Upper Tamakoshi Hydroelectric Project | |
---|---|
Country | Nepal |
Location | Gaurishankar Conservation Area, Dolakha District |
Coordinates | 27°50′38″N86°13′05″E / 27.844°N 86.218°E |
Purpose | Hydroelectricity |
Status | Operational |
Construction began | 2011 |
Opening date | 2021 |
Owner(s) | Upper Tamakoshi Hydropower Limited |
Dam and spillways | |
Type of dam | Run-of-river |
Impounds | Tamakoshi River |
Height | 22 m |
Length | 60 m |
Coordinates | 27°55′30″N86°12′47″E / 27.925°N 86.213°E |
Type | Underground 142 m long hall |
Hydraulic head | 822 m |
Turbines | 6×Pelton wheels |
Installed capacity | 456 MW @ maximum flow 66 m3/s |
Annual generation | 2,281 GWh |
Website tamakoshihydro |
The Upper Tamakoshi Hydroelectric Project is a 456 MW peaking run-of-the-river hydroelectric project in Nepal. [1] It is the largest hydroelectric project in Nepal, operating since July 2021. [2] [3] It is sited on the Tamakoshi River (also spelled Tama Koshi), a tributary of the Sapt Koshi river (also spelled Saptakoshi), near the Nepal–Tibet border.
The Upper Tamakoshi Hydroelectric Project was a Nepal national priority project. When it is operated at full capacity, it is the largest hydroelectric plant in Nepal, with a power output equivalent to two-thirds of Nepal's current power generation. [4] [5] The project was entirely financed from domestic financial institutions and companies.
Nepal Electricity Authority (NEA) has established an autonomous company named Upper Tamakoshi Hydropower Limited (UTKHPL) in March 2007 (2063/11/25 B.S.) as an executing agency for the implementation of the Project. There are six full-time and two invitee members in the Board of Directors (BoD) at present. Out of six full-time members, four members from NEA, one from Employees Provident Fund (EPF) and one from Nepal Telecom (NTC) are representing in the BoD. Similarly, representatives of Citizen Investment Trust (CIT) and Rastriya Beema Sansthan (RBS) are also in the BoD as invitee members. [6]
The majority share (51%) of the Company is held by four public entities, namely, Nepal Electricity Authority (NEA), Nepal Telecom (NTC), Citizen Investment Trust (CIT) and Rastriya Beema Sansthan (RBS). NEA has 41% stake, NTC has 6% and CIT & RBS each has 2% stake in the Company. Similarly, general public and residents of Dolakha District will have 15% and 10% share respectively. The remaining 24% share will be taken over by contributors in Employees Provident Fund (EPF), NEA & Companys staffs and staffs of financial institutions providing loans. [6]
Construction began in February 2011, and the project was originally slated for completion in July 2018, later pushed back to December 2018, and again pushed back to November 2019. [4] [7] [8] Works suffered new delays in 2019, and the most recently announced completion date of February 2020 is likely to be missed too. [3] Sinohydro is the contractor for civil construction, [9] Andritz Hydro GhmH of Austria is the contractor supplying electro-mechanical equipment, [10] and KEC International of India is the contractor for 220 kV transmission line and sub-station. [11]
The consultant for detailed design and construction supervision is Joint Venture Norconsult-Lahmeyer [12] in association with the local sub-consultant Total Management Services. [13] Norconsult is Norway's largest and one of the leading multidisciplinary consultancy firms in the Nordic region. [14] Lahmeyer is a German engineering consultant that in 2019 was re-branded to Tractebel Engineering GmbH [15] The same consultant, JV Norconsult-Lahmeyer was responsible for tender design for the project. [16]
The Nepalese Army was mobilized to provide security to the site in 2012, after it was reportedly threatened by vandalism and threats to construction staff and foreign workers. [17] Work was disrupted by the April 2015 Nepal earthquake, after which over 200 Chinese workers were evacuated. [4] [18] Work was disrupted throughout the construction project by labor strikes. [19] [20] The earthquake also caused damage to roads and bridges and buried the troop barracks at the site. [21]
In May, 2018, it was reported that the planned July completion date could be jeopardized by late assembly of the turbomachinery that had been delivered to the site. [22] Later in May, the country's finance minister said that the project was expected to contribute to robust national economic growth in 2018. [23]
Installation of penstocks began in February 2019 by a European contractor after the original Indian contractor failed to perform the work. [24] A new date of November 2019 was set for initial energy production. [8]
The project was put on hold prior to completion of its testing and commissioning phase in 2020, when skilled foreign workers became unavailable in Nepal due to the global COVID-19 epidemic. [25]
On 5 July 2021, the project was inaugurated by prime minister KP Sharma Oli. [2]
Infrastructure for the plant includes a 142 m long, 25 m high underground powerhouse hall near Gongar Khola, with six Pelton wheels; a 22 m high × 60 m wide dam at Lamabagar; a 360 m high surge shaft; and a total of 16 km of headrace and tailrace tunnels. [4] [5] The gross head will be 822 m. [4] Near the dam are two 246 m × 26 m settling basins to remove particles greater than 0.15 mm. [26]
In January 2019 it was reported that the project did not have approval to clear forest land for new double 220 kVA electrical transmission lines to replace existing 132 kVA lines. [27] After its completion, the first unit started production from 5 July 2021.
Nyagak III Power Station is a 6.6 megawatts (8,900 hp) mini hydroelectric power project, under construction in Uganda.
The Rusumo Hydroelectric Power Station, also known as the Rusumo Power Station, is a hydropower plant under construction, with initial planned capacity installation of 80 megawatts (110,000 hp) when completed. The project will involve the construction of a dam, with run of river design. A more expensive 90 megawatts (120,000 hp) reservoir design was considered before being abandoned in favor of an 80 MW project with a smaller environmental impact and an estimated cost of US$300 million compared to US$400 million for the bigger project. The World Bank announced on 6 August 2013 that it had approved loans totaling US$340 million towards the US$468.60 million needed for the project. In November 2013, the African Development Bank approved a loan of US$113 million towards completion of the project.
Renewable energy in Nepal is a sector that is rapidly developing in Nepal. While Nepal mainly relies on burning biomass for its energy needs, solar and wind power is being seen as an important supplement to solve its energy crisis. The most common form of renewable energy in Nepal is hydroelectricity.
The Broadlands Dam is a 35 MW run-of-the-river hydroelectric complex currently under construction in Kitulgala, Sri Lanka. The project is expected to be completed in 2020, and will consist of two dams, and a power station downstream.
Nepal Electricity Authority (NEA), founded on 16 August 1985, is the parent generator and distributor of electric power under the supervision of the government of Nepal.
The Duber Khwar Hydropower Plant is located near the town of Pattan in Kohistan, Khyber Pakhtunkhwa, Pakistan on the Duber Khwar River, a right bank tributary of the Indus River. It is approximately 340 km NW from Islamabad, the federal capital of Pakistan.
Panauti Hydropower Station is the third hydropower station which was constructed in Nepal, in 1965. It is the first megawatt (MW) capacity hydropower station in Nepal.
The Kulekhani Dam is a rock-fill dam on the Kulekhani River near Kulekhani in the Indrasarowar Rural Municipality of Makwanpur District in Bagmati Province, Nepal. The primary purpose of the dam is hydroelectric power generation and it supports the 60 MW Kulekhani I, 32 MW Kulekhani II and 14 MW Kulekhani III Hydropower Stations. Construction began in 1977 and Kulekhani I was commissioned in 1982. Kulekhani II was commissioned in 1986 and a third power station, the 14 MW Kulekhani III was expected to be commissioned in May 2015 but was delayed due to issues with the builder. The US$117.84 million project received funding from the World Bank, Kuwait Fund, UNDP, Overseas Economic Cooperation Fund and OPEC Fund. It is owned by Nepal Electricity Authority.
Nenskra Hydro Power Plant is a proposed hydroelectric power station to be located on the southern slopes of the Central Caucasus mountains in Svaneti, Georgia.
The Budhi Gandaki Hydroelectric Project is a proposed hydroelectric power plant in Nepal, to be developed by Nepal Electricity Authority (NEA).
The Moragolla Dam is a planned hydroelectric dam in Moragolla, Sri Lanka. The dam is to be 35 m (115 ft) high and is planned to create the 1,980,000 m3 (70,000,000 cu ft) Moragolla Reservoir with a maximum supply level at 548 m (1,798 ft) MSL. Upon completion, the Moragolla Power Station would have a gross installed capacity of 30 megawatts from two francis turbines, capable of generating approximately 85 GWh annually.
The Tamakoshi River is part of the Koshi or Sapta Koshi river system in Nepalese Himalayas. It originates from the Rongshar Chu and Lapchi Gang rivers close to the Nepal-Tibet border. It flows in a southern direction through Bagmati Province in Nepal, namely through Dolakha District and Ramechhap District.
The Nam Ou cascade hydropower project is a series of seven hydroelectric dams along the Nam Ou river which are located in the provinces of Phongsaly and Luang Prabang in northern Laos. The project is managed by the Power Construction Corporation of China (PowerChina) and the Lao government. The project is the series of dams include seven levels of reservoirs in an attempt to mitigate ecological deterioration. The construction of the hydropower project is being completed in two phases. Phase I of the dams, including Nam Ou 2, Nam Ou 5, and Nam Ou 6 began operating on May 12, 2016. Phase II of the dams, including Nam Ou 1, 3, 4, and 7 is expected to be completed in 2020.
Nuwakot Solar Power Station is located at Nuwakot District of Nepal. It is the largest solar power plant of Nepal. The plant is owned by Nepal Electricity Authority (NEA). The solar panels are installed in six locations within the premises of Devighat Hydropower Station which is also owned by the NEA. Energy generated by the project is connected to the 66 kV sub-station of Devighat Hydropower Station. The solar station generates energy only during the daytime.
Sipring Khola Hydropower Station is a run-of-river hydro-electric plant located in Dolakha District of Nepal. The flow from Sipring River, a tributary of Tamakoshi River, is used to generate 10 MW electricity. The design head is 443.7 m and the design flow is 2.61m3/s.
Kabeli B1 Hydropower Station is a 25 MW run-of-river hydro-electric plant located in Panchthar District of Nepal. The promoter and operator, with a 20% share, is Arun Kabeli Power Limited (AKPL), a subsidiary of Arun Valley Group.
Rudi A Hydropower Station is a run-of-river hydro-electric plant located in the Kaski District of Nepal that came into operation in 2019. The flow from the Rudi River is used to generate 8.8 MW electricity.