Line 1 (Chongqing Rail Transit)

Last updated
Line 1
CRT01039-Ciqikou.jpg
Overview
Termini
Stations25
Service
Type Rapid transit
System Chongqing Rail Transit
Operator(s)Chongqing Rail Transit Corporation Limited
Daily ridership690,000 (2016 Peak) [1]
History
Opened28 July 2011;13 years ago (2011-07-28)
Technical
Line length43.71 km (27.16 mi)
Operating speed100 km/h (62 mph) (peak)
Route map

Contents

BSicon utKINTa.svg
Chaotianmen
Ferry symbol.svg
BSicon utBHF.svg
Xiaoshizi
6
BSicon utBHF.svg
Jiaochangkou
2
BSicon utBHF.svg
Qixinggang
10
BSicon utINT.svg
Lianglukou
China Railways.svg Bus-logo.svg 3
BSicon utBHF.svg
Eling
BSicon utBHF.svg
Daping
2
BSicon utBHF.svg
Shiyoulu
BSicon exBLc2.svg
BSicon utBHF.svg
BSicon exKBL3.svg
Xietaizi
BSicon uextCONTgq.svg
BSicon uextBHFq.svg
BSicon exKBL1.svg
BSicon uetKRZt.svg
BSicon exBLc4.svg
BSicon uextSTR+r.svg
BSicon uetKRWg+l.svg
BSicon uextKRWgr.svg
BSicon utBHF-L.svg
BSicon utKBHFa-R.svg
BSicon uextSTR.svg
Shiqiaopu
5
BSicon utBHF.svg
BSicon utCONT2+g.svg
Gaomiaocun
BSicon utABZgl+l.svg
BSicon uKDSTCCeq.svg
Majiayan Depot
BSicon utBHF.svg
Majiayan
BSicon utBHF.svg
Xiaolongkan
9
BSicon utINT.svg
Shapingba
BSicon utBHF.svg
Yanggongqiao
BSicon utBHF.svg
Lieshimu
BSicon uhtBHFe@g.svg
Ciqikou
BSicon uhBHF.svg
Shijingpo
BSicon uhtBHFa@f.svg
Shuangbei
BSicon lGIPl.svg
BSicon uhtSTRe@f.svg
BSicon lhSTRa@fq.svg
BSicon uKDSTaq.svg
BSicon uhABZg+r.svg
Laijiaqiao Depot
BSicon uhBHF.svg
Laijiaqiao
BSicon uhBHF.svg
Weidianyuan
BSicon uhBHF.svg
Chenjiaqiao
Bus-logo.svg
BSicon uhBHF.svg
Daxuecheng
BSicon uhtBHFa@f.svg
Jiandingpo
BSicon utSTRea.svg
BSicon lGIPl.svg
BSicon utSTR.svg
BSicon uhtBHFe@g.svg
Bishan
BSicon lhSTRe@g.svg
BSicon uKDSTe.svg
Bishan Depot

Line 1 of CRT runs westwards from Chaotianmen to Bishan. Line 1 began operation on 28 July 2011. [2]

Line 1 runs 16.4 km (10.2 mi) from Chaotianmen in downtown Chongqing west to Shapingba, and eventually all the way to Shuangbei for a total length of 22.4 km (13.9 mi). It is the city's first all-heavy rail metro line and the second completed in Western China. Passenger capacity of the line is 36,000 passengers/hour/direction.

In 1992, the Chongqing government had signed a Build-Operate-Transfer in 1992 with a Hong Kong company, and provided the land for the project, but work ceased in 1997 due to legal issues.[ citation needed ] Work resumed on the first stretch of the line (from Chaotianmen to Shapingba) on 9 June 2007, and opened to limited operation on July 28. [3] An extension from Shapingba to Daxuecheng (University Town) began in 2009 and opened on December 21, 2012 before receiving a short extension from Daxuecheng to Jiandingpo a year later. And an extension, running from Jiandingpo to Bishan also opened on December 30, 2019, making Line 1 the first CRT line to reach areas outside Metropolitan Chongqing. [4] The latest extension from Xiaoshizi to Chaotianmen has been opened on 31 December 2020, making Line 1 a completely finished subway line.

Line 1 has 25 stations, including from east to west: Chaotianmen, Xiaoshizi, Jiaochangkou, Qixinggang, Lianglukou, Eling, Daping, Shiyoulu, Xietaizi, Shiqiaopu, Gaomiaocun, Majiayan, Xiaolongkan, Shapingba, Yanggongqiao, Lieshimu, Ciqikou, Shijingpo, Shuangbei, Laijiaqiao, Weidianyuan, Chenjiaqiao, Daxuecheng (University Town), Jiandingpo and Bishan stations.

Line 1 has transfer interchange stations with Line 6 at Xiaoshizi and Line 2 at Jiaochangkou in Jiefangbei CBD and at Daping and Line 3 at Lianglukou, which is near Chongqing railway station in central Yuzhong. Line 1 is also transferable with the Loop Line at Shapingba, although out-of-station transfer is currently needed due to construction setbacks on the interchange channel and concourse connecting the two subway lines.

Opening timeline

SegmentCommencementLengthStation(s)Name
Jiaochangkou Shapingba28 July 201114.2 km (8.82 mi)10Phase 1 (initial section)
Xiaoshizi Jiaochangkou27 September 20111.4 km (0.87 mi)1Phase 1 (remaining section)
Gaomiaocun17 November 2011Infill station1
Shapingba Daxuecheng20 December 201219.7 km (12.24 mi)7Phase 2
Weidianyuan28 March 2013Infill station1
Majiayan25 September 2013Infill station1
Shijingpo28 September 2014Infill station1
Daxuecheng Jiandingpo30 December 20141.9 km (1.18 mi)1Extension of Phase 2
Jiandingpo Bishan30 December 2019 [5] 5.6 km (3.48 mi) [4] 1Extension to Bishan
Xiaoshizi Chaotianmen31 December 20200.8 km (0.50 mi) [6] 1Extension to Chaotianmen

Service routes

Current stations

Service
routes
Station
Station nameConnectionsDistance
km
Location
EnglishChinese
CRT SB W 1.svg
CRT SB W 0.svgCRT SB W 1.svg
Chaotianmen 朝天门-0.00 Yuzhong
CRT SB W 1.svg
CRT SB W 0.svgCRT SB W 2.svg
Xiaoshizi 小什字      Line 6   18  0.660.66
CRT SB W 1.svg
CRT SB W 0.svgCRT SB W 3.svg
Jiaochangkou 较场口      Line 2 1.362.02
CRT SB W 1.svg
CRT SB W 0.svgCRT SB W 4.svg
Qixinggang 七星岗      Line 10   18  0.852.87
CRT SB W 1.svg
CRT SB W 0.svgCRT SB W 5.svg
Lianglukou 两路口      Line 3 China Railways.svg CQW 1.444.30
CRT SB W 1.svg
CRT SB W 0.svgCRT SB W 6.svg
Eling 鹅岭1.605.90
CRT SB W 1.svg
CRT SB W 0.svgCRT SB W 7.svg
Daping 大坪      Line 2 1.737.63
CRT SB W 1.svg
CRT SB W 0.svgCRT SB W 8.svg
Shiyoulu 石油路1.168.79
CRT SB W 1.svg
CRT SB W 0.svgCRT SB W 9.svg
Xietaizi 歇台子      Line 5       Line 18 1.039.82 Jiulongpo
CRT SB W 1.svg
CRT SB W 1.svgCRT SB W 0.svg
Shiqiaopu 石桥铺      Line 5   27  1.2511.07
CRT SB W 1.svg
CRT SB W 1.svgCRT SB W 1.svg
Gaomiaocun 高庙村1.6812.75 Shapingba
CRT SB W 1.svg
CRT SB W 1.svgCRT SB W 2.svg
Majiayan 马家岩1.2013.95
CRT SB W 1.svg
CRT SB W 1.svgCRT SB W 3.svg
Xiaolongkan 小龙坎      Line 9 1.0915.03
CRT SB W 1.svg
CRT SB W 1.svgCRT SB W 4.svg
Shapingba 沙坪坝      Line 9       Loop line   27  
China Railways.svg CYW
0.8715.90
CRT SB W 1.svg
CRT SB W 1.svgCRT SB W 5.svg
Yanggongqiao 杨公桥1.1717.08
CRT SB W 1.svg
CRT SB W 1.svgCRT SB W 6.svg
Lieshimu 烈士墓0.8217.90
CRT SB W 1.svg
CRT SB W 1.svgCRT SB W 7.svg
Ciqikou 磁器口  27  1.0518.95
CRT SB W 1.svg
CRT SB W 1.svgCRT SB W 8.svg
Shijingpo 石井坡1.4020.35
CRT SB W 1.svg
CRT SB W 1.svgCRT SB W 9.svg
Shuangbei 双碑1.9022.25
CRT SB W 1.svg
CRT SB W 2.svgCRT SB W 0.svg
Laijiaqiao 赖家桥7.0029.25
CRT SB W 1.svg
CRT SB W 2.svgCRT SB W 1.svg
Weidianyuan 微电园  7  1.7731.02
CRT SB W 1.svg
CRT SB W 2.svgCRT SB W 2.svg
Chenjiaqiao 陈家桥  15  3.3534.37
CRT SB W 1.svg
CRT SB W 2.svgCRT SB W 3.svg
Daxuecheng 大学城  17  1.9036.27
CRT SB W 1.svg
CRT SB W 2.svgCRT SB W 4.svg
Jiandingpo 尖顶坡1.5537.81
CRT SB W 1.svg
CRT SB W 2.svgCRT SB W 5.svg
Bishan 璧山      Line Bitong   Bishan SkyShuttle   [a]
  27   [7]
5.9043.71 Bishan

Notes

  1. Out of system transfer

References

  1. "重庆轨道客运量9月30日创新高 达到257.4万乘次".
  2. Chongqing Metro Line 1 into trial operation Archived 2011-09-28 at the Wayback Machine
  3. "Chongqing's Metro Line 1 Now Open". Archived from the original on 2011-08-27. Retrieved 2012-08-27.
  4. 1 2 "重庆轨道交通首次驶出主城 1号线璧山站要来了". 2019-11-13.
  5. "重庆又有两段轨道开通:1号线尖璧段、环线西南半环". 2019-12-30.
  6. "重庆轨道交通一号线朝天门至小什字段、五号线一期南段(跳磴至石桥铺段)、六号线支线二期(悦来至沙河坝段)、环线重庆图书馆至重庆西站至二郎段工程初期运营前安全评估服务招标公告". 2020-08-21. Archived from the original on 2020-08-30.
  7. "重庆轨道交通15号线计划年内开建 27号线明年开建". 2019-07-23. Archived from the original on November 13, 2019.