Line 9 (Chongqing Rail Transit)

Last updated

Line 9
CRT Line 9 Train on Jiahua Rail Bridge.jpg
Line 9 Train on Jiahua Metro Bridge
Overview
Native name重庆轨道交通9号线
StatusOperational
Line number9
Locale Chongqing, China
Termini
Stations31 (29 in operation)
Website https://www.cqmetro.cn
Service
Type Rapid transit
System Chongqing Rail Transit
Services1
Operator(s)Chongqing Rail Transit (Group) Co., Ltd.
Depot(s)Xinqiao, Taiwan Industrial Park, Huashigou
History
Opened25 January 2022;3 years ago (2022-01-25) [1]
Technical
Line length32.29 km (20.06 miles) [2] [3] (Phase 1)
7.8 km (4.8 miles) [4] (Phase 2)
Number of tracks2
CharacterMostly underground with little sections elevated
Track gauge 1,435 mm (4 ft 8+12 in)
Electrification Overhead line,  1,500 V DC
Operating speed100 km/h (62 mph) (Maximum)
Route map

Contents

BSicon uKDSTCCa.svg
Xinqiao depot
BSicon uetBHF.svg
Xinqiao
BSicon utBHF.svg
Gaotanyan
BSicon utBHF.svg
Tianlilu
BSicon utINT.svg
Shapingba
BSicon utBHF.svg
Xiaolongkan
1
BSicon utBHF.svg
Tuwan
BSicon utBHF.svg
Hongyancun
BSicon utBHF.svg
Fuhualu
BSicon uhtBHFe@g.svg
Hualongqiao
BSicon WCONTfaq.svg
BSicon uhKRZW.svg
BSicon WCONTgeq.svg
BSicon uhtBHFa@g.svg
Lijiaping
BSicon utBHF.svg
Mahuangliang
BSicon utBHF.svg
Guanyinqiao
Norwegian-road-sign-792.14-alpha.svg 3
BSicon utCONTgq.svg
BSicon utTBHFt.svg
BSicon utSTR+r.svg
Liyuchi
10
BSicon utBHF.svg
BSicon MFADEf.svg
BSicon utLSTR.svg
Liujiatai
BSicon utCONTgq.svg
BSicon utKRZt.svg
BSicon utSTR+r.svg
BSicon utXBHF-L.svg
BSicon utXBHF-R.svg
Jiangbeicheng
6
BSicon utBHF.svg
BSicon BLaq.svg
BSicon utBHF.svg
BSicon BLeq.svg
Wulidian
BSicon uhtSTRe.svg
BSicon utCONT2+g.svg
BSicon uhBHF.svg
Gailanxi
BSicon uhtSTRa.svg
BSicon utCONT1+f.svg
BSicon utBHF-L.svg
BSicon utBHF-R.svg
Toutang
4
BSicon utKRWgl+l.svg
BSicon utKRWgr+r.svg
BSicon utXBHF-L.svg
BSicon utXBHF-R.svg
Baoshuigang
4
BSicon uetBHF.svg
BSicon utSTR.svg
Cruise Port
BSicon utCONTgq.svg
BSicon utKRZt.svg
BSicon utSTRr.svg
BSicon utBHF.svg
Hejialiang
BSicon utBHF.svg
BSicon MFADEg.svg
BSicon utLSTR.svg
Shipanhe
BSicon utKRWgl+l.svg
BSicon utKRWgr+r.svg
BSicon utXBHF-L.svg
BSicon utBHF3.svg
BSicon XPLTeq.svg
Shangwanlu
10
BSicon FRMc2.svg
BSicon uKDST2.svg
BSicon utSTR3+1.svg
BSicon PORTAL2c3.svg
BSicon utSTR.svg
BSicon utSTRc4.svg
Taiwan Industrial Park depot
BSicon PORTAL2c1.svg
BSicon utSTR+1.svg
BSicon FRMc4.svg
BSicon utABZg+4.svg
BSicon MFADEf.svg
BSicon utLSTR.svg
BSicon utBHF.svg
Qinggangping
BSicon utBHF.svg
Baoshenghu
BSicon utBHF.svg
Xingke Ave.
BSicon utBHF.svg
Chunhua Ave.
BSicon MFADEg.svg
BSicon utLSTR.svg
BSicon utBHF.svg
Langui Ave.
BSicon utSTRl.svg
BSicon utHSTq.svg
BSicon utTBHFt.svg
BSicon utCONTfq.svg
Central Park East
10
BSicon uhtSTRe.svg
BSicon POINTERg@g.svg
BSicon uhtBHFa@f.svg
Congyansi
BSicon uhtBHFe@g.svg
Huashigou
BSicon lhSTRe@g.svg
BSicon uKDSTe.svg
Huashigou depot
Norwegian-road-sign-792.14-alpha.svg =
Virtual interchange: transport
card only, re-entry required.

Line 9 of CRT is a rapid transit line in Chongqing, China.

History

The line began construction on September 28, 2016.

Opening timeline

SegmentCommencementLengthStation(s)Name
Gaotanyan Xingke Ave. [a] [1] 25 January 202231.3 km (19.4 mi)23Phase 1
Baoshenghu 28 July 2022 [5] infill station1
Xingke Ave. Huashigou 18 January 20237.8 km (4.8 mi) [6] 5Phase 2
  1. except Cruise Port and Baoshenghu stations.

Stations

Service
routes
Station
No.
Station nameConnectionsDistance
km
Location
EnglishChinese
CRT SB W 9.svg
CRT SB W 0.svgCRT SB W 1.svg
Xinqiao 新桥-0.0 Shapingba
CRT SB W 9.svg
CRT SB W 0.svgCRT SB W 2.svg
Gaotanyan 高滩岩1.91.9
CRT SB W 9.svg
CRT SB W 0.svgCRT SB W 3.svg
Tianlilu 天梨路1.23.0
CRT SB W 9.svg
CRT SB W 0.svgCRT SB W 4.svg
Shapingba 沙坪坝      Line 1       Loop line   27  
China Railways.svg CYW
1.34.3
CRT SB W 9.svg
CRT SB W 0.svgCRT SB W 5.svg
Xiaolongkan 小龙坎      Line 1 1.05.3
CRT SB W 9.svg
CRT SB W 0.svgCRT SB W 6.svg
Tuwan 土湾1.16.3
CRT SB W 9.svg
CRT SB W 0.svgCRT SB W 7.svg
Hongyancun 红岩村      Line 5 1.27.6 Yuzhong
CRT SB W 9.svg
CRT SB W 0.svgCRT SB W 8.svg
Fuhualu 富华路      Line 18 1.18.7
CRT SB W 9.svg
CRT SB W 0.svgCRT SB W 9.svg
Hualongqiao 化龙桥1.910.6
CRT SB W 9.svg
CRT SB W 1.svgCRT SB W 0.svg
Lijiaping 李家坪1.612.2 Jiangbei
CRT SB W 9.svg
CRT SB W 1.svgCRT SB W 1.svg
Mahuangliang 蚂蝗梁0.913.0
CRT SB W 9.svg
CRT SB W 1.svgCRT SB W 2.svg
Guanyinqiao 观音桥      Line 3 [a] 1.014.0
CRT SB W 9.svg
CRT SB W 1.svgCRT SB W 3.svg
Liyuchi 鲤鱼池      Line 10 1.715.7
CRT SB W 9.svg
CRT SB W 1.svgCRT SB W 4.svg
Liujiatai 刘家台1.216.9
CRT SB W 9.svg
CRT SB W 1.svgCRT SB W 5.svg
Jiangbeicheng 江北城      Line 6 1.017.9
CRT SB W 9.svg
CRT SB W 1.svgCRT SB W 6.svg
Wulidian 五里店      Line 6       Loop line 1.219.1
CRT SB W 9.svg
CRT SB W 1.svgCRT SB W 7.svg
Gailanxi 溉澜溪1.020.1
CRT SB W 9.svg
CRT SB W 1.svgCRT SB W 8.svg
Toutang 头塘      Line 4 1.721.9
CRT SB W 9.svg
CRT SB W 1.svgCRT SB W 9.svg
Baoshuigang 保税港      Line 4 1.423.2
CRT SB W 9.svg
CRT SB W 2.svgCRT SB W 0.svg
Cruise Port 邮轮母港0.924.1
CRT SB W 9.svg
CRT SB W 2.svgCRT SB W 1.svg
Hejialiang 何家梁0.724.8
CRT SB W 9.svg
CRT SB W 2.svgCRT SB W 2.svg
Shipanhe 石盘河1.626.4 Yubei
CRT SB W 9.svg
CRT SB W 2.svgCRT SB W 3.svg
Shangwanlu 上湾路      Line 10 1.928.3
CRT SB W 9.svg
CRT SB W 2.svgCRT SB W 4.svg
Qinggangping 青岗坪1.730.0
CRT SB W 9.svg
CRT SB W 2.svgCRT SB W 5.svg
Baoshenghu 宝圣湖  15  2.032.0
CRT SB W 9.svg
CRT SB W 2.svgCRT SB W 6.svg
Xingke Ave. 兴科大道1.233.2
CRT SB W 9.svg
CRT SB W 2.svgCRT SB W 7.svg
Chunhua Ave. 春华大道2.335.5
CRT SB W 9.svg
CRT SB W 2.svgCRT SB W 8.svg
Langui Ave. 兰桂大道1.036.5
CRT SB W 9.svg
CRT SB W 2.svgCRT SB W 9.svg
Central Park East 中央公园东      Line 10 1.237.6
CRT SB W 9.svg
CRT SB W 3.svgCRT SB W 0.svg
Congyansi 丛岩寺2.640.2
CRT SB W 9.svg
CRT SB W 3.svgCRT SB W 1.svg
Huashigou 花石沟1.141.3
  1. out of system transfer

Station details

Xingke Ave. station

Xingke Ave. station [7] (Chinese :兴科大道站; pinyin :Xīngkēdàdào zhàn) is located in the Yubei District. The station opened on January 25, 2022. [8] There are four exits for this station. Currently only two exits (numbered 1 and 3) are opening. [9]

References

  1. 1 2 "轨道九号线一期本月开通运营". 本月即将开通运营23个车站,新桥站、邮轮母港站、宝圣湖站3个站点暂不开放
  2. "赛迪工程咨询监理的重庆轨道交通9号线即将开通运营". Archived from the original on April 17, 2022. 全长32.289km;共设站26座,本次开通的车站23座
  3. "重庆轨道交通9号线25个站安装完成 开始调试". September 21, 2021.
  4. "进展顺利!重庆地铁9号线二期工程进入铺轨阶段". November 5, 2021.
  5. "重庆地铁9号线一期宝圣湖站28日14时开通运营".
  6. "重庆地铁9号线二期通过项目工程验收". 重庆地铁9号线二期工程(兴科大道—花石沟)线路全长约7.8公里,共设5座车站
  7. "重庆轨道交通运营线网图". cqmetro.cn. Archived from the original on April 17, 2022.
  8. "赛迪工程咨询监理的重庆轨道交通9号线即将开通运营". Archived from the original on April 17, 2022.
  9. "带你探站9号线——兴科大道站 回兴片区又多了一个轨道站". January 28, 2022. Archived from the original on June 21, 2022. Retrieved June 21, 2022.