Tren de los Pueblos Libres

Last updated
Tren de los Pueblos Libres
TBA Logotipo.svg Afe logo15.png
Paso de los Toros (anden de la estacion).jpg
Paso de los Toros, terminus in Uruguay
Overview
StatusInactive
Owner Government of Argentina
Government of Uruguay
Locale Argentina, Uruguay
Termini
Stations13
Service
Type Inter-city
Services1
Operator(s) Flag of Argentina.svg TBA
Flag of Uruguay.svg AFE
History
OpenedSep 2011
ClosedMay 2012;11 years ago (2012-05)
Technical
Line length813 km (505 mi)
Track gauge 1,435 mm (4 ft 8+12 in) standard gauge
Route map
Tren pueblos libres map.jpg

The Tren de los Pueblos Libres ("Train of the Free Peoples") was an 813-km length rural railway line that connected Argentina and Uruguay, being operated by both the Argentine private company Trenes de Buenos Aires (TBA) on General Urquiza Railway standard gauge rail tracks, and Uruguayan the State-owned State Railways Administration of Uruguay "Administración de Ferrocarriles del Estado" (AFE).

Contents

History

Pilar, terminus in Argentina. Estacion pilar urquiza.jpg
Pilar, terminus in Argentina.

The train had run from 1982 to 1985 between cities of Concordia (Argentina) and Salto (Uruguay). After 26 years of being active only for freight trains, the service was officially re-opened on August 11, 2011, in a ceremony held by Presidents of both countries. [1] On 23 September the train made its first journey carrying people from Pilar to Paso de los Toros.

Some intermediate stops were Argentine stations Zárate, Enrique Carbó, Urdinarrain, Basavilbaso, Villaguay, San Salvador and Concordia and Uruguayan Salto, Quebracho and Paysandú. From Pilar to Buenos Aires passengers were carried by bus.

The project included the intention for trains to reach Montevideo in December 2011, [2] [3] although it would never be carried out.

On its first official journey, the train only reached Salto due to the Uruguayan Ministry of Transport still not having given authorisation for the service to operate in the country. Therefore, all passengers had to get out in Salto and the train continued without people to Paso de los Toros. The service was finally restarted on 30 September. Nevertheless, the service ran to Paso de los Toros only five times, with the terminus set up in Paysandú from November 2011. [4]

From March 2012, the service was shortened again, setting Salto as terminus of the line. Afterwards, in May 2012 the Government of Argentina revoked the contract of concession to TBA [5] after the Once rail disaster in which 51 people died and at least 703 people were injured on a service operated by the same company. [6] Finally, on 28 May the service was interrupted and subsequently never restarted. The railcars that served the line are currently abandoned in Pilar. [7] [8] [9] [10]

See also

Related Research Articles

<span class="mw-page-title-main">Transport in Argentina</span> Overview of transport in Argentina

Transport in Argentina is mainly based on a complex network of routes, crossed by relatively inexpensive long-distance buses and by cargo trucks. The country also has a number of national and international airports. The importance of the long-distance train is minor today, though in the past it was widely used and is now regaining momentum after the re-nationalisation of the country's commuter and freight networks. Fluvial transport is mostly used for cargo.

<span class="mw-page-title-main">Salto, Uruguay</span> Department capital city in Salto, Uruguay

Salto is the capital city of the Salto Department in northwestern Uruguay. As of the 2011 census it had a population of 104,028 and is the third most populated city in Uruguay, after Montevideo and Ciudad de la Costa.

<span class="mw-page-title-main">Federico Lacroze railway station</span> Railway station in Buenos Aires, Argentina

Federico Lacroze railway station is a passenger railway station in Buenos Aires, Argentina. The station is located in the city's outlying barrio (neighbourhood) of Chacarita in a predominantly residential area. It is just a short distance north of the Cementerio de la Chacarita, the city's largest cemetery. The station is named after Federico Lacroze, a prominent 19th century Argentine railway and transport pioneer who obtained the concession for building the Buenos Aires Central Railway in 1884. When the Argentine railway network was nationalised in 1948 the station became the Buenos Aires terminus for the lines that became part of the General Urquiza Railway (FCGU).

<span class="mw-page-title-main">Trenes de Buenos Aires</span> Argentinian rail transport company, 1995–2012

Trenes de Buenos Aires (TBA) (In English: Trains of Buenos Aires) was a private company that operated commuter rail services over the 5 ft 6 in (1,676 mm) broad gauge Sarmiento and Mitre lines of Buenos Aires. The company, owned by Claudio and Mario Cirigliano, also operated long-distance services on the General Mitre Railway to central-western Argentina and on the General Urquiza Railway to northern Argentina and Uruguay on the international Tren de los Pueblos Libres.

<span class="mw-page-title-main">Trenes Especiales Argentinos</span>

Trenes Especiales Argentinos (TEA) (English: Special Argentine Trains) was a private railway company in Argentina that operated trains from Buenos Aires to the city of Posadas in the Mesopotamia region.

<span class="mw-page-title-main">Buenos Aires–Rosario–Córdoba high-speed railway</span> Canceled transportation project

The Buenos Aires–Rosario–Córdoba high-speed railway was a project designed to link the Argentine cities of Buenos Aires, Rosario and Córdoba through a 710 km (440 mi) high-speed rail network. The plan, announced by then-President Néstor Kirchner during a press conference at the Casa Rosada on 26 April 2006, would have been the first in Argentina operating at up to 320 km/h (200 mph). The entire project was dismissed due to the financial crisis of 2007–08.

<span class="mw-page-title-main">General Urquiza Railway</span> Argentine railway division

The General Urquiza Railway (FCGU), named after the Argentine general and politician Justo José de Urquiza, is a standard gauge railway of Argentina which runs approximately northwards from Buenos Aires to Posadas, with several branches in between. It was also one of the six state-owned Argentine railway companies formed after President Juan Perón's nationalisation of the railway network in 1948. The six companies were managed by Ferrocarriles Argentinos which was later broken up during the process of railway privatisation beginning in 1991 during Carlos Menem's presidency.

<span class="mw-page-title-main">Mitre Line</span> Broad gauge commuter rail service in Buenos Aires Province

The Mitre line is an Argentine broad gauge commuter rail service in Buenos Aires Province and is part of the Ferrocarril General Bartolomé Mitre division. The service is currently operated by the State-owned company Operadora Ferroviaria Sociedad del Estado after the Government of Argentina rescinded its contract with Corredores Ferroviarios in March 2015.

<span class="mw-page-title-main">Sarmiento Line</span> Commuter rail service in Buenos Aires Province, Argentina

The Sarmiento line is a broad gauge commuter rail service in Buenos Aires Province, Argentina, run by the state-owned Trenes Argentinos since 11 September 2013.

<span class="mw-page-title-main">Railway privatisation in Argentina</span> Privatisation of Argentine state-owned railways

Railway privatisation in Argentina was a process which began in 1993 under the presidency of Carlos Menem, following a series of neoliberal economic reforms. This primarily consisted of breaking up the state-owned railway company Ferrocarriles Argentinos (FA) and allowing the former lines to be operated by private companies instead of the state. This policy was met with widespread criticism and proved catastrophic for the Argentine railways whose service worsened significantly in the years that followed, with entire lines closing and infrastructure deteriorating beyond repair. Privatisation was ultimately reversed in 2015 with the creation of Nuevos Ferrocarriles Argentinos.

<span class="mw-page-title-main">Rail transport in Argentina</span> Overview of rail transportation in Argentina

The Argentine railway network consisted of a 47,000 km (29,204 mi) network at the end of the Second World War and was, in its time, one of the most extensive and prosperous in the world. However, with the increase in highway construction, there followed a sharp decline in railway profitability, leading to the break-up in 1993 of Ferrocarriles Argentinos (FA), the state railroad corporation. During the period following privatisation, private and provincial railway companies were created and resurrected some of the major passenger routes that FA once operated.

<span class="mw-page-title-main">Rail transport in Uruguay</span>

The Uruguayan railway network has about 2900 km (1802 mi) of lines, all of 1,435 mm gauge, diesel traction with only 11 km (7 mi) of double track. Only half of the network is currently active. All the Uruguayan lines start from Montevideo, connecting the cities of Paysandú, Salto, Rivera and Río Branco. The rest of the lines (closed) connected the capital city with Fray Bentos, Cuareim, Artigas, Km. 329, Melo, La Paloma and Colonia del Sacramento.

<span class="mw-page-title-main">Unidad de Gestión Operativa Mitre Sarmiento</span> Consortium of Argentine companies that operated Mitre and Sarmiento lines

Unidad de Gestión Operativa Mitre-Sarmiento (UGOMS) was a temporary consortium of Argentine companies formed on 24 May 2012 by Ferrovías and Metrovías to take over the running of the Sarmiento and Mitre commuter rail lines, after concessions granted to Trenes de Buenos Aires (TBA) in 1995 for the operation of these services were revoked.

<span class="mw-page-title-main">Corredores Ferroviarios</span> Former Argentine railway company (2014–2015)

Corredores Ferroviarios was an Argentine private company that operated the Mitre and San Martín railway services in Buenos Aires Province for about one year until the Government of Argentina rescinded the agreement with the company in March 2015. Since then, the Mitre and San Martín line are operated by State-owned company Operadora Ferroviaria Sociedad del Estado (SOFSE).

<span class="mw-page-title-main">Materfer</span> Argentine rolling stock manufacturer

Materfer is an Argentine manufacturer of railway and road vehicles, located in the city of Ferreyra in Córdoba Province. The company was established by Fiat Concord in the late 1950s, being its subsidiary until 1980 when Sevel Argentina took over Fiat vehicles.

<span class="mw-page-title-main">Posadas-Encarnación International Train</span>

The Posadas–Encarnación International Train is a 8 km (5.0 mi) commuter rail international service operated between Posadas in Argentina and Encarnación in Paraguay, running on the Urquiza Railway standard gauge tracks. The service was opened in January 2014.

<span class="mw-page-title-main">Retiro Mitre railway station</span> Railway station in Buenos Aires, Argentina

Retiro-Mitre, or simply Retiro, is one of the six large mainline railway station termini in Buenos Aires, Argentina. Located in the neighborhood of Retiro, it serves as terminal station for the Mitre Line that runs local trains to the northern suburbs of the Buenos Aires metropolitan area. It also functions as terminal station for the national General Mitre Railway.

<span class="mw-page-title-main">Santa Fe (Mitre) railway station</span> Railway station in Santa Fe, Argentina

Santa Fe is a railway station located in the city of Santa Fe, Argentina in the province of the same name, Argentina. The station is no longer used for railway services since 2007, when defunct company Trenes de Buenos Aires cancelled its services to Santa Fe.

References