Northern extension

The northern extension of this line began construction on 25 January 2019. The extension is 8.95 km (5.56 mi) in length with 7 new stations. [4] The extension opened on 27 February 2023. [5]

Opening timeline

SegmentCommencementLengthStation(s)Name
The EXPO Garden Center Dalongshan28 December 201716.42 km (10.20 mi) [6] 9Phase 1 (North Section)
Dalongshan Dashiba24 December 20181
Shiqiaopu Tiaodeng20 January 202118.34 km (11.40 mi) [7] 12Phase 1 (South Section)
The EXPO Garden Center Yuegangbeilu27 February 2023 [5] [8] 8.95 km (5.56 mi) [4] 6Northern Extension
Dashiba Shiqiaopu30 November 2023 [3] 4.95 km (3.08 mi)3Phase 1 (Central Section)
Yuhegou15 July 2025 [9] /1Infill station

Route map

Line 5 (Chongqing Rail Transit)

Interior of a Line 5 train Interior of CRT5 trains, Chongqing Rail Transit 20230327.jpg
Interior of a Line 5 train

Stations

Line 5

Service
routes
Station
Station nameConnectionsDistance
km
Location
ELocalEnglishChinese
CRT SB W 5.svg
CRT SB W 0.svgCRT SB W 1.svg
Yuegangbeilu 悦港北路0 Yubei
CRT SB W 5.svg
CRT SB W 0.svgCRT SB W 2.svg
Yuegang Ave. 悦港大道0.940.94
CRT SB W 5.svg
CRT SB W 0.svgCRT SB W 3.svg
Chunxuan Ave. 椿萱大道1.222.16
CRT SB W 5.svg
CRT SB W 0.svgCRT SB W 4.svg
Central Park West 中央公园西      Line 10 1.283.44
CRT SB W 5.svg
CRT SB W 0.svgCRT SB W 5.svg
Lujiagou 鲁家沟1.274.71
CRT SB W 5.svg
CRT SB W 0.svgCRT SB W 6.svg
Ganyue Ave. 甘悦大道0.925.63
CRT SB W 5.svg
CRT SB W 0.svgCRT SB W 7.svg
Yuhegou 玉河沟0.966.59
CRT SB W 5.svg
CRT SB W 0.svgCRT SB W 8.svg
The EXPO Garden Center 园博中心2.358.94
CRT SB W 5.svg
CRT SB W 0.svgCRT SB W 9.svg
Danhe 丹鹤1.3710.31
CRT SB W 5.svg
CRT SB W 1.svgCRT SB W 0.svg
Huxiajie 湖霞街1.4711.78
CRT SB W 5.svg
CRT SB W 1.svgCRT SB W 1.svg
Chongguang 重光  15  1.4913.27
CRT SB W 5.svg
CRT SB W 1.svgCRT SB W 2.svg
Hemulu 和睦路2.4115.68
CRT SB W 5.svg
CRT SB W 1.svgCRT SB W 3.svg
Renhe 人和1.4017.08
CRT SB W 5.svg
CRT SB W 1.svgCRT SB W 4.svg
Xingfu Square 幸福广场1.9419.02
CRT SB W 5.svg
CRT SB W 1.svgCRT SB W 5.svg
Ranjiaba 冉家坝      Line 6       Loop line 2.5521.57
CRT SB W 5.svg
CRT SB W 1.svgCRT SB W 6.svg
Dalongshan 大龙山      Line 6 1.0122.58
CRT SB W 5.svg
CRT SB W 1.svgCRT SB W 7.svg
Dashiba 大石坝  4  2.4725.05 Jiangbei
CRT SB W 5.svg
CRT SB W 1.svgCRT SB W 8.svg
Zhongshutuo 忠恕沱0.8625.91
CRT SB W 5.svg
CRT SB W 1.svgCRT SB W 9.svg
Hongyancun 红岩村      Line 9 1.2827.19 Yuzhong
CRT SB W 5.svg
CRT SB W 2.svgCRT SB W 0.svg
Xietaizi 歇台子      Line 1       Line 18 1.6628.85 Jiulongpo
CRT SB W 5.svg
CRT SB W 2.svgCRT SB W 1.svg
Shiqiaopu 石桥铺      Line 1   27  1.5630.41
CRT SB W 5.svg
CRT SB W 2.svgCRT SB W 2.svg
Shixinlu 石新路1.1131.52
CRT SB W 5.svg
CRT SB W 2.svgCRT SB W 3.svg
Bashan 巴山1.0232.54
CRT SB W 5.svg
CRT SB W 2.svgCRT SB W 4.svg
Fengxilu 凤西路1.8134.35 Shapingba
Through-service to/from Tangjiatuo via Loop line
CRT SB W 5.svg
CRT SB W 2.svgCRT SB W 5.svg
Chongqing West 重庆西站      Loop line China Railways.svg CXW 2.7537.10 Shapingba
CRT SB W 5.svg
CRT SB W 2.svgCRT SB W 6.svg
Huayan Temple 华岩寺0.9738.07 Jiulongpo
CRT SB W 5.svg
CRT SB W 2.svgCRT SB W 7.svg
Huachenglu 华成路2.0240.09
CRT SB W 5.svg
CRT SB W 2.svgCRT SB W 8.svg
Banshan 半山0.8640.95
CRT SB W 5.svg
CRT SB W 2.svgCRT SB W 9.svg
Zhongliangshan 中梁山1.5842.53
CRT SB W 5.svg
CRT SB W 3.svgCRT SB W 0.svg
Jinjianlu 金建路1.9144.44
CRT SB W 5.svg
CRT SB W 3.svgCRT SB W 1.svg
Huayan Center 华岩中心1.5045.94
CRT SB W 5.svg
CRT SB W 3.svgCRT SB W 2.svg
Tiaodeng 跳磴      Line 18 2.3848.32 Dadukou
Through-service to/from Shengquansi via Jiangtiao line

Jiangtiao line

Jiangtiao line (Chinese :江跳线) [10] had been formerly known as the extension of Line 5. The section from Tiaodeng to Shengquansi (28.22 km (17.54 mi) in length [10] ) opened in August 2022. [11] The section from Shengquansi to Dingshan (4.524 km (2.811 mi) in length [12] ) is currently under construction.


References

  1. "重庆市主城形成多层次立体交通体系". May 16, 2017.
  2. "招标公告 - 重庆城市交通开发投资(集团)有限公司". www.cqjtkt.cn. Retrieved January 20, 2021.
  3. 1 2 "重庆轨道5号线、10号线剩余路段30日开通初期运营". www.cqcb.com. November 29, 2023. Retrieved November 29, 2023.
  4. 1 2 "轨道交通5号线北延伸段工程通过竣工验收". February 16, 2023. 5号线北延伸段起于园博中心站(不含),止于悦港北路站,线路全长8.95公里
  5. 1 2 "重庆 轨道交通5号线北延伸段计划27日通车 重庆轨道交通运营里程将突破500公里".
  6. "轨道5号线大石坝站投用". December 24, 2018.
  7. "重庆轨道交通一号线朝天门至小什字段、五号线一期南段(跳磴至石桥铺段)、六号线支线二期(悦来至沙河坝段)、环线重庆图书馆至重庆西站至二郎段工程初期运营前安全评估服务招标公告". August 21, 2020. Archived from the original on August 30, 2020.
  8. "南北"通透" 双向奔赴 "两轨一桥"通车,重庆中心城区多了三条南北向交通大动脉". January 19, 2023. Archived from the original on January 24, 2023. 预计今年一季度,5号线北延段有望初期运营
  9. "出行提示丨5号线玉河沟站7月15日开通" (in Chinese). Retrieved July 15, 2025.
  10. 1 2 "重庆轨道交通延长线江跳线开建 将采用新型快速车辆". October 27, 2020. Archived from the original on September 26, 2021.
  11. "江跳段力争2022年春节前建成通车". December 18, 2020. Archived from the original on September 26, 2021.
  12. "江跳线过江段正式开工 几江半岛半小时直通重庆中心城区". December 28, 2022. Archived from the original on January 24, 2023.